Technical Specifications Summary
This is a technical specification document for the City of Lake City, Florida's roof replacement project at Hangars 1 and 2 at Lake City Gateway Airport. The project scope includes removal and replacement of existing roof systems with new metal standing seam roof panels, gutters, downspouts, and purlins for both hangars. The work must accommodate ongoing aircraft maintenance operations during construction, with tenant occupancy continuing except during coordinated building shutdown periods. Noisy and dusty exterior work is limited to 8 am to 5 pm, and utility outages require seven days' advance notice with four-hour maximum duration limits. The project is structured as a single prime contract on a stipulated price basis with unit price adjustments for purlin replacement work authorized by the architect. Bids are due Thursday, November 19, 2026 at 2:00 pm through the City's OpenGov Procurement portal, with public opening at 2:15 pm in City Hall. Questions must be submitted by Thursday, November 5, 2026 at 4:00 pm. The contract includes an optional accelerated building shutdown alternate requiring completion within 60 consecutive calendar days, with all associated premium costs for expedited materials, additional crews, and extended work hours included in the alternate bid price.
The specifications require metal roof panels with minimum 22-gauge steel thickness, standing seam design with concealed fasteners, and factory-applied fluoropolymer finish in manufacturer-selected colors. The roof panel system must comply with current Florida Product Approval or Miami-Dade NOA, with design pressures matching structural drawing requirements and UL 580 Class 90 wind uplift classification. Contractor must submit delegated design shop drawings sealed by a Florida-licensed Professional Engineer, including panel layout, clip spacing by roof zone, and attachment calculations. The contractor must obtain manufacturer's 20-year finish and weathertightness warranties and provide a two-year installer's workmanship warranty. Purlin replacement is authorized on a unit price basis of linear feet, with contractor-documented conditions requiring architect approval prior to removal. Replacement purlins must be within five percent of the weight of existing purlins and comply with roof panel substrate requirements. All substitution requests must be submitted at least 10 days prior to bid deadline for procurement-stage requests, or within 14 days of discovery for construction-phase requests, with architect decision authority. Project record documents, operation and maintenance manuals, and warranties must be submitted at closeout, with digital PDF submissions preferred for administrative documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hangars_1_and_2_Roof_Replacement.pdf | ||
| 2026-10-21_Hangar_#1_&_2_-_Roof_Replacement_Bid_Set.pdf | ||
| General_Provisions.pdf | ||
| LCQ_AAR_Hangars_1_&_2_BID_DOCUMENTS.docx | DOCX document | |
| LCQ_AAR_Hangars_1_&_2_Price_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 20070044.A037
OCTOBER 21, 2026
PASSERO ASSOCIATES SECTION 01 10 00 - Summary
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 3
SECTION 01 10 00 - SUMMARY
PART 1 GENERAL
1.01 PROJECT INFORMATION
A. Project Identification: Hangar #1 & 2 - Roof Replacement.
B. Owner: City of Lake City.
1. Owner's Address:
205 N. Marion Ave.
Lake City, Florida 32055
C. Owner's Representative: Passero Associates.
1. Architect's Representative: Justin Vollenweider, jvollenweider@passero.com
2. Structural Representative: Conor Stucki, cstucki@passero.com.
D. Web-Based Project Software: Project software administered by Architect will be used for purposes of managing communication and documents during the Bidding and Construction stages.
E. The Project generally consists of the replacement of existing roof systems with new metal roofing system, gutters, downspouts and purlins for the Lake City Gateway Airport Hangars 1 and 2, and as further defined by the contract documents.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price, with adjustments for Work performed under unit prices as specified in Section 01 22 00 - Unit Prices.
1.03 OWNER (TENANT) OCCUPANCY
A. Owner's tenant will occupy the Hangars and conduct aircraft maintenance operations during the entire construction period, except during Building Shutdown Periods coordinated with Owner.
B. Cooperate with Owner and tenant to minimize conflict with tenant's operations.
C. Schedule the Work to accommodate tenant's occupancy.
1.04 CONTRACTOR USE OF SITE
A. Construction Operations: Limited to areas noted on Drawings .
1. Locate and conduct construction activities in ways that will limit disturbance to tenants' operations and emergency response's use of site.
B. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit, arranged at least 48 hours in advance with Owner.
C. Time Restrictions:
1. Limit conduct of especially noisy, malodorous, and dusty exterior work to the hours of 8 am to 5 pm .
D. Utility Outages and Shutdown:
1. Limit disruption of utility services to hours the site is unoccupied.
a. Notify Architect and Owner not less than seven days in advance of proposed utility interruptions.
2. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers, fire alarm system, and airfield lighting, without 7 days notice to Owner and authorities having jurisdiction.
PASSERO ASSOCIATES SECTION 01 10 00 - Summary
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 2 OF 3
3. Limit shutdown of utility services to 4 hours at a time, arranged at least 48 hours in advance with Owner.
4. Prevent accidental disruption of utility services to other facilities.
E. Control Foreign Object Debris (FOD) on site at all times.
F. Comply with airport security, badging, escort and airside access requirements established by Owner.
1.05 WORK SEQUENCE
A. Coordinate construction schedule and operations with Owner.
B. Remove only as much existing roofing as can be made weathertight the same day.
Provide temporary protection for tenant's aircraft, equipment, and building contents from weather and falling debris throughout construction.
1.06 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the
Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.
3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.
1.07 DEFINITIONS
A. Contract Documents: As defined in the Conditions of the Contract, including Drawings and Specifications prepared by Architect and issued for bidding, and Addenda and modifications issued thereafter.
1.08 ADDITIONAL CONTRACT REQUIREMENTS
A. Corrections for Construction Errors.
1. For work that the Contractor constructs incorrectly or does not meet the requirements of the Contract Documents, the Contractor has the prerogative to submit an acceptance proposal to the Architect for review and disposition. The acceptance proposal shall describe the error or defect and either describe remedial action for its correction or propose a method for its acceptance. In either case, the acceptance proposal shall address structural integrity, aesthetics, maintainability, and the effect on Contract Time. The Architect will judge any such proposal for its effect on these criteria and also for its effect on Contract Administration.
2. When the Architect judges that a proposal affects structural integrity or maintainability, Contractor shall engage a Professional Engineer licensed in the State of Florida to perform a technical assessment, at no cost to Owner, and submit it to Architect for review. Do not take corrective action without Architect's written approval.
PASSERO ASSOCIATES SECTION 01 10 00 - Summary
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 3 OF 3
3. Carry out all approved corrective construction measures at no expense to the Owner.
4. Notwithstanding any disposition of the compensation aspects of the defective work, the Architect’s decision on the technical merits of a proposal is final.
B. Coordination of Contract Documents.
1. These Specifications, the plans, Special Provisions, and all supplementary documents are integral parts of the Contract; a requirement occurring in one is as binding as though occurring in all. In addition to the work and materials specifically called for in the Contract Documents and any additional incidental work, not specifically mentioned, when so shown in the plans, or if indicated, or obvious and apparent, as being necessary for the proper completion of the work will be included in the Contract Lump Sum Price.
2. Computed dimensions govern over scaled dimensions.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION 01 10 00
This page intentionally left blank
PASSERO ASSOCIATES SECTION 01 22 00 - Unit Prices
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 2
SECTION 01 22 00 - UNIT PRICES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. List of unit prices, for use in preparing Bids.
B. Measurement and payment criteria applicable to Work performed under a unit price payment method.
1.02 COSTS INCLUDED
A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals;
erection, application or installation of an item of the Work; overhead and profit.
1.03 UNIT QUANTITIES SPECIFIED
A. Quantities indicated in the Bid Form are for bidding and contract purposes only.
Quantities and measurements of actual Work will determine the payment amount.
1.04 MEASUREMENT OF QUANTITIES
A. Contractor shall take all measurements and compute quantities. Measurements and quantities will be reviewed for general conformance by Architect.
B. Assist by providing necessary equipment, lift access, and personnel as required to permit Architect's observation of the Work.
C. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. Purlins measured between centerlines of supporting primary frames.
1.05 PAYMENT
A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Architect, multiplied by the unit price.
B. Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from the transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling, and disposing of rejected Products.
1.06 DEFECT ASSESSMENT
A. Replace Work, or portions of the Work, not complying with specified requirements.
B. If, in the opinion of Architect, it is not practical to remove and replace the Work, Architect will direct the following remedy:
1. The defective Work will be partially repaired in accordance with repair details approved by Architect, and the unit price will be adjusted to a new unit price as recommended by Architect and accepted by Owner.
C. Architect will assess the defect and recommend a payment adjustment to Owner.
1.07 SCHEDULE OF UNIT PRICES
A. Unit Price No. 1 - Purlin Replacement.
1. Description: Removal (and temporary bracing and protection of adjacent construction during replacement) of deteriorated existing roof purlins and replacement with new purlins as indicated on Drawings, including laps, clips, connections, fasteners, bracing, and disposal of removed material.
2. Unit of Measurement: Linear foot, measured between centerlines of supporting primary frames. Laps and connections are not measured separately.
PASSERO ASSOCIATES SECTION 01 22 00 - Unit Prices
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 2 OF 2
3. Authorization: Following removal of roof panels and before removing any purlin, submit a marked-up roof framing plan identifying each purlin proposed for replacement by grid line and bay, with date-stamped photographs documenting its condition. Do not remove purlins until reviewed by Architect. Purlins removed without Architect's review will not be paid. (Architect will respond within 5 working days of reciept).
4. Quantity Documentation: Maintain a purlin replacement log keyed to the roof framing plan, listing location, length, date of replacement, and photograph reference. Submit the log with each Application for Payment.
5. Adjustment: Final quantity will be adjusted by Change Order to reflect authorized quantities installed.
PART 2 PRODUCTS - NOT USED
END OF SECTION 01 22 00
PASSERO ASSOCIATES SECTION 01 23 00 - Alternates
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 1
SECTION 01 23 00 - ALTERNATES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description of Alternates.
1.02 ACCEPTANCE OF ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option. Accepted Alternates will be identified in the Contract Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each
Alternate.
1.03 SCHEDULE OF ALTERNATES
A. Alternate No. 1 - Accelerated Building Shutdown:
1. Base Bid Item: Complete the Work within the Contract Time indicated in the
Agreement, with building shutdown durations as required by Contractor's schedule.
2. Alternate: Complete the Work with a maximum Building Shutdown Period of 60 consecutive calendar days for the entire project. Include all costs for premium time, additional crews, extended work hours, weekend work, expedited material procurement, and resequencing required to meet this duration.
3. Building Shutdown Period: The Building Shutdown Period begins on the date the first hangar is vacated for the Work and ends when the last hangar is returned for use, as defined above. Hangars may be shut down concurrently or in sequence, at Contractor's option, provided the total period does not exceed 60 days.
4. Procurement: Material procurement, submittals, and shop drawings shall be complete, and materials delivered to the site or stored, before the Building Shutdown Period begins. Shop drawing and material lead times do not count toward the Building Shutdown Period.
5. Purlin Replacement: The Building Shutdown Period includes purlin replacement up to the estimated quantities listed on the Price Form. If authorized purlin quantities exceed the estimate, the Building Shutdown Period may be extended in proportion, as agreed by Change Order.
6. Schedule: Submit, with the bid, a preliminary schedule showing how the Building Shutdown Period will be met.
PART 2 PRODUCTS - NOT USED
END OF SECTION 01 23 00
PASSERO ASSOCIATES SECTION 01 25 00 - Substitution Procedures
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 3
SECTION 01 25 00 - SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 RELATED REQUIREMENTS
A. Section 01 30 00 - Administrative Requirements: Submittal procedures, coordination.
B. Section 01 60 00 - Product Requirements: Fundamental product requirements, product options, delivery, storage, and handling.
1.03 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, and assemblies .
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond
Contractor's control.
a. Unavailability.
b. Regulatory changes.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
a. Substitution requests offering advantages solely to the Contractor will not be considered.
1.04 REFERENCE STANDARDS
A. CSI/CSC Form 1.5C - Substitution Request (During the Bidding/Negotiating Stage);
Current Edition.
B. CSI/CSC Form 13.1A - Substitution Request (After the Bidding/Negotiating Phase);
Current Edition.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, and materials constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
4. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
5. Waives claims for additional costs or time extension that may subsequently become apparent.
6. Agrees to reimburse Owner and Architect for review or redesign services associated with re-approval by authorities.
B. A Substitution Request for specified installer constitutes a representation that the submitter:
1. Has acted in good faith to obtain services of specified installer, but was unable to come to commercial, or other terms.
PASSERO ASSOCIATES SECTION 01 25 00 - Substitution Procedures
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 2 OF 3
C. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non-compliant characteristics.
D. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. No specific form is required, but prefer use of the CSI forms listed under article 1.04 above. If the contractor wishes to submit a request without utilizing the suggested form, they must ensure the Substitution Request documentation includes the following:
a. Project Information:
1) Official project name and number, and any additional required identifiers established in Contract Documents.
b. Substitution Request Information:
1) Discrete and consecutive Substitution Request number, and descriptive subject/title.
2) Indication of whether the substitution is for cause or convenience.
3) Issue date.
4) Reference to particular Contract Document(s) specification section number, title, and article/paragraph(s).
5) Description of Substitution.
6) Reason why the specified item cannot be provided.
7) Differences between proposed substitution and specified item.
8) Description of how proposed substitution affects other parts of work.
c. Attached Comparative Data: Provide point-by-point, side-by-side comparison addressing essential attributes specified, as appropriate and relevant for the item:
1) Physical characteristics.
2) In-service performance.
3) Expected durability.
4) Visual effect.
5) Warranties.
6) Other salient features and requirements.
7) Include, as appropriate or requested, the following types of documentation:
(a) Product Data:
(b) Samples.
(c) Certificates, test, reports or similar qualification data.
(d) Drawings, when required to show impact on adjacent construction elements.
d. Impact of Substitution:
1) Savings to Owner for accepting substitution.
2) Change to Contract Time due to accepting substitution.
E. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into single document.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Submittal Time Restrictions:
1. Owner will consider requests for substitutions only if submitted at least 10 days prior to the date for receipt of bids.
PASSERO ASSOCIATES SECTION 01 25 00 - Substitution Procedures
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 3 OF 3
B. Approved substitutions will be issued by Addendum to all bidders. No other approval is valid.
3.03 SUBSTITUTION PROCEDURES DURING CONSTRUCTION
A. Submit request for Substitution for Cause immediately upon discovery of need for substitution, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
B. Submit request for Substitution for Convenience within 14 days of discovery of its potential advantage to the project, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
1. In addition to meeting general documentation requirements, document how the requested substitution benefits the Owner through cost savings, time savings, greater energy conservation, or in other specific ways.
2. Document means of coordinating of substitution item with other portions of the work, including work by affected subcontractors.
3. Bear the costs engendered by proposed substitution of:
a. Owner's compensation to the Architect for any required redesign, time spent processing and evaluating the request.
b. Other unanticipated project considerations.
C. Substitutions will not be considered under one or more of the following circumstances:
1. When they are indicated or implied on shop drawing or product data submittals, without having received prior approval.
2. Without a separate written request.
3. When acceptance will require revisions to Contract Documents.
3.04 RESOLUTION
A. Architect may request additional information and documentation prior to rendering a decision. Provide this data in an expeditious manner.
B. Architect will notify Contractor in writing of decision to accept or reject request.
3.05 ACCEPTANCE
A. Accepted substitutions change the work of the Project. They will be documented and incorporated into work of the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments provided for in the Conditions of the Contract.
3.06 CLOSEOUT ACTIVITIES
A. See Section 01 78 00 - Closeout Submittals, for closeout submittals.
B. Include completed Substitution Request Forms as part of the Project record. Include both approved and rejected Requests.
END OF SECTION 01 25 00
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 8
SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Electronic document submittal service.
C. Preconstruction meeting.
D. Site mobilization meeting.
E. Progress meetings.
F. Construction progress schedule.
G. Contractor's daily reports.
H. Progress photographs.
I. Submittals for review, information, and project closeout.
J. Number of copies of submittals.
K. Requests for Information (RFI) procedures.
L. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 01 60 00 - Product Requirements: General product requirements.
B. Section 01 78 00 - Closeout Submittals: Project record documents; operation and maintenance data; warranties and bonds.
1.03 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Make the following types of submittals to Architect:
1. Requests for Information (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Correction Punch List and Final Correction Punch List for Substantial Completion.
10. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL SERVICE
A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF, MS Word, or MS Excel) format, as appropriate to the document, and transmitted via an Internet-based submittal service that receives, logs and stores documents, provides electronic stamping and signatures, and notifies addressees via email.
1. Besides submittals for review, information, and closeout, this procedure applies to
Requests for Information (RFIs), progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, Contractor's correction punchlist, and any other document any participant wishes to make part of the project record.
2. Contractor and Architect are required to use this service.
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 2 OF 8
3. It is Contractor's responsibility to submit documents in allowable format.
4. Subcontractors, suppliers, and Architect's consultants will be permitted to use the service at no extra charge.
5. Users of the service need an email address, internet access, and PDF review software that includes ability to mark up and apply electronic stamps (such as Adobe Acrobat, www.adobe.com, or Bluebeam PDF Revu, www.bluebeam.com), unless such software capability is provided by the service provider.
6. Paper document transmittals will not be reviewed; emailed electronic documents will not be reviewed.
7. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
B. Submittal Service: The selected service is:
1. Newforma Info Exchange, provided by Architect.
C. Project Closeout: Architect will determine when to terminate the service for the project and is responsible for obtaining archive copies of files for Owner.
3.02 PRECONSTRUCTION MEETING
A. Architect will schedule a meeting after Notice of Award for both the Preconstruction
Meeting and Site Mobilization Meeting to be at the same time.
B. Attendance Required:
1. Owner.
2. Architect.
3. Contractor.
C. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Submission of initial Submittal schedule.
6. Designation of personnel representing the parties to Contract and
Architect/Engineer.
7. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
8. Scheduling.
D. Architect will record minutes and distribute copies within two days after meeting to participants.
3.03 SITE MOBILIZATION MEETING
A. Architect will schedule meeting at the same time as the Preconstruction Meeting.
B. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
C. Agenda:
1. Use of premises by Owner and Contractor.
2. Owner's requirements.
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 3 OF 8
3. Construction facilities and controls provided by Owner.
4. Construction facilities and controls provided by Contractor.
5. Security and housekeeping procedures.
6. Schedules.
7. Application for payment procedures.
8. Procedures for testing.
9. Procedures for maintaining record documents.
D. Architect shall record minutes (for site mobilization meeting) and distribute within two days after meeting to participants.
3.04 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Special consultants.
5. Contractor's superintendent.
6. Major subcontractors.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of RFIs log and status of responses.
7. Maintenance of progress schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Coordination of projected progress.
11. Maintenance of quality and work standards.
12. Effect of proposed changes on progress schedule and coordination.
13. Other business relating to work.
E. Contractor will record minutes and distribute copies within two days after meeting to participants, with copies to Architect, Engineer, Owner, participants, and those affected by decisions made.
3.05 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date established in Notice to Proceed, submit preliminary schedule.
B. If preliminary schedule requires revision after review, submit revised schedule within 5 days.
C. Within 10 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 5 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 4 OF 8
3.06 DAILY CONSTRUCTION REPORTS
A. Include only factual information. Do not include personal remarks or opinions regarding operations and/or personnel.
B. Prepare a daily construction report recording the following information concerning events at Project site and project progress:
1. Date.
2. High and low temperatures, and general weather conditions.
3. List of subcontractors at Project site.
4. Material deliveries.
5. Safety, environmental, or industrial relations incidents.
6. Meetings and significant decisions.
7. Stoppages, delays, shortages, and losses. Include comparison between scheduled work activities (in Contractor's most recently updated and published schedule) and actual activities. Explain differences, if any. Note days or periods when no work was in progress and explain the reasons why.
8. Testing and/or inspections performed.
9. List of verbal instruction given by Owner and/or Architect.
10. Signature of Contractor's authorized representative.
3.07 PROGRESS PHOTOGRAPHS
A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.
B. Photography Type: Digital; electronic files.
C. Provide photographs of construction throughout progress of work.
3.08 REQUESTS FOR INFORMATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
B. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.
C. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare using software provided by the Electronic Document Submittal Service.
3. Combine RFI and its attachments into a single electronic file. PDF format is preferred.
D. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 5 OF 8
b. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
2. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response.
3. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.
a. The Owner reserves the right to assess the Contractor for the costs (on time-and-materials basis) incurred by the Architect, and any of its consultants, due to processing of such RFIs.
E. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Official Project name and number, and any additional required identifiers established in Contract Documents.
2. Owner's, Architect's, and Contractor's names.
3. Discrete and consecutive RFI number, and descriptive subject/title.
4. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
5. Annotations: Field dimensions and/or description of conditions which have engendered the request.
6. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example; routing, clearances, and/or specific locations of work shown diagrammatically in Contract Documents. If applicable, state the likely impact of the suggested resolution on Contract Time or the Contract Sum.
F. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
G. Review Time: Architect will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.
1. Response period may be shortened or lengthened for specific items, subject to mutual agreement, and recorded in a timely manner in progress meeting minutes.
H. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith. Identify the amended RFI with an R suffix to the original number.
2. Do not extend applicability of a response to specific item to encompass other similar conditions, unless specifically so noted in the response.
3. Notify Architect within seven calendar days if an additional or corrected response is required by submitting an amended version of the original RFI, identified as specified above.
3.09 SUBMITTAL SCHEDULE
A. Submit to Architect for review a schedule for submittals in tabular format.
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 6 OF 8
1. Coordinate with Contractor's construction schedule and schedule of values.
2. Format schedule to allow tracking of status of submittals throughout duration of construction.
3. Arrange information to include scheduled date for initial submittal, specification number and title, submittal category (for review or for information), description of item of work covered, and role and name of subcontractor.
4. Account for time required for preparation, review, manufacturing, fabrication and delivery when establishing submittal delivery and review deadline dates.
3.10 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 78 00 - Closeout Submittals.
3.11 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Certificates.
2. Test reports.
3. Inspection reports.
4. Manufacturer's instructions.
B. Submit for Architect's knowledge as contract administrator or for Owner.
3.12 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
3.13 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; one of which will be retained by Architect.
1. Retained samples will not be returned to Contractor unless specifically so stated.
3.14 SUBMITTAL PROCEDURES
A. General Requirements:
1. Submit separate packages of submittals for review and submittals for information, when included in the same specification section.
2. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 7 OF 8
3. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number; and specification section number and article/paragraph, as appropriate on each copy.
4. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
5. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
6. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
7. When revised for resubmission, identify all changes made since previous submission.
8. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
9. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
10. Submittals not requested will not be recognized.
B. Product Data Procedures:
1. Submit only information required by individual specification sections.
2. Collect required information into a single submittal.
3. Submit concurrently with related shop drawing submittal.
4. Do not submit (Material) Safety Data Sheets for materials or products.
C. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting Contract Documents and coordinating related work.
2. Do not reproduce Contract Documents to create shop drawings.
3. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
D. Samples Procedures:
1. Transmit related items together as single package.
2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.
3. Include with transmittal high-resolution image files of samples to facilitate electronic review and approval. Provide separate submittal page for each item image.
3.15 SUBMITTAL REVIEW
A. Submittals for Review: Architect will review each submittal, and approve, or take other appropriate action.
B. Submittals for Information: Architect will acknowledge receipt, but will take no other action.
C. Architect's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
1. Notations may be made directly on submitted items and/or listed on appended
Submittal Review cover sheet.
D. Architect's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Exceptions as Noted", or language with same legal meaning.
PASSERO ASSOCIATES SECTION 01 30 00 - Administrative Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 8 OF 8
b. "No Exceptions", or language with same legal meaning.
c. "Exceptions as Noted, Resubmit for Record", or language with same legal meaning.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
2) Non-responsive resubmittals may be rejected.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
E. Architect's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
2. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
END OF SECTION 01 30 00
PASSERO ASSOCIATES SECTION 01 40 00 - Quality Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 4
SECTION 01 40 00 - QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Testing and inspection agencies and services.
E. Control of installation.
F. Tolerances.
G. Manufacturers' field services.
H. Defect Assessment.
1.02 RELATED REQUIREMENTS
A. Section 01 30 00 - Administrative Requirements: Submittal procedures.
B. Section 01 60 00 - Product Requirements: Requirements for material and product quality.
1.03 REFERENCE STANDARDS
A. ASTM C1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants; 2008 (Reapproved 2023).
B. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection; 2020.
C. ASTM E543 - Standard Specification for Agencies Performing Nondestructive Testing;
2026.
D. ASTM E699 - Standard Specification for Agencies Involved in Testing, Quality Assurance, and Evaluating of Manufactured Building Components; 2016.
E. IAS AC89 - Accreditation Criteria for Testing Laboratories; 2021.
1.04 DEFINITIONS
A. Contractor's Quality Control Plan: Contractor's management plan for executing the Contract for Construction.
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Design Data: Submit for Architect's knowledge as contract administrator for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents, or for Owner's information.
1. Include calculations that have been used to demonstrate compliance to performance and regulatory criteria provided, and to determine design solutions.
2. Include required product data and shop drawings.
3. Include a statement or certification attesting that design data complies with criteria indicated, such as building codes, loads, functional, and similar engineering requirements.
4. Include signature and seal of design professional responsible for allocated design services on calculations and drawings.
C. Test Reports: After each test/inspection, promptly submit report electronically to Architect and to Owner.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
PASSERO ASSOCIATES SECTION 01 40 00 - Quality Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 2 OF 4
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
j. Compliance with Contract Documents.
k. When requested by Architect, provide interpretation of results.
2. Test report submittals are for Architect's knowledge as contract administrator for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents, or for Owner's information.
D. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Architect, in quantities specified for Product Data.
1. Indicate material or product complies with or exceeds specified requirements.
Submit supporting reference data, affidavits, and certifications as appropriate.
E. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Owner's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
1.06 CONFLICTING REQUIREMENTS
A. Conflicting Standards and Other Requirements: If compliance with two or more standards or requirements are specified and the standards or requirements establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirements. Refer conflicting requirements that are different, but apparently equal, to Architect for direction before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numberic values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.
1.07 QUALITY ASSURANCE
A. Testing Agency Qualifications:
1. Prior to start of work, submit agency name, address, and telephone number, and names of full time registered Engineer and responsible officer.
2. Qualification Statement: Provide documentation showing testing laboratory is accredited under IAS AC89.
B. Designer Qualifications: Where professional engineering design services and design data submittals are specifically required of Contractor by Contract Documents, provide services of a Professional Engineer experienced in design of this type of work and licensed in the state of Florida.
C. Contractor's Quality Control (CQC) Plan:
1. Prior to start of work, submit a comprehensive plan describing how contract deliverables will be produced. Tailor CQC plan to specific requirements of the project. Include the following information:
a. Management Structure: Identify personnel responsible for quality. Include a chart showing lines of authority.
PASSERO ASSOCIATES SECTION 01 40 00 - Quality Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 3 OF 4
b. Management Approach: Define, describe, and include in the plan specific methodologies used in executing the work.
D. Quality-Control Personnel Qualifications. Engage a person with requisite training and experience to implement and manage quality assurance (QA) and quality control (QC) for the project.
1.08 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Obtain copies of standards where required by product specification sections.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until Substantial Completion.
E. Should specified reference standards conflict with Contract Documents, request clarification from Architect before proceeding.
F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Architect shall be altered from Contract Documents by mention or inference otherwise in any reference document.
1.09 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Contractor shall employ and pay for services of an independent testing agency to perform code required testing and inspection.
B. Owner may employ and pay for services of an independent testing agency (at its discretion) to perform additional testing and inspection.
C. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents, code and other regulatory requirements.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.
PASSERO ASSOCIATES SECTION 01 40 00 - Quality Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 4 OF 4
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 TESTING AND INSPECTION
A. See individual specification sections for testing and inspection required.
3.04 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, test, adjust and balance of equipment as applicable, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
3.05 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
END OF SECTION 01 40 00
PASSERO ASSOCIATES SECTION 01 60 00 - Product Requirements
HANGAR #1 & 2 - ROOF REPLACEMENT PAGE 1 OF 4
SECTION 01 60 00 - PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Re-use of existing products.
C. Transportation, handling, storage and protection.
D. Product option requirements.
E. Maintenance materials, including extra materials, spare parts,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .