FORM C Firm Period (FOS)

FORM C - FOS - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Firm Period(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer/Technician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 33 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Firm Period (ROS-5)

FORM C - ROS-5 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Firm Period(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option One (FOS)

FORM C - FOS - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option One(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer/Technician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 34 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option One (ROS-5)

FORM C - ROS-5 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option One(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Two (FOS)

FORM C - FOS - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Two(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer/Technician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 34 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Two (ROS-5)

FORM C - ROS-5 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Two(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Three(FOS)

FORM C - FOS - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Three(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer/Technician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 34 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Three (ROS-5)

FORM C - ROS-5 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Three(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Four (FOS)

FORM C - FOS - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Four(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer/Technician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 34 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Four (ROS-5)

FORM C - ROS-5 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Four(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Five (FOS)

FORM C - FOS - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Five(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer/Technician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department12$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 34 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

FORM C Option Five(ROS-5)

FORM C - ROS-5 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
TOTAL CREW WAGES & FRINGES*
Option Five(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseDaily OTTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Deck Department:
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen/GVA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward/Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 12 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

NUC-1

FORM C - NUC-1 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, E, F, G, and H below.
MLP
FY13(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PER DAY/PER SHIP:4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FY14(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PER DAY/PER SHIP:4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FY15(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 4 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

NUC-2

FORM C - NUC-2 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, E, F, G, and H below.
MLP
FY13(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PER DAY/PER SHIP:15$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FY14(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PER DAY/PER SHIP:15$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FY15(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 15 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

NUC-3

FORM C - NUC-3 - Schedule of Total Daily Crew Costs
Offerors shall complete columns C, D, F, G, H, and I below.
MLP
FY13(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary seaman3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PER DAY/PER SHIP:34$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FY14(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary seaman3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PER DAY/PER SHIP:34$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FY15(1 billet)(1 billet)Total DailyTotal Wages/
TotalDaily BaseTotal Daily WagesPension &(1 billet)(1 billet)PayrollFringes & Payroll/Fringes/Payroll
RatingBilletsWage (1 billet)(total billets)WelfareVacationOther**TaxesTaxes (all billets)Taxes (all billets)
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bosun2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electronics Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary seaman3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Pumpman1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Assistant/Utility2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 34 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .