MGT1_Fire_System_upgrade_scoring_.docx

DOCX document 16 KB Posted

Attached to
MGT1 Water Mist Fire Protection system replacement
Solicitation number
2026-RFP-067
Issued by
Polk County, Florida

About this file

This is a scoring document for a fire system upgrade project submitted by Lakeland Electric in Florida. The project involves the replacement of the existing MGT1 fire suppression system with a self-contained high-pressure water mist fire protection system. The new system shall operate via stored-pressure nitrogen/water cylinders and electrically supervised solenoid-operated valves, with no electric motor-driven pumps. Lakeland Electric has identified a planned outage window from September 13-19 during which actual work completion is preferred to minimize operational disruption to MGT1. Bidders are required to submit Attachment L as part of their pricing proposal.

The scoring document establishes evaluation criteria for assessing proposals submitted in response to this fire system replacement opportunity. Specific pricing terms, set-asides, incumbent information, and detailed funding requirements and sources are to be referenced in the associated bid documents and pricing proposal submissions. The document serves as the basis for evaluating and comparing qualified bids to determine the most advantageous proposal for Lakeland Electric.

View the file

Other files

File Type Posted
MGT1_Water_Mist_Fire_Protection_system_replacement.pdf PDF
Pricing_Proposal.xlsx XLSX spreadsheet
MGT1_CO2_System_Management_Justification_Memo_(1).docx DOCX document
MGT1_Water_Mist_Fire_Protection_System_Replacement.docx DOCX document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Vendor.doc DOC document
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Criteria The criteria used to score vendor responses during the evaluation process

· 1. PROJECT COST

Total proposed project cost including equipment, labor, programming, testing, commissioning, training, and documentation. Lowest cost proposal will receive maximum points. Other proposals will be scored proportionally based on their cost relative to the lowest responsive and responsible bidder. Cost transparency, completeness, and clarity of pricing will also be considered.

Scoring Method:

Points Based Weight (Points):

55 (55% of Total)

· 2. TECHNICAL QUALIFICATIONS AND EXPERIENCE

Demonstrated experience installing, programming, testing, and commissioning Water Mist fire suppression systems and releasing fire alarm control panels compliant with NFPA 12 and NFPA 72. Experience with Water Mist systems, selector valves, releasing control panels, and power generation facilities will be strongly preferred. Vendor must identify certifications, licenses, manufacturer training, and qualifications of personnel assigned to the project.

Scoring Method:

Points Based Weight (Points):

15 (15% of Total)

· 3. COMPLIANCE WITH TECHNICAL SPECIFICATIONS AND SYSTEM DESIGN

Degree to which the proposed equipment and system design meet or exceed project specifications, including UL listing, NFPA compliance, cross-zone logic capability, battery backup, and compatibility with existing piping and detection systems. Quality, reliability, and suitability of proposed control panel, cylinders, solenoids, and related components will be evaluated.

Scoring Method:

Points Based Weight (Points):

10 (10% of Total)

· 4. SAFETY RECORD AND SAFETY PROGRAM

Vendor’s safety performance record, including OSHA recordable incident rate, lost time incidents, and overall safety program effectiveness. Vendor shall demonstrate safe work practices, compliance with OSHA standards, and experience working safely in industrial and power generation Scoring Method:

Points Based Weight (Points):

10 (10% of Total)

· 5. PROJECT EXECUTION PLAN, TESTING AND COMMISSIONING

Vendor’s proposed plan for installation, system programming, functional testing, commissioning, documentation, and training. Includes ability to complete system testing, provide operator training, deliver complete documentation, and support AHJ acceptance testing. Clarity and completeness of execution plan will be evaluated.

Scoring Method:

Points Based Weight (Points):

10 (10% of Total)