Attachment_06.1_ACV_CSDR_Program_Plan.pdf

PDF 273 KB Posted

Attached to
Amphibious Combat Vehicle (ACV) 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 06.1 ACV CSDR Program Plan

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle (ACV) 1. 1, newest first.
File Type Posted
Attachment_05_-_COVER.docx DOCX document
Attachment_10.1.xlsx XLSX spreadsheet
Attachment_03_-_Meeting_List_150316.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
Attachment_02_-_COVER_150227.docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Attachment_15__-_ACV_Fielding_Table_(150129).docx DOCX document
Attachment_22_-_2015_01_30_ACV_1_1_Integrated_Program_Plan.pptx PPTX presentation
Section_L_Attachment_3_-_Proposal_Requirements_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Second_Draft_Attachment_04_-_CDRL_Submission_Instructions.docx DOCX document
ACV_CDRLs_Combined_01082015.pdf PDF
Second_Draft_Attachment_17_-_Technical_Data_Package.docx DOCX document
Second_Draft_Cover_Letter.pdf PDF
Second_Draft_Attachment_05_-_COVER.docx DOCX document
Second_Draft_Attachment_01.1_-_MASTER_SOW_-_150108.docx DOCX document
Second_Draft_Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Second_Draft_Attachment_23_-_COVER.docx DOCX document
Second_Draft_Attachment_16_-_Technical_Manual_Contract_Requirement_(TMCR).docx DOCX document
Second_Draft_Attachment_09_-_Failure_Definition_Scoring_Criteria_(FDSC).docx DOCX document
Second_Draft_Attachment_10.1_-GFP-GFI_-__12-9-14_V2.docx DOCX document
Second_Draft_Attachment_06.1_-_ACV_CSDR_PLAN_EMD_Contract_Plan_N-14-G-C1.pdf PDF
Second_Draft_Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
Second_Draft_Attachment_05.1_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
Second_Draft_Attachment_22.1_-_2014_12_10_ACV_1_1_Integrated_Program_Plan.pptx PPTX presentation
SECTION_M_dated_6_Nov_2014_M.7_updated_-_Final.docx DOCX document
Attachment_22_-_ACV__Integrated_Program_Plan.pptx PPTX presentation
Attachment_16_-_Technical_Manual_Contract_Requirement_(TMCR).docx DOCX document
Attachment_14_-_Implementation_Plan_for_Item_Unique_Identification_(IUID)_of_Tangible_Items.docx DOCX document
Attachment_05_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
Attachment_05_-_COVER_-_ACV_1.1_Integrated_Master_Plan.docx DOCX document
Attachment_12_-_COVER_-_Concept_of_Employment_(COE).docx DOCX document
SECTION_M_dated_5_Nov_2014_-_Final.docx DOCX document
Attachment_11_-_Test_Schedules_and_Test_Locations.docx DOCX document
Attachment_23_-_COVER.docx DOCX document
Attachment_22_-_COVER.docx DOCX document
Attachment_06.2_ACV_CSDR_Contract_Plan_RDTEN_-_EMD_Phase.pdf PDF
Attachment_01_141105_-_MASTER_SOW_-_For_RFP_First_Draft_Release.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Attachment_18_-_COVER_-_Ships_Loading_Characteristics_Pamphlet_(SLCP).docx DOCX document
Attachment_24_-_COVER_-_RWS_ICD.docx DOCX document
Attachment_15__-_ACV_Fielding_Table.docx DOCX document
Attachment_04.1_-_CDRL_Submission_Instructions_(CDRL_List).xlsx XLSX spreadsheet
Attachment_04_-_CDRL_Submission_Instructions_.docx DOCX document
Attachment_20_-_Configuration_Management_Plan_(CMP).docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_10_-_COVER_-_Government_Furnished_Equipment_(GFE)___Government_Furnished_Information_(GFI)_List.docx DOCX document
Show all 50

Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 4DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

PM-AAA

8. PREPARING

ORGANIZATION

Form Approved

OMB No. 0704-0188

10. APPROVED PLAN NUMBE

james.a.myers2@usmc.mil

6d. E-MAIL ADDRESS

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

2. WBS SYSTEM TYPE

Surface Vehicle System

4. CURRENT SUBMISSION DATE

(YYYYMMDD)

3. SUBMISSION TYPE

CHANGE

INITIALX

5. LAST APPROVED PLAN DATE

(YYYYMMDD)

ACV

C-FRP

C-LRIP

B

A X

X X

O&S

Pre-A

c. PRIME MISSION PRODUCTb. PHASE/MILESTONE

1. MAJOR PROGRAM Amphibious Combat Vehiclea. NAME

6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)

James Myers

105 Tech Parkway, Suite 101

Stafford, VA 22556--861

703-784-1454

6b. TELEPHONE NUMBER (Include Area Code)

7. PLAN TYPE

CONTRACT (SUB)

CONTRACT (PRIME)PROGRAMX

6c. FAX NUMBER (Include Area Code)

COST AND SOFTWARE DATA REPORTING PLAN

Refer to RDT

9a. CONTRACTOR NAME/ADDRESS

i. PERFORMING ORGANIZATION ii. DIVISION

Refer to RDT

9b. CONTRACT NUMBER 9c. APPROPRIATION

RDT&E

PROCUREMENT

O&M

1.2.2 Ground Control Systems X N/A

1.2 Remote Control System (UGV specific) X N/A

1.1.5.2 Hydrodynamic Appendages and Steering X X X X

1.1.5.1 Land Suspension System X X X X

1.1.5 Suspension/Steering X X X X

1.1.7.1 Engine System X X X X

1.1.7 Power Package/Drive Train X X X X

1.1.6 Vehicle Electronics X X X X

1.1.4 Turret Assembly - Remote Weapon Station (RWS) Assembly X X X X

1.1 Primary Vehicle - Personnel Variant X X X X

1.0 Amphibious Combat Vehicle (ACV) System X X

1.2.1 Remote Control System Integration, Assembly, Test and Checkout X N/A

1.1.3 System Survivability X X X X

1.1.2 Hull/Frame/Body/Cab X X X X

1.1.1 Vehicle Integration, Assembly, Test and Checkout X X X X

1.1.15 Vehicle Software Release 1...n X X X X X

1.1.14 Communications X X X X

1.1.13 Special Equipment X X X X

1.1.16 Other Vehicle Subsystems 1...n (Specify) X X X X

1.1.15.2 Vehicle System Software X X X X X

1.1.15.1 Vehicle Application Software X X X X X

1.1.12 Navigation and Remote Piloting X X X X

1.1.8 Auxiliary Automotive X X X X

1.1.7.3 Water Propulsion System X X X X

1.1.7.2 Automotive Drive Train System X X X X

1.1.11 Automatic Ammunition Handling X N/A

1.1.10 Armament X X X X

1.1.9 Fire Control X X X X

f. SRDR

FORMATS

d. DD 1921-2

(PCR)

c. DD 1921-1

(FCHR)

b. DD 1921

(CDSR)

a. CWBS

DICTIONARY

11. WBS ELEMENT CODE

a. PROGRAM/

CONTRACT/

SUBCONTRACT

12.

WBS REPORTING ELEMENTS

b. CONTRACT/

SUBCONTRACT

(X if applicable)

13. REPORTS REQUIRED

DD 1921-3 (CBDR): X

e. DD 1921-4

(CSR)

Page 2 of 4DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

1.4.7.1 Engine System X N/A

1.4.7 Power Package/Drive Train X N/A

1.4.6 Vehicle Electronics X N/A

1.4.7.2 Automotive Drive Train System X N/A

1.4.9 Fire Control X N/A

1.4.8 Auxiliary Automotive X N/A

1.4.7.3 Water Propulsion System X N/A

1.4.3 System Survivability X N/A

1.4.2 Hull/Frame/Body/Cab X N/A

1.4.4 Turret Assembly - Remote Weapon Station (RWS) Assembly X N/A

1.4.5.2 Hydrodynamic Appendages and Steering X N/A

1.4.5.1 Land Suspension System X N/A

1.4.5 Suspension/Steering X N/A

1.4.10 Armament X N/A

1.4.13 Special Equipment X N/A

1.4.12 Navigation and Remote Piloting X N/A

1.4.11 Automatic Ammunition Handling X N/A

1.4.14 Communications X N/A

1.4.15.2 Vehicle System Software X N/A

1.4.15.1 Vehicle Application Software X N/A

1.4.15 Vehicle Software Release 1...n X N/A

1.3.5 Suspension/Steering X N/A

1.3.4 Turret Assembly - Remote Weapon Station (RWS) Assembly X N/A

1.3.3 System Survivability X N/A

1.3.5.1 Land Suspension System X N/A

1.3.7 Power Package/Drive Train X N/A

1.3.6 Vehicle Electronics X N/A

1.3.5.2 Hydrodynamic Appendages and Steering X N/A

1.2.4 Remote Control System Software Release 1...n X N/A

1.2.3 Command and Control Subsystem X N/A

1.4.1 Vehicle Integration, Assembly, Test and Checkout X N/A

1.2.5 Other Remote Control System 1...n (Specify) X N/A

1.3.2 Hull/Frame/Body/Cab X N/A

1.3.1 Vehicle Integration, Assembly, Test and Checkout X N/A

1.3 Secondary Vehicle - Command Variant X N/A

1.3.7.1 Engine System X N/A

1.3.15 Vehicle Software Release 1...n X N/A

1.3.14 Communications X N/A

1.3.13 Special Equipment X N/A

1.3.15.1 Vehicle Application Software X N/A

1.4 Tertiary Vehicle - Recovery Variant X N/A

1.3.16 Other Vehicle Subsystems 1...n (Specify) X N/A

1.3.15.2 Vehicle System Software X N/A

1.3.8 Auxiliary Automotive X N/A

1.3.7.3 Water Propulsion System X N/A

1.3.7.2 Automotive Drive Train System X N/A

1.3.9 Fire Control X N/A

1.3.12 Navigation and Remote Piloting X N/A

1.3.11 Automatic Ammunition Handling X N/A

1.3.10 Armament X N/A

f. SRDR

FORMATS

d. DD 1921-2

(PCR)

c. DD 1921-1

(FCHR)

b. DD 1921

(CDSR)

a. CWBS

DICTIONARY

11. WBS ELEMENT CODE

a. PROGRAM/

CONTRACT/

SUBCONTRACT

12.

WBS REPORTING ELEMENTS

b. CONTRACT/

SUBCONTRACT

(X if applicable)

13. REPORTS REQUIRED

DD 1921-3 (CBDR): X

Page 3 of 4DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

1.13.1 Construction/Conversion/Expansion X X

1.13 Industrial Facilities X X X

1.12.5 Sustainment/Interim Contractor Support X X

1.14 Initial Spares and Repair Parts X X

1.13.3 Maintenance (Industrial Facilities) X X

1.13.2 Equipment Acquisition or Modernization X X

1.12.1 System Assembly, Installation and Checkout on Site X X

1.12 Operational/Site Activation X X X

1.12.4 Site/Ship/Vehicle Conversion X X

1.12.3 Site Construction X X

1.12.2 Contractor Technical Support X X

1.7.4 Test and Evaluation Support X X

1.7.3 Mock-ups / System Integration Labs (SILs) X X

1.7.2 Operational Test and Evaluation X X

1.8.1 Equipment X X

1.8 Training X X X

1.7.5 Test Facilities X X

1.5 System Engineering X X X

1.4.16 Other Vehicle Subsystems 1...n (Specify) X N/A

1.11.2 Support and Handling Equipment X X

1.7.1 Development Test and Evaluation X X

1.7 System Test and Evaluation X X X

1.6 Program Management X X X

1.8.2 Services X X

1.10.1 Test and Measurement Equipment X X

1.10 Peculiar Support Equipment X X X

1.9.5 Data Depository X X

1.11.1 Test and Measurement Equipment X X

1.11 Common Support Equipment X X X

1.10.2 Support and Handling Equipment X X

1.9.1 Technical Publications X X

1.9 Data X X X

1.8.3 Facilities X X

1.9.4 Support Data X X

1.9.3 Management Data X X

1.9.2 Engineering Data X X

f. SRDR

FORMATS

d. DD 1921-2

(PCR)

c. DD 1921-1

(FCHR)

b. DD 1921

(CDSR)

a. CWBS

DICTIONARY

11. WBS ELEMENT CODE

a. PROGRAM/

CONTRACT/

SUBCONTRACT

12.

WBS REPORTING ELEMENTS

b. CONTRACT/

SUBCONTRACT

(X if applicable)

13. REPORTS REQUIRED

DD 1921-3 (CBDR): X

Page 4 of 4DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after start of FRP Lot 3

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after completion of FRP Lot 3

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after completion of FRP Lot 2

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after start of FRP Lot 2

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after Prototype Build Complete

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after Completion of T&E

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after Critical Design Review

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after completion of FRP Lot 1

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after Contract Award

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after completion of LRIP Lot 2

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after start of FRP Lot 1

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after start of LRIP Lot 2

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after start of LRIP Lot 1

CWBS Dictionary, 1921, 1921-1, 1921-2, SRDR Initial, SRDR Final 30 days after completion of LRIP Lot 1 c.

EVENT

b.

FORM(S)

a.

SUBMISSION

14. CSDR SUBMISSION DATES

d. AS OF DATE

(YYYYMMDD)

e. DUE DATE

(YYYYMMDD)

3. Quantity Overview

2. Contracting Approach

1. Program Overview

PROGRAM OVERVIEW AND CONTRACTING APPROACH

15. REMARKS

File details come from the government source that posted it. Updated .