This is a price form for a roof replacement project on Hangars 1 and 2 issued by the City of Lake City, Florida under Invitation to Bid 001-2027. The project involves replacement of existing roofing systems and substructures on four separate roofs, with sealed bids due by Thursday, November 19, 2026 at 2:00 pm through the City's e-Procurement Portal. Bid opening will occur at 2:15 pm on the same date in the City Council Chambers. The project is structured with four base bids covering different roof sections: Roof A with 550 linear feet of purlin replacement, Roof B with 3,850 linear feet of purlin replacement, Roof C with 500 linear feet of purlin replacement, and Roof D with 2,850 linear feet of purlin replacement. Each bid includes a lump sum roof replacement component excluding purlins and a separate unit price line item for purlin replacement. The deadline for submitting written questions is Thursday, November 5, 2026 at 4:00 pm.

The price form requires bidders to submit unit prices and extended totals for each line item, with the unit price governing in cases of discrepancy between unit price and extended total. Roof replacement pricing on a lump sum basis includes all work required for complete roof replacement including removal and replacement of roof panels, gutters, downspouts, trim, and accessories regardless of purlin replacement quantities. Purlin replacement pricing is calculated on a per-linear-foot unit price basis. An Alternative 1 is included allowing for accelerated building shutdown with a maximum 60-day project duration, applicable only if all four base bids are awarded; this alternative price represents added cost only and excludes base bid amounts. Bidders must explain any deviations from specifications in detail and itemize each deviation with specific reference to applicable specification paragraphs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE FORM

HANGARS #1 & 2 ROOF REPLACEMENT

BID A: ROOF REPLACEMENT OF ROOF A

ITEM NO.
PAY ITEM DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL
A1
Roof Replacement (Excluding Purlin Replacement)
1
LS
$
$
A2
Purlin Replacement
550
LF
$
$
SUBTOTAL BID A:
$

BID B: ROOF REPLACEMENT OF ROOF B

ITEM NO.
PAY ITEM DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL
B1
Roof Replacement (Excluding Purlin Replacement)
1
LS
$
$
B2
Purlin Replacement
3,850
LF
$
$
SUBTOTAL BID B:
$

BID C: ROOF REPLACEMENT OF ROOF C

ITEM NO.
PAY ITEM DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL
C1
Roof Replacement (Excluding Purlin Replacement)
1
LS
$
$
C2
Purlin Replacement
500
LF
$
$
SUBTOTAL BID C:
$

BID D: ROOF REPLACEMENT OF ROOF D

ITEM NO.
PAY ITEM DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL
D1
Roof Replacement (Excluding Purlin Replacement)
1
LS
$
$
D2
Purlin Replacement
2,850
LF
$
$
SUBTOTAL BID D:
$

ALTERNATIVE 1: ROOF REPLACEMENT OF ROOF D

ITEM NO.
PAY ITEM DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL
ALT 1
Accelerated Building Shutdown – maximum building shutdown period of 60 consecutive calendar days for the entire project (See Section 01 23 00, Alternate No. 1). Alternate applies only if Bids A, B, C, and D are all awarded. Price shall be the added cost only and shall not include the Base Bid amounts.
1
LS
$
$
SUBTOTAL ALTERNATIVE 1:
$

NOTES

1. In the event of a discrepancy between the unit price and the extended total, the unit price governs.

1. Scope Pricing Clarification:

· Roof Replacement (Lump Sum): Includes all Work required for a complete roof replacement as indicated in the Contract Documents, except purlin replacement. Removal and replacement of roof panels, gutters, downspouts, trim, and accessories are included in the lump sum regardless of purlin replacement quantities.

· Purlin Replacement (Unit Price): Includes all Work required to remove and replace authorized purlins, as described in Section 01 22 00.