Amphibious Combat Vehicle (ACV) 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 4.1 CDRL List

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle (ACV) 1. 1, newest first.
File Type Posted
Attachment_22_-_2015_01_30_ACV_1_1_Integrated_Program_Plan.pptx PPTX presentation
Attachment_10.2_-_GFP_Report_ACV_2015_03_20.pdf PDF
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_06_-_COVER.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
Attachment_23_-_COVER.docx DOCX document
Attachment_01_-_COVER_150316.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
Attachment_02_-_COVER_150227.docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Attachment_15__-_ACV_Fielding_Table_(150129).docx DOCX document
Section_L_Attachment_3_-_Proposal_Requirements_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Second_Draft_Attachment_22.1_-_2014_12_10_ACV_1_1_Integrated_Program_Plan.pptx PPTX presentation
Second_Draft_Attachment_23.1_-_ACV_1_1_RFP_DD254_15-R-0001_Signed.pdf PDF
Second_Draft_Attachment_14_-_ACV_IUID_Plan_Signed.pdf PDF
M67854-15-R-0001_SECOND_DRAFT.doc DOC document
Second_Draft_Attachment_11-_Test_Schedules_and_Test_Locations_25_Nov_14.docx DOCX document
Second_Draft_Attachment_15__-_ACV_Fielding_Table.docx DOCX document
Second_Draft_Attachment_27_-_COVER.docx DOCX document
Second_Draft_Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Second_Draft_Attachment_06.2_-_ACV_CSDR_PLAN_PD_Contract_Plan_N-14-H-C1.pdf PDF
Second_Draft_Attachment_20_-_ACV1.1_CM_Plan_Draft_v0.3_22Dec.docx DOCX document
Second_Draft_Attachment_09_-_Failure_Definition_Scoring_Criteria_(FDSC).docx DOCX document
Second_Draft_Attachment_10.1_-GFP-GFI_-__12-9-14_V2.docx DOCX document
Second_Draft_Attachment_06.1_-_ACV_CSDR_PLAN_EMD_Contract_Plan_N-14-G-C1.pdf PDF
Second_Draft_Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
Second_Draft_Attachment_05.1_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
SECTION_M_dated_6_Nov_2014_M.7_updated_-_Final.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_10_-_COVER_-_Government_Furnished_Equipment_(GFE)___Government_Furnished_Information_(GFI)_List.docx DOCX document
ACV_CDRLs_A001-A116_1st_DRAFT_17_Oct_2014.pdf PDF
1st_DRAFT_RFP_Cover_Letter_Signed.pdf PDF
Attachment_08_-_Operational_Mode_Summary_Mission_Profile_(OMS_MP).docx DOCX document
Attachment_06_-_COVER_-_Cost_and_Software_Data_Reporting_(CSDR)_Plan_.docx DOCX document
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_01_-_COVER_-_ACV_Statement_of_Work_(SOW).docx DOCX document
Attachment_02_-_COVER_-_ACV_System_Performance_Specification.docx DOCX document
Attachment_10_-_Government_Furnished_Equipment_(GFE)_Government_Furnished_Information_(GFI)_List.docx DOCX document
Attachment_23_-_ACV_1_1_RFP_DD254_15-R-0001_Signed.pdf PDF
ACV_1.1_1st_DRAFT_RFP_Comment_Recommend_Log.xlsx XLSX spreadsheet
Attachment_23_-_COVER.docx DOCX document
Attachment_22_-_COVER.docx DOCX document
Attachment_06.2_ACV_CSDR_Contract_Plan_RDTEN_-_EMD_Phase.pdf PDF
Attachment_01_141105_-_MASTER_SOW_-_For_RFP_First_Draft_Release.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Attachment_18_-_COVER_-_Ships_Loading_Characteristics_Pamphlet_(SLCP).docx DOCX document
Attachment_24_-_COVER_-_RWS_ICD.docx DOCX document
Attachment_15__-_ACV_Fielding_Table.docx DOCX document
Show all 50

Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRLs and Timing

ACV 1.1 CDRLS
CDRL #:SOW Paragraph NumbersCLIN(S)CDRL: Title of Data item - Block 2CDRL: Subtitle - Block 3DIDFunctional AreaPrepared by:Frequency1234567891011121314151617181920212223242526272829303132333435363738394041

ellis.cooper: ellis.cooper: PAC is for the CDRLs required to be delivered as artifacts for the PAC.

PDR

ellis.cooper: ellis.cooper: PDR is for the CDRLs required to be delivered as artifacts for the PDR.

CDR

ellis.cooper: ellis.cooper: CDR is for the CDRLs required to be delivered as artifacts for the CDR.

IBR Pre TRR ellis.cooper: ellis.cooper: Pre TRR is defined as the period of time after CDR but before tests commence. Covers activities like the FIR, ATPs, and shipping.

TRR

ellis.cooper: ellis.cooper: TRR covers activities associated with the TRR events for the test sites.

SVR

ellis.cooper: ellis.cooper: SVR is for the CDRLs required to be delivered as artifacts for the SVR.

PMR's ellis.cooper: ellis.cooper: PMR is for the CDRLs required to be delivered as artifacts for the PMR.

A0893.5.1.6.3 / 3.5.1.6.7.2Technical Report - Study/ServicesTest Vehicle Support Plan (TVSP)DI-MISC-80508BEngineeringA. HannemanOne ( 1) Time and As Required1
A0053.2Program Management Plan (PMP)N/ADI-MGMT-81797Program ManagementA. ScarlatoThree (3) Times111
A0063.2.2, 3.2.7Conference AgendaMeetings/ReviewsDI-ADMN-81249AProgram ManagementA. ScarlatoAs Required
A0083.2.2, 3.2.7Conference MinutesMeetings/ReviewsDI-ADMN-81250AProgram ManagementA. ScarlatoAs Required111
A0093.2.3Status ReportProject Status ReportDI-MGMT-80368AProgram ManagementA. ScarlatoMonthly1
A0543.3.17Program Data Accession List (DAL)N/ADI-MGMT-81453AProgram ManagementA. ScarlatoAt Key Milestones1111111111111111
A0413.3.13Technical Report - Study/ServicesTechnology Readiness AssessmentDI-MISC-80508BEngineeringC. HarveyCDR1
A1123.3.13.2Small Business Subcontractor ReportSBIR/STTR Subcontracting ReportDI-MGMT-81642EngineeringC. HarveyQuarterly11111111111111
A0933.6.2.2, 3.6.3.2Technical Management Work PlanProduct Support Plan (PSP)DI-MGMT-81117LogisticsC. HigaredaKey Events111111111111111111111111111111111111111
A0943.6.3.1Parts Management PlanN/ADI-SDMP-81748LogisticsC. HigaredaAnnually111111111111111111111111111111111111111
A0953.6.3.4Engineering Data for Provisioning (EDFP)N/ADI-SESS-81874LogisticsC. HigaredaAt Key Events111
A0573.3.20Technical Report - Study/ServicesBallistic Protection ReportDI-MISC-80508BEngineeringD. FitchTwo (2) Times1
A0583.3.21Technical Report - Study/ServicesForce Protection and VulnerabilityDI-MISC-80508BEngineeringD. FitchTwo (2) Times11111111111111
A0593.3.21.1Conceptual Design Drawings/ModelsVulnerability Modeling Muves-S2 ModelDI-SESS-81001DEngineeringD. FitchTwo (2) Times11111111111111
A0643.3.25Technical Report - Study/ServicesCorrosion Prevention and Control PlanDI-MISC-80508BEngineeringD. FitchTwo (2) Times11111111111111
A0263.3.2.2Contractor's Risk Management PlanN/ADI-MGMT-81808EngineeringE. CooperAt Key Milestones1111
A0423.3.14.3Database Design DescriptionHazard Tracking System (HTS)DI-IPSC-81437AEngineeringE. CooperTwo (2) Times111
A0433.3.14.3.1Technical Report - Study/ServicesHazard Management Assessment Report (HMAR)DI-MISC-80508BEngineeringE. CooperThree (3) Times111
A0443.3.14.3.2Technical Report - Study/ServicesSystem Hazard Analysis ReportDI-MISC-80508BEngineeringE. CooperOne (1) Time111111
A0453.3.14.3.3Technical Report - Study/ServicesSafety Assessment ReportDI-MISC-80508BEngineeringE. CooperOne (1) Time111
A0463.3.14.3.4Technical Report - Study/ServicesHazardous Material Management Plan (HMMP)DI-MISC-80508BEngineeringE. CooperTwo (2) Times37156911101714121519171821182123222426242730313040303335
A0473.3.14.3.6Technical Report - Study/ServicesOperating and Support Hazard Analysis ReportDI-MISC-80508BEngineeringE. CooperOne (1) Time111111
A0483.3.14.3.7Technical Report - Study/ServicesLithium Battery Safety Data PackageDI-MISC-80508BEngineeringE. CooperOne (1) Time11111111
A0553.3.18.1DMSMS Implementation PlanN/ADI-MGMT-81949EngineeringE. CooperFour (4) Times11111111111111111111111
A0683.3.29.1Human System Integration Program Plan (HSIPP)N/ADI-HFAC-81743AEngineeringE. CooperTwo (2) Times111
A0693.3.29.2Human Engineering Design Approach Document - Operator (HEDAD-O)N/ADI-HFAC-80746CEngineeringE. CooperTwo (2) Times
A0703.3.29.3Human Engineering Design Approach Document - MaintainerN/ADI-HFAC-80747BEngineeringE. CooperTwo (2) Times111
A0713.3.29.4Critical Task Analysis (CTA)ReportN/ADI-HFAC-81399BEngineeringE. CooperTwo (2) Times
A0913.6.1, 3.6.2, 3.6.2.1, 3.6.2.3, 3.6.3.4, 3.6.6.10Logistics Product DataLogistics Product Data (LPD) Including Provisioning Technical Data (PTD)DI-SESS-81758ALogisticsG. PhillipsOne (1) Time and then Quarterly111
A0923.6.2, 3.6.2.3, 3.6.2.4, 3.6.2.5, 3.6.2.6.1, 3.6.2.6.2, 3.6.6.6.10Technical Report - Study/ServicesSupportability AnalysisDI-MISC-80508BLogisticsG. PhillipsAs Required111
A0963.6.4.5Technical Management Work PlanItem Unique Identification (IUID) Implementation PlanDI-MGMT-81117LogisticsG. PhillipsOne (1) Time and As-Required111
A0733.3.30.1, 3.3.31Technical Report - Study/ServicesLoad PlanDI-MISC-80508BEngineeringJ. AshinhurstThree (3) Times111
A0973.6.5.3, 3.6.5.7Technical Management Work PlanTraining Program PlanDI-MGMT-81117LogisticsJ. AurillioOne (1) Time with Revisions111
A0983.6.5.4, 3.6.5.8Instructional Performance Requirements DocumentPart I - Task Data
Part II - Learning Analysis DataDI-SESS-81518BLogisticsJ. AurillioTwo (2) Times with Revisions111
A0993.6.5.5.1, 3.6.5.10, 3.6.5.14.1Test PackageN/ADI-SESS-81525BLogisticsJ. AurillioFour (4) Times with Revisions11
A1003.6.5.5.3Course Conduct Support DocumentCourse Conduct information Package (Trainee and Training Course Completion Data)DI-SESS-81522BLogisticsJ. AurillioFour (4) Times with Revisions
A1013.6.5.11, 3.6.5.13, 3.6.5.14.2Training Conduct Support DocumentTrianing Conduct Support Document: Lesson Plans, Student Handouts, and instructional Visual AidsDI-SESS-81523BLogisticsJ. AurillioFour (4) Times with Revisions
A0113.2.5, 3.2.11Contract Work Breakdown Structure (CWBS)N/ADI-MGMT-81334DProgram ManagementJ. MyersAt Key Milestones
A0123.2.6.4Earned Value Management System (EVMS) DescriptionN/ADI-MISC-80711AProgram ManagementJ. MyersAs changes are made
A0133.2.8.1Cost Data Summary Report (CDSR) (DD Form 1921)N/ADI-FNCL-81565CProgram ManagementJ. MyersAt Key Milestones
A0143.2.8.1Functional Cost-Hour Report (FCHR) (DD Form 1921-1)N/ADI-FNCL-81566CProgram ManagementJ. MyersAt Key Milestones111
A0153.2.8.1Progress Curve Report (PCR) (DD Form 1921-2)N/ADI-FNCL-81567CProgram ManagementJ. MyersAt Key Milestones
A0163.2.8.1Contractor Business Data Report (CBDR) (DD Form 1921-3)N/ADI-FNCL-81765BProgram ManagementJ. MyersAnnually111
A0173.2.8.1Software Resource Data Report (SRDR): Initial Developer Report and Data DictionaryInitial SRDRDI-MGMT-81739BProgram ManagementJ. Myersw/each software version1
A0183.2.8.1Software Resource Data Report (SRDR): Final Developer Report and Data DictionaryFinal SRDRDI-MGMT-81740AProgram ManagementJ. Myersw/each software version1
A0193.2.9.1, 3.2.9.2, 3.2.9.3Scientific and Technical ReportsContractor Controlled Cost ReportsDI-MISC-80711AProgram ManagementJ. MyersSemi-Annually1
A0203.2.10Scientific and Technical ReportsContractor Controlled Life Cycle Cost Estimate (LCCE)DI-MISC-80711AProgram ManagementJ. MyersAnnually1
A0213.2.11Scientific and Technical ReportsBill of Material (BOM) Pricing ReportDI-MISC-80711AProgram ManagementJ. MyersAt Key Milestones1
A0223.2.12Scientific and Technical ReportsTime Series Lot Size Pricing ReportDI-MISC-80711AProgram ManagementJ. MyersAt Key Milestones
A0103.2.4.1, 3.2.4.2, 3.2.4.3, 3.2.6.2, 3.2.6.3, 3.2.6.4Integrated Program Management Report (IPMR)N/ADI-MGMT-81861Program ManagementJ. Myers/M. BradleyMonthly
A0883.5.1.6Technical Report - Study/ServicesBallast Plans and Ballast Material ListDI-MISC-80508BEngineeringL. FergusonOne ( 1) Time and As Required
A0903.5.1.8.1Briefing MaterialTest Readiness Review (TRR) PresentationDI-MGMT-81605EngineeringL. FergusonTwo (2) Times
A0233.2.13.1Contract Funds Status Report (CFSR)N/ADI-MGMT-81468Program ManagementL. LeeQuarterly1
A0243.2.13.2Estimate for Cost Incurred and Invoicing PlanN/AN/AProgram ManagementL. LeeMonthly111111111111
A0013.1.3Operations Security (OPSEC) PlanN/ADI-MGMT-80934CEngineeringM. DoheneyAs Required1
A0743.3.32.1Technical Report - Study/ServicesReliability Program Plan (RPP)DI-MISC-80508BEngineeringM. MorningstarTwo (2) Times1
A0753.3.32.2Technical Report - Study/ServicesRAM Progress ReportDI-MISC-80508BEngineeringM. MorningstarPDR, CDR, then Quarterly1
A0763.3.32.3Reliability Block Diagrams and Mathematical Models ReportSystem MTBOMF and MTBF Reliability ModelsDI-RELI-81496EngineeringM. MorningstarPDR, CDR, then Quarterly1
A0773.3.33Failure Analysis and Corrective Action Report (FACAR)Failure Reporting Analysis and Corrective Action Systems (FRACAS)DI-SESS-81315BEngineeringM. MorningstarQuarterly1
A0783.3.16 / 3.3.34Corrective Action PlanN/ADI-RELI-80254EngineeringM. MorningstarThree (3) Times
A0273.3.2.3Risk Management Status ReportN/ADI-MGMT-81809EngineeringM. OlreeAt Key Milestones1
A0283.3.3Quality Assurance Program Plan (QAPP)N/ADI-QCIC-81794EngineeringM. OlreeAt Key Milestones
A0303.3.5Interface Control Document (ICD)N/ADI-CMAN-81248AEngineeringM. OlreeThree (3) Times1
A0313.3.6Developmental Design Drawings/Models and Associated ListsProduct Models/Drawing PackagesDI-SESS-81002EEngineeringM. OlreeCDR, SVR1
A0403.3.12Test/Inspection ReportContractor Verification ReportDI-NDTI-80809BEngineeringM. OlreeTwo (2) Times
A0603.3.21.2Developmental Design Drawings/Models and Associated ListsVulnerability CAD ModelsDI-SESS-81002FEngineeringM. OlreeOne (1) Time11
A0613.3.22Technical Report - Study/ServicesNATO Reference Mobility Model (NRMM) AnalysisDI-MISC-80508BEngineeringM. OlreeOne (1) Time11
A0623.3.23Technical Report - Study/ServicesNATO Reference Mobility Model Ride Quality AnalysisDI-MISC-80508BEngineeringM. OlreeOne (1) Time1
A0633.3.24Technical Report - Study/ServicesSeaworthiness Analysis ReportDI-MISC-80508BEngineeringM. OlreeOne (1) Time1
A0653.3.26Technical Report - Study/ServicesThermal AnalysisDI-MISC-80508BEngineeringM. OlreeOne (1) Time1

with maintainers. This document provides a source of data to evaluate the extent to which equipment having an interface with

maintainers meets human performance requirements and human engineering criteria.Yes
A0663.3.27Technical Report - Study/ServicesAmphibious Ship Launching Compatibility AnalysisDI-MISC-80508BEngineeringM. OlreeOne (1) Time1A critical task is one requiring human performance which, if not accomplished in accordance with system requirements, will likely have adverse effects on cost, system reliability, efficiency, effectiveness, or safety. The Critical Task Analysis Report (CTAR) describes the results of analyses of critical tasks performed by the end user and provides a basis for identifying high risk tasks affecting human-system performance, mission accomplishment, system suitability, and safety. The analyses and results described support verification that human engineering technical risks have been identified, minimized, or mitigated and that human-system performance has been adequately addressed from early design development through test and evaluation of the system, equipment, or facility.May be able to combine with Human Engineering Design Approach Document – Operator (HEDAD-O)Yes
A0673.3.28Technical Report - Study/ServicesWatertight Integrity AnalysisDI-MISC-80508BEngineeringM. OlreeOne (1) Time11111111111111111111Vehicle weight is a key performance characteristic for water operations and transportabilityIncludes Load PlanYesYesYes
A0723.3.30.6Technical Report - Study/ServicesWeight Control ReportDI-MISC-80508BEngineeringM. OlreeThree (3) Times1May be included as part of the Weight ReportYes
A1083.3.1.2Briefing MaterialCritical Design Review (CDR) PresentationDI-MGMT-81605EngineeringM. OlreeOne (1) Time11Provides the Government with an understanding of how the Contractor(s) plans to manage RAM. The purpose of the RAM Program Plan is to address the Contractor's reliability strategy, risks, schedule, and outputs. To monitor and evaluate the reliability impact of Contractor changes to the design or manufacture of the system. Document reliability growth methodology in order to plan, track, and project reliabilty improvement.The content and scope of these CDRLs will change if a RGT Program is waivedYes
A1093.3.1.3Briefing MaterialSystem Verification Review (SVR) PresentationDI-MGMT-81605EngineeringM. OlreeOne (1) Time1111111111111111Provides the Government with an understanding of Reliabilty Growth Test Projections, TPMs to track progress toward specification compliance for RAM and test hours completed; failure modes detected and mitigated; and summary of engineering change requests which impact RAM; allocations and predictions for both MTBF and MTBOMF, test results from any component level ALT, summary of unseen failure modes from FMECA results, summary of Government TIRs from vehicle testing, etc.The content and scope of these CDRLs will change if an RGT Program is waivedYesYes
A0073.3.1.1Briefing MaterialPreliminary Design Review (PDR) PresentationDI-MGMT-81605EngineeringM. Olree/N. RoblesOnce1111111111111111Provides the Government with an understanding of how the Contractor generated and manages reliability allocations from the system level down to lower indenture levels; identify single points of failure; identify mission critical items and areas where additional design or testing activities are required in order to achieve the RAM requirements.The content and scope of these CDRLs will change if an RGT Program is waivedYesYesYes
A1043.7.2Parts Management PlanGovernment Property Management PlanDI-MISC-80526DLogisticsMaj W. MooreAs Required11111The Contractor would only generate this report in reponse to Critical and Major TIRs. The purpose of the report is to recommend measures required to completely correct or mitigate the documented failure.Yes
A1053.7.2.2Inventory Checklist/Record (ICL/R)Government Property Status ReportDI-MISC-81191ALogisticsMaj W. MooreOnce and then Quarterly111Captures the contractor's proposed tasks for the CAPs identified in the scheduleYes
A1063.7.2.4Technical Report - Study/ServicesGovernment Furnished Property (GFP) Failure ReportDI-MISC-80508BLogisticsMaj. W. MooreMonthly11Documents the Contractor’s approach to manufacture the EMD/Production vehiclesYesYes
A1073.7.2.5Technical Report - Study/ServicesInventory Disposal ScheduleDI-MISC-80508BLogisticsMaj. W. MooreAs Required11Provides insight into the readiness of each contractor to transition to productionYesYes
A1113.7.2.1Inventory Checklist/Record (ICL/R)N/ADI-MISC-81191ALogisticsMaj. W. MooreQuarterly1Database for the Government to use for their reporting requirements.Yes
A0253.3.2.1Systems Engineering Management Plan (SEMP)N/ADI-SESS-81785EngineeringN. RoblesAt Key Milestones
A0323.3.8.1Contractor's Configuration Management PlanN/ADI-CMAN-80858BEngineeringN. RoblesAS-Required163030A permanent record for each vehicles acceptance test results.Template to be included per Peter Antaya email on 8/18/14Yes
A0333.3.8.2Technical Report - Study/ServicesConfiguration Item Master ListDI-MISC-80508BEngineeringN. RoblesCDR, SVR, and with Revisions As Required16A permanent record for each vehicles final inspection results.Template to be included per Peter Antaya email on 8/18/14Yes
A0343.3.8.3Configuration Status Accounting InformationN/ADI-CMAN-81253AEngineeringN. RoblesMonthly111111111111111111111Knowledge of configuration of each vehicle as built & as tested

Strategy Recommended: Initial at CDR Next delivery after the Acceptance Test is complete: As Built Configuration Next Delivery prior to each CAP

In between As Built and CAP use some type of NOR.Monthly updates annotated for changesYesYesYesYes
A0353.3.9, 3.4.7.5Vehicle Configuration DataN/AN/AEngineeringN. RoblesAt Key Milestones11Provides the Government with the required spare parts list and pricing ISO the rebuild of vehicles after FUSL eventsYesYes
A0363.3.10.1Configuration Audit PlanFunctional Configuration Audit (FCA) PlanDI-SESS-81646EngineeringN. RoblesOne (1) Time and As Required
A0373.3.10.1Configuration Audit Summary ReportFCA ReportDI-CMAN-81022CEngineeringN. RoblesOne (1) Time and As Required1
A0383.3.10.2Configuration Audit PlanPhysical Configuration Audit (PCA) PlanDI-SESS-81646EngineeringN. RoblesOne (1) Time and As Required1Yes
A0393.3.10.2Configuration Audit Summary ReportPCA ReportDI-CMAN-81022CEngineeringN. RoblesOne (1) Time and As Required1Indicates readiness of vehicle, support, and personnelYes
A0493.3.15Software Requirements SpecificationN/ADI-IPSC-81433AEngineeringN. RoblesFive (5) Times1111111111GEIA STD-0007 Logistics Data
A0503.3.15.1Software Version Description (SVD)N/ADI-IPSC-81442AEngineeringN. RoblesOne (1) Time and As Required1111Logistics data development analysis, studies, reports, etc.
A0513.3.15.1Software Requirements SpecificationSoftware User Manual (SUM)DI-IPSC-81433AEngineeringN. RoblesOne (1) Time and As Required111Overall support plan and Interim Spares/initial spares package
A0523.3.15.2Technical Report - Study/ServicesSoftware License PackageDI-MISC-80508BEngineeringN. RoblesOne (1) Time111Plan for the management of parts, provisioning, and initial spares
A0533.3.15.4Firmware Support Manual (FSM)N/ADI-IPSC-81448BEngineeringN. RoblesOne (1) Time
A0563.3.18.2Source Data for Forecasting Diminishing Manufacturing Sources and Material Shortages (DMSMS)N/ADI-SESS-81656EngineeringN. RoblesOne (1) Time
A1153.3.10.1Briefing MaterialFunctional Configuration Audit (FCA) PresentationDI-MGMT-81605EngineeringN. RoblesOne (1) Time
A1163.3.10.2Briefing MaterialPhysical Configuration Audit (PCA) PresentationDI-MGMT-81605EngineeringN. RoblesOne (1) Time
A0033.1.4.2Program Protection Information Plan (PPIP)Information Assurance Plan and Status AssessmentsDI-ADMN-81306EngineeringP. KelleyQuarterly1111Hands on and written testsMay be able to combine Course Conduct Information Package, Training Test Package, and Training Conduct Support Documents into one CDRL
A0863.5.1.5.3.2Technical Report - Study/ServicesPre-Shot Modeling Prediction AnalysisDI-MISC-80508BEngineeringP. OstromAt Key Milestones1111COURSE CONDUCT INFORMATION PACKAGE (TRAINEE AND TRAINING COURSE COMPLETION DATA)May be able to combine Course Conduct Information Package, Training Test Package, and Training Conduct Support Documents into one CDRL
A0873.5.1.5.4.2Technical Report - Study/ServicesFull-Up System Level (FUSL) Rebuild Spares Analysis/LFT&E Analysis ResultsDI-MISC-80508BEngineeringP. OstromOne (1) Time1111TRAINING CONDUCT SUPPORT DOCUMENT: LESSON PLANS, STUDENT HANDOUTS, AND INSTRUCTIONAL VISUAL AIDSMay be able to combine Course Conduct Information Package, Training Test Package, and Training Conduct Support Documents into one CDRL
A0293.3.4Technical Report - Study/ServicesRequirements Management DatabaseDI-MISC-80508BEngineeringPat AntayaFour (4) Times1111Delivery of the ETM
A0793.4.1Manufacturing PlanN/ADI-MGMT-81889EngineeringPeter AntayaThree (3) Times1Basis for review, evaluation, and monitoring of the QMS activities.Yes
A0803.4.2Technical Report - Study/ServicesManufacturing Readiness Self-AssessmentDI-MISC-80508BEngineeringPeter AntayaThree (3) Times111Plan for the management of GFE
A0813.4.3Technical Report - Study/ServicesKey Characteristics Database and ReportDI-MISC-80508BEngineeringPeter AntayaOnce and then Annually
A0823.4.4Technical Report - Study/ServicesProcess Failure Modes and Effects Analysis (PFMEA)DI-MISC-80508BEngineeringPeter AntayaAs Required
A0833.4.7.1. 3.4.7.2Acceptance Test Plan (ATP)N/ADI-QCIC-80553AEngineeringPeter AntayaTwo (2) Times and Revisions1Schedule of the disposal of GFE (as req'd)
A0843.4.7.3, 3.4.7.5Test/Inspection RecordFinal Inspection Record (FIR)DI-NDTI-80809BEngineeringPeter AntayaOne per vehicle1Required - see SEPMay combine with Conference Presentation MaterialsYes
A1033.6.6.1Quality Assurance Program PlanN/ADI-QCIC-81794EngineeringPeter AntayaTwo (2) Times1Required - see SEPMay combine with Conference Presentation MaterialsYes
A1103.3.1.4Briefing MaterialProduction Readiness Review (PRR) PresentationDI-MGMT-81605EngineeringPeter AntayaTwo (2) Times
A0023.1.4Program Protection Information Plan (PPIP)N/ADI-ADMN-81306EngineeringS. McGowanAt Key Milestone111111111Government Property Physical Inventory Report
A0043.1.4.3Program Protection Information Plan (PPIP)Anti-Tamper PlanDI-ADMN-81306EngineeringS. McGowanAt Key Milestones
A1023.6.6.1, 3.6.6.2, 3.6.6.4, 3.6.6.5, 3.6.6.7Performance Specification: Manuals, Interactive Electronic Technical - General Content, Style, and User Interaction RequirementsN/AMIL-PRF 87268ALogisticsTJ PittmanFour (4) Times
A1143.6.6.1, 3.6.6.6Technical Manual Publication PlanN/ADI-TMSS-80063LogisticsTJ PittmanThree (3) Times
A085INTENTIONALLY LEFT BLANK
A113INTENTIONALLY LEFT BLANK

Timing Chart

Month ACA12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849
# of CDRLsERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

# of CDRLs (EMD) per month

# of CDRLs12345678910111213141516171819202122232425262728293031000000000000000000
# of CDRLs323334353637383940414243444546474849505100000000000000000000# of CDRLs (FRP) per month
# of CDRLs5253545556575859606162636465666768697071727374757677787980810000000000000000000

Metric Chart

Month ACA12345678910111213141516171819202122232425262728293031
# of CDRLs0000000000000000000000000000000

CDRLs (EMD) per month # of CDRLs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0