N00024-21-R-2250 Solicitation.pdf
PDF 837 KB Posted
- Attached to
- Workboat Docking
- Solicitation number
- N00024-21-R-2250
About this file
This Request for Proposal (RFP) solicits bids for the procurement of up to ten Commander, Naval Installation Command (CNIC) Workboat Docking boats. The Navy seeks boats to provide naval shore installations with capabilities for port operations, barrier tending, and towing/pushing of floating port equipment. Bids are due by 2:00 PM on March 29, 2021. The RFP includes specifications for boat design and performance. The six-year contract has firm fixed pricing for two initial boats, with options for eight additional boats to be ordered over the life of the contract. The RFP outlines requirements for boat production, testing, delivery, training, documentation, warranties, and program management. The Naval Sea Systems Command is the contracting agency.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0002421R2250 24-Feb-2021
b. TELEPHONE NUMBER
(202) 781-3927
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 29 Mar 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N000249. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TAMMY A. RYMAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N0002420NR53149
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-A3
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,000
NAICS:
336612
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF125
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0002421R2250
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
2 Each
Workboat Docking
FFP
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PURCHASE REQUEST NUMBER: N0002420NR53149
PSC CD: 1940
NET AMT
1 Each
Pre Delivery Inspection Trials
FFP
FOB: Destination
OPTION Delivery
FFP
FOB: Destination
OPTION CREWFAM - Pacific Northwest
FFP
To be held at either NB Bangor, NB Bremerton, NB Bangor, NS Everett, or NB Kitsap FOB: Destination
OPTION CREWFAM - Builders Facility
FFP
FOB: Destination
OPTION Engineering & Industrial Services
FFP
FOB: Destination
Technical Data Package Non Recurring Eng
FFP
FOB: Destination
OPTION Provisioned Item Ordered (PIO) Spares
FFP
FOB: Destination
OPTION Workboat Docking
FFP
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
OPTION Pre Delivery Inspection Trials
FFP
FOB: Destination
FFP
FOB: Destination
FFP
To be held at either NB Bangor, NB Bremerton, NB Bangor, NS Everett, or NB Kitsap FOB: Destination
FFP
FOB: Destination
FFP
FOB: Destination
FFP
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
FOB: Destination
FFP
FOB: Destination
FFP
To be held at either NB Bangor, NB Bremerton, NB Bangor, NS Everett, or NB Kitsap FOB: Destination
FFP
FOB: Destination
FFP
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
FOB: Destination
FFP
FOB: Destination
FFP
To be held at either NB Bangor, NB Bremerton, NB Bangor, NS Everett, or NB Kitsap FOB: Destination
FFP
FOB: Destination
FFP
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
FOB: Destination
FFP
FOB: Destination
FFP
To be held at either NB Bangor, NB Bremerton, NB Bangor, NS Everett, or NB Kitsap FOB: Destination
FFP
FOB: Destination
FFP
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
FFP
FOB: Destination
FFP
FOB: Destination
FFP
To be held at either NB Bangor, NB Bremerton, NB Bangor, NS Everett, or NB Kitsap FOB: Destination
FFP
FOB: Destination
SECTION B NOTES:
Note A: Optional items to which the option clause in 52.217-7 OPTION FOR INCREASED QUANTITY-- SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION I) (SEP 2009) applies are marked as (Option) and are to be supplied only if and to the extent said option is exercised. The Government is not obligated to order any or all of these items. Exercise of one option will not obligate the Government to the exercise of other options.
NOTE B: Approximately 120 man-hours of engineering and 1,200 man-hours of production support labor and $42,000 material will be needed over the life of the contract. These are estimates and do not indicate that the Government will necessarily order this amount or any at all. The actual amount of labor hours and material dollars will be determined in accordance with the clause in Section H entitled "ENGINEERING & INDUSTRIAL SERVICES.” The table below will be populated with information as entered into Attachment 8.
CLIN 0006 Engineering & Industrial Services Government Fiscal Year
Fully Loaded Engineering Rate (per Hour)
Fully Loaded Production Rate (per Hour)
Material Handling Rate
Year 1 $TBD $TBD %TBD Year 2 $TBD $TBD %TBD Year 3 $TBD $TBD %TBD Year 4 $TBD $TBD %TBD Year 5 $TBD $TBD %TBD Year 6 $TBD $TBD %TBD
NOTE C: Provisional amounts are subject to adjustment under the clause of this contract entitled “PROVISIONED ITEMS ORDERS – ALTERNATE II” for supplies or other requirements ordered pursuant to said clause. The amounts shown are for planning purposes only. Amount in actual orders, if any orders are issued, will be individually priced. All orders hereunder are to be firm-fixed price.
Section C - Descriptions and Specifications
STATEMENT OF WORK
SECTION C – DESCRIPTIONS/SPECIFICATIONS/STATEMENT OF WORK
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PART 1 – GENERAL STATEMENT OF WORK
PART 2 – CONTRACT LINE ITEM NUMBER DESCRIPTIONS
PART 3 – STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION
PART 4 – STANDARD CLAUSES
C-1 PART 1 – GENERAL STATEMENT OF WORK
This Statement of Work (SOW) defines the effort required for the design, construction, testing, configuration control, documentation, and program management for the acquisition of Workboat Docking boats.
Award of this contract does not guarantee all of these efforts will be conducted. The Contractor will only conduct efforts upon the award of specific delivery order invoking the CLIN’s in Section B in accordance with the detailed description in Section C, Parts 2 and 3 and the contract.
Only the Procuring Contracting Officer (PCO) has the authority for the U.S. Navy to authorize or change work and sign contract documents. No other personnel are authorized by their formal communications or by their course of conduct to commit the U.S. Navy to price changes, schedule changes, or to perform different or additional work.
The Contractor shall only execute tasking or requests for support under this contract when such direction comes from, or is agreed to by, the PCO.
The award of the contract does not indicate the Government has approved or certified the design provided with the proposal. The Contractor shall remain fully responsible for delivering the boat, which meets the requirements of this Contract.
C-1.1 BACKGROUND
Commander, Navy Installations Command (CNIC) has overall shore installation management responsibility in support of naval operations. The mission of the CNIC Workboat Docking is to provide naval shore installations with capability to meet various port operations and barrier tending requirements. This includes the ability to safely assist barges, submarines, and other naval vessels, open and close security barriers, and to tow/push floating port operations support equipment. In order to meet these objectives, the boat must include propulsion equipment that is optimized for bollard pull, be highly maneuverable, and include a Cabin that is climate controlled and that provides shelter for the operators from extreme weather. CNIC boats are centrally procured via the US Navy Boat and Craft Program Office, PEO SHIPS (PMS 325G).
C-1.2 QUANTITIES
The 6-year Firm Fixed Price Contract is for two (2) boats with options for up to eight (8) additional boats.
C-1.3 DESIGN, MANAGEMENT AND PRODUCTION
The Contractor will be responsible for managing all activities (design, engineering, logistics, testing and production) under this contract for successful execution. After award the Government will conduct a Design Maturity Review with the Contractor that will occur prior to the start of Initial Production.
C-2 PART 2 – CONTRACT LINE ITEM NUMBER DESCRIPTIONS
C-2.1 CLIN 0001 (AND CLINS 1001, 2001, 3001, 4001 and 5001 IF OPTIONS ARE EXERCISED) –
WORKBOAT DOCKING BOAT
The Contractor shall construct the boat in accordance with Section C-3 below and the Specification (Attachment 1).
All boat-specific efforts shall be included in the pricing for CLINs 0001 including:
C-2.1.1 Boat – The Contractor shall provide the boat in accordance with the Specification (Attachment 1).
The boat shall be delivered fully assembled and operational, to include fuel, min ¼ tank.
C-2.1.2 UID – The Contractor shall provide UIDs for each boat in accordance with (Attachment 6).
C-2.1.3 Boat Spares – The Contractor shall provide initial boat spares for each boat in accordance with Attachment 3 and Section C-3 below. Spare parts and items not integrated into the boat shall be wrapped in protective packaging or container.
C-2.1.4 Copy of Boat Specific Technical Data Package (TDP) – The contractor shall provide for each boat one (1) hard copy and one (1) electronic copy (CD/DVD) of the Final TDP developed under CLIN 0001 specific to each boat.
C-2.2 CLIN 0002 (AND CLINS 100, 2002, 3002, 4002 and 5002 IF OPTIONS ARE EXERCISED) – PRE-
DELIVERY INSPECTIONS AND TRIALS (PDIT)
The Contractor shall perform boat Pre-Delivery Inspections and Trials (PDIT), in accordance with Section C, Part 3 and the Specification (Attachment 1) Section 094.
C-2.3 (OPTION) CLIN 0003 (AND CLINS 1003, 2003, 3003, 4003 and 5003 IF OPTIONS ARE
EXERCISED) – SHIPPING – BREMERTON, WA
If exercised, the Contractor shall deliver the boat and initial boat spares to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3 and packaged in accordance with Section D.
Spares shall be shipped to the same location either with the boat or via separate shipping. Any reassembly and reactivation needed as a result of shipping shall be performed at a local yard prior to delivery at the location specified in Section F.
C-2.4 (OPTION) CLIN 0004 (AND CLINS 1004, 2004, 3004, 4004 and 5004 IF OPTIONS ARE
EXERCISED) – CREW FAMILIARIZATION AND TRAINING PACIFIC NORTHWEST
The Contractor shall provide crew familiarization and training, in accordance with Section C, Part 3.
C-2.5 (OPTION) CLIN 0005 (AND CLINS 1005, 2005, 3005, 4005 and 5005 IF OPTIONS ARE
EXERCISED) – CREW FAMILIARIZATION AND TRAINING BUILDERS FACILITY
The Contractor shall provide crew familiarization and training, in accordance with Section C, Part 3.
C-2.6 CLIN 0006 – ENGINEERING & INDUSTRIAL SERVICES
In accordance with Section H Clause entitled “ORDERS (FIXED-PRICE), the contractor shall provide labor and material to perform Engineering & Industrial Services over the life of the contract. These services are defined as any work authorized by the Contracting Officer that is required to support the program in any of the following areas: Design Engineering & Production Services, Testing Phase Support and GFP Integration & Support.
Requirements under this CLIN might include, but are not limited to, the correction of problems with Government Furnished Property (GFP), changes to the configuration baseline, Government requirements identified during pre-delivery inspection, issue resolution support during Government testing, and the development of various engineering products. Examples of work that might be accomplished under this CLIN include equipment installation, rigging support, component replacement, minor design upgrades and subject matter expert technical assistance. The requirements associated with this CLIN are over and above those specified in other contract CLINs.
Orders for this effort will be placed in accordance with the general requirements in Section H of the clause entitled
“ENGINEERING & INDUSTRIAL SERVICES.”.
C-2.7 CLIN 0007 – TECHNICAL DATA PACKAGE NON-RECURRING ENGINEERING
The Contractor shall develop the Technical Data Package (TDP) in accordance with Section 085 of the Specification (Attachment 1). Boat-specific TDP contents shall be included under the Boat CLIN and shall be provided with each boat.
C-2.8 CLIN 0008 – PROVISIONED ITEMS ORDERS (PIO) SPARES
If exercised, the Contractor shall provide spare and repair parts, special tools, test equipment, materials and related support not envisioned at the time of award, in accordance with the requirements herein and the clause entitled
“PROVISIONED ITEM ORDER – ALTERNATE II”.
C-3 PART 3 – STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION
C-3.042-1 CONFERENCES AND REVIEWS
The Contractor shall conduct a Post Award Conference (PAC) and Progress Reviews. The Contractor shall prepare meeting minutes.
C-3.042-1.1 Post Award Conference: The Contractor shall conduct a PAC with the Government within thirty
(30) days after contract award and subsequent boat options, if exercised. The conference will be held at the Contractor’s facility or by phone at the Government’s discretion. The purpose of the conference is to (1) review the contract and technical documents, (2) review the technical and schedule requirements, and (3) discuss the roles and working relationships between the Contractor and the Government.
C-3.042-1.2 Design Maturity Review (DMR): The Contractor shall schedule and host Government personnel for a (DMR) prior to the start of construction of the first boat. The purpose of the DMR is to demonstrate that the design is sufficiently mature to start construction and that the status of material ordering and delivery will support the proposed build schedule. Any potential risk areas shall be identified and mitigation plans discussed.
The Government shall be satisfied that all requirements in the Specification (Attachment 1) have been incorporated into the design. The Government will notify the Contractor within seven (7) days of the completion of the DMR whether or not the start of construction is authorized.
The following shall be provided for the Design Maturity Review:
1. Updated Design, Production, and Delivery Schedule, including:
a. Construction facilities: The Contractor shall provide evidence of the facilities readiness,
b. Production Manning: The Contractor shall provide evidence that manning resources are available to support planned production,
2. Material and purchased parts status, including but not limited to:
a. hull and deck materials,
b. major equipment,
c. long-lead time items.
3. Preliminary Master Data Index.
4. DRAFT Technical Design Analyses for final Government Approval:
a. Allocated Baseline Weight Estimate (ABWE),
b. Initial Stability (including General HydroStatics (GHS) geometry and run files used in the analysis).
5. Preliminary Technical Design Analyses demonstrating approach and maturity of the design, including but not limited to:
a. Electrical load analysis,
b. Cabin HVAC Sizing and Insulation Design,
c. Engine Room Ventilation Sizing and Design.
6. Preliminary construction drawings to support reviews of Technical Design Analyses and demonstrate the approach to meet the Specification, including but not limited to:
a. Outboard Arrangement Drawing,
b. Inboard Arrangement Drawing,
c. AC and DC Electrical One Line Drawings,
d. Winch Hydraulic System Schematic,
e. Hoisting Drawing,
f. Towing Arrangement Drawing.
7. Description of approach to completing Preliminary Test Plans, including but not limited to:
a. Stability Test,
b. Bollard Test,
c. Scale Weight,
d. Pull Tests,
e. Fuel Tank(s) and System(s) Pressure Tests
8. Specification Review of Proposed Equipment, submitted in Microsoft Word/Excel format for review of proposed commercial off-the-shelf (COTS) products intended to meet the requirements of the specification for the following, at minimum:
a. Electrical cabling and circuit protection,
b. Lighting,
c. HVAC systems,
d. Safety equipment (e.g. detectors, alarms, etc.),
e. Outfitting,
f. Any proposed brand name “equals” (see Attachment 1 Section 042),
g. Any additional items identified by the Contractor or Government during the Post Award
Conference.
9. Requests For Variance (RFV): There shall be no open RFVs. Contract Problem Identification
Reports (CPIRs) shall have a documented resolution.
10. Risk Assessment: an assessment of risk and the risk management approach to eliminate or mitigate those risks.
C-3.042-1.2 Progress Reviews: Progress Reviews shall be held at the Contractor’s discretion or by Government request, as needed to support the production schedule. Reviews will be held at the Contractor’s facility or by phone and shall not interfere with continued progress or production of boats. Reviews shall not be used as approval to proceed in design or production, unless otherwise specified, and should be used only for informing the Government of process on production, builder questions, and impending risk to program.
C-3.042-2 CONFIGURATION MANAGEMENT
The contractor shall maintain Configuration Management of the boats in accordance with Section C, Part 4 Clause C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA)(JAN 2019). The baseline configuration is set on the acceptance of the initial hull.
C-3.042-3 WARRANTY
The Contractor will correct defects for the boat and all installed equipment, for minimum of one (1) year, starting from the date the boat enters service with the Navy's end-user in accordance with the warranty provided in Attachment 7, Commercial Warranty Terms. Notification of official in-service date will be provided to the builder by the U.S. Navy Boat Inventory Manager. Note to Builders: Boats procured for the Navy may sit in stock (outdoors in uncovered storage) for up to twelve (12) months prior to issue to the Navy end-user.
C-3.042-4 PROGRAM MANAGEMENT
Roles and Responsibilities
C-3.042-4.1 The Contractor shall establish a project management structure that ensures overall quality of the boat components, consistent with their chosen engineering and manufacturing approach.
C-3.042-4.2 The Contractor shall designate a Project Manager (PM) to serve as the principal representative of the Contractor throughout the duration of contract performance. The PM shall be responsible for the performance of the contract and on-time delivery of technically compliant boats and associated equipment. At all times, the PM shall have the responsibility for ensuring program integrity and overall contract performance.
The contractor shall ensure that administration, logistics, financial and other task requirements pertinent to contract performance are addressed.
C-3.042-4.3 The Government points of contact are listed in the clause “G-242-H001 GOVERNMENT
CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA) (OCT
2018)”
C-3.042-5 INVOICES
The Contractor shall provide affidavits or invoices from the suppliers of all essential materials used in accordance with Section 085 of the Specification (Attachment 1) in the construction of the boat. The affidavits or invoices shall be used together with records identifying the lot or serial numbers of the boat in which such materials were used.
C-3.080-1 SPARES
Boat and PIO Spares:
C-3.080-1.1 Boat (initial) Spares: The Contractor shall provide initial spares for each boat as outlined in the Spare Parts List (Attachment 3). The spares provided for each boat shall match the propulsion configuration/OEM installed on the boat. Spares shall be managed as part of the configuration management process and the Contractor shall inform the Government of any necessary part number updates that will be required throughout the execution of this contract. Spares shall be packaged in accordance with Section D of this contract.
C-3.080-1.2 Updates: The Contractor shall recommend updates to the contract spares list throughout the life-cycle of this contract. It is anticipated that parts will become obsolete or newer parts will become available that should be provided as part of spares offered.
C-3.080-1.3 PIO Spares: If ordered, the Contractor shall provide PIO spares in accordance with C-217-H003
PROVISIONED ITEMS ORDERS—ALTERNATE II.
C-3.080-2 DELIVERY
C-3.080-2.1 If the Government does not exercise the option CLIN 0003-5003 for Delivery the boat is to remain assembled and operational (to include fuel – min ¼ tank). The Government will arrange for pick-up at builder’s facility.
C-3.080-2.2. If option CLIN 0003-5003 for Delivery is exercised, the Contractor shall deliver the boats to the location, as specified in Section F of the basic contract. The boats shall be packaged for shipping in accordance with Section D of this contract. The boat shall be delivered fully assembled and operational (to include fuel – min ¼ tank). Reassembly cannot take place at the Government facility. Pricing for reassembly and reactivation shall be included in this CLIN (including transport, crane service, labor, and off-base laydown area/pier space).
C-3.080-3 UNIQUE ITEM IDENTIFICATION
The Contractor shall provide Unique Item Identification (UID) and Documentation for every boat in accordance with DFARS Clause 252.211-7003 and the requirements provided in the UID (Attachment 6).
C-3.080-4 ESSENTIAL CYBERSECURITY COMPONENTS (ECSC) DOCUMENTATION
For each boat the Contractor shall document and provide Essential Cybersecurity Component (ECSC) documentation in accordance with Section 085 of the Specification (Attachment 1) and Technical Data Package
(TDP).
C.3.085-1 TECHNICAL DATA PACKAGE
C.3.085-1.1 General: The Contractor shall provide a copy of the Technical Data Package (TDP) with each boat in accordance with Section 085 of the Specification (Attachment 1). The costs (e.g. print, arrange, bind, etc.) to provide a copy of the TDP, including updating boat applicability and individual boat certifications, shall be included in the unit prices under the Boat CLIN 0001. Any TDP non-recurring engineering shall be under
CLIN 0007.
C.3.085-1.2 Format: Drawings shall be provided in hard copy, DWG/DXF format and PDF format. Boat technical manual and COTS manuals, instructions or cut sheets, certifications, analyses, master data index, and all other data shall be provided in hard copy and PDF format. Calculations, Bill of Materials, and ECSC documentation shall be submitted in their native electronic format.
C.3.085-1.3 Data Security: Most of the data in the TDP is considered Controlled Unclassified Information (CUI) and therefore, the Contractor shall exchange data with the Government via a Government provided Integrated Digital Environment (IDE) or Government approved File Exchange Server utilizing appropriate Public Key Infrastructure/Information Assurance protocols.
C.3.085-1.4: Submittals: Technical Design Analyses, Test Certification Plans, and other data requiring prior Government approval shall be submitted electronically to the TPOC in accordance with the Specification (Attachment 1).
A complete preliminary TDP shall be submitted electronically to the TPOC a minimum of forty-five (45) days prior to pre-delivery inspection and trials (PDIT). The TDP shall be organized into a folder structure consistent with the format of the Master Data Index (MDI). The Government will provide initial comments and questions on the preliminary TDP. Early submittals are encouraged and will be reviewed as soon as practicable.
One hard copy of the TDP and one electronic copy of the TDP shall be provided at PDIT for additional Government review. Any additional TDP comments will be included in the PDIT Discrepancy List. The Contractor shall respond to the comments either by correction/incorporation or by providing Contractor responses (e.g. resolution plan, notification of boat correction, clarification questions, etc.) within 15 days of the PDITs.
One (1) hard copy and one (1) electronic copy (CD/DVD) of the Final TDP (with all comments incorporated) shall be provided with the delivery of each boat. One (1) electronic copy of the Final TDP (with all comments incorporated) shall be submitted to the Government TPOC concurrent with delivery of the first boat.
C.3.085-1.5: TDP Acceptance: Government acceptance of the preliminary technical analysis package, preliminary TDP, and final TDP for payment events is predicated upon accuracy (data matching the as-built configuration of the boat) and completeness (all technical data provided with status/rationale provided for any outstanding/missing data).
C-3.085-2 DATA RIGHTS
C-3.085-2.1 It is the Government's desire that all non-commercial technical data (TD) included in the TDP (baseline or as modified by any Engineering Change Proposals) be delivered with a minimum of Government Purpose Rights (as defined in DFARS 252.227-7013 and 252.227-7014). If the Offeror proposes to deliver commercial TD, it is the Government’s desire to obtain a license to the commercial TD that would grant the Government the equivalent of Government Purpose Rights as a minimum. The Government’s overall goal is to have the ability to maintain and repair the vessel and its systems, to include providing that information to third parties for the purpose of developing and executing the required work expediently. The Government shall not use the technical data and/or the computer Software to manufacture additional quantities of the boat. All TDP deliverables shall be marked with appropriate data rights legends per DFARS 252.227-7013 and 252.227-7014 as applicable.
C-3.085-2.2 The Contractor’s Data Rights assertions will be incorporated in the contract as Attachment 5.
C-3.085-2.3 End Use License Agreement Indemnification:
(1) Except when indemnification by the Government is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures, any supply or service acquired under this contract that is subject to any End Use License Agreement (EULA) or similar legal instrument which includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(2) Any such clause is unenforceable against the Government.
(3) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA or similar legal instrument.
(4) Any such clause is deemed to be stricken from the EULA or similar legal instrument.
C-3.085-2.4 If the Contractor ceases doing business and/or cannot fulfill its obligations under this contract, the Government shall automatically be granted Government Purpose Rights to all existing data developed under this contract.
C-3.092-1 TEST CERTIFICATIONS
Test certification, Builder’s Trials, and documentation for items in the Specification (Attachment 1) Section 092 shall be provided in electronic format (PDF). All pull test plans shall be submitted to the Government TPOC and approved prior to testing as indicated in the Specification (Attachment 1). . Unless an earlier submittal is required, testing results for the first boat shall be submitted a minimum of three (3) business days prior to PDIT start date to the Government TPOC. Testing results for each subsequent boat shall be submitted no less than five (5) days prior to shipment of the boat to NSWCCD Code 83 (e-mailed to brian.mishoe@navy.mil).
C-3.094-1 BUILDER’S TRIALS (BT)
The Contractor shall perform and submit the first boat BT results in electronic format (PDF) a minimum of three (3) business days prior to PDIT start date to the Government TPOC. BT results of each subsequent boat shall be submitted no less than five (5) days prior to shipment of the boat to NSWCCD Code 83 (e-mailed to brian.mishoe@navy.mil). These trials and reports shall be conducted in accordance with the Specification (Attachment 1) Section 094.
C-3.094-2 PRE-DELIVERY INSPECTION AND TRIAL (PDIT)
C-3.094-2.1 General: The Contractor shall schedule and host Government personnel to inspect and conduct sea trials on selected boats. These trials shall be conducted in accordance with the Specification (Attachment 1) Section 094.
C-3.094-2.2 Notification of Trials: The Contractor shall provide a minimum of forty-five (45) days’ notice of date of PDIT, and it is recommended the Contractor schedule PDIT no later than three (3) weeks prior to the contracted delivery date to allow sufficient time for required evolutions (i.e. PDIT discrepancies corrections, shipping, and receipt at destination). Scheduling in this manner will ensure contracted delivery dates are met.
Notification of PDIT date(s) and agenda/test plan shall be provided to the Government APM.
C-3.094-2.3 Trials Readiness: If upon arrival, the Government and the Builder are unable to satisfactorily perform the PDIT as outlined in the Specification (Attachment 1) Section 094-2, the Builder may be held financially responsible for cost reimbursement of Government and/or Government representative's travel and labor associated with PDITs. The Contractor shall notify the Government of any PDIT delays no later than five
(5) days before planned arrival. Written notice of PDIT delay shall be accompanied by a request of extension to the Contracting Officer and Program Office Point of Contact. If as a result a delayed PDIT or other delays resulting from this action the builder cannot meet the contractual delivery date, consideration for late delivery shall be required. FAR Clause 52.246-2(e)(1) will be exercised at Government’s discretion for potential Contractor liabilities if PDIT cannot be satisfactorily performed after arrival of the Government PDIT team on-site. A typical PDIT takes place over 3-½ days.
C-3.094-2.4 Pre-Transport Inspection: The Government reserves the right to schedule and conduct a Pre- Transport Inspection. The Pre-Transport Inspection is intended to reduce the likelihood of major discrepancies at the post-delivery inspection.
C-3.094-2.5 Acceptance: Satisfactory inspection and verification, including TDP reviews (i.e. drawings, manuals, certifications, etc.), proper operation of the boat, and corrections of PDIT discrepancies are conditions for final acceptance of the boat by the Government. All PDIT and TDP discrepancies must be resolved/corrected by the Contractor prior to delivery. Any unresolved discrepancies may result in acceptance and/or payment delays.
C-3.099-1 Photos Photographs for items listed in the Specification (Attachment 1) shall be submitted to the Government TPOC electronically (jpeg format) as stages or parts are completed.
C-3.100 BOAT CREW FAMILIARIZATION AND TRAINING
The Contractor shall provide basic familiarization and training at the End User’s location or at the Builder’s Facility.
End User locations are defined in Section F. Crew familiarization shall include boat assembly, boat operations, main equipment operations and repairs and maintenance. This training shall include builder and/or OEM training and component change out procedures on engine, air conditioners, electrical systems (DC and AC), reduction gear, propeller, azimuthing drive, hydraulic systems, and navigation system. Underway operations shall include but not be limited to: maneuvering, towing (alongside and astern) and pushing. Training (at minimum) shall be three (3) days at Builder or End User’s location, as ordered, for up to ten (10) students. Contractor shall provide all training materials. The contractor is required to provide fuel for crew familiarization.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H002 ADDITIONAL DEFINITIONS–ALTERNATE I (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(e) Supervisor of Shipbuilding or Supervisor – means the Contracting Officer or duly appointed representative.
(f) Wide Area Workflow (WAWF) – means PIEE, please note the WAWF website has migrated from https://wawf.eb.mil To: https://piee.eb.mil
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
C-211-H007 PROTECTION OF THE SHIP DURING ADVERSE ENVIRONMENTAL CONDITIONS (NAVSEA)
(MAR 2019)
The Contractor shall ensure that the ship(s), all related material and Government property at the Contractor's facilities are protected during conditions of heavy weather such as, high winds, heavy snow and ice, gales, storms, hurricanes and high water or similar adverse environmental conditions. The Contractor shall develop, maintain, and implement as necessary a Heavy Weather Plan in accordance with the NAVSEA Standard Item (SI) 009-69 dated 30 April 2018, which prescribes the actions and procedures and assigns responsibilities for action to be taken in preparation for and during the period of adverse environmental conditions. The Contractor shall furnish the plan to the cognizant Supervisor of Shipbuilding (Supervisor) and shall make such changes in the plan as the Supervisor considers necessary to provide for adequate protection of the ship(s), Government property and the materials and equipment to be installed therein.
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019)
(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off-loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.
(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty-five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe-lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.
(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.
(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.
(End of Text)
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-217-H003 PROVISIONED ITEMS ORDERS--ALTERNATE II (NAVSEA) (OCT 2018)
(a) General. The Contractor agrees that it will furnish the supplies or services ordered by the Government in accordance with the procedures specified herein. Orders may be placed by the Contracting Officer, Provisioning Activity or Administrative Contracting Officer as unilateral or bilateral modifications to this contract on SF 30, Amendment of Solicitation/Modification of Contract. Any amounts shown in Section B at time of award of the initial contract for each provisioned line item are estimated amounts only and are subject to upward or downward adjustment by the issuing activity. If no amounts are shown, funding will be obligated before or at time of order issuance. It is understood and agreed that the Government has no obligation under this contract to issue any orders hereunder.
(b) Priced Orders. For each proposed order, the Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Promptly thereafter, the Contractor and the Contracting Officer shall negotiate the price and delivery schedule for the proposed order. Upon execution and receipt of the priced order, the Contractor shall promptly commence the work specified in the order.
(c) Undefinitized Orders. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a priced order, he/she may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount, and a schedule for definitization, as described in subparagraph (e)(2) below. Upon request the Contractor shall submit a maximum ceiling amount proposal before the undefinitized order is issued. The maximum ceiling amount is the maximum price at which the order may be definitized. The Contractor shall begin performing the undefinitized order upon receipt, except as provided in paragraph (d) below. The clause entitled "Contract Definitization" (DFARS 252.2l7- 7027) shall be included in any undefinitized order.
(d) Unilateral Undefinitized Orders. (1) For a unilateral undefinitized order, the Contractor shall within ten calendar days of receipt of the order notify the Contracting Officer in writing if it takes exception to the ceiling amount and/or the delivery schedule and shall propose a revised ceiling amount and/or a revised delivery schedule at that time. For unilateral undefinitized orders to which the Contractor takes no exception, the Contractor is obligated to perform just as if it were a fully definitized order.
(2) After receipt of the Contractor's Proposal to establish the revised ceiling amount and/or the revised delivery schedule, the Contracting Officer shall: (1) adjust the ceiling amount and/or revise the delivery schedule; (2) advise the Contractor that the order will be adjusted in a different amount than proposed by the Contractor; or (3) advise the Contractor that no adjustment will be made. In the event the Contractor has taken exception to the ceiling amount and/or the delivery schedule and has submitted a timely proposal in accordance with the preceding requirement and the Contracting Officer has not accepted the Contractor's proposal, the Contractor shall not be obligated to perform the order beyond the point at which it would be entitled to be compensated in an amount in excess of the Government's limitation of liability contained in the unilateral order.
(e) Definitization of Undefinitized Orders. (l) The Contractor agrees that following the issuance of an undefinitized order, it will promptly begin negotiating with the Contracting Officer the price and terms of a definitive order that will include: (A) all clauses required by regulation on the date of the order; (B) all clauses required by law on the date of execution of the definitive order; and, (C) any other mutually agreeable clauses, terms and conditions. No later than sixty (60) days after the undefinitized order is issued, the contractor agrees to submit a cost proposal with sufficient data to support the accuracy and derivation of its price; and, when required by FAR, cost or pricing data. If additional cost information is available prior to the conclusion of negotiations, the Contractor shall provide that information to the Contracting Officer. The price agreed upon shall be set forth in a bilateral modification to the order.