Summary of Invitation to Bid 001-2027
This Invitation to Bid (ITB) is issued by the City of Lake City, Florida for the roof replacement of Hangars 1 and 2 at Lake City Gateway Airport. The project involves demolition and removal of existing roofing systems and construction of new roofs on both hangars, with work including roof panel replacement, substructure work, purlin replacement, flashings, gutters, downspouts, trim, and all associated accessories. The project is funded through the Department of Commerce Rural Infrastructure Fund (Grant Agreement D0337_E) under state funding. Bids must be submitted electronically through the OpenGov Procurement portal by November 19, 2026 at 2:00 pm, with bid opening and public reading occurring at 2:15 pm the same day in the City Council Chambers. A non-mandatory pre-bid meeting and site visit are scheduled for October 29, 2026 at 10:00 am at the Airport Conference Room. The question submission deadline is November 5, 2026 at 4:00 pm, with responses due by November 12, 2026. The successful contractor is expected to be selected by December 21, 2026. The contractor must complete all work within 240 calendar days after delivery of equipment, with extension provisions available for inclement weather verified through state forestry records.
The bid pricing is structured with separate line items for four roof sections (A, B, C, and D), each containing a lump sum roof replacement component and purlin replacement measured in linear feet (quantities: 550 LF, 3,850 LF, 500 LF, and 2,850 LF respectively), plus an alternative pricing option for accelerated building shutdown with a maximum 60-day closure period. Payment and performance bonds equal to 5% of the bid amount are required by the submission deadline. The City of Lake City offers a 5% local vendor preference for Columbia County residents under Administrative Policy #18. Payment will be made within 30 days of invoice acceptance following completion and inspection of work. Liquidated damages are assessed at $1,500 per day for failure to meet the completion timeline. Contractors must maintain Commercial General Liability insurance with minimum limits of $1,000,000 combined single limit, workers' compensation insurance, and business vehicle/umbrella liability insurance with $200,000 per occurrence limits. All contractors must comply with E-Verify employment eligibility verification requirements, OSHA safety standards, FAA airport safety protocols, and airport access control procedures including daily check-ins with Airport Operations and mandatory identification requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-10-21_Hangar_#1_&_2_-_Roof_Replacement_Bid_Set.pdf | ||
| Hangars_1_&_2_Roof_Technical_Specifications.pdf | ||
| General_Provisions.pdf | ||
| LCQ_AAR_Hangars_1_&_2_BID_DOCUMENTS.docx | DOCX document | |
| LCQ_AAR_Hangars_1_&_2_Price_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
001-2027
HANGARS 1 AND 2 ROOF REPLACEMENT
City of Lake City
205 N. Marion Ave.
Lake City, FL 32055
RELEASE DATE: October 21, 2026
DEADLINE FOR QUESTIONS: November 5, 2026
PROPOSAL SUBMISSION DEADLINE: November 19, 2026, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/lcfla
Invitation to Bid #001-2027 Title: Hangars 1 and 2 Roof Replacement
City of Lake City
INVITATION TO BID
Hangars 1 and 2 Roof Replacement
I. Introduction II. Instruction To Bidders
III. Scope of Work and Related Requirements IV. General Terms and Conditions V. Pricing Proposal
VI. Vendor Questionnaire
Attachments:
A - Hangars 1 & 2 Roof Technical Specifications
B - 2026-10-21_Hangar #1 & 2 - Roof Replacement_Bid Set
C - LCQ AAR Hangars 1 & 2 BID DOCUMENTS
D - LCQ AAR Hangars 1 & 2 Price Form
E - General Provisions
1. Introduction
1.1. Summary
INVITATION TO BID
001-2027
Sealed bids will be accepted by the City of Lake City, Florida until Thursday, November 19, 2026 at 2:00 pm, local time through the City’s e-Procurement Portal, OpenGov Procurement. Any bids received after the above time will not be accepted under any circumstances. Any uncertainty regarding the time a bid is received will be resolved against the Bidder. Bids will not be accepted through any other means. Bid opening will be promptly at 2:15 PM in the City Council Chambers located on the 2nd floor in City Hall, at which time all bids will be publicly opened and read aloud for the replacement of the existing roofing systems (roof panels and substructure) on:
Hangars 1 and 2 Roof Replacement
Any deviation from the specifications must be explained in detail under “Clarifications and Exceptions”, as part of the Bidder's Response, and each deviation must be itemized by number and must specifically refer to the applicable specification paragraph and page. Otherwise, it will be considered that items offered are in strict compliance with these specifications and the successful Bidder will be held responsible for meeting the specification.
All questions related to this ITB shall be submitted in writing through the OpenGov Procurement
Question/Answer Tab via the City's e-Procurement portal, on or before the Question & Answer
Submission Date by the Question & Answer Submission Time. Please include the section title for each question, if applicable, to ensure that questions are answered correctly.
All questions must be in writing and directed to the Procurement Director. All questions will be answered in writing. Any answers which may alter the scope of work will be answered in the form of addenda. Any and all addenda must be acknowledged through the City's e-Procurement Portal. Deadline for receiving questions is Thursday, November 5, 2026 at 4:00 pm. Questions received after this date and time will not be considered.
Bidder may not withdraw his/her bid for a period of ninety (90) days following the opening of the responses.
The City of Lake City is exempt from State Use Tax, State Retail Tax, and Federal Excise Tax. The bid price must be net, exclusive of taxes. Bidder’s proposal must be dated, signed by an authorized representative, with title, firm name, address, and telephone number.
Local Vendor Preference: City of Lake City Administrative Policy #18 states that the bid of a resident of
Columbia County, Florida will have a 5% preference over the bid submitted by any non-resident of
Columbia County. A resident is defined as an individual whose primary residence is within Columbia
County, Florida, a partnership whose principals are all residents of Columbia County, Florida, a partnership or other business entity whose principal place of business is within Columbia County, Florida, or which maintains a full-time business office open to the public within Columbia County, https://procurement.opengov.com/portal/lcfla?departmentId=all&status=all
Florida. With these and other contributing factors, the City Council reserves the right to award a bid or contract in the best interest of the City.
Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and city holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the Procurement
Department or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.
Any Bidder desirous of protesting a bid for any reason must file a written notice of bid protest with the
City Manager’s office within 72 hours following posting of notice of intended award. All protests will be in writing, stating the bid being protested and the specific reason for the protest. All protests will be signed by the Protestor and include all details for a complete and thorough review. The decision of the
City Manager, after consultation with the City Attorney will be issued within five (5) working days of the receipt of the protest, unless additional time is agreed upon by all parties involved should circumstances warrant such a delay.
By submission of his/her bid, the Bidder certifies that:
1. The bid has been arrived at by the Bidder independently and has been submitted without collusion with any other vendor of materials, supplies, or equipment described in the Invitation to Bid.
2. The contents of the bid have not been communicated by the Bidder, his/her employees or agents, to his/her best knowledge and belief, to any person not an employee or agent of the
Bidder or his surety in any bond furnished herewith and will not be communicated to any such person prior to the official opening of the bids.
The City of Lake City reserves the right to accept or reject any/all bids and to award the contract in the best interest of the City of Lake City, Florida.
CITY OF LAKE CITY, FLORIDA
Don Rosenthal
City Manager
1.2. Contact Information
Project Contact:
Chad Gomes
Airport Director
3524 E HWY 90
Lake City, FL 32055
Email: gomesc@lcfla.com
Phone: (386) 719-5855 mailto:gomesc@lcfla.com tel:(386)719-5855
Procurement Contact:
Brenda Thomason
Procurement Director
205 North Marion Avenue
Lake City, FL 32055
Email: thomasonb@lcfla.com
Phone: (386) 719-5819
Department:
Procurement
1.3. Timeline
Release Project Date October 21, 2026
Pre-Proposal Meeting (Non-Mandatory) October 29, 2026, 10:00am
Airport Conference Room, located at: 3524 US-90
East, Lake City, FL 32055
Join Zoom Meeting:
https://teams.microsoft.com/meet/228728502661
411?p=wcFEhkkJeDlENtR2GX
Meeting ID: 228 728 502 661 411
One tap mobile
+1 323-694-0852, 887777138# United States, Los
Angeles
Phone conference ID: 887 777 138#
Question Submission Deadline November 5, 2026, 4:00pm
Question Response Deadline November 12, 2026, 4:00pm mailto:thomasonb@lcfla.com tel:(386)719-5819 https://teams.microsoft.com/meet/228728502661411?p=wcFEhkkJeDlENtR2GX https://teams.microsoft.com/meet/228728502661411?p=wcFEhkkJeDlENtR2GX
Proposal Submission Deadline November 19, 2026, 2:00pm
Bid Opening read aloud via Zoom Meeting on
11/19/2026 at 2:15pm
Join Zoom Meeting:
https://teams.microsoft.com/meet/256388966362
539?p=D14fQu4TeheVfn9rLk
Meeting ID: 256 388 966 362 539
One tap mobile
+1 323-694-0852,,804618311# United States, Los
Angeles
Phone conference ID: 804 618 311#
Contractor Selection Date December 21, 2026 https://teams.microsoft.com/meet/256388966362539?p=D14fQu4TeheVfn9rLk https://teams.microsoft.com/meet/256388966362539?p=D14fQu4TeheVfn9rLk
2. Instruction To Bidders
2.1. Overview
The City of Lake City is accepting bids for demolition and removal of the current roof and construction of a new roof on Hangar 1 and 2.
Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic response.
2.2. Submittal Deadline
Bids shall be submitted via the City's e-Procurement Portal, OpenGov Procurement, no later than Thursday, November 19, 2026 at 2:00 pm. Late proposals shall not be accepted.
Bids must be submitted via the City's e-Procurement Portal, OpenGov, and may not be delivered orally, by facsimile transmission, or by other telecommunication or electronic means.
2.3. Pre-Bid Meeting
Non-mandatory Pre-bid and site visit will be held on Thursday, October 29, 2026 on site located at
Airport Conference Room, located at: 3524 US-90 East, Lake City, FL 32055 Join Zoom Meeting:
https://teams.microsoft.com/meet/228728502661411?p=wcFEhkkJeDlENtR2GX Meeting ID: 228 728
502 661 411 One tap mobile +1 323-694-0852, 887777138# United States, Los Angeles Phone conference ID: 887 777 138# at 10:00 am. Bidders are highly encouraged to attend.
2.4. Questions
All questions related to this ITB shall be submitted in writing via the OpenGov Question/Answer Tab via the City's e-Procurement portal, on or before Thursday, November 12, 2026 by 4:00 pm. All questions submitted and answers provided shall be electronically distributed via email to bidders following this solicitation on the City's e-Procurement Portal. Oral answers given by anyone shall not be authoritative.
2.5. Addenda
1. The Procurement Department may issue an addendum in response to any inquiry received, prior to the deadline for questions, which changes, adds to, or clarifies the terms, provisions, or requirements of the solicitation. The Bidder should not rely on any representation, statement, or explanation whether written or verbal, regardless of the source, other than those made in this solicitation document or in any addenda issued. Where there appears to be a conflict between this solicitation and any addenda, the last addendum issued shall prevail. Bidders will be notified by email when any addendum are issued.
2. It is the Bidder's responsibility to ensure receipt of all addenda and any accompanying documentation. The Bidder is required to acknowledge receipt of the addenda in the OpenGov system. Failure to acknowledge each addendum in the OpenGov system will prevent your bid from being submitted.
https://procurement.opengov.com/signup
2.6. Contents of Solicitation and Bidders' Responsibilities
It is the responsibility of the Bidder to become thoroughly familiar with the requirements, terms, and conditions of this solicitation. Pleas of ignorance of these matters by the Bidder will not be accepted as a basis for varying the requirements of the City or the amount to be paid to the vendor.
3. Scope of Work and Related Requirements
3.1. General Scope of Work
The City of Lake City intends to undertake a project funded in whole or in part through the Department of Commerce Rural Infrastructure Fund under a Grant Agreement. The Contractor shall comply with all applicable requirements necessary for the City of Lake City to remain in compliance with the Grant
Agreement.
The grant provides state funding to replace the roofs on Hangars 1 and 2 at Lake City Gateway Airport. (LCQ RIF
Grant Agreement D0337_E)
Procurement and contracting for all services shall conform to the state and federal regulations, including
2 CFR, Part 200. All records shall be maintained in accordance with state and federal requirements.
The City of Lake City is an Equal Opportunity Employer. MBE/WBE/DBE businesses are encouraged to participate. In the event of a tie, if one of the businesses involved in the tie is minority- or female-owned, it shall be ranked above the other firm or firms involved in the tie.
In compliance with the Florida Sunshine Amendment and Code of Ethics, the City of Lake City strictly enforces open and fair competition in its ITB's. In accordance with Section 287.133, FS, a person or affiliate that has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal for a contract to provide services to a public entity. A public entity crimes statement is required.
3.2. Specifications
See the bid set attachment for the plans and drawings. See the attached technical specifications.
3.3. Code and Standards
All codes and standards referenced in the Project Manual for the Hangar #1 & #2 Roof Technical Specifications.
3.4. Permitting
The successful contractor shall be responsible for providing all required drawings and specifications required to obtain the appropriate building permits. Permit fees will be paid for by the contractor. The awarded bidder shall secure permits and arrange for inspections as required.
3.5. Installation
A. Overall: Install roofing system in accordance with approved shop drawings and metal roof panel manufacturer's instructions and recommendations, as applicable to specific project conditions; securely anchor components of roofing system in place allowing for thermal and structural movement.
1. Install roofing system with concealed clips and fasteners, except as otherwise recommended by manufacturer for specific circumstances.
2. Minimize field cutting of panels. Where field cutting is required, use methods that will not distort panel profiles. Use of torches for field cutting is prohibited.
B. Accessories: Install necessary components that are required for complete roofing assembly, including flashings, gutters, downspouts, trim, moldings, closure strips, preformed crickets, caps, equipment curbs, rib closures, ridge closures, and similar roof accessory items.
C. Roof Panels: Install metal roof panels in accordance with manufacturer's installation instructions, minimizing transverse joints except at junction with penetrations.
3.6. Protection of Property
1. If property is damaged while performing work specified or is removed for the convenience of the work, it shall be repaired or replaced at the expense of the bidder in a manner acceptable to the City of Lake City.
2. Bidder shall notify the Contract Manager for the City of the work site having pre-existing damage before beginning the work. Failure to do so shall obligate the bidder to make repairs as addressed in this solicitation.
3. Bidder shall be responsible for securing all work areas to be safe.
4. All protection requirements referenced in the Project Manual for the Hangar #1 & #2 Roof
Technical Specifications.
3.7. Safety
The Contractor shall be responsible for the safe conduct of his/her personnel during the execution of the work detailed herein. The Contractor shall meet or exceed the standards set by the Occupational Safety and Health Administration (OSHA) and requirements established by the Federal, State, and Local agencies. Should an unsafe condition be identified during the execution of this work, the Contractor will immediately suspend such activity until a safe method can be employed.
3.8. Employees
1. Contractor shall be responsible for the appearance of all working personnel assigned to the project. Personnel shall be clean and appropriately dressed at all times. Personnel must wear proper identification at all times (company shirts, ID badges, etc.)
2. All personnel of the Contractor shall be considered to be, at all times, the sole employees of the
Contractor, under the Contractor’s sole direction, and not an employee or agent of the City of
Lake City. The Contractor shall supply competent and physically capable employees and the City of Lake City may require the Contractor to remove any employee it deems careless, incompetent, insubordinate, or otherwise objectionable and whose presence on city property is not in the best interest of the City of Lake City. The City of Lake City shall not have any duty to implement or enforce such requirements.
3. Contractor shall assign an “on-duty” supervisor who speaks and reads English.
4. Contractor shall have its employees refrain from the use of tobacco products in the City’s buildings or grounds. Tobacco use will be allowed in designated areas only.
5. Contractor shall be solely responsible for receiving all materials and equipment at the site.
3.9. Storage of Materials
The contractor shall discuss material and/or equipment storage areas with the City Contract Manager.
All storage requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical
Specifications.
3.10. Disposal of Waste
The successful Contractor shall be responsible for the daily disposal of all waste materials, debris, and any and all excess materials, containers, etc. at an off-site location in accordance with local, state and federal regulations. The Contractor shall not use the City dumpsters. Disposal of waste materials shall be in a proper manner in accordance with all environmental guidelines and regulations. Roll-offs will need to be from Waste-Pro.
All disposal requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical
Specifications.
3.11. Hours of Work
1. Limit the conduct of especially noisy, malodorous, and dusty exterior work to the hours of 8:00
AM to 5:00 PM.
2. Extended working hours may be available upon request and approval by the City of Lake City prior to the commencement of the work specified under this contract.
3.12. Warranty
1. The Contractor agrees that the goods furnished under any award resulting from this solicitation shall be covered by the most favorable commercial warranties the Contractor gives any customer for such goods and that the rights and remedies provided therein are in addition to and do not limit those available to the City of Lake City by any other clause of this solicitation.
2. The Contractor warrants that, unless otherwise specified, all materials and equipment incorporated in this solicitation and under the contract shall be new, in first-class condition, and in accordance with the ITB documents. The Contractor further warrants that all workmanship shall be of the highest quality and in accordance with contract documents and shall be performed by persons qualified in their respective trades. Defects discovered during the warranty period shall be corrected by the Contractor to the City of Lake City’s satisfaction.
3. All warranty requirements referenced in the Project Manual for the Hangar #1 & #2 Roof
Technical Specifications.
3.13. Delivery
A. Transport and handle products according to the manufacturer's instructions.
B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.
C. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage.
D. All delivery requirements referenced in the Project Manual for the Hangar #1 & #2 Roof Technical
Specifications.
3.14. Site Access and Security Requirements
Due to the location of work at the City-operated aviation facility, all contractors shall adhere to strict access, escorting, and safety protocols.
1. Access Control
• All contractor personnel must check in daily with Airport Operations.
• Work areas may require escorting depending on operational conditions.
• Unauthorized entry into aircraft operational zones is prohibited.
2. Identification Requirements
All contractor staff must:
• Wear company uniforms or shirts with logos
• Display a company-issued identification badge
• Present government photo ID upon request
3. Vehicle Rules
• Contractor vehicles must be registered daily with Airport Operations.
• Vehicles may only use authorized routes and staging areas.
• Speed limits and ground movement rules must be followed at all times.
4. Restricted Areas
The following are strictly prohibited unless explicitly authorized:
• Entry into aircraft maintenance bays
• Interference with airport operations or equipment
• Access to airfield or aircraft movement areas
5. Safety Compliance
Contractors must:
• Maintain barricades around active work zones
• Follow all OSHA, FAA airport safety, and local regulations
• Report safety incidents immediately to Airport Operations and the City Project Manager
Failure to comply may result in removal from the site or termination of the contract.
4. General Terms and Conditions
4.1. Definitions
1.1. Addendum: A written change to a Solicitation.
1.2. Bid, Offer, or Response: Shall refer to any bid, offer, or response submitted in regard to this
Invitation to Bid that, if accepted, would bind the Contractor to perform the resultant contract.
1.3. Bidder: A general reference to any entity responding to this solicitation and must be the party entering into the Agreement with the City; also includes bidder, contractor, company, respondent, vendor, etc.
1.4. Contract: The Agreement to provide the goods or perform the services set forth in this solicitation.
1.4.1.Purchase of Goods- The contract will be comprised of the solicitation document signed by the vendor with any addenda and other attachments specified incorporated and a City purchase order.
1.4.2.Performance of Services – The contract will be comprised of the Agreement between the City and the vendor, the solicitation document, any addenda, and other attachments incorporated into the agreement.
1.5. Contractor: The vendor to whom award has been made.
1.6. City: Shall refer to City of Lake City, Florida.
1.7. Required Bid Bonds – Bidder is required to send in their bid bonds (if applicable) by the due date and time of the solicitation.
1.8. Invitation to Bid (ITB): Shall mean this solicitation document, including any Addenda, used to communicate City requirements to prospective bidders and to solicit bid responses from them.
1.9. Language: The City has established for purposes of this solicitation that the words “shall”, “must”, or “will” are equivalent in this solicitation and indicate a mandatory requirement or condition, the material deviation from which shall not be waived by the City. A deviation is material if, in the City’s sole discretion, the deficient response is not in substantial accord with this ITB’s mandatory requirements.
The words “should” or “may” are equivalent in this solicitation and indicate very desirable conditions or requirements, but are permissive in nature.
1.10.Owner: Shall refer to City of Lake City, Florida.
1.11. Responsible: Refers to a vendor that has the capacity and capability to perform the work required under a Solicitation and is otherwise eligible for award.
1.13. Responsive: Refers to a Bidder that has taken no exception or deviation from the terms, conditions, and specifications set forth in an ITB. Their bid, offer or response conforms to the instructions and format specified in the solicitation document.
1.14. Solicitation: The written document detailing the solicitation requirements and requesting bids, offers or submittals from Bidders.
4.2. Qualifications of Respondents
The City of Lake City reserves the right, before awarding the contract, to require the Bidder to submit such evidence of his qualifications and experience as it may deem necessary, and may consider any evidence available to it of the financial, technical and other qualifications and abilities of a respondent.
1. The Bidder is assumed to be familiar with all Federal, State or local laws, codes, ordinances, rules and regulations that in any manner affect the work, and to abide thereby if awarded the
Contract. Ignorance of legal requirements on the part of the Bidder will in no way relieve him of responsibility.
2. Any Bidder may be required to show to the complete satisfaction of the City of Lake City that he/she has the necessary personnel, facilities, abilities, and financial resources to perform the work in a satisfactory manner and within the time specified.
3. Bidder must possess any and all required licenses to perform and complete the work necessary in this project. The Bidder must be licensed at the time of submitting their bid and the license must be in effect for the entire period of the project.
4.3. Award
Award may be made to the Bidder which offers the best value to the City. The City reserves the right to reject any and all offers, to waive non-material irregularities or technicalities, and to re-advertise for all or any part of this solicitation as deemed in its best interest. The City shall be the sole judge of its best interest.
4.4. Assignment
The Contractor shall not assign or transfer any contract resulting from this solicitation, including any rights, title, or interest therein, or its power to execute such contract to any person, company, or corporation without the prior written consent of the City.
4.5. Basis for Bidding
The total amount bid shall be based on quantities, unit prices and/or lump sum(s) according to the "
Pricing Table" provided. Any quantities shown in the Pricing Table are estimates for the purpose of arriving at a total bid price for comparison of Bid Responses.
A Bidder's bid prices shall be firm for ninety (90) calendar days, after the solicitation opening date, unless stated differently in the Special Terms and Conditions. In the case of a discrepancy between the unit cost and extended cost, the unit cost quoted will take precedence, and the Procurement
Department shall make and note the correction on the Final Bid Tabulation.
4.6. Bidder Eligibility
It is the policy of the City to encourage full and open competition among all available qualified vendors.
All vendors regularly engaged in the type of work specified in the solicitation are encouraged to submit bids. Eligibility requirements for contract award are:
6.1. Have NO delinquent indebtedness to the City of Lake City or other federal, state, or local agencies;
6.2. Shall be regularly and consistently engaged in providing services the same or similar to those being requested in the solicitation;
6.3. Have adequate financial resources, or the ability to obtain such resources as required during performance of the contract;
6.4. Be able to comply with the required or proposed delivery or performance schedule;
6.5. Have a satisfactory record of performance. Vendors who are or have been seriously deficient in current or recent contract performance (when the number of contracts and the extent of the deficiency of each are considered, in the absence of evidence to the contrary or circumstances properly beyond the control of the contractor) shall be presumed unable to meet this requirement. Past unsatisfactory performance will ordinarily be sufficient to justify a finding of non-responsibility;
6.6. Have a satisfactory record of integrity and business ethics;
6.7. Be properly licensed by the appropriate regulatory agency for the work to be performed;
6.8. Not have any previous or current investigations, regardless of disposition or outcome, by the regulatory agency responsible for licensing Contractors; and
6.9. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
4.7. Cancellation of Solicitation
The City reserves the right to cancel, in whole or in part, any solicitation when it is in the best interest of the City. Availability of all information related to a canceled solicitation is subject to Chapter 119, Florida
Statutes.
4.8. Changing of Forms
If the City discovers any bid forms submitted by a bidder in response to this solicitation have been altered, the City may, at its discretion, disqualify the Bidder and not consider their bid for award.
4.9. Tax Exempt
The City is generally exempt from Federal Excise Taxes and all State of Florida sales and use taxes. The
City will provide a tax exemption certificate upon request. Contractors doing business with the City are not exempt from paying sales tax to their suppliers for materials to fulfill contractual obligations with the City, nor shall any contractor be authorized to use any of the City’s Tax Exemptions in securing such materials.
4.10. Collusion Among Firms
Where two (2) or more related parties, as defined herein, each submit a bid for the same contract, such bids shall be presumed to be collusive. The foregoing presumption may be rebutted by the presentation of evidence as to the extent of ownership, control, and management of such related parties in preparation of such submittals. Related parties shall mean an interested party or the principals thereof which have a direct or indirect ownership interest in another interested party for the same contract or in which a parent company or the principals thereof of one interested party have a direct or indirect ownership interest in another interested party for the same contract. Furthermore, any prior understanding, agreement, or connection between two (2) or more corporations, firms, or persons submitting a response for the same materials, supplies, services, or equipment shall also be presumed to be collusive. The relationship of a manufacturer or their representative(s) providing pricing to distributors while each party submits a bid for the same materials, supplies, services, or equipment shall be presumed to be collusive. Responses found to be collusive shall be rejected. Respondents that have been found to have engaged in collusion may be considered non-responsible, and may be suspended or debarred, and any contract resulting from collusive actions may be terminated for default.
4.11. Conflict of Interest
The award hereunder is subject to Chapter 112, Florida Statutes. All respondents must disclose with their response the name of any officer, director, or agent who is also an employee of the City of Lake
City. Further, all respondents must disclose the name of any City of Lake City employee who owns, directly or indirectly, an interest of five percent (5%) or more of the Bidder's firm or any of its branches.
4.12. Conflicts within the Solicitation
Where there appears to be a conflict between the General Terms and Conditions, Special Terms and
Conditions, the Supplemental Terms & Conditions the Statement of Work, the Schedule of Bid Items, or any addendum issued, the order of precedence shall be the last addendum issued, the Schedule of Bid
Items, the Statement of Work, the Special Terms & Conditions, the Supplemental Terms & Conditions and then the General Terms & Conditions. In addition, in the case of a conflict between any term or provision contained in contract documents which cannot be resolved by the order of precedence set forth previously, the term or condition that is more stringent and/or specific shall govern and apply.
4.13. Continuation of Work
Any work that commences prior to and will extend beyond the expiration date of the current contract period shall, unless terminated by mutual written agreement between the City and the vendor, continue until completion without change to the then current prices, terms and conditions.
4.14. Cost of Preparing Bid Response
All costs incurred by the Bidder for proposal preparation and participation in this competitive procurement will be the sole responsibility of the Bidder. The City of Lake City shall not reimburse any
Bidder for any such costs.
4.15. Execution of Contract
The Contractor to whom the City intends to award a Contract will be required to execute an Agreement within ten (10) days from the date of the Notice of Recommendation for Award, and deliver these executed instruments as instructed to the City of Lake City Procurement Department.
4.16. Interpretation of Contract Documents
Each Bidder shall thoroughly examine the Forms Response Form, and all other papers comprising the
Contract Documents. He shall also examine and judge for himself all matters relating to the location and the character of the proposed work. If the Bidder should be of the opinion that the meaning of any part of the specifications is doubtful or obscure, or that they contain errors or reflect omissions, he should report such opinion or opinions in writing for an interpretation to the Procurement Department at 205
N. Marion Ave., Lake City, FL 32055 or by email to procurement@lcfla.com. Your notification should be made immediately, but in no case no later than seven (7) business days before the due date and time.
The City shall not be responsible for oral interpretation given by any City representative, the issuance of a written addendum being the only official method whereby such an interpretation will be given. The failure of the Bidder to direct the attention of the Purchasing Representative to errors or discrepancies will not relieve the Bidder, should he be awarded the contract, of responsibility for performing the work to the satisfaction of the City of Lake City in accordance with the specifications.
4.17. Liability
The Contractor shall hold and save the City of Lake City, its officers, agents, and employees harmless from liability of any kind in the performance of or fulfilling the requirements of a Contract resulting from this solicitation.
4.18. Notice to Proceed
Following contract award, the City shall schedule with Contractor a pre-construction meeting. At that meeting, the parties will mutually agree on a project's start date, which will be used as the Notice to
Proceed date. The City shall provide the Notice to Proceed (NTP) to the Contractor. Contractor shall sign the NTP acknowledging receipt and agreeing to the dates. The performance period will be defined in the
NTP using the NTP date with the days stated in the Time of Completion paragraph of the Contract
Documents.
4.19. Price Bid
The unit prices, lump sum(s) and total price bid for the work shall be stated in figures in the appropriate places on the prescribed form(s), and shall be firm for ninety (90) calendar days after the solicitation opening date, unless stated differently in the Special Terms and Conditions. In the case of a discrepancy between the unit cost, and extended cost the unit cost quoted will take precedence.
4.20. Protests
Protests can only be made by Interested Parties. Any Bidder desirous of protesting a bid for any reason must file a written notice of bid protest with the City Manager’s office within 72 hours following posting of notice of intended award. All protests will be in writing, stating the bid being protested and the specific reason for the protest. All protests will be signed by the Protestor and include all details for a complete and thorough review. The decision of the City Manager, after consultation with the City
Attorney, will be issued within five (5) working days of the receipt of the protest, unless additional time is agreed upon by all parties involved should circumstances warrant such a delay.
4.21. Public Entity Crime
Pursuant to Section 287.133(12)(a) of the Florida Statutes, a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid Response on a contract to provide any goods or services to a public entity, may not submit a bond on a contract with a public entity for the construction or repair of a public building or public work, may not submit Bid
Responses on leases of real property to a public entity may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017 for Category Two ($25,000) for a period of 36 months from the date of being placed on the convicted vendor list."
4.22. Public Record
The Owner is a public agency subject to Chapter 119, Florida Statutes. The Contractor shall comply with
Florida’s public records law. Specifically, the Contractor shall:
1. Keep and maintain public records required by the public agency to perform the service.
2. Upon request from the public agency’s custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law.
3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the public agency.
4. Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the contractor or keep and maintain public records required by the public agency to perform the service. If the contractor transfers all public records to the public agency upon completion of the contract, the contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the contractor keeps and maintains public records upon completion of the contract, the contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency’s custodian of public records, in a format that is compatible with the information technology systems of the public agency
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA
STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT (386) 719-5826 OR (386) 719-5756, CITYCLERK@LCFLA.COM, CITY CLERK'S OFFICE, 205 N MARION AVE., LAKE CITY, FL, 32055.
4.23. Insurance
1. Without limiting Contractor's indemnification, it is agreed that the successful Contractor will purchase at their expense and maintain in force at all times during the performance of services under this agreement the following insurance. Where specific limits are shown, it is understood that they must be the minimum acceptable limits. If the Contractor's successful policy contains higher limits, the City of Lake City will be entitled to coverage to the extent of such higher limits.
Certificates of Insurance must be furnished to the City naming the City of Lake City as additional insured. These certificates must provide a ten (10) calendar day notice to the City in the event of cancellation, non-renewal or a material change in the policy.
2. Statutory Workers' Compensation insurance as required by the State of Florida.
3. Commercial General Liability insurance to provide coverage of not less than $1,000,000.00 combined single limit per occurrence and annual aggregates where generally applicable and must include premises-operations, independent contractors, products/completed operations, broad form property damage, blanket contractual and personal injury endorsements.
4. Business Vehicle/Umbrella Liability insurance with a minimum limit of $200,000 per occurrence, and $300,000 for all claims arising out of the same incident or occurrence, for property damage and personal injury. Notice, these limits may change according to Florida law and the protections afforded to the City pursuant to sovereign immunity for liability.
4.24. Indemnity
Successful contractor will indemnify and hold Owner and Owner’s agents harmless from any loss, cost, damage or injury sustained by any persons as a result of the actions of employees or officers of the
Contractor, subcontractors or suppliers.
4.25. Liquidated Damages
In the event the bidder is awarded the contract and fails to complete the work within the time limit or extended time limit agreed upon, liquidated damages will be paid to the City of Lake City at the sum of
$1500.00 per day for all work awarded under the contract until the work has been satisfactorily completed and accepted by the City.
4.26. Schedule
1. Upon receipt of all required documents, a Notice to Proceed will be issued.
2. The successful Contractor must complete all work within two hundred forty (240) calendar days after delivery of equipment.
4.27. Special Conditions
1. Extended time may be allowed for the completion of this project due to inclement weather.
2. Decisions to allow days added to the contract due to inclement weather will be based upon weather records as recorded with the State of Florida, Division of Forestry located in Lake City, Florida and approved by the City of Lake City Project Manager.
3. In the event additional days are awarded the contractor must notify the City of Lake City
Procurement department at the beginning of work stoppage and each succeeding day until work can be safely resumed.
4.28. Payment
Payment will be based on: (a) City’s acceptance of work, and (b) submitted evidence, if requested by the
City, that all payrolls, materials, bills, and indebtedness connected with the work have been paid. The
City may withhold an amount as may be necessary to pay such claims for labor and services rendered and materials involved with the work. Payment to Contractor will be made within thirty (30) calendar days of receipt of invoice, assuming there are no contested amounts with the invoice.
4.29. Or Equal
Any manufacturers’ names, trade names, brand names or catalog numbers used in the specifications are for the purpose of describing and establishing general performance and quality levels. Such references are not intended to be restrictive. Bids are invited on these, and comparable brands or products provided the quality of the proposed products meet or exceed the quality of the specifications listed for any item. All requests for “or equal” consideration must be received prior to the deadline for receiving questions.
4.30. Experience/References
Bidders must provide a statement of qualifications and include with their proposal a minimum ofthree
(3)references for similar projects in the last five (5) years. The list of references must be submitted as a part of the bidder response as provided within the vendor questionnaire. All reference materials provided become the property of the City of Lake City and also become public record.
4.31. Change Orders
1. Notify the City of Lake City of any conditions in the project area that are not addressed within the specifications that may require a change order.
2. Change orders to the scope of work or additional work requested by the City of Lake City must be in written form and initiated by the Contractor.
3. All changes or additions will be approved by the City of Lake City prior to work being initiated.
4.32. Addendum
It will be the sole responsibility of the bidder to contact the Purchasing Department prior to submitting a bid to determine if any addenda have been issued, to obtain such addenda, and to acknowledge addenda with their bid. Failure to submit acknowledgment of any addendum that affects the bid price is considered a major irregularity and will be cause for rejection of the bid.
4.33. Required Documents
The enclosed documents must be executed and returned with the bid proposal, or the proposal may be considered non-responsive. (Conflict of Interest Statement, Disputes Disclosure Form, Drug Free
Workplace Certificate, Non-Collusion Affidavit of Proposer, References, Public Entity Crime Statement and E-Verify Affirmation Statement.
4.34. Employment Eligibility Verification (E-Verify)
In accordance with State of Florida, Office of the Governor, Executive Order 11-116 (superseding
Executive Order 11-02; Verification of Employment Status), in the event performance of this Agreement is or will be funded using state or federal funds, the CONTRACTOR must comply with the Employment
Eligibility Verification Program(“E-Verify Program”) developed by the federal government to verify the eligibility of individuals to work in the United States and 48 CFR 52.222-54 (as amended) is incorporated herein by reference. If applicable, in accordance with Subpart 22.18 of the Federal Acquisition Register, the CONTRACTOR must (1) enroll in the E-Verify Program, (2) use E-Verify to verify the employment eligibility of all new hires working in the United States, except if the CONTRACTOR is a state or local government, the CONTRACTOR may choose to verify only new hires assigned to the Agreement; (3) use
E-Verify to verify the employment eligibility of all employees assigned to the Agreement; and (4) include these requirement in certain subcontracts, such as construction. Information on registration for and use of the E-Verify Program can be obtained via the internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.
4.35. Payment And Performance Bonds
Payment and performance bonds are required for this bid in the amount of 5%, due by 2 pm on
November 19, 2026.
4.36. Additional Information
The City of Lake City reserves the right to request any additional information needed for clarification from any Bidder for evaluation purposes.
5. Pricing Proposal
BID A: ROOF REPLACEMENT OF ROOF A
Line Item Description Quantity Unit of
Measure Unit Cost Total
A1 Roof Replacement 1 LS
A2 Purlin Replacement 550 LF
TOTAL
BID B: ROOF REPLACEMENT OF ROOF B
Line Item Description Quantity Unit of
Measure Unit Cost Total
B1 Roof Replacement 1 LS
B2 Purlin Replacment 3,850 LF
BID C: ROOF REPLACEMENT OF ROOF C
Measure Unit Cost Total
C1 Roof Replacement 1 LS
C2 Purlin Replacement 500 LF
BID D: ROOF REPLACEMENT OF ROOF D
Measure Unit Cost Total
D1 Roof Replacement 1 LS
D2 Purlin Replacement 2,850 LF
Measure Unit Cost Total
ALTERNATIVE 1: ROOF REPLACEMENT OF ROOF D
Measure Unit Cost Total
1 Accelerated Building Shutdown-maximum building shutdown period of 60 consecutive calendar days for the entire project (See Section 01
23.00, Alternate No. 1). Alternate applies only if Bids A, B, C, and D are all awarded. Price shall be the added cost only and shall not include the
Base Bid amounts.
1 LS
6. Vendor Questionnaire
6.1. Required Documents*
Please upload all required documents.
*Response required
| 1. Introduction |
| 1.1. Summary |
| 1.2. Contact Information |
| 1.3. Timeline |
| 2. Instruction To Bidders |
| 2.1. Overview |
| 2.2. Submittal Deadline |
| 2.3. Pre-Bid Meeting |
| 2.4. Questions |
| 2.5. Addenda |
| 2.6. Contents of Solicitation and Bidders' Responsibilities |
| 3. Scope of Work and Related Requirements |
| 3.1. General Scope of Work |
| 3.2. Specifications |
| 3.3. Code and Standards |
| 3.4. Permitting |
| 3.5. Installation |
| 3.6. Protection of Property |
| 3.7. Safety |
| 3.8. Employees |
| 3.9. Storage of Materials |
| 3.10. Disposal of Waste |
| 3.11. Hours of Work |
| 3.12. Warranty |
| 3.13. Delivery |
| 3.14. Site Access and Security Requirements |
| 4. General Terms and Conditions |
| 4.1. Definitions |
| 4.2. Qualifications of Respondents |
| 4.3. Award |
| 4.4. Assignment |
| 4.5. Basis for Bidding |
| 4.6. Bidder Eligibility |
| 4.7. Cancellation of Solicitation |
| 4.8. Changing of Forms |
| 4.9. Tax Exempt |
| 4.10. Collusion Among Firms |
| 4.11. Conflict of Interest |
| 4.12. Conflicts within the Solicitation |
| 4.13. Continuation of Work |
| 4.14. Cost of Preparing Bid Response |
| 4.15. Execution of Contract |
| 4.16. Interpretation of Contract Documents |
| 4.17. Liability |
| 4.18. Notice to Proceed |
| 4.19. Price Bid |
| 4.20. Protests |
| 4.21. Public Entity Crime |
| 4.22. Public Record |
| 4.23. Insurance |
| 4.24. Indemnity |
| 4.25. Liquidated Damages |
| 4.26. Schedule |
| 4.27. Special Conditions |
| 4.28. Payment |
| 4.29. Or Equal |
| 4.30. Experience/References |
| 4.31. Change Orders |
| 4.32. Addendum |
| 4.33. Required Documents |
| 4.34. Employment Eligibility Verification (E-Verify) |
| 4.35. Payment And Performance Bonds |
| 4.36. Additional Information |
| 5. Pricing Proposal |
| 6. Vendor Questionnaire |
| 6.1. Required Documents* |
File details come from the government source that posted it. Updated .