Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicle Design/Development
FPI
Engineering, Manufacturing, and Development (EMD) Vehicle design/develop software/Integrate Government Furnished Equipment (GFE) In Accordance With (IAW) Statement of Work (SOW) ACV-SOW-03001.
FOB: Destination
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
120%
SHARE RATIO ABOVE TARGET
50%
SHARE RATIO BELOW TARGET
50%
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicle Tooling
FFP
Tooling required to build EMD Vehicles IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Program Management Support
EMD Systems Engineering and Program Management IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicles
Manufacture EMD Vehicles (P Variant) IAW ACV-SOW-03001.
120%
50%
50%
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicles
120%
50%
50%
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicles
120%
50%
50%
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicles
120%
50%
50%
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD LMI Data
CPFF
Logistics Management Information (LMI) Data
Initial Data (operator/operator maintenance to support OA) IAW ACV-SOW-03001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Training Materials
Operator/Operator maintenance training packages in System Approach to Training (SAT) format IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Technical Manuals
Operator/Operator maintenance Technical Manuals in Electronic Maintenance System Next Generation (EMS NG) format IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Pre MS-C Test Support
EMD Pre MS-C Test Support Test and Evaluation Efforts IAW ACV-SOW-03001.
NOTE: THIS INCLUDES REPAIRS TO LIVE FIRE VEHICLES IN PREPARATION FOR REMAINING SHOTS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Corrective Action Mods
Corrective action modifications to EMD Vehicles IAW ACV-SOW-03001. This CLIN shall only apply to reliability growth items and safety improvements for the EMD vehicles.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD CDRLs
Data IAW Exhibits A001-A116 and IAW ACV-SOW-03001.
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Vehicle Transportation
EMD Vehicle Transportation -- Labor and Transportation to/around/from test sites IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Performance Incentive
Technical Performance/Test Availability Incentive -- Please see clause H-2.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
EMD Delivery Incentive
Delivery Incentive -- Please see clause H-3.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| EMD Advanced Capability Improvements |
CPFF
EMD Design Advanced Capability Improvements IAW ACV-SOW-03001. Applicable to EMD Vehicles.
TBD. GOVERNMENT WILL PROVIDE A NUMBER FOR THIS CLIN BEFORE FINAL RFP.
TBD – GOVERNMENT TO PROVIDE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Data Rights Listing |
FFP
Price Data IAW Section J Attachment 17. The Government retains the right to purchase each data item up to three years after Contract expiration IAW DFARS 252.277-7013 and 252.227-7027.
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FUSL Vehicles Lot 1 |
FFP
Manufacture FUSL vehicles Lot 1 (P Variant) IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| EMD Post MS-C Test Support |
CPFF
EMD Post MS-C Test Support Test and Evaluation Efforts IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| EMD Advanced Capability Improvements |
CPFF
EMD Advanced Capability Improvements Installation IAW ACV-SOW-03001. Applicable to EMD Vehicles.
TBD. GOVERNMENT WILL PROVIDE A NUMBER FOR THIS CLIN BEFORE FINAL RFP.
TBD – GOVERNMENT TO PROVIDE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FUSL/EMD Test Vehicle Transportation/AT |
CPFF
Test Vehicle Transportation and Acceptance Testing (AT) for EMD & FUSL LRIP Vehicles (Lot 1) IAW ACV-SOW-03001. Labor and transportation to/around/from DT and OT Test Sites.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FUSL Lot 1 Test Support |
CPFF
Test Support Test and Evaluation Efforts LRIP FUSL Lot 1 Vehicles IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FUSL Lot 1 Test Spares |
CPFF
Test Spares in support of FUSL, PQT/RQT, IOT&E, PCA, FCA IAW ACV-SOW-03001. DT and OT test spares to support vehicle availability.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| EMD Vehicle Disposition Non-Selectee |
FFP
Non-selectee disposition of EMD vehicles and all supporting items and equipment IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Vehicles Lot 1 |
FFP
Manufacture LRIP Vehicles Lot 1 (P Variant) IAW ACV-SOW-03001.
CONTRACTORS SHALL PROPOSE DELIVERY SCHEDULE WITHIN THE DELIVERY PARAMETERS SPECIFIED IN SECTION F -- DELIVERY SCHEDULE WILL BE INCORPORATED AT AWARD
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Program Management Support Lot 1 |
FFP
Program Management Support LRIP Lot 1 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Training Materials Lot 1 |
CPFF
Develop and Deliver Training Materials IAW ACV-SOW-03001. Field Intermediate Maintenance and BDAR Training Packages in SAT format. Update Operator/Operator Maintenance Training Packages in SAT format.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Support Equipment Lot 1 |
FFP
Develop first set of Support Equipment for IOT&E and Test Support, then deliver sets to support IOC for LRIP Lot 1 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP LMI Data Lot 1 |
CPFF
LRIP Logistics Management Info (LMI) Data Lot 1 IAW ACV-SOW-03001. Update operator/operator maintenance provide, field level maintenance and initial provisioning.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Technical Manuals Lot 1 |
CPFF
Develop and Deliver Technical Manuals IAW ACV-SOW-03001. Field Intermediate Maintenance and BDAR Technical Manuals in EMS/NG format. Update Operator/Operator Maintenance Technical Manuals in EMS/NG format.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Initial Spares for Fielding Lot 1 |
FFP
LRIP Initial Spares for Fielding Lot 1 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP/FUSL Vehicle Field Support Lot 1 |
FFP
Contractor support in developing planning for fielding of vehicles to receiving units and participation at receiving units in handover of vehicles and support infrastructure IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP/EMD Test Vehicle Transportation/AT |
CPFF
Test Vehicle Transportation and Acceptance Testing (AT) for EMD & LRIP Vehicles (Lot 1) IAW ACV-SOW-03001. Labor and transportation to/around/from DT and OT Test Sites and to LRIP Test Vehicles refurbish locations.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
Data IAW Exhibits A001-A116 and ACV-SOW-03001.
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Corrective Action Mods Lot 1 |
CPFF
Corrective Action Modifications LRIP Lot 1 IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP FSR & Training Support Lot 1 |
FFP
LRIP Field Service Representative (FSR) and Training Support for Lot 1 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Lot 1 Test Support |
CPFF
Test Support Test and Evaluation Efforts LRIP Lot 1 Vehicles IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Lot 1 Test Spares |
CPFF
Test Spares in support of LRIP, PQT/RQT, IOT&E, PCA, FCA IAW ACV-SOW-03001. DT and OT test spares to support vehicle availability.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
Tooling for LRIP Vehicles IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Refurbish Test Vehicles Lot 1 |
CPFF
Refurbish LRIP Lot 1 Test Vehicles before fielding IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP First Article Test Lot 1 |
FFP
First Article Testing for LRIP Lot 1.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Vehicles Lot 2 |
FFP
Manufacture LRIP Vehicles Lot 2 (P Variant) IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Program Management Support Lot 2 |
FFP
Program Management Support LRIP Lot 2 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Training Materials Lot 2 |
CPFF
Develop and Deliver Training Materials IAW ACV-SOW-03001. Field Intermediate Maintenance and BDAR Training Packages in SAT format. Update Operator/Operator Maintenance Training Packages in SAT format.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Support Equipment Lot 2 |
FFP
Develop first set of Support Equipment for IOT&E and Test Support, then deliver sets to support IOC for LRIP Lot 2 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP LMI Data Lot 2 |
CPFF
LRIP Logistics Management Info (LMI) Data Lot 2 IAW ACV-SOW-03001. Update operator/operator maintenance provide, field level maintenance and initial provisioning.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Technical Manuals Lot 2 |
CPFF
Develop and Deliver Technical Manuals IAW ACV-SOW-03001. Field Intermediate Maintenance and BDAR Technical Manauals in EMS/NG format. Update Operator/Operator Maintenance Technical Manuals in EMS/NG format.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Initial Spares for Fielding Lot 2 |
FFP
LRIP Initial Spares for Fielding Lot 2 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Vehicle Field Support Lot 2 |
FFP
Contractor support in developing planning for fielding of vehicles to receiving units and participation at receiving units in handover of vehicles and support infrastructure IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Vehicle Transportation/AT Lot 2 |
CPFF
Vehicle Transportation and Acceptance Testing (AT) for LRIP Vehicles (Lot 2) IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP Corrective Action Mods Lot 2 |
CPFF
Corrective Action Modifications LRIP Lot 2 IAW ACV-SOW-03001.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| LRIP FSR & Training Support Lot 2 |
FFP
LRIP Field Service Representative (FSR) and Training Support for Lot 2 IAW ACV-SOW-03001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicles Lot 1 |
FFP
Manufacture FRP Lot 1 vehicles (P Variant) IAW ACV-SOW-03001.
CONTRACTORS SHALL PROPOSE DELIVERY SCHEDULE WITHIN THE DELIVERY PARAMETERS SPECIFIED IN SECTION F. THIS CLIN SHALL BE PRICED AS A NOT TO EXCEED (NTE).
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Program Management Support Lot 1 |
FFP
FRP Program Management Support Lot 1 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Training Materials Lot 1 |
FFP
Develop and Deliver Training Materials FRP Lot 1 IAW ACV-SOW-03001. Update Operator/Operator maintenance, field intermediate Maintenance and BDAR Training Packages in SAT format
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Support Equipment Lot 1 |
FFP
Deliver Support Equipment to support vehicle fielding FRP Lot 1 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP LMI Data Lot 1 |
FFP
FRP Lot 1 LMI Data IAW ACV-SOW-03001. Update operator, update maintenance, update provisioning and provide depot instructions.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Technical Manual Updates Lot 1 |
FFP
FRP Lot 1 Technical Manual Updates IAW ACV-SOW-03001. Update Operator/Operator maintenance, Field Intermediate Maintenance and BDAR Technical Manuals in EMS/NG format.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Initial Spares Lot 1 |
FFP
FRP Lot 1 Initial Spares IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicle Fielding Support Lot 1 |
FFP
Vehicle Fielding Support FRP Lot 1 IAW ACV-SOW-03001. Contractor participation at receiving units in handover of vehicles and support infrastructure.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicle Transportation/AT Lot 1 |
FFP
Vehicle Transportation and Acceptance Testing (AT) for FRP Lot 1 Vehicles IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Depot Support Products Lot 1 |
FFP
Development of Depot Support Products FRP Lot 1 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicles Lot 2 |
FFP
Manufacture FRP Lot 2 vehicles (P variant) IAW ACV-SOW-03001.
CONTRACTORS SHALL PROPOSE DELIVERY SCHEDULE WITHIN THE DELIVERY PARAMETERS SPECIFIED IN SECTION F. THIS CLIN SHALL BE PRICED AS A NOT TO EXCEED (NTE).
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Program Management Support Lot 2 |
FFP
Program Management Support FRP Lot 2 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Training Materials Lot 2 |
FFP
Develop and Deliver Training Materials FRP Lot 2 IAW ACV-SOW-03001. Update Operator/Operator maintenance, field intermediate Maintenance and BDAR Training Packages in SAT format.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Support Equipment Lot 2 |
FFP
Support Equipment FRP Lot 2 IAW ACV-SOW-03001. Deliver Support Equipment to support vehicle fielding.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP LMI Data Lot 2 |
FFP
LMI Data FRP Lot 2 IAW ACV-SOW-03001. Update operator, update maintenance, update provisioning & provide depot instructions.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Technical Manual Updates Lot 2 |
FFP
Technical Manual Updates FRP Lot 2 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Initial Spares Lot 2 |
FFP
Initial Spares FRP Lot 2 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicle Fielding Support Lot 2 |
FFP
Vehicle Fielding Support FRP Lot 2 IAW ACV-SOW-03001. Contractor participation at receiving units in handover of vehicles and support infrastructure.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicle Transportation/AT Lot 2 |
FFP
Vehicle Transportation and Acceptance Testing (AT) for FRP Lot 2 Vehicles IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Depot Support Products Lot 2 |
FFP
Development of Depot Support Products FRP Lot 2 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicles Lot 3 |
FFP
Manufacture FRP Lot 3 Vehicles IAW ACV-SOW-03001.
CONTRACTORS SHALL PROPOSE DELIVERY SCHEDULE WITHIN THE DELIVERY PARAMETERS SPECIFIED IN SECTION F. THIS CLIN SHALL BE PRICED AS A NOT TO EXCEED (NTE).
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Program Management Support Lot 3 |
FFP
Program Management Support FRP Lot 3 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Training Materials Lot 3 |
FFP
Develop and Deliver Training Materials FRP Lot 3 IAW ACV-SOW-03001. Update Operator/Operator maintenance, field intermediate Maintenance and BDAR Training Packages in SAT format.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Support Equipment Lot 3 |
FFP
Support Equipment FRP Lot 3 IAW ACV-SOW-03001. Deliver Support Equipment to support vehicle fielding.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP LMI Data Lot 3 |
FFP
LMI Data FRP Lot 3 IAW ACV-SOW-03001. Update operator, update maintenance, update provisioning & provide depot instructions.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Technical Manual Updates Lot 3 |
FFP
Technical Manual Updates FRP Lot 3 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Initial Spares Lot 3 |
FFP
Initial Spares FRP Lot 3 IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicle Fielding Support Lot 3 |
FFP
Vehicle Fielding Support FRP Lot 3 IAW ACV-SOW-03001. Contractor participation at receiving units in handover of vehicles and support infrastructure.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Vehicle Transportation/AT Lot 3 |
FFP
Vehicle Transportation and Acceptance Testing (AT) for FRP Lot 3 Vehicles IAW ACV-SOW-03001.
| NET AMT |
| $ NOT TO EXCEED (NTE) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
| NET AMT |
| NOT SEPARATELY PRICED (NSP) |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| FRP Depot Support Products Lot 3 |
FFP
Development of Depot Support Products FRP Lot 3 IAW ACV-SOW-03001. Contractor participation at receiving units in handover of vehicles and support infrastructure.
| NET AMT |
| $ NOT TO EXCEED (NTE) |