L-5 Quality Assurance Surveillance Plan (QASP).docx
DOCX document 63 KB Posted
- Attached to
- JWCC UCM Core Solicitation
- Solicitation number
- 852571198_
- Issued by
-
Defense Information Systems Agency
About this file
This is a Quality Assurance Surveillance Plan (QASP) document for the JWCC UCM Core Solicitation, a hyperscale cloud services requirement managed by the Defense Information Systems Agency (DISA). The QASP serves as the Government's tool for monitoring contractor performance and ensuring compliance with contract requirements throughout the performance period. The document establishes quality standards, inspection procedures, and performance metrics that the contractor must meet for cloud infrastructure and management services. It defines the surveillance methodology, including specific performance indicators, acceptable quality levels, and remedies for non-conformance, enabling DISA to systematically assess whether the contractor is delivering services in accordance with the Performance Work Statement and contract specifications.
The QASP is one of multiple supporting documents accompanying the JWCC UCM Core final solicitation, which includes attachments covering performance requirements, security documentation, pricing, reporting obligations, and small business subcontracting plans. Questions regarding this solicitation were due by September 11, 2026 at 9:00 AM Central Time, and proposals were due by October 6, 2026 at 11:00 AM Central Time, both submitted to DISA Scott AFB PSD. The surveillance plan ensures Government oversight of contractor performance on what represents a critical defense cloud computing initiative under the Joint Warfighting Cloud Capability (JWCC) contract vehicle.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract Title Joint Warfighting Cloud Capability (JWCC) Unified Cloud Marketplace (UCM) Core
2. Purpose:
This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The purpose of this plan is to identify the methods and procedures the Government will use to ensure it receives the offerings required under this contract, and the associated task orders (TOs), including those measures and metrics identified in the Performance Work Statement (PWS).
2.1. Intent.
The intent of this plan is to allow the Government to consistently and fairly monitor the Contractor’s quality control practices applied to delivered outcomes. In the event there is a quality issue, this plan provides the basis to identify any weaknesses or deficiencies and enables the Government to provide the Contractor with the necessary information required for corrective actions to be taken to improve quality, processes and procedures. The Contractor is responsible for developing an effective and efficient methodology to ensure they meet and/or exceed the required thresholds of service stipulated in this contract. The Government intends to perform surveillance on this contract in accordance with this Quality Assurance Surveillance Plan (QASP) but reserves the right to monitor the contract in any manner and at any time necessary to ensure that the services provided conform to contract requirements. The Government reserves the right to apply quality assurance at the subcontract level, and may perform quality assurance at the Contractor's, or subcontractor’s, place of business. Non-conforming services discovered with subcontractors will be identified to the prime Contractor for resolution.
2.2. Authority.
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation (FAR), Inspection of Services clauses, which provide for inspection, acceptance and documentation of the services called for in the contract or orders. This acceptance is to be executed by the Contracting Officer (KO) or a duly authorized representative.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Other Key Government Personnel – This may include performance monitors, inspectors, technical experts, workforce service division and center directorate level security personnel, requirements office, or others (i.e. users) who provide information that helps the COR monitor contractor performance.
Contractor – Roles and Responsibilities of the Contractor as related to quality assurance are as follows:
· Complies fully with the terms and conditions of the contract.
· Participates as a member of the multi-functional team after contract award.
· Maintains and implements a quality control plan that is acceptable to the Government.
· Ensures that non-conformance of contract requirements is identified, corrected, and prevents recurrence.
· Tenders to the Government for acceptance only those services that conform to contract requirements.
· Recommends any changes to the contract that will provide more effective operations or eliminate unnecessary costs
4. Primary Method of Surveillance:
A combination of random sampling, 100% inspection and stakeholder input will be used to evaluate contractor performance for this IDIQ. Periodic Inspection applies to all required deliverables and Contract Data Requirement Lists (CDRLs), stakeholder input may be utilized to either initiate inspections or supplement any issues discovered resulting from these inspections.
The performance standards, acceptable quality level (AQL) and surveillance methods are outlined in Section 5. In addition to the Performance Standards defined in Section 5 below, the Government shall perform annual surveillance for contractor compliance as required by FAR 52.222-50, Combating Trafficking in Persons (see Section 7 below).
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished. Therefore, you know exactly when to conduct the evaluations. Periodic inspections automatically become 100 percent evaluations or "100 percent checks." Inspections should be divided and scheduled by frequency: annual, semiannual, quarterly, monthly, weekly and as required. Sometimes services are required for which the time or frequency cannot be predicted, such as accident investigations, one-time special tasking by higher headquarters, etc. These would be labeled "as required inspections." Others are known and predictable such as the quarterly status report or the monthly travel report currently included in some DISA service contracts.
· Stakeholder Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
Surveillance Matrix
The Surveillance Matrix is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.
5. Performance Standards:
| Performance Standard |
| Acceptable Quality Level |
| Methods of Surveillance |
6.1.1 Identify Key Personnel
6.1.2.2.1 Program Management Plan
6.1.2.2.1.4 Ad Hoc Reporting/Information Products
6.1.2.2.2 Communication Plan
6.1.2.2.3 Risk Management Plan
6.1.2.2.4 Quality Control Plan
6.1.2.2.5 Information Technology Service Management (ITSM) Plan
6.1.2.2.6 Lifecycle Management Plan
6.2.4.3 Ordering Guide Inputs
6.2.10 Training and Documentation
6.3.1 Cybersecurity Management Plan
6.3.4 Support of DoD Zero Trust Strategy
6.3.6.1 Controlled Cryptographic Item Management Plan
6.3.9.1 Supply Chain Risk Management Plan
6.3.12.2 Self-Certification of Control
6.3.12.2.2 Co-Use Agreements
6.3.13 System and Organization Controls (SOC) 1 Type II
6.6.2 Policy Implementation, Automation, and Monitoring
Contract Management (CDRL A001)
| The Plan shall contain the mutually agreed-to content 90% of the time |
| 100% inspection |
6.1.2 Presentation Materials
Requirements per CDRL A002 Kickoff Meeting Materials required two business days prior to Kickoff IPR Meeting Materials required three business days prior to IPR TEMs and all other meeting materials within timelines agreed to, upon Government request Minimum Acceptable:
90% on-time delivery of Meeting Materials 100% inspection
6.1.2.2.1.4 Ad Hoc Reporting/Information Products
Requirements per CDRL A008
| Ad Hoc Reports submitted in response to Government requests as mutually agreed to 90% of the time. |
| 100% inspection |
6.1.2.2.8 Contract Monthly Progress Report (CMPR)
Requirements per CDRL A003
| Reports shall contain mutually agreed to content and be submitted according to schedule set by KO 90% of the time. |
| 100% inspection of CMPR |
6.1.3 JWCC UCM Core Service Catalog
Requirements per CDRL A004
| Catalogs shall contain mutually agreed to content and be provided according to schedule set by KO 90% of the time. |
| 100% inspection of authorization status of Services |
6.2.2.3.2 Exception requests for “high availability” capability
6.2.2.7.2 Data Center Timeline Extension Request
6.2.2.2 Exception requests for Contractor Lifecycle Management Plan
6.2.8.1.1 Exception requests for Artificial Intelligence and Advanced Data Analytics
6.2.8.1.2 Exception requests for Artificial Intelligence and Advanced Data Analytics
6.2.11.8 Exception Request for JWCC Console Third-Party Service Provider (3SP) Mandatory Addendum to Licens Agreements or SLAs
6.4.3.3 Extension Request for DoD Account Provisioning API
Requirements per CDRL A006, JWCC UCM Core Exception/Extension Request PWS requirements 90% of the time.
6.2.4.2 Contractor Cloud Information Portal
| The Contractor’s Cloud Information Portal shall contain the mutually agreed-to content 90% of the time |
| Random sampling and stakeholder input |
6.2.2.5 – Service Incident Reports Service Incident Follow-up Reports Service Incident After-Action Reports
Requirements per CDRL A005
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
6.2.2.6. - Service Health Dashboard
| The Service Health Dashboard shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.2.3.4 - Peering Report Requirements per CDRL A08
| The Peering report shall be provided 90% of the time, within 12 months of DoD notifying the Contractor of new location, and contain latency information, as stipulated in the PWS |
| 100% inspection |
6.2.4.4 - Contractor Calculator
| The Contractor Calculators shall meet the mutually agreed-to requirements 90% of the time |
| 100% initial inspection and random sampling, thereafter and stakeholder input |
| 6.2.5 Service Parity |
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random inspection and stakeholder input |
| 6.2.6 Service Delivery |
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection via submitted Service Catalogs, Authorization Letters |
6.2.6.2 - Special Access Program (SAP) Requirements per CDRL A007
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
6.2.6.3 - Cross-Domain Solution Requirements per CDRL A007
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
6.2.7 - Edge Device Specifications and Hardware Asset Management Processes Requirements per CDRL A009 The Contractor shall meet the mutually agreed-to requirements 90% of the time
100% inspection
6.2.11 - JWCC UCM Core Console Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.3.5.3 - Security Authorization Letters
6.3.5.5 - SAP Authorization Information
6.3.5.6 - CDS Authorization Information Requirements per CDRL A007 The Contractor shall meet the mutually agreed-to requirements 90% of the time Access to authorization BoE within five days of Government request 90% of the time 100% inspection
6.3.2 Auditing, Logging and Monitoring
Requirements per CDRL A08 The Contractor shall meet the mutually agreed-to requirements 90% of the time
Periodic inspection, as required
| 6.3.3 Cybersecurity Assessments of JWCC UCM Core Infrastructure |
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection, as required and stakeholder input |
6.3.6.1 - CCI Tracking Documents (SF-153, Orders, Returns, Transfers, Needs) Requirements per CDRL A007
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection, as required |
6.3.7 – Vulnerability, Cybersecurity Incident, and Breach Capability Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection, as required and stakeholder input |
6.3.10.2 - Cybersecurity Incident Reports Requirements per CDRL A005
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
6.3.10.3 Cyber Cooperation and Information Sharing
6.3.10.4 Cybersecurity Queries
Requirements per CDRL A08
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
6.3.10.9 Execution of Directives
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection, as required |
6.3.10.8 Third Party Marketplace Vulnerability Report
Requirements per CDRL A005
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection, as required |
6.4.1 - Secure Data Transfer Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.4.2 - Contractor API and End Point Link Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.4.3 - DoD Account Provisioning Tool API Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.6.1.1 - FinOps Data set Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection |
6.6.1.1 - FinOps Documentation Requirements per CDRL A001
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Periodic inspection |
6.6.1.4 - Spend Threshold Capability Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.6.1.5 - Billing Capability (Time-based & Real-Time) Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.6.1.6 - Financial Reporting Capability Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.6.2 - Policy Implementation Capability Deliverable
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| Random sampling and stakeholder input |
6.7 - Desired Capabilities and Emerging Technologies Requirements per CDRL A002
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
12.1 Government-Furnished Property Reporting
Requirements per CDRL A008
| The Contractor shall meet the mutually agreed-to requirements 90% of the time |
| 100% inspection |
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 1). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the 0.5% administrative billing fee associated with that specific task order.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 2) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication and may be through the PAR template (Appendix 2). The COR shall document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 3).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.
7. Mandatory or regulatory compliance items:
The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO. The contractor shall inform its employees in writing of contractor employee whistleblower rights and protections as required by DFARS 252.203-7002, Requirement to Inform Employees of Whistleblower Rights. The contractor shall also ensure that the clause is included in all subcontracts. No later than 60 days prior to expiration of the period of performance, the contractor shall provide written affirmation to the COR that a written notification was provided to Contractor employees and the forum/means in which the written notification was provided (e.g., posted in hallways, cubicle spaces, common room spaces, email correspondence).
8. Acceptable Quality Level (AQL):
AQL for tasks on this IDIQ are detailed in Section 5 above.
9. Evaluation Method:
The COR will distribute deliverables to the Program Management Office for technical review and recommendations for acceptance. The COR will review all contractor deliverables for completeness, accuracy, and compliance with the requirements outlined in the contract. Furthermore, the COR will continuously monitor contractor performance against the Performance Requirements through observation, sampling, and review of contractor-provided performance data. Any identified deficiencies in deliverables or performance will be documented and communicated to the contractor in writing, including specific corrective actions required and a specific timeline for completion. Repeated or significant performance failures will be escalated according to the procedures established in the contract and the separate Evaluation Plan.
10. Performance Rating
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
| Rating |
| Definition |
| Note |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter). |
| Unsatisfactory |
| Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
| To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters). |
Appendix 1 – Performance Assessment Report
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 2 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 3 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Controlled By: DISA Controlled By: J-924 CUI Category: PROCURE Distribution/Dissemination Control: FEDCON POC: disa.meade.j-9.list.jwcc-next@mail.mil