NEW - 2022-04-20 JBMDL B678 BIDDER RFI 0001 AE002.pdf

PDF 231 KB Posted

Attached to
Building 678 Laboratory Expansion
Solicitation number
FA448422R0010
Issued by

About this file

This document provides details for a federal solicitation seeking construction services. The solicitation involves a laboratory expansion project at Joint Base McGuire Dix Lakehurst in New Jersey, with a one year period of performance. Services include demolition, construction, and renovation work. The project is set aside for a HUB Zone Small Business. The estimated value is between $5 million and $10 million, with NAICS code 236220 and size standard of $39.5 million. Offerors must submit pricing on the bid schedule by the closing date and provide an itemized cost breakdown. A pre-bid site visit will be held on April 12th and all questions must be submitted by April 19th. Past performance information is due May 2nd. The Department of the Air Force Air Mobility Command is the contracting agency.

View the file

Other files

File Type Posted
NEW - Sign In Sheet - B678 Site Visit.pdf PDF
NEW - Solicitation Amendment FA448422R00100002 SF 30.pdf PDF
NEW - JBMDL B678 Laboratory Expansion_M20 - Sheet - M-103 - MECHANICAL FLOOR PLAN - AREA B.pdf PDF
NEW - FA448422R0010 B678 Lab Expansion Q and A.pdf PDF
NEW - Geo Tech Report.pdf PDF
NEW - 0690-00-JBMDL B678_S-004_Amendment 1.pdf PDF
UPDATED L-1 - Section L - Instructions Conditions Notices to Offerors or Quoters.pdf PDF
Solicitation Amendment FA448422R00100001 SF 30.pdf PDF
J-8 - B678 Drawings.pdf PDF
B-1 Bid Schedule B678.docx DOCX document
L-1 - Section L - Instructions Conditions Notices to Offerors or Quoters.pdf PDF
J-7 - Past Performance Questionnaire - B678.pdf PDF
J-2 - JB MDL Antiterrorism Awareness for Contractors (Trifold).pdf PDF
M-1 - Section M - Evaluation Factors for Award.pdf PDF
Solicitation - FA448422R0010.pdf PDF
J-5 - Medical Statement for Contractors.pdf PDF
J-9 - B678 Submittal Register.pdf PDF
B-2 Bid Form - B678.xlsx XLSX spreadsheet
J-3 - JB MDL AT Awareness Guide for Contractors.pdf PDF
C-1 - Statement of Work - B678.pdf PDF
J-6 - EAL Form - B678 Laboratory Expansion Pre-Proposal Site Visit - 20220412.pdf PDF
J-1 - Wage Determination - New Jersey - Building Construction.pdf PDF
C-2 - B678 Specifications.pdf PDF
J-4 - JB MDL SFS Appendix.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5/8" GYPSUM WALL BOARD,

EACH SIDE

METAL STUDS

METAL TRACK

LINE OF DECK

SOUND ATTENUATING BATT INSULATION

5/8" GYPSUM WALL BOARD,

EACH SIDE

METAL STUDS

SCHEDULED BASE OVER

GYPSUM WALL BOARD,

RE: ROOM FINISH SCHEDULE

METAL TRACK

5/8" GYPSUM WALL BOARD

METAL STUDS

METAL TRACK

LINE OF DECK

METAL TRACK

6" M

IN

TWO LAYERS 5/8" GYPSUM WALL

BOARD EACH SIDE STAGGER JOINTS

METAL STUDS @ 16 O.C. MAX

LINE OF CEILING, RE: ROOM

FINISH SCHEDULE

SOUND ATTENUATING BATT INSULATION

LINE OF DECK

F.F.

5/8" GYPSUM WALL BOARD

METAL STUDS @ 16 O.C MAX

F.F.

SOUND ATTENUATING BATT INSULATION

TWO LAYERS 5/8"

GYPSUM WALL BOARD

BRACING BY STUD MANUFACTURER

5/8" GLASS MAT GYPSUM WALL BOARD,

TAPE AND MUD NOT REQUIRED

2X WOOD STUDS@ 16" O.C. MAX

2X TREATED SILL PLATE ON

GASKET MATERIAL

EXISTING LAB FLOOR SLAB

SOUND ATTENUATING BATT INSULATION

3/4" PLYWOOD SHEATHING

VAPOR BARRIER

METAL TRACK

F.F.F.F.F.F.

F.F.

CONTINUOUS SEALANT, BOTH SIDES

C1 1 LAYER 5/8" GYPSUM WALL BOARD EACH

SIDE, ON 3 5/8" METAL STUD FRAMING

C2 1 LAYER 5/8" GYPSUM WALL BOARD EACH

SIDE, ON 6" METAL STUD FRAMING

1 LAYER 5/8" GYPSUM WALL BOARD ON 3 5/8"

FURRING STUDS

B1

B2

1 LAYER 5/8" GYPSUM WALL BOARD ON 1 1/2" FURRING

STUDS

1 LAYER 5/8" GYPSUM WALL BOARD ON 6"

FURRING STUDS

B3

A1 NON-RATED PARTITION - 1 LAYER 5/8" GYPSUM WALL BOARD

EACH SIDE, ON 3 5/8" 20 GAUGE STUD FRAMING WITH 3 1/2"

GLASS FIBER INSULATION, STC-35 MIN. REQUIRED (NGC 2018106)

A2 NON-RATED PARTITION - 1 LAYER 5/8" GYPSUM WALL BOARD

EACH SIDE, ON 6" 20 GAUGE METAL STUD FRAMING WITH 6"

GLASS FIBER INSULATION, STC-35 MIN. REQUIRED (NGC 2018130)

A3 NON-RATED PARTITION - 1 LAYER 5/8" GYPSUM WALL BOARD EACH

SIDE, ON 3 5/8" STUD FRAMING, NO GLASS FIBER INSULATION

A4 NON-RATED PARTITION - 1 LAYER 5/8" GYPSUM WALL BOARD EACH

SIDE, ON 6" METAL STUD FRAMING, NO GLASS FIBER INSULATION

CONTINUOUS SEALANT

SCHEDULED BASE OVER

GYPSUM WALL BOARD,

RE: ROOM FINISH SCHEDULE

CONTINUOUS SEALANT

SCHEDULED BASE OVER

GYPSUM WALL BOARD,

RE: ROOM FINISH SCHEDULE

CONTINUOUS SEALANT, BOTH SIDES

CONTINUOUS SEALANT, BOTH SIDES

CONTINUOUS SEALANT, BOTH SIDES

SCHEDULED BASE OVER

GYPSUM WALL BOARD,

RE: ROOM FINISH SCHEDULE

G1 NON-RATED PARTITION - 2 LAYERS OF 5/8" GYPSUM

WALL BOARD ON EACH SIDE, ON 3 5/8" 20 GAUGE

METAL STUD FRAMING WITH 2 1/2" GLASS FIBER

INSULATION, STC-50 MIN. REQUIRED (NGC 2018113)

G2 NON-RATED PARTITION - 2 LAYERS OF 5/8" GYPSUM

WALL BOARD ON EACH SIDE, ON 6" 20 GAUGE METAL

STUD FRAMING WITH 6" GLASS FIBER INSULATION,

STC-50 MIN. REQUIRED (NGC 2018130)

E1 6" TEMPORARY WEATHER TIGHT PARTION

NOTE: EXISTING LABS ARE TO REMAIN OPERATIONAL DURING

CONSTRUCTION. CONSTRUCT TEMPORARY WEATHER TIGHT PARTITION

PRIOR TO THE START OF DEMOLITION TO ALLOW USE OF THE LABS

DURING CONSTRUCTION. REMOVE AND RETURN USE ONCE EAST

BUILDING HAS BEEN ENCLOSED AND INTERIOR FINISHED REPAIRED.

COORDINATE PHASING WITH CONTRACTING OFFICER REPRESENTATIVE.

D1 2 LAYERS GYPSUM WALL BOARD ON SIDE TO MATCH

ADJACENT ACOUSTIC WALL, ONE LAYER OPPOSITE

SIDE, ON 6" METAL STUD FRAMING, NO GLASS FIBER

INSULATION, TO DECK

D2 2 LAYERS GYPSUM WALL BOARD ON SIDE TO MATCH

ADJACENT ACOUSTIC WALL, ONE LAYER OPPOSITE

SIDE, 6" METAL STUD FRAMING, 6" GLASS FIBER

INSULATION, TO DECK

CONTINUOUS SEALANT, BOTH SIDES

SCHEDULED BASE OVER

GYPSUM WALL BOARD,

RE: ROOM FINISH SCHEDULE

CONTINUOUS SEALANT, BOTH SIDES

LINE OF DECK

CONTINUOUS SEALANT, BOTH SIDESCONTINUOUS SEALANT, BOTH SIDES

LINE OF CEILING, RE: ROOM

FINISH SCHEDULE

LINE OF DECK

CONTINUOUS SEALANT, BOTH SIDES

LINE OF CEILING, RE: ROOM

FINISH SCHEDULE

2 LAYERS 5/8" GYPSUM WALL BOARD ON 6"

FURRING STUDS

B4

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

BIM 360://JBMDL B678 Lab Expansion/JBMDL B678_A20.rvt

4/20/2022 1:35:11 PM

AE002

W

AL

L

TY

PE

S

N

AV

AL

A

IR

W

AR

FA

R E

C

EN

TE

R

, A

IR

C R

AF

T

D

IV

IS

IO

N (N

AW

C

AD

LA

KE

H U

R

ST

, N J

D . R

EM

Y

M . R

O

BI

N

SO

N

D C

AV

IN

R . W

EN

TE

JU

LY

FINAL DESIGN SUBMITTAL - FOR CONSTRUCTION

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

, B

LA

BO

R

AT

O R

Y

EX

PA

N

SI

O

N

AM

M

EN

D M

E N T

0 1

IN

R

ES

PO

N

SE

T O

B

ID

D

ER

IN

Q

U

IR

IE

S

A

PR

1 STUD SUPPLIER RESPONSIBLE FOR GAUGE AND

BRACING REQUIREMENTS, UNLESS NOTED OTHERWISE.

2 MOISTURE RESISTANT GYPSUM WALL BOARD IN WET

LOCATIONS; BACKER BD @ TILE LOCATIONS RE:

INTERIOR ELEVATIONS

3 FIRE RATED SEALANT MUST BE USED FOR SMOKE

PARTITIONS, ACOUSTICAL SEALANT FOR OTHER

LOCATIONS.

4 R-13 MINIMUM BATT INSULATION AT EXTERIOR WALL

FURRING

5 GLASS MAT GYPSUM WALL BOARD AT INTERIOR FACE

OF ALL EXTERIOR WALLS.

GENERAL NOTES

Sheets
AE002 - WALL TYPES

File details come from the government source that posted it. Updated .