J-9 - B678 Submittal Register.pdf

PDF 810 KB Posted

Attached to
Building 678 Laboratory Expansion Federal contract opportunity
Solicitation number
FA448422R0010
Issued by
Department of the Air Force Air Mobility Command

About this file

This federal solicitation is for construction services for a laboratory expansion project at Joint Base McGuire Dix Lakehurst in New Jersey. The project scope includes demolition, construction, renovation, and related work for administrative spaces. The contract period of performance is one year. This is a set aside for a HUB Zone Small Business with an estimated value between $5 and $10 million. The NAICS code is 236220. Prices must be included on the bid schedule attachment by the deadline of 2PM EST on 2 May 2022. A site visit will be held on 12 April and questions are due by 2PM EST on 19 April. The solicitation will be evaluated based on price and past performance.

View the file

Other files for this federal contract opportunity

Other files attached to Building 678 Laboratory Expansion, newest first.
File Type Posted
NEW - Solicitation Amendment FA448422R00100002 SF 30.pdf PDF
NEW - Geo Tech Report.pdf PDF
NEW - JBMDL B678 Laboratory Expansion_M20 - Sheet - M-103 - MECHANICAL FLOOR PLAN - AREA B.pdf PDF
NEW - 0690-00-JBMDL B678_S-004_Amendment 1.pdf PDF
NEW - Sign In Sheet - B678 Site Visit.pdf PDF
NEW - FA448422R0010 B678 Lab Expansion Q and A.pdf PDF
NEW - 2022-04-20 JBMDL B678 BIDDER RFI 0001 AE002.pdf PDF
Solicitation Amendment FA448422R00100001 SF 30.pdf PDF
UPDATED L-1 - Section L - Instructions Conditions Notices to Offerors or Quoters.pdf PDF
Solicitation - FA448422R0010.pdf PDF
B-2 Bid Form - B678.xlsx XLSX spreadsheet
C-1 - Statement of Work - B678.pdf PDF
J-3 - JB MDL AT Awareness Guide for Contractors.pdf PDF
M-1 - Section M - Evaluation Factors for Award.pdf PDF
C-2 - B678 Specifications.pdf PDF
J-4 - JB MDL SFS Appendix.pdf PDF
J-7 - Past Performance Questionnaire - B678.pdf PDF
J-8 - B678 Drawings.pdf PDF
B-1 Bid Schedule B678.docx DOCX document
J-2 - JB MDL Antiterrorism Awareness for Contractors (Trifold).pdf PDF
L-1 - Section L - Instructions Conditions Notices to Offerors or Quoters.pdf PDF
J-1 - Wage Determination - New Jersey - Building Construction.pdf PDF
J-5 - Medical Statement for Contractors.pdf PDF
J-6 - EAL Form - B678 Laboratory Expansion Pre-Proposal Site Visit - 20220412.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 72 PAGES

Support Equipment ALRE Materials Laboratory Expansion, BLDG 678

01 11 00 SD-01 Preconstruction Submittals

1.6 G ROSalvage Plan

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.13 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

1.5.3.1 GAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable

Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 72 PAGES

01 35 26 SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.7.2.2 G ROStandard Lift Plan

1.7.2.3Critical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet;

1.14.1 G ROPortable Gauge Operations

Planning Worksheet;

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

1.6.1.4 GContractor Computer

Cybersecurity Compliance

Statements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 72 PAGES

01 50 00 1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SD-03 Product Data

1.4 GBackflow Preventers

SD-06 Test Reports

3.4Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 GEnvironmental Protection Plan

3.2.1.1 GStormwater Pollution Prevention

Plan

3.2.1.2 GStormwater Notice of Intent

1.7.9.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications

SD-06 Test Reports

3.2.1.3Inspection Reports

1.10.1 GMonthly Solid Waste Disposal

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 72 PAGES

01 57 19 SD-07 Certificates

1.6.5 GEmployee Training Records

1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 GStormwater Notice of Termination

3.6.1 GWaste Determination

Documentation

3.6.3.5 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.5 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.6.2.1 GProject Solid Waste Disposal

Documentation Report

3.6.3.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.6.2.1 GSales Documentation

3.6.2.1Contractor Certification

3.2.1.5As-Built Topographic Survey

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.5Warranty Tags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 72 PAGES

01 78 00 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

2.2 GCertification of EPA Designated

Items

3.9.1 GInterim DD FORM 1354

3.9.2 GChecklist for DD FORM 1354

3.9.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 72 PAGES

01 78 23 1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 G RONotification

SD-11 Closeout Submittals

3.3.4Receipts

03 30 00 SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder and Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 72 PAGES

03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

3.14.2.3 GCompressive Strength Tests

3.14.2.4Air Content

3.14.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 72 PAGES

03 30 00 1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

2.6.6 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay Brick

2.6.2 GVeneer Anchors

2.2.3.1.1 GCement

2.4.1.1 GCementitious Materials

2.6.10 GInsulation

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay Brick

3.6.7 GFlashing and Weeps

2.2.3.1 GConcrete Masonry Units (CMU)

3.6.7 GPolyethylene Drainage Mesh

2.4.1.4 GAdmixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 72 PAGES

04 20 00 2.6.2 GVeneer Anchors

1.3.1.3 GJoint Reinforcement

2.6.8 GClay Masonry Expansion-Joint

Materials

2.6.10 GInsulation

2.1.2 GMasonry Compressive Strength

3.2.5 GBracing Calculations

SD-06 Test Reports

1.3.2Efflorescence Test

2.2.2.1.3Efflorescence Test

3.8.1.1Field Testing of Mortar

3.8.1.2Field Testing of Grout

SD-07 Certificates

2.2.2Clay Brick

2.2.3.1Concrete Masonry Units (CMU)

2.2.4Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

1.3.1.3Joint Reinforcement

2.6.10Insulation

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

05 12 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 72 PAGES

05 12 00 1.5.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.5.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-05 Design Data

1.5.3 GDesign Calculations for Steel

Connections

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.2.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 72 PAGES

05 12 00 1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.5.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 72 PAGES

05 30 00 SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Galvanizing Repair Paint

2.2.16Mechanical Fasteners

2.1.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 G ROFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.6.2 G ROMetal Framing Calculations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 72 PAGES

05 40 00 1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.4 GAngles and Plates

05 72 00 SD-01 Preconstruction Submittals

1.3.3 GExisting Conditions

SD-02 Shop Drawings

2.2 GOrnamental Metal Items

3.1 GInstallation Drawings

3.1 GShop and Field Connections

3.1 GConstruction Details

SD-03 Product Data

2.1 GMaterials

2.2 GOrnamental Metal Items

2.2.2Aluminum-Alloy Extrusions

2.2.3Aluminum-Alloy Sheets And

Plates

SD-04 Samples

1.3.2 GManufacturer's Color Charts

1.3.1 GAluminum Finishes

2.2.6 GAluminum Finishes

1.3.1 GAnchorage Devices and

Fasteners

SD-07 Certificates

2.2 GOrnamental Metal Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 72 PAGES

05 72 00 SD-08 Manufacturer’s Instructions

3.3Cleaning Materials

3.3Preventative Maintenance and

Inspection

3.4Maintenance Instructions

3.3Application Methods

06 10 00 SD-02 Shop Drawings

2.2.1 G RONailing Strips

SD-03 Product Data

2.4Underlayment

1.8Fire-retardant Treatment

2.5.2Adhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.7Preservative Treatment

06 41 16.00 10 SD-02 Shop Drawings

2.10 G AEShop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AEWood Materials

2.8 G AEWood Finishes

2.10.8.3 G AEFinish Schedule

1.4.2 G AECertification

SD-04 Samples

2.3 G ROPlastic Laminates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 72 PAGES

06 41 16.00 10 2.5 G ROCabinet Hardware

SD-07 Certificates

1.4 G ROQuality Assurance

2.8 G ROLaminate Clad Casework

3.1 G ROLaminate Clad Casework

06 61 16 SD-02 Shop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G ROSolid Polymer Material

1.4.1 G ROQualifications

2.3 G ROFabrications

SD-04 Samples

2.1 G ROMaterial

2.3.4 G ROCounter and Vanity Tops

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 72 PAGES

07 05 23 SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.6 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 12 00 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.7 GProtection Board

2.4 GMembrane Fabric

SD-07 Certificates

2.4 GMembrane Fabric

2.7 GProtection Board

SD-08 Manufacturer’s Instructions

3.3.5.1Installation Instructions

SD-11 Closeout Submittals

2.1.1 SVolatile Organic Compounds

(VOC) Contents

07 21 13 SD-03 Product Data

1.3 G AEManufacturer's Standard Details

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 72 PAGES

07 21 13 2.1 G AEBlock or Board Insulation

2.2 G AEVapor Retarder

2.3 G AEPressure Sensitive Tape

1.4 G AEProtection Board or Coatings

2.5 G AEAccessories

2.1.4 G AERecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 G AEBlock or Board Insulation

2.2 G AEVapor Retarder

2.4 G AEProtection Board or Coating

3.4.4 G AEProtection Board or Coating

1.8 G AESpecial Warranties

1.8 G AESpecial Warranties

2.1.5Indoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.5.1Adhesive

07 21 16 SD-03 Product Data

2.1 G AEBlanket insulation

2.2 G AESill sealer insulation

2.3 G AEAccessories

1.3Certification

SD-08 Manufacturer’s Instructions

3.2.1Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 72 PAGES

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.3 GFasteners

2.1.3 SRecycled Content For Insulation

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.3 GFasteners

2.1 GInsulation

07 27 10.00 10 SD-04 Samples

3.1.2 GMock-up

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 G ROQualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 72 PAGES

07 27 19.01 1.8.2 G ROQualifications of Installer

SD-02 Shop Drawings

1.4 G AESelf-adhering Air Barrier

SD-03 Product Data

1.4 G AESelf-adhering Air Barrier

2.3 G AEPrimers, Adhesives, and Mastics

1.4.2 G AESafety Data Sheets

SD-04 Samples

1.4 G ROSelf-adhering Air Barrier

SD-06 Test Reports

1.6 G ROField Peel Adhesion Test

1.4.4 G ROFlame Propagation of Wall

Assemblies

1.4.4 G ROFlame Spread and Smoke

Developed Index Ratings

3.4.1 G ROSite Inspections and Testing

SD-07 Certificates

1.4 G ROSelf-adhering Air Barrier

1.8.1 G ROQualifications of Manufacturer

1.8.2 G ROQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 G ROSelf-adhering Air Barrier

2.3 G ROPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 S AEVolatile Organic Compound

(VOC) Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 72 PAGES

07 27 26 SD-01 Preconstruction Submittals

1.9.1 G ROQualifications of Manufacturer

1.9.2 G ROQualifications of Installer

SD-02 Shop Drawings

1.4 G AEFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 G AEFluid-Applied Membrane Air

Barrier

2.3 G AETransition Membrane

2.2 G AEPrimers, Adhesives, and Mastics

2.6 G AEReinforcement

1.4.2 G AESafety Data Sheets

SD-04 Samples

1.4.3 G ROMockup

SD-06 Test Reports

1.6 G ROCapillary Moisture Test

1.4.4 G ROField Peel Adhesion Test

1.4.4 G ROFlame Propagation of Wall

Assemblies

1.4.4 G ROFlame Spread and Smoke

Developed Index Ratings

3.4.1 G ROSite Inspections

SD-07 Certificates

1.4 G ROFluid-Applied Membrane Air

Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 72 PAGES

07 27 26 2.3 G ROTransition Membrane

1.9.1 G ROQualifications of Manufacturer

1.9.2 G ROQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 G ROFluid-Applied Membrane Air

Barrier

2.3 G ROTransition Membrane

2.2 G ROPrimers, Adhesives, and Mastics

07 41 13 SD-02 Shop Drawings

1.4.5 G AERoofing Panels

1.4.5 G AEFlashing and Accessories

1.4.5 G AEGutter/Downspout Assembly

SD-03 Product Data

2.1 G AERoof panels

1.4.5 G AEFactory-Applied Color Finish

2.4 G AEAccessories

1.4.5 G AEFasteners

1.4.5 G AEPressure Sensitive Tape

2.6 G AEUnderlayments

2.7 G AEGaskets and Sealing/Insulating

Compounds

1.4.5 G AECoil Stock

1.4.5 G AEEnamel Repair Paint

2.8.1 G AESnow Retention System

3.8.2 G AESnow Retention System

2.8.2 G AEPipe Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 72 PAGES

07 41 13 1.4.5 G AEGalvanizing Repair Paint

SD-04 Samples

2.1 G RORoof Panels

1.4.5 G ROFactory-applied Color Finish

2.4 G ROAccessories

1.4.5 G ROFasteners

1.4.5 G ROGaskets and Sealant/Insulating

Compounds

SD-05 Design Data

1.2.1.2 G AEWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 G ROLeakage Test Report

1.2.1.2 G ROWind Uplift Test Report

2.2 G ROFactory Finish and Color

Performance Requirements

SD-07 Certificates

2.1 G AERoof Panels

1.4.5 G AECoil stock compatibility

2.6.1 G AESelf-Adhering Modified Bitumen

Underlayment

1.4.1 G AEQualification of Manufacturer

1.4.2 G AEQualification of Applicator

SD-08 Manufacturer’s Instructions

1.4.5 G ROINSTALLATION MANUAL

SD-09 Manufacturer’s Field

Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 72 PAGES

07 41 13 3.11.1 G ROManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 G AEWarranties

3.12 G ROInformation Card

07 42 13.01 01 SD-01 Preconstruction Submittals

1.5.3 G AEQualification of Manufacturer

1.5.4 G AEQualification of Installation

Contractor

1.8 G ROWarranty

SD-02 Shop Drawings

1.5.1.1 G AEInstallation Drawings

SD-03 Product Data

2.2.1 G ROWall and Soffit Panels

2.2.2Factory Color Finish

1.5.5Closure Materials

2.5.4.4Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

1.5.5Accessories

2.5Accessories

SD-04 Samples

2.2.1 G ROWall and Soffit Panels

1.5.3.1 G ROFasteners

2.5.3 G ROMetal Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 72 PAGES

07 42 13.01 01 SD-05 Design Data

1.5.1.2 G AEWind load design analysis

SD-06 Test Reports

3.7.2 G AELeakage Tests

2.2.2.6 G AECoating

2.2.2.6 G AEChalking

SD-07 Certificates

1.5.3.1 G ROCoil Stock

1.5.3.1 G ROFasteners

1.5.3.1 G ROEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 G AEInstallation

SD-11 Closeout Submittals

1.8 G ROWarranty

1.5.6 G ROMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material

07 42 13.23 23 SD-01 Preconstruction Submittals

1.5.3 G AEQualification of Manufacturer

1.5.4 G AEQualification of Installation

Contractor

1.8 G AEWarranty

SD-02 Shop Drawings

1.5.1.1 G AEInstallation Drawings

SD-03 Product Data

1.5.1Recycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 72 PAGES

07 42 13.23 23 1.5.1 G AEWall Panels

1.5.1 G AEWall Panels

1.5.1.1 G AEWall Panels

1.5.5 G AEAnchorage/Mounting and Shims

1.3 G ROFactory Color Finish

1.5.5 G AEClosure Materials

1.5.5 G AEAccessories

1.3 G AEGaskets

SD-04 Samples

1.5.1 G ROWall Panels

1.5.1 G ROWall Panels

1.5.1.1 G ROWall Panels

1.5.5 G ROAnchorage/Mounting and Shims

1.3 G ROFasteners

1.5.1 G ROColor chart

SD-05 Design Data

1.5.1.2 G AEWind load design analysis

SD-06 Test Reports

1.3.2 G AEWind Load Tests

SD-08 Manufacturer’s Instructions

3.2 G ROInstallation

SD-11 Closeout Submittals

1.8 G AEWarranty

1.5.6 G ROMaintenance Instructions

1.8.1 G AE20 year 'No Dollar Limit' warranty

for labor and material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 72 PAGES

07 53 23 SD-02 Shop Drawings

1.3.1Roof Plan Drawing

1.3.1Wind Load Calculations

1.3.1Boundaries of Enhanced

Perimeter

1.3.1Corner Attachments of Roof

System Components

1.3.1Location of Perimeter Half-Sheets

1.3.1Slopes and Drain Locations

SD-03 Product Data

2.2Cement

2.1.1EPDM Sheet

2.1.2Seam Tape

2.1.4Bonding Adhesive

2.1.3Lap Splice Adhesive

2.1.6Water Cutoff Mastic/Water Block

2.1.5Lap Cleaner, Lap Sealant, and

Edge Treatment

3.3Flashings

2.1.7Flashing Accessories

2.1.7.1Flashing Tape

2.1.8Fasteners and Plates

2.1.11Roof Insulation

2.1.9Pre-Manufactured Accessories

1.8 Gwarranty

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 72 PAGES

07 53 23 1.4.4 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.4 GWind Uplift Resistance

1.4.3 GFire Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.2Seam Tape

3.2.4Tape Seams / Lap Splices

3.2.5Adhesive Seams / Lap Splices

3.2.6Perimeter Attachment

3.2.4Primer

3.2.7Fasteners

2.1.9Pre-Manufactured Accessories

1.6 GCold Weather

SD-11 Closeout Submittals

1.8Warranty

3.10Information Card

3.9Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 G AEExposed Sheet Metal

3.1.15 G AEGutters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 72 PAGES

07 60 00 3.1.16 G AEGDownspouts

2.2.1 G AEGravel Stops and fascia

3.1.17 G AEFlashing for Roof Drains

3.1.10 G AEBase Flashing

3.1.11 G AECounterflashing

3.1.21 G AEFlashing at Roof Penetrations

and Equipment Supports

2.2.11 G AEReglets

3.1.24 G AECopings

3.1.14 G AEDrip Edges

3.1.18 G AEOpen Valley Flashing

3.1.19 G AEEave Flashing

2.1 G AERecycled Content

SD-04 Samples

1.4.2 G ROFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

SD-10 Operation and Maintenance

Data

1.4.3 G ROCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 G AEFirestopping System

SD-03 Product Data

2.2 G AEFirestopping Materials

SD-06 Test Reports

3.3 G ROInspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 72 PAGES

07 84 00 SD-07 Certificates

1.5.2 G AEInspector Qualifications

2.2 G AEFirestopping Materials

1.5.1 G AEInstaller Qualifications

07 91 00 SD-03 Product Data

2.1Preformed Seismic Seal

2.2Primers

07 92 00 SD-03 Product Data

2.2 G AESealants

2.3 G AEPrimers

2.4 G AEBond Breakers

2.5 G AEBackstops

SD-06 Test Reports

3.1 G AEField Adhesion

SD-07 Certificates

1.4.1 G AEIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 G AEIndoor Air Quality For Interior

Sealants

2.2.3 G AEIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 G AEIndoor Air Quality For Interior

Acoustical Sealants

07 95 00 SD-03 Product Data

2.1Sample

2.1 GShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 72 PAGES

08 11 13 SD-02 Shop Drawings

2.1 G AEDoors

2.1 G AEDoors

2.5 G AEFrames

2.5 G AEFrames

2.3 G AEAccessories

SD-03 Product Data

2.1 G AEDoors

2.1 S AERecycled Content for Steel Door

Product

2.5 G AEFrames

2.5 S AERecycled Content for Steel Frame

Product

2.3 G AEAccessories

08 14 00 SD-02 Shop Drawings

2.1 G AEDoors

SD-03 Product Data

2.1 G AEDoors

2.1.1.1 SRecycled Content for Door Cores

2.2Accessories

2.3.7Water-resistant Sealer

1.5Warranty

2.1.2 G AESound Transmission Class

Rating

2.1.3 G AEFire Resistance Rating

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 72 PAGES

08 14 00 2.1Doors

2.3.6.2 G AEDoor Finish Colors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Flush Wood Doors

2.1.1.1 SIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 G AEAccess Doors And Panels

SD-03 Product Data

1.3 G AEAccess Doors And Panels

1.3.2 G AEHardware

2.2.7 G AEAccessories

2.1 S AERecycled Content

SD-04 Samples

2.5 G ROFinishes

1.3.1 G AEAcoustical Ratings of Assemblies

08 34 73 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 72 PAGES

08 34 73 2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

SD-03 Product Data

2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

2.1 GDoor Hardware

2.1 GIntumescent Seals and Gasketing

2.1 GThresholds

2.1 GAstragals

SD-06 Test Reports

2.4.1 GWind Loading Tests

2.4.1 GWater Leakage Tests

2.4.4 GAcoustical Tests

2.4.4 GAir Infiltration Tests

2.4.4 GPositive Pressure Tests

SD-07 Certificates

2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

2.1 GDoor Hardware

1.3.1.3 GVision Panel(s)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 72 PAGES

08 34 73 1.3.1.2 GIntumescent Seals,Gasketing and

Door Bottoms

2.1 GThresholds

2.1 GAstragals

08 41 13 SD-01 Preconstruction Submittals

1.2.1 G AESample Warranty

1.2.1 G AEList of Product Installations

SD-02 Shop Drawings

3.3 G AEInstallation Drawings

2.2 G AEFabrication Drawings

SD-03 Product Data

1.2.1 G AEManufacturer's Catalog Data

2.2.3 G AEFinish

2.1.1.2 S AERecycled Content of Aluminum

Material

SD-04 Samples

1.2.1 G ROFinish and Color Samples

SD-06 Test Reports

1.2.1 G AECertified Test Reports

3.4.3Deflection

3.4.1Air Infiltration

3.4.4Condensation Resistance and

Thermal Transmittance

3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 72 PAGES

08 41 13 SD-11 Closeout Submittals

3.6 G ROManufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.10 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.3 G AEInsulating Glass

1.3 G AEGlazing Accessories

2.4.1.1 G AESealants

SD-04 Samples

2.3 G ROInsulating Glass

2.4.3 G ROTape

2.4.3 G ROSealing Tapes

SD-07 Certificates

2.3 G ROInsulating Glass

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 72 PAGES

08 81 00 SD-08 Manufacturer’s Instructions

2.4 G ROSetting and Sealing Materials

3.2 G ROGlass Setting

SD-11 Closeout Submittals

1.7.1 G ROInsulated Glass Units

1.7.2 G ROMonolithic Opacified Spandrel

08 91 00 SD-02 Shop Drawings

1.4 G AEWall Louvers

SD-03 Product Data

2.2 G AEMetal Wall Louvers

SD-04 Samples

1.5 G ROWall Louver Samples

09 22 00 SD-02 Shop Drawings

2.1 G AEMetal Support Systems

SD-03 Product Data

2.1 G AEMetal Support Systems

2.1 S AERecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.6 G AECementitious Backer Units

2.1.4 G AEGlass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.12 G AEShaftwall Liner

2.1.3 G AEWater-Resistant Gypsum Backing

Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 72 PAGES

09 29 00 2.1.7 G AEMold-Resistant Glass Mat

Gypsum Board

2.1.5 G AEGlass Mat Covered or Reinforced

Gypsum Sheathing

2.1.5.1 G AEGlass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.1.13 G AEAccessories

2.1.1 G AEGypsum Board

2.1.1 S AERecycled Content for Gypsum

Board

2.1.1 S AERecycled Content for Paper

Facing and Gypsum Cores

2.1.9 S AEVOC Content of Joint Compound

SD-06 Test Reports

3.8 G ROASTM E90 Factory Test Report

3.11 G ROASTM E90 Factory Test Report

3.11 G ROASTM E336 Field Test Report

SD-07 Certificates

2.1 G ROAsbestos Free Materials

2.1.1 S AEIndoor Air Quality for Gypsum

Board

2.1.11 S AEIndoor Air Quality for Non-aerosol

Adhesives

2.1.11 S AEIndoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 72 PAGES

09 30 10 3.2 G AEDetail Drawings

SD-03 Product Data

2.1.1 G AEPorcelain Tile

2.1.1 S AERecycled Content for Porcelain

Tile

2.1.2 G AEMosaic Tile

2.1.2 S AERecycled Content for Mosaic Tile

2.2 G AESetting-Bed

2.4 G AEMortar, Grout, and Adhesive

2.2.6Reinforcing Wire Fabric

SD-04 Samples

2.1 G ROTile

2.1 G ROAccessories

2.1 G ROTransition Strips

2.6 G ROTransition Strips

2.4.3 G ROGrout

SD-07 Certificates

2.4 S AEIndoor Air Quality for Adhesives

2.4.4 S AEIndoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 G ROInstallation

09 51 00 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 72 PAGES

09 51 00 SD-03 Product Data

1.9 GAcoustical Ceiling Systems

2.3 GRecycled Content for Suspension

Systems

SD-04 Samples

2.2 GAcoustical Units

2.2.1.1 GAcoustical Ceiling Tiles

SD-06 Test Reports

1.9 GFire-Rated Ceilings

2.1.1 GCeiling Attenuation Class and

Test

SD-07 Certificates

1.3.1.2 GIndoor Air Quality

2.8 GIndoor Air Quality for Sealants

09 65 00 SD-02 Shop Drawings

2.8 GResilient Flooring and

Accessories

SD-03 Product Data

2.8 GResilient Flooring and

Accessories

2.4Adhesives

2.1Vinyl Composition Tile

2.1 SRecycled content for Vinyl

Composition Tile

2.2Wall Base

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 72 PAGES

09 65 00 2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 SIndoor Air Quality for Vinyl

Composition Tile

2.2 SIndoor Air Quality for Wall Base

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.8 GResilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1 GCarpet

2.1.1 SRecycled Content for Carpeting

SD-04 Samples

2.1 GCarpet

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 72 PAGES

09 68 00 2.1.1 SIndoor Air Quality for Carpet

2.1.2 SIndoor Air Quality for Carpet

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.6Warranty

09 90 00 SD-02 Shop Drawings

3.11Piping Identification

SD-03 Product Data

2.1 GCoating

3.2.5Sealant

SD-04 Samples

1.10 GColor

SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2 GQualification Testing

2.1Indoor Air Quality for Paints and

Primers

2.1Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.3.1Application Instructions

3.7.2Mixing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 72 PAGES

09 90 00 1.8.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 14 00.10 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data

3.1Installation

1.2 GExterior Signage

1.2.1Wind Load Requirements

SD-04 Samples

1.2 GExterior Signage

SD-10 Operation and Maintenance

Data

3.1.2 GProtection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.4.2 G AEDetail Drawings

SD-03 Product Data

3.1 G AEInstallation

1.6 G AEWarranty

SD-04 Samples

1.4.1 G ROInterior Signage

1.3 G ROSoftware

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 72 PAGES

10 14 00.20 3.1 G ROApproved Manufacturer's

Instructions

3.1.2 G ROProtection and Cleaning

10 21 13 SD-02 Shop Drawings

2.1 G AEFabrication Drawings

3.2 G AEInstallation Drawings

SD-03 Product Data

2.1 G AECleaning and Maintenance

Instructions

2.9 G AEColors And Finishes

2.2.2 G AEAnchoring Devices and Fasteners

2.2.4 G AEHardware and Fittings

2.2.3 G AEBrackets

2.2.5 G AEDoor Hardware

2.3.1 G AEToilet Enclosures

2.3.2 G AEUrinal Screens

2.7 G AEPilaster Shoes

2.2.4.2 G AEFinishes

2.9.2 G AEFinishes

SD-04 Samples

2.9 G ROColors and Finishes

2.2.4 G ROHardware and Fittings

2.2.2 G ROAnchoring Devices and Fasteners

SD-07 Certificates

1.5 G ROWarranty

10 26 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 72 PAGES

10 26 00 2.2 G AECorner Guards

SD-03 Product Data

2.2 G AECorner Guards

2.2.1 S AERecycled content for steel

component of corner guards

SD-04 Samples

2.2 G ROCorner…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .