MultnomahLodge-DWGS-22x36-20210122.pdf
PDF 34 MB Posted
- Attached to
- Multnomah Falls Lodge Electrical Upgrades
- Solicitation number
- 1240BH21R0011-1
About this file
This document outlines a federal contract opportunity for electrical upgrades at the Multnomah Falls Lodge. The USDA Forest Service intends to issue an RFP seeking proposals to demolish and install new electric components including replacement of all electric panels, installation of an ATS, emergency shut-off switch and strobe lights, new distribution panels, main switchboard, panelboard T, lighting, and other electrical equipment. Site work is included for installation of the main switchboard and ATS. Prospective offerors must be registered in SAM and maintain registration through final payment. The anticipated start date is October 2021, with a site visit scheduled for April 28, 2021 and pre-bid conference call on May 4, 2021. The government estimates the project magnitude to be between $1,000,000 and $5,000,000.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA MAP VICINITY MAP
PROJECT
AREA
PROJECT
AREA
SHEET INDEX
COLUMBIA RIVER GORGE NATIONAL SCENIC AREA
ELECTRICAL UPGRADE AND STANDBY GENERATOR
MULTNOMAH COUNTY, OREGON
JANUARY 202
UNITED STATES FOREST SERVICE
PROJECT APPROVALS
FOR CONSTRUCTION
KRISTIN AUSTIN Digitally signed by KRISTIN AUSTIN Date: 2021.03.08 14:25:11 -08'00'
CHRISTY CHEYNE Digitally signed by CHRISTY CHEYNE Date: 2021.03.08 15:08:33 -08'00'
CHRISTY DARDEN Digitally signed by CHRISTY DARDEN Date: 2021.03.11 14:27:23 -08'00'
1 CONTRACT BID SCHEDULE
FOR CONSTRUCTION
MULTNOMAH FALLS
LODGE
TOE OF SLOPE
US HIGHWAY 30
SERVICE DRIVE
MAINTENANCE
BUILDING
GREASE TRAP
COLLECTION
STORAGE
SS
SS
SS
SS
SS SS
SS
SS SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
MULTNOMAH FALLS
LODGE
TOE OF SLOPE
US HIGHWAY 30
EXISTING
TRANSFORMER
SERVICE DRIVE
MAINTENANCE
BUILDING
GREASE TRAP
COLLECTION
STORAGE
SS
SS
SS
SS
SS SS
SS
SS SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
EXISTING
PROPANE TANK
SHEET NOTES:
A
PLAN VIEW
SECTION AA END VIEW
A
2 GROUND WELL DETAIL
1 VAULT DETAIL
1 EXISTING SLAB
2 CONCRETE REPAIR DETAIL
3 LAP SPLICE REQUIREMENTS
" M
IN
CLASS B,
4"-0 CRUSHED ROCK
3.5' MIN.
8" M
IN
TRENCH FOUNDATION
STABILIZATION, AS REQUIRED
6" MIN. BEDDING
PER SECTION
31-23-33
AC PAVEMENT OR
CONCRETE
TOP OF SUBGRADE
FINISH GRADE
SLOPE PER
OSHA
REQUIREMENTS
Extg. pvmt.
Seal surface over joint with tack material and sand (AC patch only)
Undisturbed base (Extg.)
Compacted aggregate base, as specified
Compacted trench backfill as specified
12" min.
12" min.
Min. width=Roller width plus 2" m in
Trench width (Actual)
Pvmt. replacement, see general notes
NOTES:
1. All existing AC or PCC pavement shall be sawcut prior to repaving.
2. Place AC mix minimum thkn. of 4" or the thkn.
of the removed pavement, whichever is greater. Compact as specified.
8 TYPICAL PIPE OR CONDUIT PENETRATION
9 ELECTRICAL CONDUIT LINE DETAIL
11 AC PAVEMENT SECTION
10 SAWCUT DETAIL
1 EXISTING SITE ELECTRICAL LAYOUT
1 ENALRGED NEW SITE ELECTRICAL PLAN 2 RESPONSIBLITY MATRIX
3 LIGHT FIXTURE SCHEDULE
1 NORTH ELEVATION 2 WEST ELEVATION
1 BASEMENT ELECTRICAL DEMOLITION PLAN
2 ENLARGED SNACK BAR ELECTRICAL DEMOLITION PLAN
1 BASEMENT POWER PLAN
2 ENLARGED SNACK BAR POWER PLAN 3 ELECTRICAL ROOM ELEVATIONS
1 EXISTING BASEMENT LIGHTING PLAN
1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
1 FIRST FLOOR POWER PLAN
1 EXISTING FIRST FLOOR LIGHTING PLAN
1 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
2 ENLARGED SECOND FLOOR ELECTRICAL DEMOLITION PLAN
1 SECOND FLOOR POWER PLAN
3 ENLARGED SECOND FLOOR POWER PLAN
2 SECOND FLOOR ROOFTOP POWER PLAN
1 EXISTING SECOND FLOOR LIGHTING PLAN
1 THIRD FLOOR ELECTRICAL DEMOLITION PLAN
1 THIRD FLOOR POWER PLAN
1 EXISTING THIRD FLOOR LIGHTING PLAN
1 DEMOLITION ONE-LINE DIAGRAM
2 EXISTING DISTRIBUTION SWITCHBOARD BREAKER LAYOUT
1 NEW ONE-LINE DIAGRAM2 BUILDING LOAD SUMMARY
1 EXISTING ELECTRICAL SYSTEM SHORT CIRCUIT ANALYSIS
1 EQUIPMENT ELECTRICAL SCHEDULE
2 MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE
2 (D)PANEL 'C' - KITCHEN STORAGE ROOM
1 (D)PANEL 'AA' - KITCHEN STORAGE ROOM
1 (D)PANEL 'COMP' - ABOVE KITCHEN WALK-IN COOLER
1 (N)PANEL 'C' - KITCHEN STORAGE
2 (D)PANEL 'HP920604' - OUTSIDE BASEMENT ELECTRICAL
1 (D)PANEL 'HP920594' - OUTSIDE BASEMENT ELECTRICAL
1 (N)PANEL 'H' - OUTSIDE BASEMENT ELECTRICAL ROOM
1 (D)PANEL 'J' - BASEMENT ELECTRICAL ROOM
1 (N)PANEL 'J' - BASEMENT ELECTRICAL ROOM
2 (D)PANEL 'N' - SECOND FLOOR OFFICE
1 (D)PANEL 'M' - SECOND FLOOR OFFICE
1 (N)PANEL 'M' - SECOND FLOOR HALLWAY
1 (D)PANEL 'NN' - OUTSIDE BASEMENT ELECTRICAL ROOM
1 (N)PANEL 'N' - OUTSIDE BASEMENT ELECTRICAL ROOM
2 (N)PANEL 'Q' - BASEMENT ELECTRICAL ROOM
1 (D)PANEL 'Q' - BASEMENT ELECTRICAL ROOM
1 (D)PANEL 'R' - BASEMENT ELECTRICAL ROOM
1 (N)PANEL 'R' - BASEMENT ELECTRICAL ROOM
1 (D)PANEL 'SB1' - BASEMENT GIFT SHOP STORAGE
1 (N)PANEL 'SB1' - BASEMENT GIFT SHOP STORAGE
1 (D)PANEL 'SB2' - BASEMENT GIFT SHOP STORAGE
1 (N)PANEL 'SB2' - BASEMENT GIFT SHOP STORAGE
1 (D)PANEL 'SB3' - BASEMENT GIFT SHOP STORAGE
1 (N)PANEL 'SB3' - BASEMENT GIFT SHOP STORAGE
2 (N)PANEL 'T' - EXTERIOR STORAGE BUILDING
1 (D)PANEL 'T' - BASEMENT OLD PUMP ROOM
1 (D)DISTRIBUTION PANELBOARD 'DP1' - BASEMENT ELECTRICAL ROOM 2 (N)DISTRIBUTION PANELBOARD 'DP1' - BASEMENT ELECTRICAL ROOM
1 (D)DISTRIBUTION PANELBOARD 'DP2' - BASEMENT ELECTRICAL ROOM 2 (N)DISTRIBUTION PANELBOARD 'DP2' - BASEMENT ELECTRICAL ROOM
1 HVAC SINGLE POWER CONTROL ENCLOSURE LAYOUT
2 HVAC SINGLE POWER CONTROL ENCLOSURE SCHEMATIC
3 HVAC DOUBLE POWER CONTROL ENCLOSURE LAYOUT
4 HVAC DOUBLE POWER CONTROL ENCLOSURE SCHEMATIC
2 HVAC TRIPLE POWER CONTROL ENCLOSURE LAYOUT1 HVAC TRIPLE POWER CONTROL ENCLOSURE SCHEMATIC
PLAN VIEW
N
SOUTH END VIEW EAST SIDE VIEW
S
E W
TOP
No. 64-352P
BASE
No. 644-B
1 UNDERGROUND SPLICE VAULT ISOMETRIC 2 UNDERGROUND SPLICE VAULT BOX DETAILS
1 HVAC CONTROL SYSTEM ADDITIONS OVERVIEW
1 EXISTING SEWAGE BOOSTER CONNECTION 2 EXISTING J-BOX (PREVIOUS PANEL 'A') OVERFILL
File details come from the government source that posted it. Updated .