The file's text, extracted by GovTribe without its formatting.
Instructions
| HTC711-16-R-D001 | |
| Attachment 8: Pricing Matrix 14 April 2016 | | |
| UNITED STATES TRANSPORTATION COMMAND (USTRANSCOM) | | |
| INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT | | |
| | Editable cell |
| ITSM | | |
| Instructions | | |
| [Offeror Name] | | |
| Description | |
| 1 | It is ESSENTIAL that the Offeror use this model in preparing its pricing response. Failure to provide the pricing details as required in this Pricing Template will be considered non-compliant and the Offeror's response may be subject to rejection. | |
| 2 | Some data cells in this workbook are protected to minimize the risk of compromising the integrity of the workbook structure and formulae. No data entry is allowed on the Contract Summary, Labor Rate Summary, Period of Performance Tasks-Lbr Hr Summaries (Purple Tabs), or Staffing Matrix worksheets (Orange Tabs). | |
| 3 | The Staffing Matrix worksheets (Orange Tabs) do not require data entry. The hours populated on these sheets will originate from the proposed hours on the corresponding Prime/Subcontractor Tasks-Lbr Hrs worksheets. | |
| 4 | Data cells that are editable within each worksheet are indicated in light yellow. | |
| 5 | Contract line item types include FPIF, CPFF, FFP & CR for ITSM Enterprise Support. CLINs 1,4,6, 7, 9,10, 11, 12, 13 & 14 will be FFP. Travel & ODC NTE costs are provided for evaluation purposes only. | |
| 6 | FPIF CLINS utilize government set parameters. The profit percentage is set at 10%, the ceiling price is 120% of target cost, and the overrun/underrun share ratio is 50/50. | |
| 7 | Offeror will input Fringe Benefit, Overhead, and G&A percentages on All Option Period Onsite and Offsite Tasks-Lbr Hrs worksheets for both Prime and Subcontractor Tabs. (Column M, Rows 2-4). | |
| 8 | On the Base Period Tasks-Lbr Hr Worksheets (Transition), Unburdened Labor Rates, the Fringe, Overhead and G&A percentages will autopopulate from the corresponding Option Period 1 worksheets. | |
| 9 | Offeror will input Proposed Profit percentages on the Option Period 1 Onsite Tasks-Lbr Hrs worksheets for the CPFF and FFP CLINS, respectively. (Column S, Row 2-3 for Profit Percentages). These rates will then autopopulate in the rest of the workbook. | |
| 10 | Offeror may choose to input a 12 month escalation factor for Option Periods 2 through 5 on the Prime and Subcontractor Option Period 1 Onsite Tasks-Lbr Hrs worksheet. (Column Z, Rows 2-5). These rates will then autopopulate in the other worksheets to escalate the unburdened labor rates proposed. | |
| 11 | Offeror will input unburdened labor rates on the Prime and Subcontractor Option Period 1 Onsite and Offsite Tasks-Lbr Hrs worksheets. (Row 10) These rates will then autopopulate in the rest of the worksheets using the proposed 12 month escalation factor proposed on the Option Period 1 Onsite Tasks-Lbr Hrs worksheet. | |
| 12 | Do not make changes to this pricing model. If you need to include additional elements, please include pricing for those elements as supplemental cost information in a separate worksheet. Please refer to the PWS documentation for details describing each of the service deliverables that the Offeror is expected to provide and price in accordance with the PWS. | |
The data in this document is Confidential and Proprietary Information
HTC711-16-R-D001 &P of &N Confidential Information
Contract Summary
| UNITED STATES TRANSPORTATION COMMAND (USTRANSCOM) |
| INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT |
Section B - ITSM ENTERPRISE SUPPORT PRICING
[Offeror Name]
| CLIN | | Type | Service / Description | Max Quantity | Unit | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | Option Period 5 | 6 Month Extension |
| | | ITSM Enterprise Support | | | | | | | | | |
| 0001 | FFP | ITSM Enterprise Support - (OPTIONAL) Transition In Svcs - Task 1, Sub 9 | 1 | Lot | $ - 0 | | | | | | |
| | | Proposed Cost | | | $ - 0 | | | | | | |
| | | Proposed Profit | 0.00% | | $ - 0 | | | | | | |
| 02 | FPIF | ITSM Enterprise Support - Tasks 1, 2, 3, 4, 5, 6, 8 | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Target Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Target Profit Amount | 10.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Ceiling Price | 120% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Above/Below Target Share Ratio | 50/50 | | | | | | | |
| 03 | CPFF | ITSM Enterprise Support - Tasks 2, 3, 4, 5, 6 | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Estimated Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Fixed Fee | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 04 | FFP | ITSM Enterprise Support - Task 6, Sub 4: eDiscovery | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 05 | CPFF | ITSM Enterprise Support - (OPTIONAL) Task 7: C4S Training | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Estimated Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Fixed Fee | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 06 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 2: Sub 4.4: SharePoint Sustainment | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 07 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 1.3: Demand Management | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 08 | FPIF | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 3.2.3: TWCF Enterprise | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Target Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Target Profit Amount | 10.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Ceiling Price | 120% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Above/Below Target Share Ratio | 50/50 | | | | | | | |
| 09 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 4.3: Service Level Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 5: Availability Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 6: Capacity Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 7: IT Svc Continuity Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 5, Sub 1.4: COMSEC Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14 | FFP | ITSM Enterprise Support - (OPTIONAL) Task 3, Sub 4.1.2: Rqt Processing Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Proposed Profit | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 15 | CPFF | ITSM Enterprise Support - (OPTIONAL) Task 5, Sub 2.1: Risk Mgmt | 1 | Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Estimated Cost | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | Fixed Fee | 0.00% | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
16 COST Other Direct Costs 1 Lot $ 516,000.00 $ 516,000.00 $ 516,000.00 $ 516,000.00 $ 516,000.00 $ 258,000.00
17 COST Travel 1 Lot $ 78,000.00 $ 78,000.00 $ 78,000.00 $ 78,000.00 $ 78,000.00 $ 39,000.00
TOTAL ITSM ENTERPRISE SUPPORT AT TARGET PRICE/COST $ - 0 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 297,000.00
TOTAL ITSM ENTERPRISE SUPPORT AT CEILING PRICE/COST $ - 0 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 297,000.00
ITSM CONTRACT TEP AT CEILING PRICE/COST $ 3,267,000.00
HTC711-16-R-D001 &P of &N Confidential Information
Labor Rates Summary
| UNITED STATES TRANSPORTATION COMMAND (USTRANSCOM) |
| INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT |
| Labor Categories |
| [Offeror Name] | | | | | | | | | | | | |
| Option Period 1 | | Option Period 2 | | Option Period 3 | | Option Period 4 | | Option Period 5 | | 6 Month Extension | |
| | | Prime Esc | 0.00% | Prime Esc | 0.00% | Prime Esc | 0.00% | Prime Esc | 0.00% | | |
| | | Sub Escalation | 0.00% | Sub Escalation | 0.00% | Sub Escalation | 0.00% | Sub Escalation | 0.00% | | |
| Labor Category | Onsite | Offsite | Onsite | Offsite | Onsite | Offsite | Onsite | Offsite | Onsite | Offsite | Onsite | Offsite |
| Program Manager – Senior | | | | | | | | | | | | |
| Program Manager – Intermediate | | | | | | | | | | | | |
| Program Manager – Associate | | | | | | | | | | | | |
| Administrator – Senior | | | | | | | | | | | | |
| Administrator – Intermediate | | | | | | | | | | | | |
| Administrator – Associate | | | | | | | | | | | | |
| Project Manager – Senior | | | | | | | | | | | | |
| Project Manager – Intermediate | | | | | | | | | | | | |
| Project Manager – Associate | | | | | | | | | | | | |
| Project Engineer – Senior | | | | | | | | | | | | |
| Project Engineer – Intermediate | | | | | | | | | | | | |
| Project Engineer – Associate | | | | | | | | | | | | |
| Quality Assurance Analyst – Senior | | | | | | | | | | | | |
| Quality Assurance Analyst – Intermediate | | | | | | | | | | | | |
| Quality Assurance Analyst – Associate | | | | | | | | | | | | |
| Quality Professional Staff – Senior | | | | | | | | | | | | |
| Quality Professional Staff – Intermediate | | | | | | | | | | | | |
| Quality Professional Staff – Associate | | | | | | | | | | | | |
| Client/Server Network Architect | | | | | | | | | | | | |
| Systems Engineer – Senior | | | | | | | | | | | | |
| Systems Engineer – Intermediate | | | | | | | | | | | | |
| Systems Engineer – Associate | | | | | | | | | | | | |
| Managed System Engineer – Senior | | | | | | | | | | | | |
| Managed Systems Engineer – Intermediate | | | | | | | | | | | | |
| Managed Systems Engineer – Associate | | | | | | | | | | | | |
| Applications Systems Analyst – Senior | | | | | | | | | | | | |
| Applications Systems Analyst – Intermediate | | | | | | | | | | | | |
| Applications Systems Analyst – Associate | | | | | | | | | | | | |
| Applications Programmer – Senior | | | | | | | | | | | | |
| Applications Programmer – Intermediate | | | | | | | | | | | | |
| Applications Programmer – Associate | | | | | | | | | | | | |
| IT Certified Professional – Senior | | | | | | | | | | | | |
| IT Certified Professional – Intermediate | | | | | | | | | | | | |
| IT Certified Professional – Associate | | | | | | | | | | | | |
| Configuration Management (CM) Specialist – Senior | | | | | | | | | | | | |
| Configuration Management (CM) Specialist – Intermediate | | | | | | | | | | | | |
| Configuration Management (CM) Specialist – Associate | | | | | | | | | | | | |
| Information Assurance Engineer – Senior | | | | | | | | | | | | |
| Information Assurance Engineer – Intermediate | | | | | | | | | | | | |
| Information Assurance Engineer – Associate | | | | | | | | | | | | |
| Information Systems Auditor – Senior | | | | | | | | | | | | |
| Information Systems Auditor – Intermediate | | | | | | | | | | | | |
| Information Systems Auditor – Associate | | | | | | | | | | | | |
| Information Security Specialist – Senior | | | | | | | | | | | | |
| Information Security Specialist – Intermediate | | | | | | | | | | | | |
| Information Security Specialist – Associate | | | | | | | | | | | | |
| Advanced Database Analyst/Programmer – Senior | | | | | | | | | | | | |
| Advanced Database Analyst/Programmer – Intermediate | | | | | | | | | | | | |
| Advanced Database Analyst/Programmer – Associate | | | | | | | | | | | | |
| IA Policy and Compliance Certified Professional – Senior | | | | | | | | | | | | |
| IA Policy and Compliance Certified Professional – Intermediate | | | | | | | | | | | | |
| IA Policy and Compliance Certified Professional – Associate | | | | | | | | | | | | |
| Cyber Watch Operations Certified Analyst – Senior | | | | | | | | | | | | |
| Cyber Watch Operations Certified Analyst – Intermediate | | | | | | | | | | | | |
| Cyber Watch Operations Certified Analyst – Associate | | | | | | | | | | | | |
| Systems Administrator – Senior | | | | | | | | | | | | |
| Systems Administrator – Intermediate | | | | | | | | | | | | |
| Systems Administrator – Associate | | | | | | | | | | | | |
| Database Administrator | | | | | | | | | | | | |
| Database Analyst/Programmer – Senior | | | | | | | | | | | | |
| Database Analyst/Programmer – Intermediate | | | | | | | | | | | | |
| Database Analyst/Programmer – Associate | | | | | | | | | | | | |
| Senior IT Systems Solution Architect | | | | | | | | | | | | |
| Help Desk Coordinator | | | | | | | | | | | | |
| Help Desk Support Service Specialist – Senior | | | | | | | | | | | | |
| Help Desk Support Service Specialist – Intermediate | | | | | | | | | | | | |
| Help Desk Support Service Specialist – Associate | | | | | | | | | | | | |
| PC Support Manager | | | | | | | | | | | | |
| PC Systems Specialist | | | | | | | | | | | | |
| PC Maintenance Technician | | | | | | | | | | | | |
| Web Project Manager | | | | | | | | | | | | |
| Web Designer – Senior | | | | | | | | | | | | |
| Web Designer – Intermediate | | | | | | | | | | | | |
| Web Designer – Associate | | | | | | | | | | | | |
| Web Software Developer – Senior | | | | | | | | | | | | |
| Web Software Developer – Intermediate | | | | | | | | | | | | |
| Web Software Developer – Associate | | | | | | | | | | | | |
| Web Technical Administrator | | | | | | | | | | | | |
| Web Content Administrator | | | | | | | | | | | | |
| Network Administrator – Senior | | | | | | | | | | | | |
| Network Administrator – Intermediate | | | | | | | | | | | | |
| Network Administrator – Associate | | | | | | | | | | | | |
| Network Support Technician – Senior | | | | | | | | | | | | |
| Network Support Technician – Intermediate | | | | | | | | | | | | |
| Network Support Technician – Associate | | | | | | | | | | | | |
| Business Systems Analyst – Senior | | | | | | | | | | | | |
| Business Systems Analyst – Intermediate | | | | | | | | | | | | |
| Business Systems Analyst – Associate | | | | | | | | | | | | |
| Information Systems Training Manager | | | | | | | | | | | | |
| Information Systems Training Specialist – Senior | | | | | | | | | | | | |
| Information Systems Training Specialist – Intermediate | | | | | | | | | | | | |
| Information Systems Training Specialist – Associate | | | | | | | | | | | | |
| AV Fabrication Engineer – Senior | | | | | | | | | | | | |
| AV Fabrication Engineer – Intermediate | | | | | | | | | | | | |
| AV Fabrication Engineer – Associate | | | | | | | | | | | | |
| Audio Visual Programmer – Senior | | | | | | | | | | | | |
| Audio Visual Programmer – Intermediate | | | | | | | | | | | | |
| Audio Visual Programmer – Associate | | | | | | | | | | | | |
| Other | | | | | | | | | | | | |
| Other | | | | | | | | | | | | |
| Other | | | | | | | | | | | | |
| Other | | | | | | | | | | | | |
| Other | | | | | | | | | | | | |
HTC711-16-R-D001 &P of &N Confidential Information
Prime Base Onsite Tasks-Lbr Hr
| [Offeror Name] Prime Contractor Base Period - Onsite Labor Hours by Task | Prime Contractor Onsite Fringe Benefit % | 0.00% | Proposed Profit % on FFP CLINS | 0.00% |
| Prime Contractor Onsite Overhead % | 0.00% | Proposed Profit % on CPFF CLINS | 0.00% |
| Prime Contractor Onsite G&A % | 0.00% | | |
| | | | | | | | | PROGRAM MANAGEMENT | | | | | | PROJECT MANAGEMENT | | | | | | QUALITY ASSURANCE | | | | | | IT SYSTEMS ARCHITECTURE | | | | | | | APPLICATION SYSTEMS | | | | | | | | | OPERATIONS AND LOGISTICS | | | INFORMATION ASSURANCE | | | |
| | | | | Program Manager – Senior | Program Manager – Intermediate | Program Manager – Associate | Administrator – Senior | Administrator – Intermediate | Administrator – Associate | Project Manager – Senior | Project Manager – Intermediate | Project Manager – Associate | Project Engineer – Senior | Project Engineer – Intermediate | Project Engineer – Associate | Quality Assurance Analyst – Senior | Quality Assurance Analyst – Intermediate | Quality Assurance Analyst – Associate | Quality Professional Staff – Senior | Quality Professional Staff – Intermediate | Quality Professional Staff – Associate | Client/Server Network Architect | Systems Engineer – Senior | Systems Engineer – Intermediate | Systems Engineer – Associate | Managed System Engineer – Senior | Managed Systems Engineer – Intermediate | Managed Systems Engineer – Associate | Applications Systems Analyst – Senior | Applications Systems Analyst – Intermediate | Applications Systems Analyst – Associate | Applications Programmer – Senior | Applications Programmer – Intermediate | Applications Programmer – Associate | IT Certified Professional – Senior | IT Certified Professional – Intermediate | IT Certified Professional – Associate | Configuration Management (CM) Specialist – Senior | Configuration Management (CM) Specialist – Intermediate | Configuration Management (CM) Specialist – Associate | Information Assurance Engineer – Senior | Information Assurance Engineer – Intermediate | Information Assurance Engineer – Associate | Information Systems Auditor – Senior | Information Systems Auditor – Intermediate | Information Systems Auditor – Associate | Information Security Specialist – Senior | Information Security Specialist – Intermediate |
| | | | Unburdened Onsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Fringe Benefits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Burdened Onsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN | Type | Task 1 | | Contract Level and Contract Management | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 0001 | FFP | Task 1 | Subtask 9 | Transition-In (Optional) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Total Hours
Estimated FTE's
HTC711-16-R-D001 &P of &N Confidential Information
Prime Base Offsite Tasks-LbrHr
| [Offeror Name] Prime Contractor Base Period - Offsite Labor Hours by Task | Prime Contractor Onsite Fringe Benefit % | 0.00% | Proposed Profit % on FFP CLINS | 0.00% |
| Prime Contractor Onsite Overhead % | 0.00% | Proposed Profit % on CPFF CLINS | 0.00% |
| Prime Contractor Onsite G&A % | 0.00% | | |
| | | | | | | | | PROGRAM MANAGEMENT | | | | | | PROJECT MANAGEMENT | | | | | | QUALITY ASSURANCE | | | | | | IT SYSTEMS ARCHITECTURE | | | | | | | APPLICATION SYSTEMS | | | | | | | | | OPERATIONS AND LOGISTICS | | | INFORMATION ASSURANCE | | | |
| | | | | Program Manager – Senior | Program Manager – Intermediate | Program Manager – Associate | Administrator – Senior | Administrator – Intermediate | Administrator – Associate | Project Manager – Senior | Project Manager – Intermediate | Project Manager – Associate | Project Engineer – Senior | Project Engineer – Intermediate | Project Engineer – Associate | Quality Assurance Analyst – Senior | Quality Assurance Analyst – Intermediate | Quality Assurance Analyst – Associate | Quality Professional Staff – Senior | Quality Professional Staff – Intermediate | Quality Professional Staff – Associate | Client/Server Network Architect | Systems Engineer – Senior | Systems Engineer – Intermediate | Systems Engineer – Associate | Managed System Engineer – Senior | Managed Systems Engineer – Intermediate | Managed Systems Engineer – Associate | Applications Systems Analyst – Senior | Applications Systems Analyst – Intermediate | Applications Systems Analyst – Associate | Applications Programmer – Senior | Applications Programmer – Intermediate | Applications Programmer – Associate | IT Certified Professional – Senior | IT Certified Professional – Intermediate | IT Certified Professional – Associate | Configuration Management (CM) Specialist – Senior | Configuration Management (CM) Specialist – Intermediate | Configuration Management (CM) Specialist – Associate | Information Assurance Engineer – Senior | Information Assurance Engineer – Intermediate | Information Assurance Engineer – Associate | Information Systems Auditor – Senior | Information Systems Auditor – Intermediate | Information Systems Auditor – Associate | Information Security Specialist – Senior | Information Security Specialist – Intermediate |
| | | | Unburdened Onsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Fringe Benefits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Burdened Offsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN | Type | Task 1 | | Contract Level and Contract Management | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 0001 | FFP | Task 1 | Subtask 9 | Transition-In (Optional) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Total Hours
Estimated FTE's
HTC711-16-R-D001 &P of &N Confidential Information
Prime OP1 Onsite Tasks-Lbr Hrs
| [Offeror Name] Prime Contractor Option Period 1 - Onsite Labor Hours by Task | Prime Contractor Onsite Fringe Benefit % | 0.00% | Proposed Profit % on FFP CLINS | 0.00% | Option Period 2 Proposed 12 Month Escalation | 0.00% |
| Prime Contractor Onsite Overhead % | 0.00% | Proposed Profit % on CPFF CLINS | 0.00% | Option Period 3 Proposed 12 Month Escalation | 0.00% |
| Prime Contractor Onsite G&A % | 0.00% | | | Option Period 4 Proposed 12 Month Escalation | 0.00% |
| | | | | Option Period 5 Proposed 12 Month Escalation | 0.00% |
| | | | | | | | | PROGRAM MANAGEMENT | | | | | | PROJECT MANAGEMENT | | | | | | QUALITY ASSURANCE | | | | | | IT SYSTEMS ARCHITECTURE | | | | | | | APPLICATION SYSTEMS | | | | | | | | | OPERATIONS AND LOGISTICS | | | INFORMATION ASSURANCE | | | |
| | | | | Program Manager – Senior | Program Manager – Intermediate | Program Manager – Associate | Administrator – Senior | Administrator – Intermediate | Administrator – Associate | Project Manager – Senior | Project Manager – Intermediate | Project Manager – Associate | Project Engineer – Senior | Project Engineer – Intermediate | Project Engineer – Associate | Quality Assurance Analyst – Senior | Quality Assurance Analyst – Intermediate | Quality Assurance Analyst – Associate | Quality Professional Staff – Senior | Quality Professional Staff – Intermediate | Quality Professional Staff – Associate | Client/Server Network Architect | Systems Engineer – Senior | Systems Engineer – Intermediate | Systems Engineer – Associate | Managed System Engineer – Senior | Managed Systems Engineer – Intermediate | Managed Systems Engineer – Associate | Applications Systems Analyst – Senior | Applications Systems Analyst – Intermediate | Applications Systems Analyst – Associate | Applications Programmer – Senior | Applications Programmer – Intermediate | Applications Programmer – Associate | IT Certified Professional – Senior | IT Certified Professional – Intermediate | IT Certified Professional – Associate | Configuration Management (CM) Specialist – Senior | Configuration Management (CM) Specialist – Intermediate | Configuration Management (CM) Specialist – Associate | Information Assurance Engineer – Senior | Information Assurance Engineer – Intermediate | Information Assurance Engineer – Associate | Information Systems Auditor – Senior | Information Systems Auditor – Intermediate | Information Systems Auditor – Associate | Information Security Specialist – Senior | Information Security Specialist – Intermediate |
| | | | Unburdened Onsite Labor Rate | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Burdened Onsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN | Type | Task 1 | | Contract Level and Contract Management | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 1 | Contract Mgmt Plan | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 2 | Weekly Activity Report (WAR) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 3 | Monthly Status Report (MSR) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 4 | In-Process Reviews (IPRs) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 5 | Trip Report | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 6 | Meeting/Conference Minutes | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 7 | Subject Matter Expertise (SME) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 8 | Personnel Status Report | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 10 | Transition-Out | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 11 | Contractor Manpower Reporting | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| CLIN | | Task 2 | Task 2 | Service Operations |
| 1002 | FPIF | Task 2 | Subtask 1.1 | IT Ops Mgmt - Duty Controller |
| 1002 | FPIF | Task 2 | Subtask 1.2 | USTRANSCOM Service Desk |
| 1002 | FPIF | Task 2 | Subtask 2 | C2 System Support |
| 1002 | FPIF | Task 2 | Subtask 2.1 | GCCS Program Support |
| 1002 | FPIF | Task 2 | Subtask 2.2 | TRAC2ES Program Support |
| 1002 | FPIF | Task 2 | Subtask 3 | Problem Mgmt |
| 1002 | FPIF | Task 2 | Subtask 4.1 | System Admin |
| 1002 | FPIF | Task 2 | Subtask 4.1.1 | FAA Data Feed System Support |
| 1002 | FPIF | Task 2 | Subtask 4.2 | Database Administration and Support |
| 1002 | FPIF | Task 2 | Subtask 4.3 | Virtual Environment and Network Storage |
| 1002 | FPIF | Task 2 | Subtask 4.4.1 | DoD Enterprise Email (DEE) Spt |
| 1002 | FPIF | Task 2 | Subtask 4.4.2 | Collaboration Tools Spt |
| 1002 | FPIF | Task 2 | Subtask 4.4.2.1 | OCS/Lync |
| 1006 | FFP | Task 2 | Subtask 4.4.2.2 | SharePoint Sustainment (Optional) |
| 1002 | FPIF | Task 2 | Subtask 4.5 | Directory Services & Identify Access Mgmt |
| 1002 | FPIF | Task 2 | Subtask 4.6 | End User IT System Support |
| 1002 | FPIF | Task 2 | Subtask 4.6.1 | End User Service Provisioning |
| 1002 | FPIF | Task 2 | Subtask 4.6.2 | End-User Device O&M (Includes FACCSM) |
| 1002 | FPIF | Task 2 | Subtask 4.6.3 | Virtual Desktop Infrastructure (VDI) Support |
| 1002 | FPIF | Task 2 | Subtask 4.6.4 | Service Design and Transition Support |
| 1002 | FPIF | Task 2 | Subtask 4.7.1 | USTRANSCOM Key Information Technology (IT) Service Support (KITSS) |
| 1002 | FPIF | Task 2 | Subtask 5.1 | Network Infrastructure Support |
| 1002 | FPIF | Task 2 | Subtask 5.2 | JTEN Support |
| 1002 | FPIF | Task 2 | Subtask 5.3 | Telephone Support Services |
| 1002 | FPIF | Task 2 | Subtask 5.4 | Long Haul Comm |
| 1002 | FPIF | Task 2 | Subtask 6.1 | USTRANSCOM AV/VTC Ops Spt |
| 1002 | FPIF | Task 2 | Subtask 6.1.2 | VTC Support |
| 1002 | FPIF | Task 2 | Subtask 6.1.3 | Server & Multipoint Controller Unit (MCU) Support |
| 1002 | FPIF | Task 2 | Subtask 6.1.4 | COMSEC Spt |
| 1003 | CPFF | Task 2 | Subtask 6.2.1 | USTRANSCOM AV/VTC Maintenance & Engineering Spt |
| 1003 | CPFF | Task 2 | Subtask 6.2.2 | SDDC AV/VTC Maintenance & Engineering Spt |
| 1003 | CPFF | Task 2 | Subtask 6.2.3 | JECC AV/VTC Maintenance & Engineering Spt |
| CLIN | | Task 3 | | Service Support |
| 1002 | FPIF | Task 3 | Subtask 1.1 | IT Service Portfolio Mgmt |
| 1002 | FPIF | Task 3 | Subtask 1.2 | Business Relationship Mgmt |
| 1007 | FFP | Task 3 | Subtask 1.3 | Demand Mgmt (Optional) |
| 1002 | FPIF | Task 3 | Subtask 2.1 | Enterprise Procurement Mgmt Spt |
| 1002 | FPIF | Task 3 | Subtask 3.1 | Service Asset & Configuration Mgmt |
| 1002 | FPIF | Task 3 | Subtask 3.2 | Application Portfolio Management |
| 1008 | FPIF | Task 3 | Subtask 3.2.3 | TWCF Enterprisie S/W APfM (Optional) |
| 1002 | FPIF | Task 3 | Subtask 3.3 | H/W Asset Mgmt - ADPE Mgmt |
| 1002 | FPIF | Task 3 | Subtask 4.1.1 | Service Catalog Mgmt |
| 1014 | FFP | Task 3 | Subtask 4.1.2 | Requirements Processing Oversight Management (Optional) |
| 1003 | CPFF | Task 3 | Subtask 4.2.1 | Project Portfolio Mgmt |
| 1003 | CPFF | Task 3 | Subtask 4.2.2 | IT Project Mgmt |
| 1009 | FFP | Task 3 | Subtask 4.3 | Service Level Mgmt (Optional) |
| 1010 | FFP | Task 3 | Subtask 5 | Availability Mgmt (Optional) |
| 1011 | FFP | Task 3 | Subtask 6 | Capacity Mgmt (Optional) |
| 1012 | FFP | Task 3 | Subtask 7 | IT Service Continuity Mgmt (Optional) |
| 1002 | FPIF | Task 3 | Subtask 8 | Change Mgmt |
| 1003 | CPFF | Task 3 | Subtask 9.1 | Design & Tranistion Planning & Spt |
| 1003 | CPFF | Task 3 | Subtask 9.2 | Release and Deployment Mgmt |
| 1002 | FPIF | Task 3 | Subtask 9.3.1 | Service Design Config Support |
| 1002 | FPIF | Task 3 | Subtask 9.3.2-4 | Test Lab & Environment O&M |
| 1002 | FPIF | Task 3 | Subtask 9.3.5 | New Technology Integration |
| 1003 | CPFF | Task 3 | Subtask 9.4.1 | Tools Portfolio Mgmt & Support |
| 1003 | CPFF | Task 3 | Subtask 9.4.2.1 | ITSM Tool Suite Support |
| 1003 | CPFF | Task 3 | Subtask 9.4.2.2 | CSM & BAM Support |
| 1002 | FPIF | Task 3 | Subtask 9.5 | Knowledge Mgmt |
| 1002 | FPIF | Task 3 | Subtask 10 | CSI Process Spt |
| CLIN | | Task 4 | | Exercise and Contingency Operations Support |
| 1002 | FPIF | Task 4 | Subtask 1 | Readiness & Joint Tng |
| 1002 | FPIF | Task 4 | Subtask 2 | Communications, Cyberspace, and Exercise Planning |
| 1002 | FPIF | Task 4 | Subtask 3 | Communications Spectrum Management |
| 1002 | FPIF | Task 4 | Subtask 4 | SATCOM Management and Planning |
| 1002 | FPIF | Task 4 | Subtask 5 | MILSTAR Operations and Management |
| 1002 | FPIF | Task 4 | Subtask 6 | Airborne Communications Task Management |
| 1002 | FPIF | Task 4 | Subtask 7 | Tactical Communications Task Management |
| 1003 | CPFF | Task 4 | Subtask 8 | Contingency, Emergency, Exercise Operations Support |
| CLIN | | Task 5 | | Security |
| 1002 | FPIF | Task 5 | Subtask 1 | Security Ops |
| 1002 | FPIF | Task 5 | Subtask 1.1 | Cyber Security Defense |
| 1002 | FPIF | Task 5 | Subtask 1.2 | Intrusion Detection |
| 1002 | FPIF | Task 5 | Subtask 1.3 | Cyber Threat Analysis |
| 1002 | FPIF | Task 5 | Subtask 1.4 | COMSEC Mgmt |
| 1013 | FFP | Task 5 | Subtask 1.4.5 | Sensistive Compartmented Information Facility (SCIF) Rep (Optional) |
| 1002 | FPIF | Task 5 | Subtask 1.5 | EMSEC |
| 1003 | CPFF | Task 5 | Subtask 2 | Risk Management |
| 1003 | CPFF | Task 5 | Subtask 2.1 | Info Sys security Engineering |
| 1015 | CPFF | Task 5 | Subtask 2.1.1 | Cyber security support for USTRANSCOM Component Commands and Cyber Security Service Provider Subscribers (Optional) |
| 1003 | CPFF | Task 5 | Subtask 2.2 | Security Auditing, Config, Vuln Mgmt |
| 1003 | CPFF | Task 5 | Subtask 2.3.1 | Authorization Spt for Physical & Virtual |
| 1003 | CPFF | Task 5 | Subtask 2.3.2 | Authorization Spt for SCA and OA |
| 1003 | CPFF | Task 5 | Subtask 2.4 | Insider Threat Risk Mitigation |
| 1003 | CPFF | Task 5 | Subtask 2.5 | Software Assurance |
| CLIN | | Task 6 | | Web Applications and Support |
| 1003 | CPFF | Task 6 | Subtask 1 | Web Development |
| 1003 | CPFF | Task 6 | Subtask 2 | Customer Support & Content Admin |
| 1003 | CPFF | Task 6 | Subtask 3 | Web Dev Support |
| 1004 | FFP | Task 6 | Subtask 4 | Electronically Stored Information (ESI) Search Support - eDiscovery |
| CLIN | | Task 7 | | C4S Training (Optional) |
| 1005 | CPFF | Task 7 | Subtask 1 | Training Support (Optional) |
| 1005 | CPFF | Task 7 | Subtask 2 | Support for New Training Requirements (Optional) |
| 1005 | CPFF | Task 7 | Subtask 3 | Training Videos and Computer Based Training (CBT) Development (Optional) |
| CLIN | | Task 8 | | JOSAC Support |
| 1002 | FPIF | Task 8 | Subtask 1 | JOSAC Data Entry Support |
| 1002 | FPIF | Task 8 | Subtask 2 | JOSAC Scheduling System Support |
| 1002 | FPIF | Task 8 | Subtask 3 | JOSAC FACCSM & Gatekeeper Support |
Total Hours
Estimated FTE's
HTC711-16-R-D001 &P of &N Confidential Information
Prime OP1 Offsite Tasks-Lbr Hrs
| [Offeror Name] Prime Contractor Option Period 1 - Offsite Labor Hours by Task | Prime Contractor Onsite Fringe Benefit % | 0.00% | Proposed Profit % on FFP CLINS | 0.00% |
| Prime Contractor Onsite Overhead % | 0.00% | Proposed Profit % on CPFF CLINS | 0.00% |
| Prime Contractor Onsite G&A % | 0.00% | | |
| | | | | | | | | PROGRAM MANAGEMENT | | | | | | PROJECT MANAGEMENT | | | | | | QUALITY ASSURANCE | | | | | | IT SYSTEMS ARCHITECTURE | | | | | | | APPLICATION SYSTEMS | | | | | | | | | OPERATIONS AND LOGISTICS | | | INFORMATION ASSURANCE | | | |
| | | | | Program Manager – Senior | Program Manager – Intermediate | Program Manager – Associate | Administrator – Senior | Administrator – Intermediate | Administrator – Associate | Project Manager – Senior | Project Manager – Intermediate | Project Manager – Associate | Project Engineer – Senior | Project Engineer – Intermediate | Project Engineer – Associate | Quality Assurance Analyst – Senior | Quality Assurance Analyst – Intermediate | Quality Assurance Analyst – Associate | Quality Professional Staff – Senior | Quality Professional Staff – Intermediate | Quality Professional Staff – Associate | Client/Server Network Architect | Systems Engineer – Senior | Systems Engineer – Intermediate | Systems Engineer – Associate | Managed System Engineer – Senior | Managed Systems Engineer – Intermediate | Managed Systems Engineer – Associate | Applications Systems Analyst – Senior | Applications Systems Analyst – Intermediate | Applications Systems Analyst – Associate | Applications Programmer – Senior | Applications Programmer – Intermediate | Applications Programmer – Associate | IT Certified Professional – Senior | IT Certified Professional – Intermediate | IT Certified Professional – Associate | Configuration Management (CM) Specialist – Senior | Configuration Management (CM) Specialist – Intermediate | Configuration Management (CM) Specialist – Associate | Information Assurance Engineer – Senior | Information Assurance Engineer – Intermediate | Information Assurance Engineer – Associate | Information Systems Auditor – Senior | Information Systems Auditor – Intermediate | Information Systems Auditor – Associate | Information Security Specialist – Senior | Information Security Specialist – Intermediate |
| | | | Unburdened Onsite Labor Rate | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Fringe Benefits | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Overhead | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | G&A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Burdened Offsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN | Type | Task 1 | | Contract Level and Contract Management | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 1 | Contract Mgmt Plan | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 2 | Weekly Activity Report (WAR) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 3 | Monthly Status Report (MSR) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 4 | In-Process Reviews (IPRs) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 5 | Trip Report | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 6 | Meeting/Conference Minutes | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 7 | Subject Matter Expertise (SME) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 8 | Personnel Status Report | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 10 | Transition-Out | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 1002 | FPIF | Task 1 | Subtask 11 | Contractor Manpower Reporting | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| CLIN | | Task 2 | Task 2 | Service Operations |
| 1002 | FPIF | Task 2 | Subtask 1.1 | IT Ops Mgmt - Duty Controller |
| 1002 | FPIF | Task 2 | Subtask 1.2 | USTRANSCOM Service Desk |
| 1002 | FPIF | Task 2 | Subtask 2 | C2 System Support |
| 1002 | FPIF | Task 2 | Subtask 2.1 | GCCS Program Support |
| 1002 | FPIF | Task 2 | Subtask 2.2 | TRAC2ES Program Support |
| 1002 | FPIF | Task 2 | Subtask 3 | Problem Mgmt |
| 1002 | FPIF | Task 2 | Subtask 4.1 | System Admin |
| 1002 | FPIF | Task 2 | Subtask 4.1.1 | FAA Data Feed System Support |
| 1002 | FPIF | Task 2 | Subtask 4.2 | Database Administration and Support |
| 1002 | FPIF | Task 2 | Subtask 4.3 | Virtual Environment and Network Storage |
| 1002 | FPIF | Task 2 | Subtask 4.4.1 | DoD Enterprise Email (DEE) Spt |
| 1002 | FPIF | Task 2 | Subtask 4.4.2 | Collaboration Tools Spt |
| 1002 | FPIF | Task 2 | Subtask 4.4.2.1 | OCS/Lync |
| 1006 | FFP | Task 2 | Subtask 4.4.2.2 | SharePoint Sustainment (Optional) |
| 1002 | FPIF | Task 2 | Subtask 4.5 | Directory Services & Identify Access Mgmt |
| 1002 | FPIF | Task 2 | Subtask 4.6 | End User IT System Support |
| 1002 | FPIF | Task 2 | Subtask 4.6.1 | End User Service Provisioning |
| 1002 | FPIF | Task 2 | Subtask 4.6.2 | End-User Device O&M (Includes FACCSM) |
| 1002 | FPIF | Task 2 | Subtask 4.6.3 | Virtual Desktop Infrastructure (VDI) Support |
| 1002 | FPIF | Task 2 | Subtask 4.6.4 | Service Design and Transition Support |
| 1002 | FPIF | Task 2 | Subtask 4.7.1 | USTRANSCOM Key Information Technology (IT) Service Support (KITSS) |
| 1002 | FPIF | Task 2 | Subtask 5.1 | Network Infrastructure Support |
| 1002 | FPIF | Task 2 | Subtask 5.2 | JTEN Support |
| 1002 | FPIF | Task 2 | Subtask 5.3 | Telephone Support Services |
| 1002 | FPIF | Task 2 | Subtask 5.4 | Long Haul Comm |
| 1002 | FPIF | Task 2 | Subtask 6.1 | USTRANSCOM AV/VTC Ops Spt |
| 1002 | FPIF | Task 2 | Subtask 6.1.2 | VTC Support |
| 1002 | FPIF | Task 2 | Subtask 6.1.3 | Server & Multipoint Controller Unit (MCU) Support |
| 1002 | FPIF | Task 2 | Subtask 6.1.4 | COMSEC Spt |
| 1003 | CPFF | Task 2 | Subtask 6.2.1 | USTRANSCOM AV/VTC Maintenance & Engineering Spt |
| 1003 | CPFF | Task 2 | Subtask 6.2.2 | SDDC AV/VTC Maintenance & Engineering Spt |
| 1003 | CPFF | Task 2 | Subtask 6.2.3 | JECC AV/VTC Maintenance & Engineering Spt |
| CLIN | | Task 3 | | Service Support |
| 1002 | FPIF | Task 3 | Subtask 1.1 | IT Service Portfolio Mgmt |
| 1002 | FPIF | Task 3 | Subtask 1.2 | Business Relationship Mgmt |
| 1007 | FFP | Task 3 | Subtask 1.3 | Demand Mgmt (Optional) |
| 1002 | FPIF | Task 3 | Subtask 2.1 | Enterprise Procurement Mgmt Spt |
| 1002 | FPIF | Task 3 | Subtask 3.1 | Service Asset & Configuration Mgmt |
| 1002 | FPIF | Task 3 | Subtask 3.2 | Application Portfolio Management |
| 1008 | FPIF | Task 3 | Subtask 3.2.3 | TWCF Enterprisie S/W APfM (Optional) |
| 1002 | FPIF | Task 3 | Subtask 3.3 | H/W Asset Mgmt - ADPE Mgmt |
| 1002 | FPIF | Task 3 | Subtask 4.1.1 | Service Catalog Mgmt |
| 1014 | FFP | Task 3 | Subtask 4.1.2 | Requirements Processing Oversight Management (Optional) |
| 1003 | CPFF | Task 3 | Subtask 4.2.1 | Project Portfolio Mgmt |
| 1003 | CPFF | Task 3 | Subtask 4.2.2 | IT Project Mgmt |
| 1009 | FFP | Task 3 | Subtask 4.3 | Service Level Mgmt (Optional) |
| 1010 | FFP | Task 3 | Subtask 5 | Availability Mgmt (Optional) |
| 1011 | FFP | Task 3 | Subtask 6 | Capacity Mgmt (Optional) |
| 1012 | FFP | Task 3 | Subtask 7 | IT Service Continuity Mgmt (Optional) |
| 1002 | FPIF | Task 3 | Subtask 8 | Change Mgmt |
| 1003 | CPFF | Task 3 | Subtask 9.1 | Design & Tranistion Planning & Spt |
| 1003 | CPFF | Task 3 | Subtask 9.2 | Release and Deployment Mgmt |
| 1002 | FPIF | Task 3 | Subtask 9.3.1 | Service Design Config Support |
| 1002 | FPIF | Task 3 | Subtask 9.3.2-4 | Test Lab & Environment O&M |
| 1002 | FPIF | Task 3 | Subtask 9.3.5 | New Technology Integration |
| 1003 | CPFF | Task 3 | Subtask 9.4.1 | Tools Portfolio Mgmt & Support |
| 1003 | CPFF | Task 3 | Subtask 9.4.2.1 | ITSM Tool Suite Support |
| 1003 | CPFF | Task 3 | Subtask 9.4.2.2 | CSM & BAM Support |
| 1002 | FPIF | Task 3 | Subtask 9.5 | Knowledge Mgmt |
| 1002 | FPIF | Task 3 | Subtask 10 | CSI Process Spt |
| CLIN | | Task 4 | | Exercise and Contingency Operations Support |
| 1002 | FPIF | Task 4 | Subtask 1 | Readiness & Joint Tng |
| 1002 | FPIF | Task 4 | Subtask 2 | Communications, Cyberspace, and Exercise Planning |
| 1002 | FPIF | Task 4 | Subtask 3 | Communications Spectrum Management |
| 1002 | FPIF | Task 4 | Subtask 4 | SATCOM Management and Planning |
| 1002 | FPIF | Task 4 | Subtask 5 | MILSTAR Operations and Management |
| 1002 | FPIF | Task 4 | Subtask 6 | Airborne Communications Task Management |
| 1002 | FPIF | Task 4 | Subtask 7 | Tactical Communications Task Management |
| 1003 | CPFF | Task 4 | Subtask 8 | Contingency, Emergency, Exercise Operations Support |
| CLIN | | Task 5 | | Security |
| 1002 | FPIF | Task 5 | Subtask 1 | Security Ops |
| 1002 | FPIF | Task 5 | Subtask 1.1 | Cyber Security Defense |
| 1002 | FPIF | Task 5 | Subtask 1.2 | Intrusion Detection |
| 1002 | FPIF | Task 5 | Subtask 1.3 | Cyber Threat Analysis |
| 1002 | FPIF | Task 5 | Subtask 1.4 | COMSEC Mgmt |
| 1013 | FFP | Task 5 | Subtask 1.4.5 | Sensistive Compartmented Information Facility (SCIF) Rep (Optional) |
| 1002 | FPIF | Task 5 | Subtask 1.5 | EMSEC |
| 1003 | CPFF | Task 5 | Subtask 2 | Risk Management |
| 1003 | CPFF | Task 5 | Subtask 2.1 | Info Sys security Engineering |
| 1015 | CPFF | Task 5 | Subtask 2.1.1 | Cyber security support for USTRANSCOM Component Commands and Cyber Security Service Provider Subscribers (Optional) |
| 1003 | CPFF | Task 5 | Subtask 2.2 | Security Auditing, Config, Vuln Mgmt |
| 1003 | CPFF | Task 5 | Subtask 2.3.1 | Authorization Spt for Physical & Virtual |
| 1003 | CPFF | Task 5 | Subtask 2.3.2 | Authorization Spt for SCA and OA |
| 1003 | CPFF | Task 5 | Subtask 2.4 | Insider Threat Risk Mitigation |
| 1003 | CPFF | Task 5 | Subtask 2.5 | Software Assurance |
| CLIN | | Task 6 | | Web Applications and Support |
| 1003 | CPFF | Task 6 | Subtask 1 | Web Development |
| 1003 | CPFF | Task 6 | Subtask 2 | Customer Support & Content Admin |
| 1003 | CPFF | Task 6 | Subtask 3 | Web Dev Support |
| 1004 | FFP | Task 6 | Subtask 4 | Electronically Stored Information (ESI) Search Support - eDiscovery |
| CLIN | | Task 7 | | C4S Training (Optional) |
| 1005 | CPFF | Task 7 | Subtask 1 | Training Support (Optional) |
| 1005 | CPFF | Task 7 | Subtask 2 | Support for New Training Requirements (Optional) |
| 1005 | CPFF | Task 7 | Subtask 3 | Training Videos and Computer Based Training (CBT) Development (Optional) |
| CLIN | | Task 8 | | JOSAC Support |
| 1002 | FPIF | Task 8 | Subtask 1 | JOSAC Data Entry Support |
| 1002 | FPIF | Task 8 | Subtask 2 | JOSAC Scheduling System Support |
| 1002 | FPIF | Task 8 | Subtask 3 | JOSAC FACCSM & Gatekeeper Support |
Total Hours
Estimated FTE's
HTC711-16-R-D001 &P of &N Confidential Information
Prime OP2 Onsite Tasks-Lbr Hrs
| [Offeror Name] Prime Contractor Option Period 2 - Onsite Labor Hours by Task | Prime Contractor Onsite Fringe Benefit % | 0.00% | Proposed Profit % on FFP CLINS | 0.00% |
| Prime Contractor Onsite Overhead % | 0.00% | Proposed Profit % on CPFF CLINS | 0.00% |
| Prime Contractor Onsite G&A % | 0.00% | | |
| | | 0.00% | Option Period 2 Escalation Rate | | | | | PROGRAM MANAGEMENT | | | | | | PROJECT MANAGEMENT | | | | | | QUALITY ASSURANCE | | | | | | IT SYSTEMS ARCHITECTURE | | | | | | | APPLICATION SYSTEMS | | | | | | | | | OPERATIONS AND LOGISTICS | | | INFORMATION ASSURANCE | | | |
| | | | | Program Manager – Senior | Program Manager – Intermediate | Program Manager – Associate | Administrator – Senior | Administrator – Intermediate | Administrator – Associate | Project Manager – Senior | Project Manager – Intermediate | Project Manager – Associate | Project Engineer – Senior | Project Engineer – Intermediate | Project Engineer – Associate | Quality Assurance Analyst – Senior | Quality Assurance Analyst – Intermediate | Quality Assurance Analyst – Associate | Quality Professional Staff – Senior | Quality Professional Staff – Intermediate | Quality Professional Staff – Associate | Client/Server Network Architect | Systems Engineer – Senior | Systems Engineer – Intermediate | Systems Engineer – Associate | Managed System Engineer – Senior | Managed Systems Engineer – Intermediate | Managed Systems Engineer – Associate | Applications Systems Analyst – Senior | Applications Systems Analyst – Intermediate | Applications Systems Analyst – Associate | Applications Programmer – Senior | Applications Programmer – Intermediate | Applications Programmer – Associate | IT Certified Professional – Senior | IT Certified Professional – Intermediate | IT Certified Professional – Associate | Configuration Management (CM) Specialist – Senior | Configuration Management (CM) Specialist – Intermediate | Configuration Management (CM) Specialist – Associate | Information Assurance Engineer – Senior | Information Assurance Engineer – Intermediate | Information Assurance Engineer – Associate | Information Systems Auditor – Senior | Information Systems Auditor – Intermediate | Information Systems Auditor – Associate | Information Security Specialist – Senior | Information Security Specialist – Intermediate |
| | | | Unburdened Onsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Fringe Benefits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | | Burdened Onsite Labor Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN | Type | Task 1 | | Contract Level and Contract Management | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 1 | Contract Mgmt Plan | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 2 | Weekly Activity Report (WAR) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 3 | Monthly Status Report (MSR) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 4 | In-Process Reviews (IPRs) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 5 | Trip Report | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 6 | Meeting/Conference Minutes | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 7 | Subject Matter Expertise (SME) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 8 | Personnel Status Report | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 10 | Transition-Out | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 2002 | FPIF | Task 1 | Subtask 11 | Contractor Manpower Reporting | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| CLIN | | Task 2 | Task 2 | Service Operations |
| 2002 | FPIF | Task 2 | Subtask 1.1 | IT Ops Mgmt - Duty Controller |
| 2002 | FPIF | Task 2 | Subtask 1.2 | USTRANSCOM Service Desk |
| 2002 | FPIF | Task 2 | Subtask 2 | C2 System Support |
| 2002 | FPIF | Task 2 | Subtask 2.1 | GCCS Program Support |
| 2002 | FPIF | Task 2 | Subtask 2.2 | TRAC2ES Program Support |
| 2002 | FPIF | Task 2 | Subtask 3 | Problem Mgmt |
| 2002 | FPIF | Task 2 | Subtask 4.1 | System Admin |
| 2002 | FPIF | Task 2 | Subtask 4.1.1 | FAA Data Feed System Support |
| 2002 | FPIF | Task 2 | Subtask 4.2 | Database Administration and Support |
| 2002 | FPIF | Task 2 | Subtask 4.3 | Virtual Environment and Network Storage |
| 2002 | FPIF | Task 2 | Subtask 4.4.1 | DoD Enterprise Email (DEE) Spt |
| 2002 | FPIF | Task 2 | Subtask 4.4.2 | Collaboration Tools Spt |
| 2002 | FPIF | Task 2 | Subtask 4.4.2.1 | OCS/Lync |
| 2006 | FFP | Task 2 | Subtask 4.4.2.2 | SharePoint Sustainment (Optional) |
| 2002 | FPIF | Task 2 | Subtask 4.5 | Directory Services & Identify Access Mgmt |
| 2002 | FPIF | Task 2 | Subtask 4.6 | End User IT System Support |
| 2002 | FPIF | Task 2 | Subtask 4.6.1 | End User Service Provisioning |
| 2002 | FPIF | Task 2 | Subtask 4.6.2 | End-User Device O&M (Includes FACCSM) |
This is the start of the file's text. The full file is on GovTribe.