ACV CDRLs A001-A116_1st DRAFT 17 Oct 2014
View the file
Other files for this federal contract opportunity
Show all 50
Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
OPERATIONS SECURITY (OPSEC) PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80934C
5. CONTRACT REFERENCE
SOW PARA 3.1.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg Repro
16. REMARKS
BLOCK 4: CONTRACTOR FORMAT IS ACCEPTABLE.
BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS TO THE CONTRACTOR. FINAL SUBMISSION IS DUE NLT 30 CALENDAR DAYS
AFTER RECEIPT OF GOVERNMENT COMMENTS. IF NO GOVERNMENT COMMENTS ARE
RECEIVED WITHIN 30 CALENDAR DAYS OF DRAFT SUBMISSION, PLAN IS APPROVED AS FINAL.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE U.S.
GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER
REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM
AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 12: DRAFT SUBMISSION IS DUE NO LATER THAN (NLT) 60 CALENDAR DAYS AFTER
CONTRACT AWARD.
BLOCK 13: OPSEC PLAN MUST BE UPDATED AS SECURITY REQUIREMENTS CHANGE. ALL
CHANGES MUST BE APPROVED BY THE ACV 1.1 PdM.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE COR AND THE ALTERNATE COR.
15. TOTAL
G. PREPARED BY
Doheney CIV Michael J
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
J. DATE
[Approved By Date]
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1)/R
12. DATE OF FIRST
SUBMISSION
60 CALENDAR DAC AWARD
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: GUIDANCE FOR ADDRESSING THE OUTLINE AREAS OF THE GOVERNMENT'S
PROGRAM PROTECTION PLAN (PPP) IS PROVIDED IN THE PROGRAM PROTECTION PLAN
OUTLINE AND GUIDANCE, VERSION 1.0 OF JULY 2011 (LINK:
HTTP://WWW.ACQ.OSD.MIL/SE/DOCS/PPP-OUTLINE-AND-GUIDANCE-V1-JULY2011.PDF). THE
PPIP SHALL BE DELIVERED IN MICROSOFT OFFICE 2010 OR A COMPATIBLE FORMAT. FILES
SHALL NOT BE SUBMITTED IN ADOBE PDF FORMAT AND ALL TEXT AND TABULAR DATA SHALL
BE SEARCHABLE (I.E.NOT SCANNED).
BLOCK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS. GOVERNMENT APPROVAL IS CONTINGENT UPON CONTRACTOR
INCORPORATION OF THE COMMENTS PROVIDED.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE U.S.
GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER
REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM
AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., AND SEC 2751, ET SEQ) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE 210 CALENDAR DAYS AFTER CONTRACT
AWARD (30 DAYS PRIOR TO CDR) AND 60 CALENDAR DAYS PRIOR TO THE END OF THE
CONTRACT (OR 30 CALENDAR DAYS PRIOR TO SVR, WHICHEVER IS SOONER). UPDATES TO
THE CONTRACTOR ANTI-TAMPER PLAN SHALL BE PROVIDED 60 CALENDAR DAYS AFTER
OPTION AWARD FOR LRIP AND FRP (OPTIONS, IF EXERCISED).
McGowan CIV Steven J
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
PROGRAM PROTECTION INFORMATION PLAN (PPIP)
3. SUBTITLE
INFORMATION ASSURANCE (IA) PLAN AND
STATUS ASSESSMENTS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
QUARTERLY
12. DATE OF FIRST
SUBMISSION
90 CALENDAR DAC AWARD
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS. GOVERNMENT APPROVAL IS CONTINGENT UPON CONTRACTOR
INCORPORATION OF THE COMMENTS PROVIDED.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE U.S.
GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER
REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM
AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., AND SEC 2751, ET SEQ) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13: INFORMATION ASSURANCE STATUS ASSESSMENTS SHALL BE PROVIDED 90
CALENDAR DAYS AFTER OPTION AWARD FOR LRIP AND FRP (OPTIONS, IF EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Kelley CIV Peter
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
ANTI-TAMPER PLAN
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1)/R
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: DI-ADMN-81306 GUIDANCE FOR ADDRESSING PREPARATION OF THE
CONTRACTOR'S ANTI-TAMPER PLAN CAN BE FOUND IN DOD ANTI-TAMPER PLAN TEMPLATE,
VERSION 3.0 OF 29 AUGUST 2011. REQUESTS FOR THE TEMPLATE SHALL BE REFERRED TO
THE PROGRAM EXECUTIVE OFFICE - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22134-6050. THE CONTRACTOR ANTI-TAMPER PLAN SHALL BE DELIVERED
WITH APPROPRIATE MARKINGS IN MICROSOFT OFFICE 2010 OR A COMPATIBLE FORMAT.
FILES SHALL NOT BE SUBMITTED IN ADOBE PDF FORMAT AND ALL TEXT AND TABULAR DATA
SHALL BE SEARCHABLE (I.E. NOT SCANNED)
BLOCK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS TO REVIEW AN PROVIDE
COMMENTS. GOVERNMENT APPROVAL IS CONTINGENT UPON CONTRACTOR
INCORPORATION OF THE COMMENTS PROVIDED.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE U.S.
GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER
REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM
AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., AND SEC 2751, ET SEQ) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.
DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE 210 CALENDAR DAC AWARD (30 CALENDAR
DAYS PRIOR TO CDR) AND 60 CALENDAR DAYS PRIOR TO THE END OF THE CONTRACT (OR 30
CALENDAR DAYS PRIOR TO SVR, WHICHEVER IS SOONER). UPDATES TO THE CONTRACTOR
ANTI-TAMPER PLAN SHALL BE PROVIDED 60 CALENDAR DAYS AFTER OPTION AWARD FOR
LRIP AND FRP (OPTIONS, IF EXERCISED)
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
McGowan CIV Steven J
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
PROGRAM MANAGEMENT PLAN (PMP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81797
5. CONTRACT REFERENCE
SOW PARA 3.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
THREE (3) TIMES
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE, TAILORING REQUIRES PRIOR PM AAA
APPROVAL. THE PMP SHALL ADDRESS THE DATA REQUIREMENTS OF DI-MGMT-81797, TO
INCLUDE IDENTIFICATION OF PM AND ALL TEAM MEMBERS, A DETAILED PROGRAM
SCHEDULE IN MICROSOFT (MS) PROJECT SHOWING ACTIVITIES REQUIRED FOR THE FIRST
THREE (3) LEVELS OF WORK BREAKDOWN STRUCTURE (WBS) IN ACCORDANCE WITH MIL-STD
881C, MAJOR PROGRAM TASKS AND EVENTS, IDENTIFICATION OF PROGRAM RISKS,
MITIGATION, AND POTENTIAL IMPACTS TO COST/SCHEDULE/PERFORMANCE. A PMP WILL BE
REQUIRED FOR THE EMD CLINS, THE LOW RATE INITIAL PRODUCTION (LRIP) CLINS (OPTIONS, IF EXERCISED), AND THE FULL RATE PRODUCTION (FRP) CLINS (OPTIONS, IF EXERCISED).
BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS TO THE CONTRACTOR ON THE DRAFT PMP. THE CONTRACTOR SHALL
INCORPORATE THE GOVERNMENT COMMENTS AND RESUBMIT THE FINAL PMP WITHIN 15
CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE U.S.
GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER
REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM
AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE 60 CALENDAR DAYS AFTER LRIP (OPTION,
IF EXERCISED) AWARD, AND 60 CALENDAR DAYS AFTER FRP (OPTION, IF EXERCISED)
AWARD.
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
MEETINGS/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A
5. CONTRACT REFERENCE
SOW PARA 3.2.2 / 3.2.7
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: THE CONTRACTOR SHALL PROVIDE THE CONFERENCE AGENDAS IN ACCORDANCE
WITH THE REFERENCED DID. CONTRACTOR FORMAT IS ACCEPTABLE.
BLOCK 5: THE SUBMISSION OF CONFERENCE AGENDAS SHALL APPLY TO ALL STATEMENT OF
WORK (SOW) PARAGRAPHS THAT REQUIRE CONFERENCE AGENDAS.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1
OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER -
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCKS 12 AND 13: THE CONTRACTOR SHALL PROVIDE CONFERENCE AGENDAS SEVEN (7)
CALENDAR DAYS PRIOR TO ANY FORMAL MEETING.
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
BRIEFING MATERIAL
3. SUBTITLE
PRELIMINARY DESIGN REVIEW (PDR)
PRESENTATION
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81605
5. CONTRACT REFERENCE
SOW PARA 3.3.1.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1) TIME
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: THE PDR PRESENTATION SHALL INCLUDE THE FOLLOWING AS IT PERTAINS TO THE
ACV DESIGN:
• SUMMARY OF ARTIFACTS
• STATUS OF ARTIFACT DELIVERIES
• APPROPRIATE LEVEL OF BASELINE TRACE
BLOCK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS, WHICH SHALL BE INCLUDED IN FINAL PDR PRESENTATION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND U.S. DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER –
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 12: DRAFT PRESENTATION IS DUE 14 CALENDAR DAYS PRIOR TO PDR.
BLOCK 13: FINAL PRESENTATION IS DUE ON DAY OF PRESENTATION.
Olree CIV Michael R
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
MEETING/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A
5. CONTRACT REFERENCE
SOW PARA 3.2.2 / 3.2.7
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: CONFERENCE MINUTES SHALL BE A MICROSOFT (MS) WORD DOCUMENT IN THE
CONTRACTOR’S FORMAT, AND AT A MINIMUM CONTAIN THE FOLLOWING INFORMATION:
• TITLE PAGE
• PURPOSE AND OBJECTIVE OF THE EVENT
• LOCATION, DATE AND DURATION OF THE EVENT
• LIST OF ATTENDEES
• SUMMARY OF THE DISCUSSIONS, DECISIONS, AGREEMENTS REACHED, AND DIRECTIONS
OF THE CONFERENCE OR INDIVIDUALS THEREOF
• COPY OF PRESENTATIONAL MATERIAL
• ACTION ITEMS RESULTING FROM THE EVENT, INCLUDING THE ACTION TO BE TAKEN BY
RESPONSIBLE INDIVIDUAL OR GROUP, AND DUE DATE OF EACH ACTION ITEM COMPLETION
BLOCK 5: THE SUBMISSION OF CONFERENCE MINUTES SHALL APPLY TO ALL STATEMENT OF
WORK (SOW) PARAGRAPHS THAT REQUIRE MEETINGS/REVIEWS.
BLOCK 8: THE GOVERNMENT WILL HAVE SEVEN (7) CALENDAR DAYS TO REVIEW AND
PROVIDE COMMENTS. THE CONTRACTOR SHALL HAVE THREE (3) CALENDAR DAYS TO MAKE
CORRECTIONS AND RESUBMIT FOR APPROVAL.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1
OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER -
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCKS 12 AND 13: THE CONTRACTOR SHALL SUBMIT THE CONFERENCE MINUTES WITHIN
SEVEN (7) CALENDAR DAYS AFTER EACH MEETING/REVIEW.
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
STATUS REPORT
3. SUBTITLE
PROJECT STATUS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
SOW PARA 3.2.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
MONTHLY
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
MONTHLY
Reg Repro
16. REMARKS
BLOCK 4: DI-MGMT-80368A IS TAILORED AS FOLLOWS: EXCEPT CONTENT DESCRIBED IN 3.2.3
ITEMIZED MAN-HOURS AND COSTS.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1
OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER -
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 10: THE MONTHLY PROGRESS STATUS REPORT SHALL BE DELIVERED TO THE
GOVERNMENT NO LATER THAN THE LAST BUSINESS DAY OF EACH MONTH.
EMD CONTRACT AWARD:
BLOCK 12: INITIAL SUBMISSION OF THE PROJECT STATUS REPORT SHALL OCCUR NO LATER
THAN 30 CALENDAR DAYS AFTER THE ENGINEERING, MANUFACTURING, AND DEVELOPMENT
(EMD) CONTRACT AWARD.
LRIP (OPTION, IF EXERCISED) AWARD:
BLOCK 12: INITIAL SUBMISSION OF THE PROJECT STATUS REPORT SHALL OCCUR NO LATER
THAN 30 CALENDAR DAYS AFTER THE LOW RATE INITIAL PRODUCTION (LRIP) (OPTION, IF
EXERCISED) AWARD.
FRP (OPTION, IF EXERCISED) AWARD:
BLOCK 12: INITIAL SUBMISSION OF THE PROJECT STATUS REPORT SHALL OCCUR NO LATER
THAN 30 CALENDAR DAYS AFTER THE FULL RATE PRODUCTION (FRP) (OPTION, IF
EXERCISED) AWARD.
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
0T0TA
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
INTEGRATED PROGRAM MANAGEMENT REPORT
(IPMR)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861
5. CONTRACT REFERENCE
SOW PARA 3.2.4.1 / 3.2.4.2 / 3.2.4.3 / 3.2.6.2
/ 3.2.6.3 / 3.2.6.4
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 21 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS. THE CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO MAKE CORRECTIONS
AND RESUBMIT FOR APPROVAL.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND U.S. DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER –
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
THE CONTRACTOR SHALL PROVIDE A MONTHLY IPMR PER DID DI-MGMT-81861 AND SHALL BE
DEVELOPED IN ACCORDANCE WITH DOD IMP AND SCHEDULE GUIDE (V0.9 DATED 21 OCT 05)
EXCEPT AS MODIFIED PER THE FOLLOWING:
BLOCKS 10, 12, 13: INITIAL SUBMISSIONS, SUBSEQUENT SUBMISSIONS, & FREQUENCY:
FORMATS 1-5 SUBMISSIONS:
BLOCK 12:
• DRAFT SUBMISSIONS ARE DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH
OCCURS APPROXIMATELY 60 CALENDAR DAYS AFTER AWARD OF CONTRACT
• FINAL SUBMISSIONS ARE DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH
OCCURS APPROXIMATELY 90 CALENDAR DAYS AFTER AWARD OF CONTRACT
BLOCKS 10 AND 13:
• SHALL BE SUBMITTED MONTHLY NO LATER THAN 21 CALENDAR DAYS FOLLOWING THE
CONTRACTOR’S ACCOUNTING PERIOD CUTOFF DATE.
FORMAT 6 - CONTRACT INTEGRATED MASTER PLAN (IMP) SUBMISSIONS
BLOCK 12:
• DRAFT CONTRACT IMP SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD
WHICH OCCURS APPROXIMATELY 60 CALENDAR DAYS AFTER AWARD OF CONTRACT
• FINAL CONTRACT IMP SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD
WHICH OCCURS APPROXIMATELY 90 CALENDAR DAYS AFTER AWARD OF CONTRACT
BLOCKS 10 AND 13:
• AS REQUIRED
FORMAT 6 - CONTRACT INTEGRATED MASTER SCHEDULE (IMS) SUBMISSIONS
Bradley CIV Walter M
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
0T0TA
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A010)
BLOCK 12:
• DRAFT CONTRACT IMS SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 60
CALENDAR DAYS AFTER AWARD OF CONTRACT
• FINAL CONTRACT IMS SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90
CALENDAR DAYS AFTER AWARD OF CONTRACT
BLOCKS 10 AND 13:
• IMS SUBSEQUENT MONTHLY SUBMISSIONS SHALL BE PROVIDED 21 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF THE
CONTRACTOR ACCOUNTING PERIOD.
FORMAT 6 - SCHEDULE RISK ASSESSMENT (SRA) SUBMISSIONS
BLOCK 12:
• THE FIRST SRA SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90 CALENDAR
DAYS AFTER CONTRACT AWARD
BLOCKS 10 AND 13:
• SRA SUBSEQUENT SUBMISSIONS SHALL BE PROVIDED QUARTERLY AFTER THE INITIAL SRA. THE SRA SHALL BE COMPLETED AND AVAILABLE FOR GOVERNMENT APPROVAL AND COMMENT 21 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF EVERY THREE
CONTRACTOR’S ACCOUNTING PERIODS (QUARTERLY).
FORMAT 7 SUBMISSIONS:
BLOCK 12:
• DRAFT SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 60 CALENDAR DAYS
AFTER AWARD OF CONTRACT
• FINAL SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90 CALENDAR DAYS AFTER
AWARD OF CONTRACT
BLOCKS 10 AND 13:
• SHALL BE SUBMITTED ANNUALLY NO LATER THAN 21 CALENDAR DAYS FOLLOWING THE CONTRACTOR’S ACCOUNTING PERIOD
CUTOFF DATE IN JULY OF EACH YEAR.
FORMAT 1 INSTRUCTIONS:
• UNLESS OTHERWISE SPECIFIED, CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) ELEMENTS SHALL BE REPORTED TO LEVEL FOUR (4) OF THE WBS AS SHOWN IN THE “COST AND SOFTWARE DATA REPORTING (CSDR) PLAN,” CONTRACT ATTACHMENT 06.
• FORMAT 1 SHALL BE PROVIDED BY ELEMENT OF COST AT THE WBS REPORTING LEVEL. ONLY THE FORMAT 1 (NON-EOC FORMAT
PROVIDED AT THE REPORTING LEVEL) SHOULD BE UPLOADED TO THE DCARC REPOSITORY.
FORMAT 2 INSTRUCTIONS:
• USE ORGANIZATION CATEGORIES. REPORT ANY CHANGES TO ORG STRUCTURE AND/OR MOVEMENT OF CONTROL ACCOUNT TO A
NEW ORG.
FORMAT 3 INSTRUCTIONS:
• FORMAT 3 SHALL CONTAIN BASELINE AND ETC BY MONTH FOR COLUMNS 4-9, THEN BY THREE MONTH PERIODS FOR COLUMNS 10-11, THEN BY 12 MONTH PERIODS FOR THE NEXT TWO SUBSEQUENT PERIODS (COL 12 & 13) AND THE REMAINDER OF THE CONTRACT FOR
THE LAST PERIOD (COLUMN 14).
FORMAT 4 INSTRUCTIONS:
• THE CONTRACTOR’S ESTIMATE TO COMPLETE PROJECTIONS SHALL BE USED FOR TIMEPHASING OF EQUIVALENT PERSON MONTHS
FOR EACH ORGANIZATIONAL CATEGORY SPECIFIED IN FORMAT 2.
• STAFFING SHALL BE REPORTED IN HOURS.
FORMAT 5 INSTRUCTIONS:
• VARIANCE ANALYSIS SHALL BE REPORTED IN DOLLARS.
• THE FORMAT 5 NARRATIVE SHALL INCLUDE A SUMMARY, IMPACT TO IMMEDIATE TASKS, IMPACT TO OVERALL PROGRAM, CORRECTIVE ACTION AND IMPACT TO EAC.
• PROBLEM ANALYSIS AND NARRATIVE EXPLANATIONS SHALL BE REQUIRED FOR FORMAT 1 ELEMENTS WHICH MEET THE FOLLOWING
THRESHOLDS:
• EXCEEDING +/- $50K AND +/- 5% OF THE WBS REPORTING LEVEL CURRENT SV
• EXCEEDING +/- $50K AND +/- 5% OF THE WBS REPORTING LEVEL CURRENT CV
• EXCEEDING +/- $200K AND +/- 5% OF THE WBS REPORTING LEVEL CUMMULATIVE SV
• EXCEEDING +/- $200K AND +/- 5% OF THE WBS REPORTING LEVEL CUMMULATIVE CV
DD FORM 1423-1, FEB 2001 Page of Pages
0TA
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A010)
• EXCEEDING +/- $200K AND +/- 5% OF THE WBS REPORTING LEVEL VAC
• AS REQUESTED PROVIDE OTHER COST AND SCHEDULE VARIANCES OR TECHNICAL PERFORMANCE ISSUES THAT ARE CAUSING
OR ARE LIKELY TO CAUSE SIGNIFICANT SCHEDULE DELAYS OR COST OVERRUNS.
• CHANGES IN FORMAT 4 WHICH REQUIRE EXPLANATIONS ARE THOSE THAT CHANGE THE ABSOLUTE VALUE OF THE PROJECTED TOTAL STAFF-MONTHS AT COMPLETION OF ANY ORGANIZATIONAL OR FUNCTIONAL CATEGORY BY MORE THAN +/-5,000 HOURS OF
BASELINE BETWEEN REPORTING PERIODS.
• EXPLANATION OF DIFFERENCES BETWEEN MOST LIKELY, BEST AND WORST CASE EAC AS COMPARED TO EAC SHOWN ON
FORMAT 1 BLOCK 8E.
• EXPLANATION OF OH, COM, G&A VARIANCES WITHIN THE SUMMARY SECTION OF THE FORMAT 5.
• NARRATIVE EXPLANATIONS REQUIRED AND VARIANCE THRESHOLDS WILL BE REVIEWED PERIODICALLY.
• THE CONTRACTOR SHALL DELIVER A NARRATIVE REPORT WITH IMS ANALYSIS AND CRITICAL PATH DISCUSSION.
• ALL SRA INPUT DATA, METHODOLOGY AND ANALYSIS SHALL BE PROVIDED IN THE NARRATIVE REPORT.
OTHER SUPPLEMENTAL DOCUMENTATION:
• THE CPR SUBMISSION SHALL INCLUDE THE PROGRAM LOG WHICH WILL PROVIDE A DESCRIPTION FOR EACH CHANGE AS WELL AS THE BCR IMPLEMENTING THE CHANGES AND THE CONTROL ACCOUNTS AFFECTED BY THE CHANGES REPORTED IN FORMAT 3.
• CONTRACTOR SHALL PROVIDE ALL SUBCONTRACTOR CPR REPORTS WHICH ARE APPLICABLE AND SUPPORT THE MONTHLY CDRL SUBMISSION. CONTRACTOR IS NOT REQUIRED TO UPLOAD SUBCONTRACTOR REPORTS TO THE DCARC REPOSITORY.
FORMAT SIX (6) INSTRUCTIONS:
THE CONTRACT IMP:
• THE CONTRACT IMP SHALL TIE DIRECTLY TO THE GOVERNMENT PROVIDED PROGRAM IMP. ALL CONTRACTOR RECOMMENDED UPDATES TO THE PROGRAM IMP SHALL BE SUBMITTED AS REQUIRED FOR REVIEW AND APPROVAL BY THE GOVERNMENT.
• THE CONTRACT IMP SHALL BE DELIVERED USING THE COTS SOFTWARE, MICROSOFT OFFICE EXCEL 2010 OR LATER SUPPORTED
VERSION.
THE CONTRACT IMS:
• THE CONTRACT IMS SHALL INCLUDE ALL DISCRETE WORK. SUBCONTRACTORS WITH FLOWDOWN SHALL BE INCORPORATED WITH
SUFFICIENT DETAIL TO DEVELOP A REALISTIC CRITICAL PATH.
• THE CONTRACTOR SHALL UPDATE THE IMS AT A MINIMUM ON A MONTHLY BASIS WITH A STATUS DATE AS OF THE LAST DAY OF THE
ACCOUNTING MONTH. THE CONTRACTOR SHALL CONDUCT MONTHLY STATUS REVIEWS.
• THE CONTRACT IMS SHALL BE DELIVERED USING THE COTS SOFTWARE, MICROSOFT OFFICE PROJECT 2010 OR LATER SUPPORTED
VERSION.
THE SRA:
• THE PROJECT FILE INCLUDING SRA DATA FIELDS SHALL BE DELIVERED USING THE COTS SOFTWARE, MICROSOFT OFFICE PROJECT
2010 VERSION OR LATER SUPPORTED VERSION.
BLOCK 14: ALL FORMATS SHALL BE SUBMITTED ELECTRONICALLY IN ACCORDANCE WITH THE DOD-APPROVED XML SCHEMAS LOCATED IN THE EVM CENTRAL REPOSITORY (EVM-CR). REFER TO THE PARCA EVM WEBSITE FOR A LINK TO THE EVM-CR (HTTP://WWW.ACQ.OSD.MIL/EVM/). ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE COR AND THE
ALTERNATE COR.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
CONTRACT WORK BREAKDOWN STRUCTURE
(CWBS)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
SOW PARA 3.2.5 / 3.2.11
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLOCK 8: THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON ALL COST AND SOFTWARE DATA REPORTING (CSDR) SUBMISSIONS (TO
INCLUDE THE CWBS DICTIONARY AND STRUCTURE). THE CONTRACTOR SHALL REVIEW AND
INCORPORATE GOVERNMENT COMMENTS WITHIN SEVEN (7) CALENDAR DAYS AND
RESUBMIT TO THE GOVERNMENT.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND U.S. DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER –
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCKS 10 - 13: PREPARE THE CWBS IN ACCORDANCE WITH DI-MGMT-81334D AND THE OSD
DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED CONTRACT CSDR PLAN. THE DID,
DI-MGMT-81334D, IS AVAILABLE FROM THE DEFENSE COST AND RESOURCE CENTER (DCARC)
WEBSITE AT HTTP://DCARC.CAPE.OSD.MIL. THE CSDR PLAN IS INCLUDED AS CONTRACT
ATTACHMENT 06.
CONTRACTORS SHALL BE REQUIRED TO SUBMIT THE CWBS DICTIONARY AT FREQUENCIES
SPECIFIED IN THE OSD DDCA-APPROVED CONTRACT CSDR PLAN AND IN THE CONTRACT.
THE CONTRACT CSDR PLAN USES THE EVENT FIELD AS THE DRIVER FOR THE SUBMISSION
OF THE REPORTS, NOT THE "AS OF DATE." IF THE EVENT SLIPS, THE CONTRACTOR MUST
NOTIFY THE GOVERNMENT PROGRAM OFFICE THAT A DATE CHANGE IS NEEDED. IT IS THE
RESPONSIBILITY OF THE GOVERNMENT PROGRAM OFFICE TO SUBMIT A REQUEST FOR
CHANGE IN THE EVENT-DRIVEN DATE FOR REPORTING THROUGH THE CSDR SUBMIT-REVIEW
SYSTEM FOR DCARC APPROVAL BEFORE THE DATE REFLECTED IN THE OSD DDCA-
APPROVED CSDR PLAN.
BLOCK 14: THE CWBS DICTIONARY SHALL BE SUBMITTED ELECTRONICALLY USING THE
CSDR SUBMIT-REVIEW SYSTEM. DATA SUBMITTERS MUST REGISTER THROUGH THE DCARC
WEBSITE AND POSSESS A DOD-APPROVED ECA DIGITAL CERTIFICATE OR A DOD-ISSUED CAC
TO OBTAIN A DCARC PORTAL ACCOUNT AND BE AUTHORIZED TO UPLOAD CSDR CONTENT.
USERS CAN OBTAIN ACCESS BY SUBMITTING USER INFORMATION ABOUT THEMSELVES AND
THEIR ORGANIZATIONS TO THE DCARC PORTAL AND REQUESTING A CSDR SUBMITTER USER
ROLE. AFTER THE REGISTRATION INFORMATION HAS BEEN VERIFIED, THE DCARC SHALL
AUTHORIZE THE USER ACCOUNT AND REQUESTED ROLE. ALL DCARC PORTAL ACCOUNTS
NEED TO BE RENEWED AT LEAST ANNUALLY.
Myers CIV James A
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A011)
SUBCONTRACTOR REPORTING. PRIME CONTRACTORS ARE RESPONSIBLE FOR FLOWING DOWN CSDR REQUIREMENTS CONTAINED IN THEIR PRIME CONTRACTS TO ALL SUBCONTRACTORS WHO MEET THE REPORTING THRESHOLDS SPECIFIED IN THE DODI 5000.02, OR AS REQUIRED BY THE CWIPT. THIS INCLUDES REQUIRING SUBCONTRACTORS TO ELECTRONICALLY REPORT DIRECTLY TO THE DCARC USING
THE CSDR SUBMIT-REVIEW SYSTEM.
THE PRIME CONTRACTOR SHALL BE REQUIRED TO WORK WITH THE CWIPT AND ALL APPROPRIATE SUBCONTRACTORS TO PREPARE
SEPARATE SUBCONTRACT CSDR PLANS FOR SUBMISSION TO THE DCARC FOR DDCA APPROVAL.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
EARNED VALUE MANAGEMENT SYSTEM (EVMS)
DESCRIPTION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW PARA 3.2.6.4
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1)/R
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND U.S. DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER –
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCKS 10, 12 AND 13: 60 CALENDAR DAYS PRIOR TO INTEGRATED BASELINE REVIEW (IBR);
AS REVISED THEREAFTER.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Myers CIV James A
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
COST DATA SUMMARY REPORT(CDSR) (DD FORM
1921)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81565C
5. CONTRACT REFERENCE
SOW PARA 3.2.8.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS
ON ALL CSDR SUBMISSIONS. THE CONTRACTOR SHALL REVIEW AND INCORPORATE
GOVERNMENT COMMENTS WITHIN SEVEN (7) CALENDAR DAYS AND RESUBMIT TO THE
GOVERNMENT.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND U.S. DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER –
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCKS 10-13: PREPARE THE CDSR IN ACCORDANCE WITH DI-FNCL-81565C AND THE OSD
DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED CONTRACT CSDR PLAN. THE
DID, DI-FNCL-81565C, IS AVAILABLE FROM THE DEFENSE COST AND RESOURCE CENTER
(DCARC) WEBSITE AT HTTP://DCARC.CAPE.OSD.MIL. THE CSDR PLAN IS INLCUDED AS
CONTRACT ATTACHMENT 06. CONTRACTORS SHALL BE REQUIRED TO SUBMIT THE
CONTRACTOR COST DATA REPORTS (CCDRS) AT FREQUENCIES SPECIFIED IN THE OSD
DDCA-APPROVED CSDR PLAN AND IN THE CONTRACT. THE CONTRACT CSDR PLAN USES
THE EVEN TFIELD AS THE DRIVER FOR THE SUBMSSION OF THE REPORTS, NOT THE "AS OF"
DATE. IF THE EVENT SLIPS, THE CONTRACTOR MUST NOTIFY THE GOVERNMENT PROGRAM
OFFICE THAT A DATE CHANGE IS NEEDED. IT IS THE RESPONSIBILITY OF THE GOVERNMENT
PROGRAM OFFICE THAT A DATE CHANGE IS NEEDED. IT IS THE RESPONSIBILITY OF THE
GOVERNMENT PROGRAM OFFICE TO SUBMIT A REQUEST FOR A CHANGE IN THE EVENT-
DRIVEN DATE FOR REPORTING THROUGH THE CSDR SUBMIT-REVIEW SYSTEM FOR DCARC
APPROVAL BEFORE THE DATE REFLECTED IN THE OSD DDCA-APPROVED CSDR PLAN.
BLOCK 14: ALL CCDRS SHALL BE SUBMITTED ELECTRONICALLY USING THE CSDR SUBMIT-
REVIEW SYSTEM. ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY
TO THE COR AND ALTERNATE COR. THE REQUIRED FORM AND FILE TYPE FOR EACH CCDR IS
SPECIFIED IN ITS DATA ITEM DESCRIPTION (DID). DATA SUBMITTERS MUST REGISTER
THROUGH THE DCARC WEBSITE AND POSSESS A DOD-APPROVED ECA DIGITAL CERTIFICATE
OR DOD-ISSUED CAC TO OBTAIN A DCARC PORTAL ACCOUNT AND BE AUTHORIZED TO
UPLOAD CSDR CONTENT. USERS CAN OBTAIN ACCESS BY SUBMITTING USER INFORMATION
ABOUT THEMSELVES AND THEIR ORGANIZATIONS TO THE DCARC PORTAL AND REQUESTING
A CSDR SUBMITTER USER ROLE. AFTER THE REGISTRATION INFORMATION HAS BEEN
VERIFIED, THE DCARC SHALL AUTHORIZE THE USER ACCOUNT AND REQUESTED ROLES. ALL
DCARC PORTAL ACCOUNTS NEED TO BE RENEWED AT LEAST ANNUALLY.
Myers CIV James A
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A013)
SUBCONTRACTOR REPORTING: PRIME CONTRACTORS ARE RESPONSIBLE FOR FLOWING DOWN CSDR REQUIREMENTS CONTAINED IN THEIR PRIME CONTRACTS TO ALL SUBCONTRACTORS WHO MEET THE REPORTING THRESHOLDS SPECIFIED IN THE DODI 5000.02, OR AS REQUIRED BY THE CWIPT. THIS INCLUDES REQUIRING SUBCONTRACTORS TO ELECTRONICALLY REPORT DIRECTLY TO THE DCARC USING
THE CSDR SUBMIT-REVIEW SYSTEM.
THE PRIME CONTRACTOR SHALL BE REQUIRED TO WORK WITH THE CWIPT AND ALL APPROPRIATE SUBCONTRACTORS TO PREPARE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
FUNCTIONAL COST-HOUR REPORT (FCHR) (DD
FORM 1921-1)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81566C
5. CONTRACT REFERENCE
SOW PARA 3.2.8.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS
ON ALL CSDR SUBMISSIONS. THE CONTRACTOR SHALL REVIEW AND INCORPORATE
GOVERNMENT COMMENTS WITHIN SEVEN (7) CALENDAR DAYS AND RESUBMIT TO THE
GOVERNMENT.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND U.S. DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER –
LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCKS 10 - 13: PREPARE THE FCHR IN ACCORDANCE WITH DI-FNCL-81566C AND THE OSD
DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED CONTRACT CSDR PLAN. THE DID,
DI-FNCL-81566C, IS AVAILABLE FROM THE DEFENSE COST AND RESOURCE CENTER (DCARC)
WEBSITE AT HTTP://DCARC.CAPE.OSD.MIL. THE CSDR PLAN IS INCLUDED AS CONTRACT
ATTACHMENT 06.
CONTRACTORS SHALL BE REQUIRED TO SUBMIT THE CONTRACTOR COST DATA REPORTS
(CCDRS) AT FREQUENCIES SPECIFIED IN THE OSD DDCA-APPROVED CSDR PLAN AND IN THE
CONTRACT. THE CONTRACT CSDR PLAN USES THE EVENT FIELD AS THE DRIVER FOR THE
SUBMISSION OF THE REPORTS, NOT THE "AS OF DATE." IF THE EVENT SLIPS, THE
CONTRACTOR MUST NOTIFY THE GOVERNMENT PROGRAM OFFICE THAT A DATE CHANGE IS
NEEDED. IT IS THE RESPONSIBILITY OF THE GOVERNMENT PROGRAM OFFICE TO SUBMIT A
REQUEST FOR CHANGE IN THE EVENT-DRIVEN DATE FOR REPORTING THROUGH THE CSDR
SUBMIT-REVIEW SYSTEM FOR DCARC APPROVAL BEFORE THE DATE REFLECTED IN THE OSD
DDCA-APPROVED CSDR PLAN
BLOCK 14: ALL CCDRS SHALL BE SUBMITTED ELECTRONICALLY TO THE DCARC USING THE
CSDR SUBMIT-REVIEW SYSTEM. ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE COR AND ALTERNATE COR. THE REQUIRED FORM AND FILE TYPE
FOR EACH CCDR IS SPECIFIED IN ITS DATA ITEM DESCRIPTION (DID). DATA SUBMITTERS
MUST REGISTER THROUGH THE DCARC WEBSITE AND POSSESS A DOD-APPROVED ECA
DIGITAL CERTIFICATE OR DOD-ISSUED CAC TO OBTAIN A DCARC PORTAL ACCOUNT AND BE
AUTHORIZED TO UPLOAD CSDR CONTENT. USERS CAN OBTAIN ACCESS BY SUBMITTING
USER INFORMATION ABOUT THEMSELVES AND THEIR ORGANIZATIONS TO THE DCARC
PORTAL AND REQUESTING A CSDR SUBMITTER USER ROLE. AFTER THE REGISTRATION
INFORMATION HAS BEEN VERIFIED, THE DCARC SHALL AUTHORIZE THE USER ACCOUNT AND
REQUESTED ROLES. ALL DCARC PORTAL ACCOUNTS NEED TO BE RENEWED AT LEAST
ANNUALLY.
Myers CIV James A
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
C. CATEGORY:
TM: ____ TDP: ____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A014)
SUBCONTRACTOR REPORTING: PRIME CONTRACTORS ARE RESPONSIBLE FOR FLOWING DOWN CSDR REQUIREMENTS CONTAINED IN THEIR PRIME CONTRACTS TO ALL SUBCONTRACTORS WHO MEET THE REPORTING THRESHOLDS SPECIFIED IN THE DODI 5000.02, OR AS REQUIRED BY THE CWIPT. THIS INCLUDES REQUIRING SUBCONTRACTORS TO ELECTRONICALLY REPORT DIRECTLY TO THE DCARC USING
THE CSDR SUBMIT-REVIEW SYSTEM.
THE PRIME CONTRACTOR SHALL BE REQUIRED TO WORK WITH THE CWIPT AND ALL APPROPRIATE SUBCONTRACTORS TO PREPARE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).