2018.03.26_Q&A_Master_Log.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Japan ATGHS Federal contract opportunity
- Solicitation number
- HTC711-18-R-C001
About this file
Attch 2 Q&As
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2018.03.22_PWS_Fukuoka.doc | DOC document | |
| Amend_002.pdf | ||
| Japan_Preproposal_Conference.pptx | PPTX presentation | |
| 2018.03.22_PWS_Misawa.doc | DOC document | |
| Japan_meeting_minutes.pdf | ||
| Amend_001.pdf | ||
| HTC711-18-R-C001_Released.pdf | ||
| Attch_3_PP_Survey.docx | DOCX document | |
| Attch_5_DD254.pdf | ||
| RFP_Cover_Letter.pdf | ||
| HTC711-18-R-C001.pdf | ||
| Attch_2_Misawa_PWS.pdf | ||
| Attch_4_Contract_Information_Sheet.docx | DOCX document | |
| Attch_3_PP_Cover_Letter.pdf | ||
| Attch_1_Fukuoka_PWS.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question # | Par. Ref | Quick Reference | Question | Date | Government Answer |
| 1 | SF1449, Pg. 42 & 44 | Subfactors | Section L , Technical Proposal lists Subfactor A: Staffing, but not a Subfactor B: Implementation which IS listed in Section M under Evaluation Criteria. | Section L has been updated to include Subfactor B: Implementation in Amendment 001. | |
| 2 | SF1449, Pg. 41 | Technical | If Implementation is to be included, is the 10 pages total limit still? Correct? | Yes. | |
| 3 | SF1449, Pg. 42 & 44 | Technical | Is there going to be an amendment to state Subfactor B Implementation requirements? | Yes. See Amendment 001. | |
| 4 | PWS 1.3. | Aircraft Services | Does Misawa air freight conduct land bridge truck operations to/from Yokota Air Base? What is the frequency of service? | Misawa ATGHS does handle land bridge trucks IAW PWS paragraph 1.3. see AMCI 24-101, Vol 11, Paragraphs 32.2.8. through 32.2.8.1.1.2. There is not standardized frequency of service it is dependent on the amount of cargo at Yokota AB. When there is a sufficient amount of cargo, a truck will run. | |
| 5 | PWS 4.2. | Hours of Operation | How often are services in PWS areas, other than ATOC, required outside of the established operating hours of 0600-1800? If so, can workload data be provided? | We do not track mission requirements worked outside of the 0600-1800 established operating hours for this performance based contract. Please see PWS paragraph 4.2. | |
| 6 | PWS Appendix C-1 | GFM | Who is responsible for the purchase of light bulbs? | Please see PWS Appendix C-1, Note. The Government will replace industrial warehouse light bulbs as required. | |
| 7 | PWS Appendix C-2 | GFE | How many employees are required? How much Material Handling Equipment is required? | This is a performance based contract and the Government does not establish the number of contractor employees required. For the MHE please see PWS paragraphs 3.2., 4., and Appendix C-2. | |
| 8 | SF1449, Pg 41 | Section L, Para. ( e ) | The paragraph states, “Complete blocks 6 a through c and 7 a through c of the DD Form 254...” However, in Attachment 4, DD Form 254 blocks 6 a through c and 7 a through c state “NOT APPLICABLE for solicitations” or N/A. Please clarify that the contractor has no action at this time. | Correct, no action needs to be taken by the contractor at this time. | |
| 9 | PWS 4.1, Contractor Personnel | Fukuoka pg. 9, Misawa pg. 10 | Are interim secret clearances acceptable for staff (other than the Station Manager and Alternate) in the positions outlined in the PWS? If so, what duration of the interim clearance is acceptable to the Government? | See Misawa PWS paragraphs 4.6.2.1. and 4.6.2.1.1. Fukuoka PWS paragraphs 4.5.2.1. and 4.5.2.1.1. 4.6.2.1./4.5.2.1. states Interim security clearance requests are only accepted if they have been opened with OPM in JPAS. 4.6.2.1.1./4.5.2.1.1. states Contractor personnel required to access, handle, or transport classified material or equipment must have a Secret Clearance posted in JPAS, an Interim Secret Clearance is not authorized. | |
| 10 | PWS Appendix C-2 | Scales | Calibration of scales and other precision measuring equipment (PME). Is there an on-sight capability to calibrate PME or does all calibration need to be worked through the 730 AMS? | Calibration of scales shall be coordinated with COR and accomplished by the Government. Statement added to Appendix C-3 for both locations. | |
| 11 | |||||
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 |
Sheet2
Sheet3
File details come from the government source that posted it.