About this file

The document is a detailed matrix for the Massachusetts Electric Vehicle Incentive Program (MassEVIP) VW Settlement Charging Station Programs, issued on December 24, 2020. The program involves multiple state-level entities including National Grid and Eversource, and offers funding for electric vehicle charging station installations across different sectors in Massachusetts. The program is structured around four distinct charging station initiatives: Direct Current Fast Charging (DCFC), Workplace & Fleet (WPF), Multi-Unit Dwelling & Educational Campus (MUDC), and Public Access Charging (PAC).

The program provides substantial funding with $1.5-$2.5 million available across different categories, offering up to $50,000 per charging station or address. Eligible applicants include private, public, and non-profit organizations, with specific requirements for location types such as workplaces, educational campuses, fleet locations, and public access sites. Funding levels range from 60% to 100% depending on the property ownership, with varying availability requirements. The charging stations must be compatible with multiple vehicle manufacturers, clearly marked, and either Level 1, Level 2, or Direct Current Fast Charging (DCFC) types. Application deadlines and project completion timelines differ by program, with some having a fixed deadline (March 19, 2021) and others operating on a rolling basis.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Electric Vehicle Incentive Program (MassEVIP) VW Settlement Charging Station Programs

December 24, 2020

Direct Current Fast Charging

(DCFC)

Workplace & Fleet (WPF)

Multi-Unit Dwelling & Educational Campus

(MUDC)

Public Access Charging (PAC)

Amount available $1.5 million; up to $50,000 per

DCFC charging station $2.5 million; up to $50,000 per address

$1.5 million; up to $50,000 per address

$1.5 million (in addition to prior $2 million); up to $50,000 per address

Who may apply Private, public or non-profit

Private, public and non-profit workplaces

Private or non-profit light-duty fleet owners with at least 15 employees in

MA

Municipal, public university and college or state agency light-duty fleet owners

Private, public or non-profit Private, public or non-profit

Eligible Location Types

Non-residential site available for public use

Educational campus with at least 15 students on-site

Non-residential workplace with at least employees on-site

Non-residential location where applicant garages fleet vehicle

Non-residential location where applicant garages fleet vehicle

Dwelling with 5 or more residential units

Educational campus with at least 15 students on-site

Non-residential site available for public use

Who must be allowed to use charging station?

Anyone who drives an EV

All students/staff who drive an

EV

All employees who drive an EV

Applicant’s EV fleet users

Applicant’s EV fleet users

All residents who drive an

EV

All students/staff who drive an

EV

Anyone who drives an

EV

Maximum level of funding

100% at government owned property;

80% at all other locations

60% 60% 60% 100% at government owned property; 80% at all other locations

Minimum required hours of availability

24 hours/day N/A N/A

24 hours/day unless location has restriction, then 12 hours/day

Application deadline March 19, 2021 Rolling Rolling Rolling

Charging station type DCFC Level 1 or Level 2 Level 1 or Level 2 Level 1 or Level 2

Time to complete project – existing locations/ new construction

12 months/ 24 months

6 months/ 24 months

6 months/ 24 months

6 months/ 24 months

For all programs:

• For National Grid and Eversource program participants, funding covers equipment only; For all others,

• funding covers both equipment and Installation. Charging station must be able to charge EVs produced by multiple manufacturers

• A parking spot must be clearly marked as EV-only with permanent signage for each port installed

• The applicant must own the location or provide written permission from the location owner to install charging stations