Amendment 1.pdf

PDF 504 KB Posted

Attached to
Workboat Docking
Solicitation number
N00024-21-R-2250
Issued by

About this file

This amendment modifies an existing solicitation for workboat docking services. The Naval Sea Systems Command seeks to procure up to ten workboats from a qualified contractor to support the Commander, Naval Installation Command. The amendment corrects errors in Attachment 8, which contains revised pricing information dated February 25, 2021. Responses to the solicitation are due as specified in the original posting available through the Federal Business Opportunities website. Inquiries about the opportunity should be directed to the contracting officer or specialist listed in the summary of changes section.

View the file

Other files

File Type Posted
Amendment 6.pdf PDF
Amendment 5.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Att_4_-REV B_Delivery Schedule.XLS XLS spreadsheet
Att_4_-REV A_Delivery Schedule.XLS XLS spreadsheet
Amendment 2.pdf PDF
Att_5_-REV A_Techncial_Data_Rights.pdf PDF
Att_8_-_CLIN Pricing Chart Rev A.xls XLS spreadsheet
Redacted Signed J-A 21-R-2250.pdf PDF
Att_4_-_Delivery Schedule.XLS XLS spreadsheet
Att_6_-_Unique_Item_Identification_(UID).doc DOC document
Attachment Index.docx DOCX document
Att_9_-_Past_Performance_Information.doc DOC document
N00024-21-R-2250 Solicitation.pdf PDF
Att 11 - Past_Performance_Questionnaire.doc DOC document
Att_1_WBD_CNRNW_Specification_22Feb2021.pdf PDF
Att_7_-_Warranty Terms.doc DOC document
Att_5_- Technical Data Rights Assertion.doc DOC document
Att_8_-_CLIN Pricing Chart.xls XLS spreadsheet
Att 2 WBD Specification Response Matrix 7Dec2020.xlsx XLSX spreadsheet
Att 10 Heeling Moment Calculation 17Sep2020.xlsx XLSX spreadsheet
Att 3 - WBD Vendor Provided Spare Parts List.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002420NR53149

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to correct errors on Attachment 8 in Section J of the solicitation

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002421R2250

X 9B. DATED (SEE ITEM 11)

24-Feb-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2021

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVENUE

WASHINGTON NAVY YARD DC 20376

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R2250

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMETS

List of Attachments

Attachment 1: Specification Attachment 2: Response Matrix Attachment 3: Spare Parts List Attachment 4: Delivery Schedule Attachment 5: Technical Data Rights Assertions (Non-Commercial) Attachment 6: UID Attachment 7: Warranty

Proposal attachments (will not be included in the contract, see Section L) Attachment 8: Pricing – Rev A dated 2/25/2021 Attachment 9: Past Performance & Experience Attachment 10: Heeling Moment Calculation Attachment 11: Past Performance Questionnaire

(End of Summary of Changes)

File details come from the government source that posted it. Updated .