This is a solicitation for machine shop rapid prototyping services. The Naval Surface Warfare Center, Dahlgren Division seeks to award multiple IDIQ contracts for the rapid manufacture, assembly, inspection and delivery of machined prototypes and assemblies. The total value of orders under all awarded contracts shall not exceed $50 million over five-year ordering periods. This requirement is set aside for small business competition and proposals are due by the date specified in Section A. Offerors should not rely on previous postings as this solicitation represents the governing requirements document. The statement of work outlines machining, welding, sheet metal fabrication, additive manufacturing, coating, treating, assembly and inspection services to be provided according to technical data packages. Acceptance criteria and quality management system requirements are also specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA 82.pdf | ||
| QA 80 - 81.pdf | ||
| QA 76-79.pdf | ||
| QA 74-75.pdf | ||
| QA 71-73.pdf | ||
| QA 69-70.pdf | ||
| N0017822R4305 Amend 0001.pdf | ||
| QA 38-51.pdf | ||
| QA 52-68.pdf | ||
| Q10-Q37.pdf | ||
| Q4-Q9.pdf | ||
| QA 2-3.pdf | ||
| QA 1.pdf | ||
| MSMAIDIQ - CDRL A001.pdf | ||
| MSMAIDIQ - CDRL A003.pdf | ||
| MSMAIDIQ - CDRL A002.pdf | ||
| N0017822R4305.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 11:00 AM local time 05 Aug 2022
X
A X B X C X D
EX
X
G F 93 - 96
97 - 113 X H 114 - 117 stacey.l.palivoda.civ@us.navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A7 1 117
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00178 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Electronic Delivery Only conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
STACEY L. PALIVODA 540-653-8133
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 4
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
5 - 18 19 - 24
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
25 - 28 29 - 32
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 33 - 47 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 48 - 51 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
52 - 91
PART II - CONTRACT CLAUSES
NSWCDD 3
ATTN: S. PALIVODA, 0232
STACEY.L.PALIVODA.CIV@US.NAVY.MIL
17632 DAHLGREN ROAD STE 157
DAHLGREN VA 22448-5110
540-653-8133
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
12 May 2022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0017822R4305
Section A - Solicitation/Contract Form
GENERAL INFORMATION
DESCRIPTION: The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) has a need for the rapid manufacture, assembly, inspection and delivery of machined prototypes and assemblies. The Government anticipates competitively awarding multiple contracts for proposals submitted in response to this solicitation. Each contract will be for Indefinite-Delivery-Indefinite-Quantity (IDIQ) type, awarded on a Firm-Fixed-Price (FFP) basis, with Ordering periods of five (5) years. The Government intends to make an award to each and all qualifying Offerors. The combined total price of all Delivery Orders (DO) under all awarded contracts will not exceed $50,000,000.
This requirement is Set-Aside for Small Business competition. It is not a direct follow-on to any current effort.
FAR clause 52.219-6, Notice of Total Small Business Set-Aside applies.
Special attention is drawn to the text at G-216-H003. SeaPort-o will be used to issue solicitations for DOs, receive proposals, and award DOs. All awardees will be required to have a SeaPort-o portal account.
PROPOSAL DUE DATE: Proposals are required to be delivered to the location specified in Block 9 by the time and date specified there. This requirement is set aside for Small Business. Initial orders are expected to be competed among the successful Offerors who are awarded a contract in response to this solicitation.
CRITICAL DATES: This Solicitation represents the Government’s requirements and shall be the governing document. All questions regarding this requirement shall be submitted by e-mail to stacey.l.palivoda.civ@us.navy.mil and will be responded to as an attachment to the solicitation posting at https://www.BETA.SAM.gov. To provide ample time to adequately address all questions and, if necessary, amend the solicitation, all questions shall be submitted in accordance with L-215-H007.
GENERAL INFORMATION: During the solicitation phase, this General Information Section will be used to summarize Amendments issued. Following Contract Award, this General Information Section will be used to summarize the nature of subsequent modifications. The information contained in this General Information Section is only part of the modification being issued at that time. The information will not be repeated in subsequent conformed copies of the Task Order.
THE SOLICITATION AND PREVIOUS POSTINGS: Offerors should not rely on information contained in previous postings. This solicitation represents the Government’s requirements and shall be the Governing Document.
Section B - Supplies or Services and Prices
CLIN INFORMATION
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table:
CLIN MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 $500 $50,000,000
The minimum amount requirements for this IDIQ contract being conducted under FAR 16.5 will be satisfied by the issuance of Delivery Order 0001 in the amount of $500. Each MAC awardee’s first Delivery Order will be funded/awarded at the contract minimum of $500. The purpose of Delivery Order 0001 will be for the Contractor to attend the Post-Award Meeting.
ITEM NO SUPPLIES/SERVICES MAX
UNIT UNIT PRICE MAX AMOUNT
0001 1 Each Rapid Machining Assembly
FFP
In accordance with Section C., Statement of Work, and the Technical Data Package (TDP).
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 5340
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Lot Data in Support of CLIN 0001 (CDRLs)
Data Deliverables in accordance with Exhibit A, CDRLS.
PSC CD: 5340
MAX
NET AMT
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
MACHINE SHOP RAPID PROTOTYPING
STATEMENT OF WORK (SOW)
C.1 BACKGROUND
The Naval Surface Warfare Center Dahlgren Division (NSWCDD), Integrated Engagement Systems Department (E), Weapon System Test Engineering Branch (E42), Engineering Prototype Facility (EPF) is tasked with providing rapid prototyping support to a wide variety of programs and sponsors. Their mission is to design, fabricate, assemble, integrate, and inspect prototype hardware under a compressed timeline in order to meet test and deployment dates. Based on internal bandwidth, technical capabilities, or the program’s required schedule, the EPF has a requirement to outsource the manufacturing of prototype hardware.
C.2 SCOPE
The purpose of this contract is for the fabrication and assembly of prototype hardware. The Contractor shall provide completed prototypes by performing precision machining (mill and lathe operations), welding, sheet-metal fabrication, additive manufacturing/3D printing, coating, treating, assembly, and inspection of prototype hardware in accordance with the drawing packages furnished by the Government at the Delivery Order level.
C.3 APPLICABLE DOCUMENTS AND STANDARDS
Specific versions of standards, handbooks, and applicable interface documentation will be articulated in individual Delivery Orders for the respective prototype deliverables.
Drawings shall be in accordance with ANSI/ASME applicable standards and practices with specific tailoring provided in individual Delivery Orders.
C.4 MANDATORY REQUIREMENT
The Prime Contractor shall meet the Mandatory Requirement in order to receive the Manufacturing Sample instructions and the corresponding Data Package discussed in Paragraph L.4.4. In addition, the mandatory requirement must be maintained throughout the life of the contract. The mandatory requirement is as follows:
Certifications:
The Prime Contractor’s manufacturing facilities must be ASQ/ANSI/ISO 9001:2015 certified. These certifications must be for the following process areas: Project Planning, Project Management and Control, Supplier Agreement Management, Product and Process Quality Assurance, Requirement Management & Development, Risk Management, Verification, and Validation.
C.5 REQUIREMENTS
The Contractor shall review Government provided Technical Data Packages (TDP) and submit any recommended revisions for Government approval in accordance with (IAW) CDRL A003. Some aviation TDPs may require AS9100D certification.
C.5.1 FABRICATION
C.5.1.1 The Contractor shall perform precision machine work (mill and lathe operations) in order to manufacture prototype hardware in accordance with the geometric tolerances identified in the drawing packages furnished by the Government.
C.5.1.2 The Contractor shall perform welding operations in order to fabricate and modify parts, structures, and assemblies as specified in the drawing packages furnished by the Government. Representative welding operations shall include Gas Metal Arc Welding (GMAW), Metal Inert Gas (MIG), Gas Tungsten Arc Welding (GTAW), Shielded Metal Arc Welding (SMAW), and Oxy-fuel Welding. The Contractor shall ensure that all welding operations are performed within the requirements of industry certification standards which will be identified at the Delivery Order level.
C.5.1.3 The Contractor shall perform casting from molds and patterns as specified in the drawing packages furnished by the Government. Representative casting products shall include silicon, polymer resin, and other chemical compounds identified by the Government in the drawing packages.
C.5.1.4 The Contractor shall perform sheet-metal fabrication required to manufacture prototype components and assemblies in accordance with the drawing packages furnished by the Government.
C.5.1.5 The Contractor shall provide hardware deliverables with the appropriate treatments (ex. Heat treatment) and coatings (ex. anodize) identified in the drawing packages furnished by the Government.
C.5.1.6 The Contractor shall perform sandblasting and glass beading surface operations on hardware items in accordance with the drawing packages furnished by the Government.
C.5.2 ASSEMBLY
C.5.2.1 The Contractor shall assemble components into sub-assemblies and complete assemblies in accordance with the drawing packages furnished by the Government.
C.5.2.2 The Contractor shall procure hardware identified in the Bill of Materials (BOM) within the Government furnished drawing package as necessary in order to complete prototype assemblies to the Government.
C.5.3 GAUGING AND INSPECTION
C.5.3.1 The Contractor shall perform gauging, Coordinated Measurement Machine (CMM) inspection, and acceptance testing for produced and provided parts and assemblies. (CDRL A002)
C.5.4 WARRANTY OF DEVELOPED PROTOTYPE HARDWARE
C.5.4.1 The Contractor shall extend to the Government a warranty on developed prototype hardware at no additional cost to the Government. The warranty period shall begin upon the final acceptance of the deliverables and cover repairs of defects/damages that occur due to no fault of the Government. Acceptance of the warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. The warranty will be specified on each delivery order.
C.5.5 DELIVERABLES
The Contractor shall maintain quality and inspection processes that are compliant with the latest ISO9001 and AS9100 standards for all deliverables. The Contractor shall document this inspection process and submit to the Government (CDRL A002). The Contractor shall label all hardware assemblies, hardware sub-assemblies, and hardware kits in accordance with all Government drawings or tasking specified within each Delivery Order.
C.6 ACCEPTANCE CRITERIA
C.6.1 The Contractor shall submit a test procedure to the Government for approval. (CDRL A001) After approval by the Government, the test procedure shall be placed under Contractor configuration control. Any revision to the test procedure shall require Government approval. The test procedure shall:
Identify how each functional and performance characteristics shall be demonstrated or tested;
Identify measurable parameters by acceptable operating limits and use measured results to record performance metrics;
Identify special tools and test equipment required for performing the test procedure.
C.6.2 The Contractor shall generate, conduct, and submit a Government approved Post Fabrication Report for all prototype deliverables. (CDRL A002) The report shall include, as appended material, any tests and demonstrations necessary to verify that each prototype meets the requirements of the SOW for the respective Delivery Order. These tests and demonstrations include:
Lower level tests Vendor tests Inspection/Gauging Reports Vendor certifications Electrical, mechanical, and visual inspections System functional tests and demonstrations
The Post Fabrication Report shall also include an indentured As-Built Configuration List (ABCL) down to the Lowest Replaceable Unit (LRU) level. The indentured ABCL shall identify drawing numbers, revision levels, and serial numbers.
C.6.4 Subsequent prototype deliverables shall pass a Government developed and conducted Acceptance Test Plan/Procedure (ATP) prior to official acceptance. The ATP will be provided at the Delivery Order Level if applicable.
C.7 CONTRACT MANAGEMENT
C.7.1 GENERAL: All work will be conducted under individual Delivery Orders (DO) providing fair opportunity under a Multiple Award Contract (MAC). Each DO solicitations will include Action Sheets containing a TDP and the Contractor’s responses shall be based on the provided TDP. All pricing must include the total price and shipping. It is understood and agreed that the Government has no obligation to issue any order except the minimum order as detailed under “CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE” in Section B.
C.7.2 FAIR OPPORTUNITY: The Government reserves the right to evaluate Delivery Order proposals using either a Price/Technical Tradeoff or Lowest Price Technically Acceptable approach based on the individual requirements.
All Past Performance of all awardees under this IDIQ will be documented and considered during the award decision.
Additionally, a review of each Offeror’s System for Award Management (SAM) account will be reviewed at https://sam.gov. Offerors whose SAM registration has expired or whom appear on the Excluded Parties List will not be considered eligible for award.
C.8 GOVERNMENT FURNISHED EQUIPMENT (GFE) AND GOVERNMENT FURNISHED
INFORMATION (GFI)
The Government will provide GFE and GFI when it is required at the DO level for integration and testing of prototype deliverables.
C.9 DIGITAL DELIVERY OF DATA
(a) Delivery by the Contractor to the Government of certain technical data and other information is now frequently required to be made in digital form rather than in hardcopy form. The method of delivery of such data and/or other information (i.e., in electronic, digital, paper hardcopy, or other form) shall not be deemed to affect in any way either the identity of the information (i.e., as “technical data” or “computer software”) or the Government’s and the Contractor’s respective rights therein.
(b) Whenever technical data and/or computer software deliverables required by this contract are to be delivered in digital form, any authorized, required, or permitted markings relating to the Government’s rights in and to such technical data and/or computer software must also be digitally included as part of the deliverable and on or in the same medium used to deliver the technical data and/or software. Such markings must be clearly associated with the corresponding technical data and/or computer software to which the markings relate and must be included in such a way that the marking(s) appear in human-readable form when the technical data and/or software is accessed and/or used. Such markings must also be applied in conspicuous human-readable form on a visible portion of any physical medium used to effect delivery of the technical data and/or computer software. Nothing in this paragraph shall replace or relieve the Contractor’s obligations with respect to requirements for marking technical data and/or computer software that are imposed by other applicable clauses such as, where applicable and without limitation, DFARS 252.227-7013 and/or DFARS 252.227-7014.
(c) Digital delivery (includes internet tools, websites, shared networks, and the like) may require an agreement by a user to certain terms, agreements, or other restrictions such as “Terms of Use,” licenses, or other restrictions intended to be applicable to the information being delivered via the digital delivery means. The Contractor expressly acknowledges that, with respect to deliverables made according to this contract, no such terms, agreements, or other restrictions shall be applicable to or enforceable with respect to such deliverables unless such terms, agreements, or other restrictions expressly have been accepted in writing by the Contracting Officer; otherwise, the Government’s rights in and to such deliverables shall be governed exclusively by the terms of the contract.
C.10 NON-DISCLOSURE AGREEMENTS (NDAs)
Non-Disclosure Agreements (NDAs) may be utilized to allow for access to company sensitive or proprietary data.
For tasks requiring NDAs, the Contractor shall obtain appropriate agreements for all of their employees that are associated with the task requiring such an agreement.
Contractor personnel may be required, from time to time to sign NDAs as applicable to specific SOW tasking. The COR will notify the Contractor of the number and type of personnel that will need to sign NDAs. The signed NDAs shall be executed prior to accessing data or providing support for information that must be safeguarded and shall be returned to the COR for endorsement and retention. Copies of all executed NDAs shall be provided to the COR.
C.11 CYBERSECURITY (ALL ITEMS)
The Contractor shall implement the security requirements of the clauses under Section I of this contract entitled DFARS 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, and DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements.
This requirement includes Covered Defense Information (CDI) that will be stored on the Contractor’s information system(s). CDI for this requirement includes drawings and models. Per DFARS 252.204-7012(a), “covered defense information” means unclassified controlled technical information or other information, as described in the Controlled Unclassified Information (CUI) Registry at http://www.archives.gov/cui/registry/category-list.html.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT DEFENSE
INDUSTRIAL BASE PARTNER NETWORKS (NAVSEA) (JAN 2020)
1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor’s facility. The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government’s review of the SSPs at the Contractor’s facility.
b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government. The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a
POAM.
c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor’s facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor’s site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days’ notice to the Contractor.
2. Compliance to NIST 800-171
a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 1) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b)(2), for all covered contractor information systems affecting this contract.
b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(4) Audit user privileges on at least an annual basis;
(5) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.e.
FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM); and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response
a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs/Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification.
The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.
d) Recommended Number (IAW FAR 52.1 and DFARS 252.103)
(End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal TBD dated TBD in response to Solicitation No.
N0017822R4305.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.
Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph
(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-242-H002 POST AWARD MEETNG (NAVSEA) (OCT 2018)
(a) A post-award meeting with the successful offeror will be conducted within 15 days after award of Contract No.
TBD. The meeting will be held at the address below:
Location/Address: [ * ]
(b) The contractor will be given [ * ] working days notice prior to the date of the meeting by the Contracting Officer.
(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the contract.
(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out.
Specific topics shall be mutually agreed to prior to the meeting.
[ * ] To be specified at [contract / task order] award.
C-244-H002 SUBCONTRACTORS/CONSULTANTS (NAVSEA) (OCT 2018)
Notwithstanding FAR 52.244-2(d) and in addition to the information required by FAR 52.244-2(e) of the contract, the contractor shall include the following information in requests to add subcontractors or consultants during performance, regardless of subcontract type or pricing arrangement:
(1) Impact on subcontracting goals,
(2) Impact on providing support at the contracted value,
(3) IF SEAPORT TASK ORDER - The results of negotiations to incorporate fee rate caps no higher than the lower of
(i) SeaPort-e fee rate caps for the prime contractor, or in the case where the proposed subcontractor is also a SeaPort-e prime, (ii) fee rate caps that are no higher than the subcontractor's prime SeaPort-e contract.
C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I
(NAVSEA) (MAY 2019)
(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.
(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:
(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or
(ii) add items of data or information to the attachment identified in Section J; or
(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or
(2) By submitting a request to the
Department of Defense Single Stock Point (DoDSSP)
Building 4, Section D
700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)
The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.
C-246-H003 LIMITATION OF LIABILITY--HIGH VALUE ITEMS (NAVSEA) (OCT 2018)
The following items are subject to the clause of this contract entitled "Limitation of Liability--High Value Items" (FAR 52.246-24 Alternate I):
CLIN
*To be specified at Delivery Order level.
C-246-N001 NONDESTRUCTIVE TESTING (NDT) PROCEDURE APPROVAL (NAVSEA) (JAN 2019)
All NDT procedures shall be submitted for approval by thirty (30) days prior to production use. Procedures shall be in accordance with the controlling fabrication document. Evidence of prior approval may be submitted in lieu of procedure submittal for application requirements.
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
Section D - Packaging and Marking
Any special Packaging and Marking requirements will be identified in any applicable Delivery Order.
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) sponsor:
(Name of Individual Sponsor)
(Name of Requiring Activity)
(City and State)
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-211-H005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (OCT 2018)
(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.
(2) Parts manufactured to Government specifications shall be marked as follows:
(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.
(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.
(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N(1).
(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-223-W001 EXPLOSIVE OR HAZARDOUS MATERIALS--PACKAGING & LABELING (NAVSEA) (OCT
(a) Packaging, Packing, Marking and Labeling of Explosive materials to be shipped by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, placarded, etc.) for shipment in accordance with all applicable Department of Transportation/Department of Defense regulations in effect at time of shipment.
(b) In the event of a conflict between specific requirements in the contract or order and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .