Attachment_04.1_-_CDRL_Submission_Instructions_(CDRL_List).xlsx
XLSX spreadsheet 98 KB Posted
- Attached to
- Amphibious Combat Vehicle (ACV) 1. 1 Federal contract opportunity
- Solicitation number
- M67854-15-R-0001
- Issued by
- United States Marine Corps
About this file
Attachment 4.1 CDRL List
View the file
Other files for this federal contract opportunity
Show all 50
Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRLs and Timing
| ACV 1.1 CDRLS | |||||||||||||||||||||||||||||||||||||||||||||||||
| CDRL #: | SOW Paragraph Numbers | CLIN(S) | CDRL: Title of Data item - Block 2 | CDRL: Subtitle - Block 3 | DID | Functional Area | Prepared by: | Frequency | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 |
ellis.cooper: ellis.cooper: PAC is for the CDRLs required to be delivered as artifacts for the PAC.
PDR
ellis.cooper: ellis.cooper: PDR is for the CDRLs required to be delivered as artifacts for the PDR.
CDR
ellis.cooper: ellis.cooper: CDR is for the CDRLs required to be delivered as artifacts for the CDR.
IBR Pre TRR ellis.cooper: ellis.cooper: Pre TRR is defined as the period of time after CDR but before tests commence. Covers activities like the FIR, ATPs, and shipping.
TRR
ellis.cooper: ellis.cooper: TRR covers activities associated with the TRR events for the test sites.
SVR
ellis.cooper: ellis.cooper: SVR is for the CDRLs required to be delivered as artifacts for the SVR.
PMR's ellis.cooper: ellis.cooper: PMR is for the CDRLs required to be delivered as artifacts for the PMR.
| A089 | 3.5.1.6.3 / 3.5.1.6.7.2 | Technical Report - Study/Services | Test Vehicle Support Plan (TVSP) | DI-MISC-80508B | Engineering | A. Hanneman | One ( 1) Time and As Required | 1 | |||||||||||||||||||||||||||||||||||||||||
| A005 | 3.2 | Program Management Plan (PMP) | N/A | DI-MGMT-81797 | Program Management | A. Scarlato | Three (3) Times | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A006 | 3.2.2, 3.2.7 | Conference Agenda | Meetings/Reviews | DI-ADMN-81249A | Program Management | A. Scarlato | As Required | ||||||||||||||||||||||||||||||||||||||||||
| A008 | 3.2.2, 3.2.7 | Conference Minutes | Meetings/Reviews | DI-ADMN-81250A | Program Management | A. Scarlato | As Required | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A009 | 3.2.3 | Status Report | Project Status Report | DI-MGMT-80368A | Program Management | A. Scarlato | Monthly | 1 | |||||||||||||||||||||||||||||||||||||||||
| A054 | 3.3.17 | Program Data Accession List (DAL) | N/A | DI-MGMT-81453A | Program Management | A. Scarlato | At Key Milestones | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||
| A041 | 3.3.13 | Technical Report - Study/Services | Technology Readiness Assessment | DI-MISC-80508B | Engineering | C. Harvey | CDR | 1 | |||||||||||||||||||||||||||||||||||||||||
| A112 | 3.3.13.2 | Small Business Subcontractor Report | SBIR/STTR Subcontracting Report | DI-MGMT-81642 | Engineering | C. Harvey | Quarterly | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||
| A093 | 3.6.2.2, 3.6.3.2 | Technical Management Work Plan | Product Support Plan (PSP) | DI-MGMT-81117 | Logistics | C. Higareda | Key Events | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||
| A094 | 3.6.3.1 | Parts Management Plan | N/A | DI-SDMP-81748 | Logistics | C. Higareda | Annually | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||
| A095 | 3.6.3.4 | Engineering Data for Provisioning (EDFP) | N/A | DI-SESS-81874 | Logistics | C. Higareda | At Key Events | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A057 | 3.3.20 | Technical Report - Study/Services | Ballistic Protection Report | DI-MISC-80508B | Engineering | D. Fitch | Two (2) Times | 1 | |||||||||||||||||||||||||||||||||||||||||
| A058 | 3.3.21 | Technical Report - Study/Services | Force Protection and Vulnerability | DI-MISC-80508B | Engineering | D. Fitch | Two (2) Times | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||
| A059 | 3.3.21.1 | Conceptual Design Drawings/Models | Vulnerability Modeling Muves-S2 Model | DI-SESS-81001D | Engineering | D. Fitch | Two (2) Times | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||
| A064 | 3.3.25 | Technical Report - Study/Services | Corrosion Prevention and Control Plan | DI-MISC-80508B | Engineering | D. Fitch | Two (2) Times | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||
| A026 | 3.3.2.2 | Contractor's Risk Management Plan | N/A | DI-MGMT-81808 | Engineering | E. Cooper | At Key Milestones | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||
| A042 | 3.3.14.3 | Database Design Description | Hazard Tracking System (HTS) | DI-IPSC-81437A | Engineering | E. Cooper | Two (2) Times | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A043 | 3.3.14.3.1 | Technical Report - Study/Services | Hazard Management Assessment Report (HMAR) | DI-MISC-80508B | Engineering | E. Cooper | Three (3) Times | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A044 | 3.3.14.3.2 | Technical Report - Study/Services | System Hazard Analysis Report | DI-MISC-80508B | Engineering | E. Cooper | One (1) Time | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||
| A045 | 3.3.14.3.3 | Technical Report - Study/Services | Safety Assessment Report | DI-MISC-80508B | Engineering | E. Cooper | One (1) Time | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A046 | 3.3.14.3.4 | Technical Report - Study/Services | Hazardous Material Management Plan (HMMP) | DI-MISC-80508B | Engineering | E. Cooper | Two (2) Times | 3 | 7 | 15 | 6 | 9 | 11 | 10 | 17 | 14 | 12 | 15 | 19 | 17 | 18 | 21 | 18 | 21 | 23 | 22 | 24 | 26 | 24 | 27 | 30 | 31 | 30 | 40 | 30 | 33 | 35 | ||||||||||||
| A047 | 3.3.14.3.6 | Technical Report - Study/Services | Operating and Support Hazard Analysis Report | DI-MISC-80508B | Engineering | E. Cooper | One (1) Time | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||
| A048 | 3.3.14.3.7 | Technical Report - Study/Services | Lithium Battery Safety Data Package | DI-MISC-80508B | Engineering | E. Cooper | One (1) Time | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||
| A055 | 3.3.18.1 | DMSMS Implementation Plan | N/A | DI-MGMT-81949 | Engineering | E. Cooper | Four (4) Times | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||
| A068 | 3.3.29.1 | Human System Integration Program Plan (HSIPP) | N/A | DI-HFAC-81743A | Engineering | E. Cooper | Two (2) Times | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A069 | 3.3.29.2 | Human Engineering Design Approach Document - Operator (HEDAD-O) | N/A | DI-HFAC-80746C | Engineering | E. Cooper | Two (2) Times | ||||||||||||||||||||||||||||||||||||||||||
| A070 | 3.3.29.3 | Human Engineering Design Approach Document - Maintainer | N/A | DI-HFAC-80747B | Engineering | E. Cooper | Two (2) Times | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A071 | 3.3.29.4 | Critical Task Analysis (CTA)Report | N/A | DI-HFAC-81399B | Engineering | E. Cooper | Two (2) Times | ||||||||||||||||||||||||||||||||||||||||||
| A091 | 3.6.1, 3.6.2, 3.6.2.1, 3.6.2.3, 3.6.3.4, 3.6.6.10 | Logistics Product Data | Logistics Product Data (LPD) Including Provisioning Technical Data (PTD) | DI-SESS-81758A | Logistics | G. Phillips | One (1) Time and then Quarterly | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A092 | 3.6.2, 3.6.2.3, 3.6.2.4, 3.6.2.5, 3.6.2.6.1, 3.6.2.6.2, 3.6.6.6.10 | Technical Report - Study/Services | Supportability Analysis | DI-MISC-80508B | Logistics | G. Phillips | As Required | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A096 | 3.6.4.5 | Technical Management Work Plan | Item Unique Identification (IUID) Implementation Plan | DI-MGMT-81117 | Logistics | G. Phillips | One (1) Time and As-Required | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A073 | 3.3.30.1, 3.3.31 | Technical Report - Study/Services | Load Plan | DI-MISC-80508B | Engineering | J. Ashinhurst | Three (3) Times | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A097 | 3.6.5.3, 3.6.5.7 | Technical Management Work Plan | Training Program Plan | DI-MGMT-81117 | Logistics | J. Aurillio | One (1) Time with Revisions | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A098 | 3.6.5.4, 3.6.5.8 | Instructional Performance Requirements Document | Part I - Task Data | ||||||||||||||||||||||||||||||||||||||||||||||
| Part II - Learning Analysis Data | DI-SESS-81518B | Logistics | J. Aurillio | Two (2) Times with Revisions | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||||
| A099 | 3.6.5.5.1, 3.6.5.10, 3.6.5.14.1 | Test Package | N/A | DI-SESS-81525B | Logistics | J. Aurillio | Four (4) Times with Revisions | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||
| A100 | 3.6.5.5.3 | Course Conduct Support Document | Course Conduct information Package (Trainee and Training Course Completion Data) | DI-SESS-81522B | Logistics | J. Aurillio | Four (4) Times with Revisions | ||||||||||||||||||||||||||||||||||||||||||
| A101 | 3.6.5.11, 3.6.5.13, 3.6.5.14.2 | Training Conduct Support Document | Trianing Conduct Support Document: Lesson Plans, Student Handouts, and instructional Visual Aids | DI-SESS-81523B | Logistics | J. Aurillio | Four (4) Times with Revisions | ||||||||||||||||||||||||||||||||||||||||||
| A011 | 3.2.5, 3.2.11 | Contract Work Breakdown Structure (CWBS) | N/A | DI-MGMT-81334D | Program Management | J. Myers | At Key Milestones | ||||||||||||||||||||||||||||||||||||||||||
| A012 | 3.2.6.4 | Earned Value Management System (EVMS) Description | N/A | DI-MISC-80711A | Program Management | J. Myers | As changes are made | ||||||||||||||||||||||||||||||||||||||||||
| A013 | 3.2.8.1 | Cost Data Summary Report (CDSR) (DD Form 1921) | N/A | DI-FNCL-81565C | Program Management | J. Myers | At Key Milestones | ||||||||||||||||||||||||||||||||||||||||||
| A014 | 3.2.8.1 | Functional Cost-Hour Report (FCHR) (DD Form 1921-1) | N/A | DI-FNCL-81566C | Program Management | J. Myers | At Key Milestones | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A015 | 3.2.8.1 | Progress Curve Report (PCR) (DD Form 1921-2) | N/A | DI-FNCL-81567C | Program Management | J. Myers | At Key Milestones | ||||||||||||||||||||||||||||||||||||||||||
| A016 | 3.2.8.1 | Contractor Business Data Report (CBDR) (DD Form 1921-3) | N/A | DI-FNCL-81765B | Program Management | J. Myers | Annually | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||
| A017 | 3.2.8.1 | Software Resource Data Report (SRDR): Initial Developer Report and Data Dictionary | Initial SRDR | DI-MGMT-81739B | Program Management | J. Myers | w/each software version | 1 | |||||||||||||||||||||||||||||||||||||||||
| A018 | 3.2.8.1 | Software Resource Data Report (SRDR): Final Developer Report and Data Dictionary | Final SRDR | DI-MGMT-81740A | Program Management | J. Myers | w/each software version | 1 | |||||||||||||||||||||||||||||||||||||||||
| A019 | 3.2.9.1, 3.2.9.2, 3.2.9.3 | Scientific and Technical Reports | Contractor Controlled Cost Reports | DI-MISC-80711A | Program Management | J. Myers | Semi-Annually | 1 | |||||||||||||||||||||||||||||||||||||||||
| A020 | 3.2.10 | Scientific and Technical Reports | Contractor Controlled Life Cycle Cost Estimate (LCCE) | DI-MISC-80711A | Program Management | J. Myers | Annually | 1 | |||||||||||||||||||||||||||||||||||||||||
| A021 | 3.2.11 | Scientific and Technical Reports | Bill of Material (BOM) Pricing Report | DI-MISC-80711A | Program Management | J. Myers | At Key Milestones | 1 | |||||||||||||||||||||||||||||||||||||||||
| A022 | 3.2.12 | Scientific and Technical Reports | Time Series Lot Size Pricing Report | DI-MISC-80711A | Program Management | J. Myers | At Key Milestones | ||||||||||||||||||||||||||||||||||||||||||
| A010 | 3.2.4.1, 3.2.4.2, 3.2.4.3, 3.2.6.2, 3.2.6.3, 3.2.6.4 | Integrated Program Management Report (IPMR) | N/A | DI-MGMT-81861 | Program Management | J. Myers/M. Bradley | Monthly | ||||||||||||||||||||||||||||||||||||||||||
| A088 | 3.5.1.6 | Technical Report - Study/Services | Ballast Plans and Ballast Material List | DI-MISC-80508B | Engineering | L. Ferguson | One ( 1) Time and As Required | ||||||||||||||||||||||||||||||||||||||||||
| A090 | 3.5.1.8.1 | Briefing Material | Test Readiness Review (TRR) Presentation | DI-MGMT-81605 | Engineering | L. Ferguson | Two (2) Times | ||||||||||||||||||||||||||||||||||||||||||
| A023 | 3.2.13.1 | Contract Funds Status Report (CFSR) | N/A | DI-MGMT-81468 | Program Management | L. Lee | Quarterly | 1 | |||||||||||||||||||||||||||||||||||||||||
| A024 | 3.2.13.2 | Estimate for Cost Incurred and Invoicing Plan | N/A | N/A | Program Management | L. Lee | Monthly | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||
| A001 | 3.1.3 | Operations Security (OPSEC) Plan | N/A | DI-MGMT-80934C | Engineering | M. Doheney | As Required | 1 | |||||||||||||||||||||||||||||||||||||||||
| A074 | 3.3.32.1 | Technical Report - Study/Services | Reliability Program Plan (RPP) | DI-MISC-80508B | Engineering | M. Morningstar | Two (2) Times | 1 | |||||||||||||||||||||||||||||||||||||||||
| A075 | 3.3.32.2 | Technical Report - Study/Services | RAM Progress Report | DI-MISC-80508B | Engineering | M. Morningstar | PDR, CDR, then Quarterly | 1 | |||||||||||||||||||||||||||||||||||||||||
| A076 | 3.3.32.3 | Reliability Block Diagrams and Mathematical Models Report | System MTBOMF and MTBF Reliability Models | DI-RELI-81496 | Engineering | M. Morningstar | PDR, CDR, then Quarterly | 1 | |||||||||||||||||||||||||||||||||||||||||
| A077 | 3.3.33 | Failure Analysis and Corrective Action Report (FACAR) | Failure Reporting Analysis and Corrective Action Systems (FRACAS) | DI-SESS-81315B | Engineering | M. Morningstar | Quarterly | 1 | |||||||||||||||||||||||||||||||||||||||||
| A078 | 3.3.16 / 3.3.34 | Corrective Action Plan | N/A | DI-RELI-80254 | Engineering | M. Morningstar | Three (3) Times | ||||||||||||||||||||||||||||||||||||||||||
| A027 | 3.3.2.3 | Risk Management Status Report | N/A | DI-MGMT-81809 | Engineering | M. Olree | At Key Milestones | 1 | |||||||||||||||||||||||||||||||||||||||||
| A028 | 3.3.3 | Quality Assurance Program Plan (QAPP) | N/A | DI-QCIC-81794 | Engineering | M. Olree | At Key Milestones | ||||||||||||||||||||||||||||||||||||||||||
| A030 | 3.3.5 | Interface Control Document (ICD) | N/A | DI-CMAN-81248A | Engineering | M. Olree | Three (3) Times | 1 | |||||||||||||||||||||||||||||||||||||||||
| A031 | 3.3.6 | Developmental Design Drawings/Models and Associated Lists | Product Models/Drawing Packages | DI-SESS-81002E | Engineering | M. Olree | CDR, SVR | 1 | |||||||||||||||||||||||||||||||||||||||||
| A040 | 3.3.12 | Test/Inspection Report | Contractor Verification Report | DI-NDTI-80809B | Engineering | M. Olree | Two (2) Times | ||||||||||||||||||||||||||||||||||||||||||
| A060 | 3.3.21.2 | Developmental Design Drawings/Models and Associated Lists | Vulnerability CAD Models | DI-SESS-81002F | Engineering | M. Olree | One (1) Time | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||
| A061 | 3.3.22 | Technical Report - Study/Services | NATO Reference Mobility Model (NRMM) Analysis | DI-MISC-80508B | Engineering | M. Olree | One (1) Time | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||
| A062 | 3.3.23 | Technical Report - Study/Services | NATO Reference Mobility Model Ride Quality Analysis | DI-MISC-80508B | Engineering | M. Olree | One (1) Time | 1 | |||||||||||||||||||||||||||||||||||||||||
| A063 | 3.3.24 | Technical Report - Study/Services | Seaworthiness Analysis Report | DI-MISC-80508B | Engineering | M. Olree | One (1) Time | 1 | |||||||||||||||||||||||||||||||||||||||||
| A065 | 3.3.26 | Technical Report - Study/Services | Thermal Analysis | DI-MISC-80508B | Engineering | M. Olree | One (1) Time | 1 |
with maintainers. This document provides a source of data to evaluate the extent to which equipment having an interface with
| maintainers meets human performance requirements and human engineering criteria. | Yes | |||||||||||||||||||||||||||||||||||||||||||||
| A066 | 3.3.27 | Technical Report - Study/Services | Amphibious Ship Launching Compatibility Analysis | DI-MISC-80508B | Engineering | M. Olree | One (1) Time | 1 | A critical task is one requiring human performance which, if not accomplished in accordance with system requirements, will likely have adverse effects on cost, system reliability, efficiency, effectiveness, or safety. The Critical Task Analysis Report (CTAR) describes the results of analyses of critical tasks performed by the end user and provides a basis for identifying high risk tasks affecting human-system performance, mission accomplishment, system suitability, and safety. The analyses and results described support verification that human engineering technical risks have been identified, minimized, or mitigated and that human-system performance has been adequately addressed from early design development through test and evaluation of the system, equipment, or facility. | May be able to combine with Human Engineering Design Approach Document – Operator (HEDAD-O) | Yes | |||||||||||||||||||||||||||||||||||
| A067 | 3.3.28 | Technical Report - Study/Services | Watertight Integrity Analysis | DI-MISC-80508B | Engineering | M. Olree | One (1) Time | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Vehicle weight is a key performance characteristic for water operations and transportability | Includes Load Plan | Yes | Yes | Yes | ||||||||||||||
| A072 | 3.3.30.6 | Technical Report - Study/Services | Weight Control Report | DI-MISC-80508B | Engineering | M. Olree | Three (3) Times | 1 | May be included as part of the Weight Report | Yes | ||||||||||||||||||||||||||||||||||||
| A108 | 3.3.1.2 | Briefing Material | Critical Design Review (CDR) Presentation | DI-MGMT-81605 | Engineering | M. Olree | One (1) Time | 1 | 1 | Provides the Government with an understanding of how the Contractor(s) plans to manage RAM. The purpose of the RAM Program Plan is to address the Contractor's reliability strategy, risks, schedule, and outputs. To monitor and evaluate the reliability impact of Contractor changes to the design or manufacture of the system. Document reliability growth methodology in order to plan, track, and project reliabilty improvement. | The content and scope of these CDRLs will change if a RGT Program is waived | Yes | ||||||||||||||||||||||||||||||||||
| A109 | 3.3.1.3 | Briefing Material | System Verification Review (SVR) Presentation | DI-MGMT-81605 | Engineering | M. Olree | One (1) Time | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Provides the Government with an understanding of Reliabilty Growth Test Projections, TPMs to track progress toward specification compliance for RAM and test hours completed; failure modes detected and mitigated; and summary of engineering change requests which impact RAM; allocations and predictions for both MTBF and MTBOMF, test results from any component level ALT, summary of unseen failure modes from FMECA results, summary of Government TIRs from vehicle testing, etc. | The content and scope of these CDRLs will change if an RGT Program is waived | Yes | Yes | |||||||||||||||||||
| A007 | 3.3.1.1 | Briefing Material | Preliminary Design Review (PDR) Presentation | DI-MGMT-81605 | Engineering | M. Olree/N. Robles | Once | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Provides the Government with an understanding of how the Contractor generated and manages reliability allocations from the system level down to lower indenture levels; identify single points of failure; identify mission critical items and areas where additional design or testing activities are required in order to achieve the RAM requirements. | The content and scope of these CDRLs will change if an RGT Program is waived | Yes | Yes | Yes | ||||||||||||||||||
| A104 | 3.7.2 | Parts Management Plan | Government Property Management Plan | DI-MISC-80526D | Logistics | Maj W. Moore | As Required | 1 | 1 | 1 | 1 | 1 | The Contractor would only generate this report in reponse to Critical and Major TIRs. The purpose of the report is to recommend measures required to completely correct or mitigate the documented failure. | Yes | ||||||||||||||||||||||||||||||||
| A105 | 3.7.2.2 | Inventory Checklist/Record (ICL/R) | Government Property Status Report | DI-MISC-81191A | Logistics | Maj W. Moore | Once and then Quarterly | 1 | 1 | 1 | Captures the contractor's proposed tasks for the CAPs identified in the schedule | Yes | ||||||||||||||||||||||||||||||||||
| A106 | 3.7.2.4 | Technical Report - Study/Services | Government Furnished Property (GFP) Failure Report | DI-MISC-80508B | Logistics | Maj. W. Moore | Monthly | 1 | 1 | Documents the Contractor’s approach to manufacture the EMD/Production vehicles | Yes | Yes | ||||||||||||||||||||||||||||||||||
| A107 | 3.7.2.5 | Technical Report - Study/Services | Inventory Disposal Schedule | DI-MISC-80508B | Logistics | Maj. W. Moore | As Required | 1 | 1 | Provides insight into the readiness of each contractor to transition to production | Yes | Yes | ||||||||||||||||||||||||||||||||||
| A111 | 3.7.2.1 | Inventory Checklist/Record (ICL/R) | N/A | DI-MISC-81191A | Logistics | Maj. W. Moore | Quarterly | 1 | Database for the Government to use for their reporting requirements. | Yes | ||||||||||||||||||||||||||||||||||||
| A025 | 3.3.2.1 | Systems Engineering Management Plan (SEMP) | N/A | DI-SESS-81785 | Engineering | N. Robles | At Key Milestones | |||||||||||||||||||||||||||||||||||||||
| A032 | 3.3.8.1 | Contractor's Configuration Management Plan | N/A | DI-CMAN-80858B | Engineering | N. Robles | AS-Required | 16 | 30 | 30 | A permanent record for each vehicles acceptance test results. | Template to be included per Peter Antaya email on 8/18/14 | Yes | |||||||||||||||||||||||||||||||||
| A033 | 3.3.8.2 | Technical Report - Study/Services | Configuration Item Master List | DI-MISC-80508B | Engineering | N. Robles | CDR, SVR, and with Revisions As Required | 16 | A permanent record for each vehicles final inspection results. | Template to be included per Peter Antaya email on 8/18/14 | Yes | |||||||||||||||||||||||||||||||||||
| A034 | 3.3.8.3 | Configuration Status Accounting Information | N/A | DI-CMAN-81253A | Engineering | N. Robles | Monthly | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Knowledge of configuration of each vehicle as built & as tested |
Strategy Recommended: Initial at CDR Next delivery after the Acceptance Test is complete: As Built Configuration Next Delivery prior to each CAP
| In between As Built and CAP use some type of NOR. | Monthly updates annotated for changes | Yes | Yes | Yes | Yes | |||||||||||||||||||||||||||||||||
| A035 | 3.3.9, 3.4.7.5 | Vehicle Configuration Data | N/A | N/A | Engineering | N. Robles | At Key Milestones | 1 | 1 | Provides the Government with the required spare parts list and pricing ISO the rebuild of vehicles after FUSL events | Yes | Yes | ||||||||||||||||||||||||||
| A036 | 3.3.10.1 | Configuration Audit Plan | Functional Configuration Audit (FCA) Plan | DI-SESS-81646 | Engineering | N. Robles | One (1) Time and As Required | |||||||||||||||||||||||||||||||
| A037 | 3.3.10.1 | Configuration Audit Summary Report | FCA Report | DI-CMAN-81022C | Engineering | N. Robles | One (1) Time and As Required | 1 | ||||||||||||||||||||||||||||||
| A038 | 3.3.10.2 | Configuration Audit Plan | Physical Configuration Audit (PCA) Plan | DI-SESS-81646 | Engineering | N. Robles | One (1) Time and As Required | 1 | Yes | |||||||||||||||||||||||||||||
| A039 | 3.3.10.2 | Configuration Audit Summary Report | PCA Report | DI-CMAN-81022C | Engineering | N. Robles | One (1) Time and As Required | 1 | Indicates readiness of vehicle, support, and personnel | Yes | ||||||||||||||||||||||||||||
| A049 | 3.3.15 | Software Requirements Specification | N/A | DI-IPSC-81433A | Engineering | N. Robles | Five (5) Times | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | GEIA STD-0007 Logistics Data | ||||||||||||||||||||
| A050 | 3.3.15.1 | Software Version Description (SVD) | N/A | DI-IPSC-81442A | Engineering | N. Robles | One (1) Time and As Required | 1 | 1 | 1 | 1 | Logistics data development analysis, studies, reports, etc. | ||||||||||||||||||||||||||
| A051 | 3.3.15.1 | Software Requirements Specification | Software User Manual (SUM) | DI-IPSC-81433A | Engineering | N. Robles | One (1) Time and As Required | 1 | 1 | 1 | Overall support plan and Interim Spares/initial spares package | |||||||||||||||||||||||||||
| A052 | 3.3.15.2 | Technical Report - Study/Services | Software License Package | DI-MISC-80508B | Engineering | N. Robles | One (1) Time | 1 | 1 | 1 | Plan for the management of parts, provisioning, and initial spares | |||||||||||||||||||||||||||
| A053 | 3.3.15.4 | Firmware Support Manual (FSM) | N/A | DI-IPSC-81448B | Engineering | N. Robles | One (1) Time | |||||||||||||||||||||||||||||||
| A056 | 3.3.18.2 | Source Data for Forecasting Diminishing Manufacturing Sources and Material Shortages (DMSMS) | N/A | DI-SESS-81656 | Engineering | N. Robles | One (1) Time | |||||||||||||||||||||||||||||||
| A115 | 3.3.10.1 | Briefing Material | Functional Configuration Audit (FCA) Presentation | DI-MGMT-81605 | Engineering | N. Robles | One (1) Time | |||||||||||||||||||||||||||||||
| A116 | 3.3.10.2 | Briefing Material | Physical Configuration Audit (PCA) Presentation | DI-MGMT-81605 | Engineering | N. Robles | One (1) Time | |||||||||||||||||||||||||||||||
| A003 | 3.1.4.2 | Program Protection Information Plan (PPIP) | Information Assurance Plan and Status Assessments | DI-ADMN-81306 | Engineering | P. Kelley | Quarterly | 1 | 1 | 1 | 1 | Hands on and written tests | May be able to combine Course Conduct Information Package, Training Test Package, and Training Conduct Support Documents into one CDRL | |||||||||||||||||||||||||
| A086 | 3.5.1.5.3.2 | Technical Report - Study/Services | Pre-Shot Modeling Prediction Analysis | DI-MISC-80508B | Engineering | P. Ostrom | At Key Milestones | 1 | 1 | 1 | 1 | COURSE CONDUCT INFORMATION PACKAGE (TRAINEE AND TRAINING COURSE COMPLETION DATA) | May be able to combine Course Conduct Information Package, Training Test Package, and Training Conduct Support Documents into one CDRL | |||||||||||||||||||||||||
| A087 | 3.5.1.5.4.2 | Technical Report - Study/Services | Full-Up System Level (FUSL) Rebuild Spares Analysis/LFT&E Analysis Results | DI-MISC-80508B | Engineering | P. Ostrom | One (1) Time | 1 | 1 | 1 | 1 | TRAINING CONDUCT SUPPORT DOCUMENT: LESSON PLANS, STUDENT HANDOUTS, AND INSTRUCTIONAL VISUAL AIDS | May be able to combine Course Conduct Information Package, Training Test Package, and Training Conduct Support Documents into one CDRL | |||||||||||||||||||||||||
| A029 | 3.3.4 | Technical Report - Study/Services | Requirements Management Database | DI-MISC-80508B | Engineering | Pat Antaya | Four (4) Times | 1 | 1 | 1 | 1 | Delivery of the ETM | ||||||||||||||||||||||||||
| A079 | 3.4.1 | Manufacturing Plan | N/A | DI-MGMT-81889 | Engineering | Peter Antaya | Three (3) Times | 1 | Basis for review, evaluation, and monitoring of the QMS activities. | Yes | ||||||||||||||||||||||||||||
| A080 | 3.4.2 | Technical Report - Study/Services | Manufacturing Readiness Self-Assessment | DI-MISC-80508B | Engineering | Peter Antaya | Three (3) Times | 1 | 1 | 1 | Plan for the management of GFE | |||||||||||||||||||||||||||
| A081 | 3.4.3 | Technical Report - Study/Services | Key Characteristics Database and Report | DI-MISC-80508B | Engineering | Peter Antaya | Once and then Annually | |||||||||||||||||||||||||||||||
| A082 | 3.4.4 | Technical Report - Study/Services | Process Failure Modes and Effects Analysis (PFMEA) | DI-MISC-80508B | Engineering | Peter Antaya | As Required | |||||||||||||||||||||||||||||||
| A083 | 3.4.7.1. 3.4.7.2 | Acceptance Test Plan (ATP) | N/A | DI-QCIC-80553A | Engineering | Peter Antaya | Two (2) Times and Revisions | 1 | Schedule of the disposal of GFE (as req'd) | |||||||||||||||||||||||||||||
| A084 | 3.4.7.3, 3.4.7.5 | Test/Inspection Record | Final Inspection Record (FIR) | DI-NDTI-80809B | Engineering | Peter Antaya | One per vehicle | 1 | Required - see SEP | May combine with Conference Presentation Materials | Yes | |||||||||||||||||||||||||||
| A103 | 3.6.6.1 | Quality Assurance Program Plan | N/A | DI-QCIC-81794 | Engineering | Peter Antaya | Two (2) Times | 1 | Required - see SEP | May combine with Conference Presentation Materials | Yes | |||||||||||||||||||||||||||
| A110 | 3.3.1.4 | Briefing Material | Production Readiness Review (PRR) Presentation | DI-MGMT-81605 | Engineering | Peter Antaya | Two (2) Times | |||||||||||||||||||||||||||||||
| A002 | 3.1.4 | Program Protection Information Plan (PPIP) | N/A | DI-ADMN-81306 | Engineering | S. McGowan | At Key Milestone | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Government Property Physical Inventory Report | |||||||||||||||||||||
| A004 | 3.1.4.3 | Program Protection Information Plan (PPIP) | Anti-Tamper Plan | DI-ADMN-81306 | Engineering | S. McGowan | At Key Milestones | |||||||||||||||||||||||||||||||
| A102 | 3.6.6.1, 3.6.6.2, 3.6.6.4, 3.6.6.5, 3.6.6.7 | Performance Specification: Manuals, Interactive Electronic Technical - General Content, Style, and User Interaction Requirements | N/A | MIL-PRF 87268A | Logistics | TJ Pittman | Four (4) Times | |||||||||||||||||||||||||||||||
| A114 | 3.6.6.1, 3.6.6.6 | Technical Manual Publication Plan | N/A | DI-TMSS-80063 | Logistics | TJ Pittman | Three (3) Times | |||||||||||||||||||||||||||||||
| A085 | INTENTIONALLY LEFT BLANK | |||||||||||||||||||||||||||||||||||||
| A113 | INTENTIONALLY LEFT BLANK |
Timing Chart
| Month ACA | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 |
| # of CDRLs | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
# of CDRLs (EMD) per month
| # of CDRLs | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| # of CDRLs | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | # of CDRLs (FRP) per month | ||||||||
| # of CDRLs | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Metric Chart
| Month ACA | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
| # of CDRLs | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
CDRLs (EMD) per month # of CDRLs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .