INSTRUCTIONS
INSTRUCTIONS:
(1) ' FORM B ' AND ' SECTION B RATE SCHEDULE ' ARE BOTH LINKED TO ' FORM A FY13, FY14, FY15, FY16, FY17, AND FY18 '
| (2) COMPLETE ' FORM A FY13 ', ' FORM A FY14 ', ' FORM A FY15 ', ' FORM A FY16 ', ' FORM A FY17 ', ' FORM A FY18 ' AND ALL REMAINING DATA WILL POPULATE |
| DATA WILL POPULATE |
FORM A FY13
FORM A - SCHEDULE OF BASIC PRICING DATA
| Contractor's Average Daily Cost & Profit (one ship, per day) based on the estimated number of days per year as specified in the Section B. |
| Rate Schedule for FOS, ROS-5 & NUC-1,2,3. For RAV and ROS, offeror shall complete only categories that are open. |
| For ROS (Undefined Crew) & RAV, offeror shall complete only Direct Costs categories that are open (crew wages and fringes will be negotiated on a case by case basis, prior to a ship entering RAV & ROS (Undefined Crew) status). |
| ALL MLP | | | |
| FIRM PERIOD: (FY13) | FOS | RAV | ROS |
| (Undefined Crew) | ROS-5 | NUC-1 | NUC-2 | NUC-3 |
| DIRECT COSTS | | | | | | | |
| Crew Payroll Costs: | | | | | | | |
| Total Crew Wage Cost | $ - 0 | XXXXXX | XXXXXX | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
| Total Crew Fringe Benefits & Payroll Taxes | $ - 0 | XXXXXX | XXXXXX | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
Subtotal Crew Payroll Costs $ - 0 XXXXXX XXXXXX XXXXXX $ - 0 $ - 0 $ - 0
| OTHER DIRECT COSTS: | | | | | | | |
| Overlapping Crew Wages | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Port Engineers/Port Captains | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Provisions | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Loose Equipment & Consumables | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Transportation & Handling of Items | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Other Ship Expenses (Itemize) | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Insurance (Itemize) | $ - 0 | $ - 0 | $ - 0 | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
Subtotal - Payroll and Other Direct Costs $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
Indirect Expenses (Itemize Rate/Base Amt) $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
| General & Administrative Expenses | $ - 0 | $ - 0 | $ - 0 | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
| (Itemize Rate/Base Amt) | | | | | | | |
Subtotal - Direct and Indirect Costs $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
PROFIT $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
| TOTAL PER DIEM PRICE | $ - 0 | $ - 0 | $ - 0 | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
| All Itemized Costs Should be Set Forth in a Separate Schedule | | | | | | | |
| Complete for each Contract Year | | | | | | | |
FORM A FY14
FORM A - SCHEDULE OF BASIC PRICING DATA
| Contractor's Average Daily Cost & Profit (one ship, per day) based on the estimated number of days per year as specified in the Section B. |
| Rate Schedule for FOS, ROS-5 & NUC-1,2,3. For RAV and ROS, offeror shall complete only categories that are open. |
| For ROS (Undefined Crew) & RAV, offeror shall complete only Direct Costs categories that are open (crew wages and fringes will be negotiated on a case by case basis, prior to a ship entering RAV & ROS (Undefined Crew) status). |
| ALL MLP | | | |
| OPTION PERIOD ONE: (FY14) | FOS | RAV | ROS |
| (Undefined Crew) | ROS-5 | NUC-1 | NUC-2 | NUC-3 |
| DIRECT COSTS | | | | | | | |
| Crew Payroll Costs: | | | | | | | |
| Total Crew Wage Cost | $ - 0 | XXXXXX | XXXXXX | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
| Total Crew Fringe Benefits & Payroll Taxes | $ - 0 | XXXXXX | XXXXXX | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
Subtotal Crew Payroll Costs $ - 0 XXXXXX XXXXXX XXXXXX $ - 0 $ - 0 $ - 0
| OTHER DIRECT COSTS: | | | | | | | |
| Overlapping Crew Wages | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Port Engineers/Port Captains | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Provisions | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Loose Equipment & Consumables | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Transportation & Handling of Items | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Other Ship Expenses (Itemize) | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX | XXXXXX |
| Insurance (Itemize) | $ - 0 | $ - 0 | $ - 0 | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
Subtotal - Payroll and Other Direct Costs $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
Indirect Expenses (Itemize Rate/Base Amt) $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
| General & Administrative Expenses | $ - 0 | $ - 0 | $ - 0 | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
| (Itemize Rate/Base Amt) | | | | | | | |
Subtotal - Direct and Indirect Costs $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
PROFIT $ - 0 $ - 0 $ - 0 XXXXXX $ - 0 $ - 0 $ - 0
| TOTAL PER DIEM PRICE | $ - 0 | $ - 0 | $ - 0 | XXXXXX | $ - 0 | $ - 0 | $ - 0 |
| All Itemized Costs Should be Set Forth in a Separate Schedule | | | | | | | |
| Complete for each Contract Year | | | | | | | |
FORM A FY15
FORM A - SCHEDULE OF BASIC PRICING DATA
| Contractor's Average Daily Cost & Profit (one ship, per day) based on the estimated number of days per year as specified in the Section B. |
| Rate Schedule for FOS, ROS-5 & NUC-1,2,3. For RAV and ROS, offeror shall complete only categories that are open. |
| For ROS (Undefined Crew) & RAV, offeror shall complete only Direct Costs categories that are open (crew wages and fringes will be negotiated on a case by case basis, prior to a ship entering RAV & ROS (Undefined Crew) status). |
| ALL MLP | | | |
| OPTION PERIOD TWO: (FY15) | FOS | RAV | ROS |
| (Undefined Crew) | ROS-5 | NUC-1 | NUC-2 | NUC-3 |
| DIRECT COSTS | | | | | | | |
| Crew Payroll Costs: | | | | | | | |
| Total Crew Wage Cost | $ - 0 | XXXXXX | XXXXXX | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Crew Fringe Benefits & Payroll Taxes | $ - 0 | XXXXXX | XXXXXX | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal Crew Payroll Costs $ - 0 XXXXXX XXXXXX $ - 0 $ - 0 $ - 0 $ - 0
| OTHER DIRECT COSTS: | | | | | | | |
| Overlapping Crew Wages | $ - 0 | XXXXXX | XXXXXX | $ - 0 | XXXXXX | XXXXXX | XXXXXX |
| Port Engineers/Port Captains | $ - 0 | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX |
| Provisions | $ - 0 | XXXXXX | XXXXXX | $ - 0 | XXXXXX | XXXXXX | XXXXXX |
| Loose Equipment & Consumables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX |
| Transportation & Handling of Items | $ - 0 | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX |
| Other Ship Expenses (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | XXXXXX | XXXXXX | XXXXXX |
| Insurance (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal - Payroll and Other Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Indirect Expenses (Itemize Rate/Base Amt) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| General & Administrative Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| (Itemize Rate/Base Amt) | | | | | | | |
Subtotal - Direct and Indirect Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
PROFIT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| TOTAL PER DIEM PRICE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| All Itemized Costs Should be Set Forth in a Separate Schedule | | | | | | | |
| Complete for each Contract Year | | | | | | | |
FORM A FY16
FORM A - SCHEDULE OF BASIC PRICING DATA
| Contractor's Average Daily Cost & Profit (one ship, per day) based on the estimated number of days per year as specified in the Section B. |
| Rate Schedule for FOS, ROS-5 & NUC-1,2,3. For RAV and ROS, offeror shall complete only categories that are open. |
| For ROS (Undefined Crew) & RAV, offeror shall complete only Direct Costs categories that are open (crew wages and fringes will be negotiated on a case by case basis, prior to a ship entering RAV & ROS (Undefined Crew) status). |
| ALL MLP | | | |
| OPTION PERIOD THREE: (FY16) | FOS | RAV | ROS |
| (Undefined Crew) | ROS-5 | | | |
| DIRECT COSTS | | | | |
| Crew Payroll Costs: | | | | |
| Total Crew Wage Cost | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Total Crew Fringe Benefits & Payroll Taxes | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
Subtotal Crew Payroll Costs $ - 0 XXXXXX XXXXXX $ - 0
| OTHER DIRECT COSTS: | | | | |
| Overlapping Crew Wages | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Port Engineers/Port Captains | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Provisions | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Loose Equipment & Consumables | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Transportation & Handling of Items | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Ship Expenses (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Insurance (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal - Payroll and Other Direct Costs $ - 0 $ - 0 $ - 0 $ - 0
Indirect Expenses (Itemize Rate/Base Amt) $ - 0 $ - 0 $ - 0 $ - 0
| General & Administrative Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| (Itemize Rate/Base Amt) | | | | |
Subtotal - Direct and Indirect Costs $ - 0 $ - 0 $ - 0 $ - 0
PROFIT $ - 0 $ - 0 $ - 0 $ - 0
| TOTAL PER DIEM PRICE | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| All Itemized Costs Should be Set Forth in a Separate Schedule | | | | |
| Complete for each Contract Year | | | | |
FORM A FY17
FORM A - SCHEDULE OF BASIC PRICING DATA
| Contractor's Average Daily Cost & Profit (one ship, per day) based on the estimated number of days per year as specified in the Section B. |
| Rate Schedule for FOS, ROS-5 & NUC-1,2,3. For RAV and ROS, offeror shall complete only categories that are open. |
| For ROS (Undefined Crew) & RAV, offeror shall complete only Direct Costs categories that are open (crew wages and fringes will be negotiated on a case by case basis, prior to a ship entering RAV & ROS (Undefined Crew) status). |
| ALL MLP | | | |
| OPTION PERIOD FOUR: (FY17) | FOS | RAV | ROS |
| (Undefined Crew) | ROS-5 | | | |
| DIRECT COSTS | | | | |
| Crew Payroll Costs: | | | | |
| Total Crew Wage Cost | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Total Crew Fringe Benefits & Payroll Taxes | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
Subtotal Crew Payroll Costs $ - 0 XXXXXX XXXXXX $ - 0
| OTHER DIRECT COSTS: | | | | |
| Overlapping Crew Wages | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Port Engineers/Port Captains | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Provisions | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Loose Equipment & Consumables | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Transportation & Handling of Items | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Ship Expenses (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Insurance (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal - Payroll and Other Direct Costs $ - 0 $ - 0 $ - 0 $ - 0
Indirect Expenses (Itemize Rate/Base Amt) $ - 0 $ - 0 $ - 0 $ - 0
| General & Administrative Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| (Itemize Rate/Base Amt) | | | | |
Subtotal - Direct and Indirect Costs $ - 0 $ - 0 $ - 0 $ - 0
PROFIT $ - 0 $ - 0 $ - 0 $ - 0
| TOTAL PER DIEM PRICE | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| All Itemized Costs Should be Set Forth in a Separate Schedule | | | | |
| Complete for each Contract Year | | | | |
FORM A FY18
FORM A - SCHEDULE OF BASIC PRICING DATA
| Contractor's Average Daily Cost & Profit (one ship, per day) based on the estimated number of days per year as specified in the Section B. |
| Rate Schedule for FOS, ROS-5 & NUC-1,2,3. For RAV and ROS, offeror shall complete only categories that are open. |
| For ROS (Undefined Crew) & RAV, offeror shall complete only Direct Costs categories that are open (crew wages and fringes will be negotiated on a case by case basis, prior to a ship entering RAV & ROS (Undefined Crew) status). |
| ALL MLP | | | |
| OPTION PERIOD FIVE: (FY18) | FOS | RAV | ROS |
| (Undefined Crew) | ROS-5 | | | |
| DIRECT COSTS | | | | |
| Crew Payroll Costs: | | | | |
| Total Crew Wage Cost | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Total Crew Fringe Benefits & Payroll Taxes | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
Subtotal Crew Payroll Costs $ - 0 XXXXXX XXXXXX $ - 0
| OTHER DIRECT COSTS: | | | | |
| Overlapping Crew Wages | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Port Engineers/Port Captains | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Provisions | $ - 0 | XXXXXX | XXXXXX | $ - 0 |
| Loose Equipment & Consumables | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Transportation & Handling of Items | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Ship Expenses (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Insurance (Itemize) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal - Payroll and Other Direct Costs $ - 0 $ - 0 $ - 0 $ - 0
Indirect Expenses (Itemize Rate/Base Amt) $ - 0 $ - 0 $ - 0 $ - 0
| General & Administrative Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| (Itemize Rate/Base Amt) | | | | |
Subtotal - Direct and Indirect Costs $ - 0 $ - 0 $ - 0 $ - 0
PROFIT $ - 0 $ - 0 $ - 0 $ - 0
| TOTAL PER DIEM PRICE | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| All Itemized Costs Should be Set Forth in a Separate Schedule | | | | |
| Complete for each Contract Year | | | | |
FORM B
| FORM B - PER DIEM RATES - TOTAL CONTRACT PRICE SUMMARY |
| (offeror's proposed prices will transfer forward from Sec B Rate Schedule; no data entry required) |
| FIRM PERIOD FY13 | | | |
| Item | Per Ship | # Days/ | Total Price |
| Per Diem | Incidents | (per item) |
| MLP-1 | | | |
| FOS | $ - 0 | 140 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| NUC-1 | $ - 0 | 62 | $ - 0 |
| NUC-2 | $ - 0 | 56 | $ - 0 |
| NUC-3 | $ - 0 | 14 | $ - 0 |
Total Price FY13 $ - 0
| OPTION PERIOD ONE FY14 | | | |
| Item | Per Ship | # Days/ | Total Price |
| Per Diem | Incidents | (per item) |
| MLP-1 | | | |
| FOS | $ - 0 | 365 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| MLP-2 | | | |
| FOS | $ - 0 | 201 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| NUC-1 | $ - 0 | 70 | $ - 0 |
| NUC-2 | $ - 0 | 56 | $ - 0 |
| NUC-3 | $ - 0 | 14 | $ - 0 |
| MLP-3 | | | |
| FOS | $ - 0 | 0 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| NUC-1 | $ - 0 | 37 | $ - 0 |
| NUC-2 | $ - 0 | 0 | $ - 0 |
| NUC-3 | $ - 0 | 0 | $ - 0 |
Total Price FY14 $ - 0
| OPTION PERIOD TWO FY15 | | | |
| Item | Per Ship | # Days/ | Total Price |
| Per Diem | Incidents | (per item) |
| MLP-1 | | | |
| FOS | $ - 0 | 365 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| MLP-2 | | | |
| FOS | $ - 0 | 10 | XXXXX |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | $ - 0 | 355 | $ - 0 |
| MLP-3 | | | |
| FOS | $ - 0 | 262 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| NUC-1 | $ - 0 | 33 | $ - 0 |
| NUC-2 | $ - 0 | 56 | $ - 0 |
| NUC-3 | $ - 0 | 14 | $ - 0 |
Total Price FY15 $ - 0
| OPTION PERIOD THREE FY16 | | | |
| Item | Per Ship | # Days/ | Total Price |
| Per Diem | Incidents | (per item) |
| MLP-1 | | | |
| FOS | $ - 0 | 366 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| MLP-2 | | | |
| FOS | $ - 0 | 10 | XXXXX |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | $ - 0 | 356 | $ - 0 |
| MLP-3 | | | |
| FOS | $ - 0 | 366 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
Total Price FY16 $ - 0
| OPTION PERIOD FOUR FY17 | | | |
| Item | Per Ship | # Days/ | Total Price |
| Per Diem | Incidents | (per item) |
| MLP-1 | | | |
| FOS | $ - 0 | 365 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| MLP-2 | | | |
| FOS | $ - 0 | 10 | XXXXX |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | $ - 0 | 355 | $ - 0 |
| MLP-3 | | | |
| FOS | $ - 0 | 365 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
Total Price FY17 $ - 0
| OPTION PERIOD FIVE FY18 | | | |
| Item | Per Ship | # Days/ | Total Price |
| Per Diem | Incidents | (per item) |
| MLP-1 | | | |
| FOS | $ - 0 | 93 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
| MLP-2 | | | |
| FOS | $ - 0 | XXXXX | XXXXX |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS -5 | $ - 0 | 93 | $ - 0 |
| MLP-3 | | | |
| FOS | $ - 0 | 93 | $ - 0 |
| RAV | $ - 0 | XXXXX | XXXXX |
| ROS (Undefined Crew) | $ - 0 | XXXXX | XXXXX |
| ROS-5 | XXXXX | XXXXX | XXXXX |
Total Price FY18 $ - 0
TOTAL EVALUATION PRICE $ - 0
SECTION B RATE SCHEDULE
| SECTION B - MLP RATE SCHEDULE |
| Offeror shall enter proposed prices (per ship) in column D below |
| (per diem rates should match Form A totals) |
| FIRM PERIOD FY13 |
| OPERATION AND MAINTENANCE OF THE MOBILE LANDING PLATFORM |
| EXP | | Per Diem/Per Ship |
| TYPE | Description | Price |
| 25213 | FOS MLP-1 | $ - 0 |
25213 RAV MLP-1 $ - 0
25213 ROS (Undefined Crew) MLP-1 $ - 0
25213 ROS-5 MLP-1 XXXXXX
| 25213 | NUC-1 | $ - 0 |
| 25213 | NUC-2 | $ - 0 |
| 25213 | NUC-3 | $ - 0 |
| OPTION PERIOD ONE FY14 |
| OPERATION AND MAINTENANCE OF THE MOBILE LANDING PLATFORM |
| EXP | | Per Diem/Per Ship |
| TYPE | Description | Price |
| 25213 | FOS MLP-1 | $ - 0 |
| 25213 | FOS MLP-2 | $ - 0 |
| 25213 | RAV MLP-1 | $ - 0 |
| 25213 | RAV MLP-2 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-1 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-2 | $ - 0 |
| 25213 | ROS-5 MLP-1 | XXXXXX |
| 25213 | ROS-5 MLP-2 | XXXXXX |
| 25213 | NUC-1 | $ - 0 |
| 25213 | NUC-2 | $ - 0 |
| 25213 | NUC-3 | $ - 0 |
| OPTION PERIOD TWO FY15 |
| OPERATION AND MAINTENANCE OF THE MOBILE LANDING PLATFORM |
| EXP | | Per Diem/Per Ship |
| TYPE | Description | Price |
| 25213 | FOS MLP-1 | $ - 0 |
| 25213 | FOS MLP-2 | $ - 0 |
| 25213 | FOS MLP-3 | $ - 0 |
| 25213 | RAV MLP-1 | $ - 0 |
| 25213 | RAV MLP-2 | $ - 0 |
| 25213 | RAV MLP-3 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-1 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-2 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-3 | $ - 0 |
| 25213 | ROS-5 MLP-1 | $ - 0 |
| 25213 | ROS-5 MLP-2 | $ - 0 |
| 25213 | ROS-5 MLP-3 | $ - 0 |
| 25213 | NUC-1 | $ - 0 |
| 25213 | NUC-2 | $ - 0 |
| 25213 | NUC-3 | $ - 0 |
| OPTION PERIOD THREE FY16 |
| OPERATION AND MAINTENANCE OF THE MOBILE LANDING PLATFORM |
| EXP | | Per Diem/Per Ship |
| TYPE | Description | Price |
| 25213 | FOS MLP-1 | $ - 0 |
| 25213 | FOS MLP-2 | $ - 0 |
| 25213 | FOS MLP-3 | $ - 0 |
| 25213 | RAV MLP-1 | $ - 0 |
| 25213 | RAV MLP-2 | $ - 0 |
| 25213 | RAV MLP-3 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-1 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-2 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-3 | $ - 0 |
| 25213 | ROS-5 MLP-1 | $ - 0 |
| 25213 | ROS-5 MLP-2 | $ - 0 |
| 25213 | ROS-5 MLP-3 | $ - 0 |
| OPTION PERIOD FOUR FY17 |
| OPERATION AND MAINTENANCE OF THE MOBILE LANDING PLATFORM |
| EXP | | Per Diem/Per Ship |
| TYPE | Description | Price |
| 25213 | FOS MLP-1 | $ - 0 |
| 25213 | FOS MLP-2 | $ - 0 |
| 25213 | FOS MLP-3 | $ - 0 |
| 25213 | RAV MLP-1 | $ - 0 |
| 25213 | RAV MLP-2 | $ - 0 |
| 25213 | RAV MLP-3 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-1 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-2 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-3 | $ - 0 |
| 25213 | ROS-5 MLP-1 | $ - 0 |
| 25213 | ROS-5 MLP-2 | $ - 0 |
| 25213 | ROS-5 MLP-3 | $ - 0 |
| OPTION PERIOD FIVE FY18 |
| OPERATION AND MAINTENANCE OF THE MOBILE LANDING PLATFORM |
| EXP | | Per Diem/Per Ship |
| TYPE | Description | Price |
| 25213 | FOS MLP-1 | $ - 0 |
| 25213 | FOS MLP-2 | $ - 0 |
| 25213 | FOS MLP-3 | $ - 0 |
| 25213 | RAV MLP-1 | $ - 0 |
| 25213 | RAV MLP-2 | $ - 0 |
| 25213 | RAV MLP-3 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-1 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-2 | $ - 0 |
| 25213 | ROS (Undefined Crew) MLP-3 | $ - 0 |
| 25213 | ROS-5 MLP-1 | $ - 0 |
| 25213 | ROS-5 MLP-2 | $ - 0 |
| 25213 | ROS-5 MLP-3 | $ - 0 |
KOCAK CLASS Section B - Rate Schedule N00033-09-R-3316