Schedule of Items-Revision 2.pdf
PDF 97 KB Posted
- Attached to
- Multnomah Falls Lodge Electrical Upgrades
- Solicitation number
- 1240BH21R0011-1
About this file
This document contains a solicitation for electrical upgrades at the Multnomah Falls Lodge. The USDA Forest Service is seeking proposals to demolish and install new electric components including replacement of all electric panels, installation of an automatic transfer switch, emergency shut-off switch and strobe lights, as well as new distribution panels, main switchboard, panelboard, lighting, and other electrical equipment. Site work is included for installation of the main switchboard and automatic transfer switch. The project is located in Bridal Veil, Oregon and has an estimated budget between $1,000,000 to $5,000,000. A pre-bid site visit was scheduled for April 28, 2021 and a pre-bid conference call is scheduled for May 4, 2021. Prospective awardees must be registered in the System for Award Management database and maintain active registration through final payment to be eligible for award.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service
1/22/2021 Multnomah Falls Electrical Upgrade & Emergency Generators Page 1/1
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS (Revision 2-dated 05/17/2021)
Item Number Item Description Unit of
Measurement Price
Base Bid Items
1 Multnomah Falls Electrical System Lump Sum $ 2 Install Panel C (Originally BO #1) Lump Sum $ 3 Install Panel R (Originally BO #8) Lump Sum $ 4 Install Panel J (Originally BO #9) Lump Sum $ 5 Install Panel Q (Originally BO #10) Lump Sum $
TOTAL BASE ITEMS $
Bid Options
6 BO #2 - Install Panel H Lump Sum $ 7 BO #3 - Install Panel M Lump Sum $ 8 BO #4 - Install Panel SB1 Lump Sum $ 9 BO #5 - Install Panel SB2 Lump Sum $
10 BO #6 – Install Panel SB3 Lump Sum $ 11 BO #7 - Install Panel N Lump Sum $ 12 BO #11 - Replace Outlet Receptacles Lump Sum $ 13 BO #12 - Install New HVAC Disconnects Lump Sum $
TOTAL OPTION ITEMS $
TOTAL ALL ITEMS $
| PART I – THE SCHEDULE |
| SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS |
| SCHEDULE OF ITEMS (Revision 2-dated 05/17/2021) |
File details come from the government source that posted it. Updated .