Intake_Form_-_Solicitations_(005).pdf
PDF 111 KB Posted
- Attached to
- California Villas Pool Improvement Project
- Solicitation number
- 2026-IFB-052
- Issued by
- Riverside County, California
About this file
This is an Intake Form for Solicitations submitted by the Palm Desert Housing Authority for the California Villas Pool Improvement Project, a competitive Invitation for Bid (IFB) project. The scope of work encompasses full removal of existing pool and spa plaster finish, surface preparation, bond coat application, and installation of new plaster finish; waterline tile cleaning and restoration; installation of three LED pool and spa lights; application of brick clay coping sealer; and repair and repainting of pool and spa deck surfacing. The project is classified as a public project under California Labor Code Section 1720(a). The anticipated contract duration is from June 30, 2026, to August 31, 2026, with an anticipated release date of May 27, 2026. Both project and director approvals were granted on May 21, 2026, with HR review completed the same date.
The anticipated contract cost is $60,000.00. The project procurement is necessitated by significant safety concerns related to deteriorating pool and spa plaster, which creates rough surfaces posing slip and abrasion hazards, compromises water quality and chemical balance, and risks exposure of underlying structural materials. The replacement of plaster is intended to restore a safe, sanitary, and compliant swimming environment, extend pool and spa infrastructure lifespan, and mitigate health and liability risks. A 45-day hold is required for this purchase, indicating a standard procurement review period prior to bid release.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| California_Villas_Pool_Improvement_Project.pdf | ||
| Short-Form-Construction-Sample.docx | DOCX document | |
| BID_GUARANTEE_(Bid_Bond).docx | DOCX document | |
| Construction_Waste_Management_Package_(4).pdf | ||
| Wage_Determination-_California_Villas_Pool_CA20260025.pdf | ||
| CA_Villas_Pool_Area_Site_Map.png | PNG image | |
| CDBG_General_Conditions_City_of_Palm_Desert.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Intake Form - Solicitations To Be Used for All Solicitations Published in OpenGov.
Pursuant to AB 339 Requirements
Requester Name:
Alex Vasquez
Date
05/21/2026
Project Title:
California Villas Pool Improvement Project
What type of solicitation?
IFB
Project Manager:
Alex Vasquez
Is this a public project as described in CA Labor Code 1720(a)?
Yes No
Brief Description of Scope of Work to be Performed:
The scope of work consists of full removal of existing pool and spa plaster finish. Surface preparation, bond coat application, and installation of new plaster finish. Waterline tile cleaning and restoration. Installation of three LED’s pool/spa lights. Application of brick clay coping sealer to protect and extend lifespan of coping. Repair and repainting of pool/spa deck surfacing.
Attach a Draft Solicitation to be published (Opengov):
california_villas_pool_improvement_project-2026-05-21-22-20-27.docx 154.15KB
Anticipated Duration of Contract:
06/30/2026 to 08/31/2026
Anticipated Cost of Contract: Anticipated Release Date:
$60,000.00 05/27/2026
Reason the City Believes this Procurement is Necessary:
The new pool and spa plaster requires replacement, due to significant safety concerns that can impact residents. Deteriorating plaster can create rough, uneven surfaces that may cause cuts, abrasions, and slip hazards for swimmers. In addition, plaster failure can lead to water quality issues, improper chemical balance, and exposure of underlying structural materials, increasing the risk of further damage and costly repairs.
Replacing the plaster is necessary to restore a safe, sanitary, and compliant swimming environment, extend the lifespan of the pool and spa infrastructure, and ensure continued residents use without health or liability risks.
Manager Approval Date
05/21/2026
Director Approval Date
05/21/2026
Is a 45-Day hold required for this purchase?*
Yes No
HR Review Date
2026-05-21