Atch_8_-_Pricing_Matrix_Amd_3.xlsx

XLSX spreadsheet 5 MB Posted

Attached to
INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT
Solicitation number
HTC711-16-R-D001
Issued by

About this file

Atch 8 - Pricing Matrix - Amd 3

View the file

Other files

File Type Posted
Conformed_RFP.pdf PDF
RFP_Amendment__5.pdf PDF
Atch_8_-_Pricing_Matrix_Amd_5.xlsx XLSX spreadsheet
RFP_Amendment__4.pdf PDF
RFP_Amendment__3.pdf PDF
Atch_4_-_PP_Info_Sheets_-_Amd3.docx DOCX document
Q A__5_(posted_13_April_2016).pdf PDF
Instructions_for_Bidders_Library.pdf PDF
Q A__4_(posted_8_April_2016).pdf PDF
RFP_Amendment__2.pdf PDF
Atch_1_-_PWS_5Apr16_(with_changes).pdf PDF
Atch_1_-_PWS_5Apr16_(Clean)_.pdf PDF
Atch_4_-_PP_Info_Sheets_-_Amd2.docx DOCX document
Q A__3.pdf PDF
RFP_Amendment__1.pdf PDF
Atch_8_-_Pricing_Matrix_Amd1.xlsx XLSX spreadsheet
Atch_5_-_PPQ_Amd1.doc DOC document
Atch_3_-_QASP_Amd1.pdf PDF
Q A__2_(posted_1_April_2016.pdf PDF
Q A__1_(posted_25_March_2016).pdf PDF
Atch_4_-_PP_Info_Sheets.docx DOCX document
Atch_3_-_QASP.pdf PDF
Atch_8_-_Pricing_Matrix.xlsx XLSX spreadsheet
Atch_1_-_PWS.pdf PDF
Atch_5_-_PPQ.doc DOC document
Atch_2_-_DD254.pdf PDF
Atch_7_-_Lbr_Cat_Descriptions.pdf PDF
Atch_6_-_SB_SubKtg_Plan_Template.doc DOC document
ITSM_RFP.pdf PDF
ITSM_Draft_PWS_8FEB16.pdf PDF
ITSM_Pre-Solicitation_Notice.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

HTC711-16-R-D001
Attachment 8: Pricing Matrix 12 April 2016
UNITED STATES TRANSPORTATION COMMAND (USTRANSCOM)
INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT
Editable cell
ITSM
Instructions
[Offeror Name]
Description
1It is ESSENTIAL that the Offeror use this model in preparing its pricing response. Failure to provide the pricing details as required in this Pricing Template will be considered non-compliant and the Offeror's response may be subject to rejection.
2Some data cells in this workbook are protected to minimize the risk of compromising the integrity of the workbook structure and formulae. No data entry is allowed on the Contract Summary, Labor Rate Summary, Period of Performance Tasks-Lbr Hr Summaries (Purple Tabs), or Staffing Matrix worksheets (Orange Tabs).
3The Staffing Matrix worksheets (Orange Tabs) do not require data entry. The hours populated on these sheets will originate from the proposed hours on the corresponding Prime/Subcontractor Tasks-Lbr Hrs worksheets.
4Data cells that are editable within each worksheet are indicated in light yellow.
5Contract line item types include FPIF, CPFF, FFP & CR for ITSM Enterprise Support. CLINs 1,4,6, 7, 9,10, 11, 12, 13 & 14 will be FFP. Travel & ODC NTE costs are provided for evaluation purposes only.
6FPIF CLINS utilize government set parameters. The profit percentage is set at 10%, the ceiling price is 120% of target cost, and the overrun/underrun share ratio is 50/50.
7Offeror will input Fringe Benefit, Overhead, and G&A percentages on All Option Period Onsite and Offsite Tasks-Lbr Hrs worksheets for both Prime and Subcontractor Tabs. (Column M, Rows 2-4).
8On the Base Period Tasks-Lbr Hr Worksheets (Transition), Unburdened Labor Rates, the Fringe, Overhead and G&A percentages will autopopulate from the corresponding Option Period 1 worksheets.
9Offeror will input Proposed Profit percentages on the Option Period 1 Onsite Tasks-Lbr Hrs worksheets for the CPFF and FFP CLINS, respectively. (Column S, Row 2-3 for Profit Percentages). These rates will then autopopulate in the rest of the workbook.
10Offeror may choose to input a 12 month escalation factor for Option Periods 2 through 5 on the Prime and Subcontractor Option Period 1 Onsite Tasks-Lbr Hrs worksheet. (Column Z, Rows 2-5). These rates will then autopopulate in the other worksheets to escalate the unburdened labor rates proposed.
11Offeror will input unburdened labor rates on the Prime and Subcontractor Option Period 1 Onsite and Offsite Tasks-Lbr Hrs worksheets. (Row 10) These rates will then autopopulate in the rest of the worksheets using the proposed 12 month escalation factor proposed on the Option Period 1 Onsite Tasks-Lbr Hrs worksheet.
12Do not make changes to this pricing model. If you need to include additional elements, please include pricing for those elements as supplemental cost information in a separate worksheet. Please refer to the PWS documentation for details describing each of the service deliverables that the Offeror is expected to provide and price in accordance with the PWS.

The data in this document is Confidential and Proprietary Information

HTC711-16-R-D001 &P of &N Confidential Information

Contract Summary

UNITED STATES TRANSPORTATION COMMAND (USTRANSCOM)
INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT

Section B - ITSM ENTERPRISE SUPPORT PRICING

[Offeror Name]

CLINTypeService / DescriptionMax QuantityUnitBase PeriodOption Period 1Option Period 2Option Period 3Option Period 4Option Period 56 Month Extension
ITSM Enterprise Support
0001FFPITSM Enterprise Support - (OPTIONAL) Transition In Svcs - Task 1, Sub 91Lot$ - 0
Proposed Cost$ - 0
Proposed Profit0.00%$ - 0
02FPIFITSM Enterprise Support - Tasks 1, 2, 3, 4, 5, 6, 81Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Target Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Target Profit Amount10.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ceiling Price120%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Above/Below Target Share Ratio50/50
03CPFFITSM Enterprise Support - Tasks 2, 3, 4, 5, 61Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Estimated Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fixed Fee0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
04FFPITSM Enterprise Support - Task 6, Sub 4: eDiscovery1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
05CPFFITSM Enterprise Support - (OPTIONAL) Task 7: C4S Training1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Estimated Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fixed Fee0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
06FFPITSM Enterprise Support - (OPTIONAL) Task 2: Sub 4.4: SharePoint Sustainment1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
07FFPITSM Enterprise Support - (OPTIONAL) Task 3, Sub 1.3: Demand Management1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
08FPIFITSM Enterprise Support - (OPTIONAL) Task 3, Sub 3.2.3: TWCF Enterprise1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Target Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Target Profit Amount10.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ceiling Price120%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Above/Below Target Share Ratio50/50
09FFPITSM Enterprise Support - (OPTIONAL) Task 3, Sub 4.3: Service Level Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10FFPITSM Enterprise Support - (OPTIONAL) Task 3, Sub 5: Availability Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11FFPITSM Enterprise Support - (OPTIONAL) Task 3, Sub 6: Capacity Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12FFPITSM Enterprise Support - (OPTIONAL) Task 3, Sub 7: IT Svc Continuity Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13FFPITSM Enterprise Support - (OPTIONAL) Task 5, Sub 1.4: COMSEC Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14FFPITSM Enterprise Support - (OPTIONAL) Task 3, Sub 4.1.2: Rqt Processing Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposed Profit0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15CPFFITSM Enterprise Support - (OPTIONAL) Task 5, Sub 2.1: Risk Mgmt1Lot$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Estimated Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fixed Fee0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

16 COST Other Direct Costs 1 Lot $ 516,000.00 $ 516,000.00 $ 516,000.00 $ 516,000.00 $ 516,000.00 $ 258,000.00

17 COST Travel 1 Lot $ 78,000.00 $ 78,000.00 $ 78,000.00 $ 78,000.00 $ 78,000.00 $ 39,000.00

TOTAL ITSM ENTERPRISE SUPPORT AT TARGET PRICE/COST $ - 0 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 297,000.00

TOTAL ITSM ENTERPRISE SUPPORT AT CEILING PRICE/COST $ - 0 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 594,000.00 $ 297,000.00

ITSM CONTRACT TEP AT CEILING PRICE/COST $ 3,267,000.00

HTC711-16-R-D001 &P of &N Confidential Information

Labor Rates Summary

UNITED STATES TRANSPORTATION COMMAND (USTRANSCOM)
INFORMATION TECHNOLOGY SERVICE MANAGEMENT (ITSM) ENTERPRISE SUPPORT
Labor Categories
[Offeror Name]
Option Period 1Option Period 2Option Period 3Option Period 4Option Period 56 Month Extension
Escalation0.00%Escalation0.00%Escalation0.00%Escalation0.00%
Labor CategoryOnsiteOffsiteOnsiteOffsiteOnsiteOffsiteOnsiteOffsiteOnsiteOffsiteOnsiteOffsite
Program Manager – Senior
Program Manager – Intermediate
Program Manager – Associate
Administrator – Senior
Administrator – Intermediate
Administrator – Associate
Project Manager – Senior
Project Manager – Intermediate
Project Manager – Associate
Project Engineer – Senior
Project Engineer – Intermediate
Project Engineer – Associate
Quality Assurance Analyst – Senior
Quality Assurance Analyst – Intermediate
Quality Assurance Analyst – Associate
Quality Professional Staff – Senior
Quality Professional Staff – Intermediate
Quality Professional Staff – Associate
Client/Server Network Architect
Systems Engineer – Senior
Systems Engineer – Intermediate
Systems Engineer – Associate
Managed System Engineer – Senior
Managed Systems Engineer – Intermediate
Managed Systems Engineer – Associate
Applications Systems Analyst – Senior
Applications Systems Analyst – Intermediate
Applications Systems Analyst – Associate
Applications Programmer – Senior
Applications Programmer – Intermediate
Applications Programmer – Associate
IT Certified Professional – Senior
IT Certified Professional – Intermediate
IT Certified Professional – Associate
Configuration Management (CM) Specialist – Senior
Configuration Management (CM) Specialist – Intermediate
Configuration Management (CM) Specialist – Associate
Information Assurance Engineer – Senior
Information Assurance Engineer – Intermediate
Information Assurance Engineer – Associate
Information Systems Auditor – Senior
Information Systems Auditor – Intermediate
Information Systems Auditor – Associate
Information Security Specialist – Senior
Information Security Specialist – Intermediate
Information Security Specialist – Associate
Advanced Database Analyst/Programmer – Senior
Advanced Database Analyst/Programmer – Intermediate
Advanced Database Analyst/Programmer – Associate
IA Policy and Compliance Certified Professional – Senior
IA Policy and Compliance Certified Professional – Intermediate
IA Policy and Compliance Certified Professional – Associate
Cyber Watch Operations Certified Analyst – Senior
Cyber Watch Operations Certified Analyst – Intermediate
Cyber Watch Operations Certified Analyst – Associate
Systems Administrator – Senior
Systems Administrator – Intermediate
Systems Administrator – Associate
Database Administrator
Database Analyst/Programmer – Senior
Database Analyst/Programmer – Intermediate
Database Analyst/Programmer – Associate
Senior IT Systems Solution Architect
Help Desk Coordinator
Help Desk Support Service Specialist – Senior
Help Desk Support Service Specialist – Intermediate
Help Desk Support Service Specialist – Associate
PC Support Manager
PC Systems Specialist
PC Maintenance Technician
Web Project Manager
Web Designer – Senior
Web Designer – Intermediate
Web Designer – Associate
Web Software Developer – Senior
Web Software Developer – Intermediate
Web Software Developer – Associate
Web Technical Administrator
Web Content Administrator
Network Administrator – Senior
Network Administrator – Intermediate
Network Administrator – Associate
Network Support Technician – Senior
Network Support Technician – Intermediate
Network Support Technician – Associate
Business Systems Analyst – Senior
Business Systems Analyst – Intermediate
Business Systems Analyst – Associate
Information Systems Training Manager
Information Systems Training Specialist – Senior
Information Systems Training Specialist – Intermediate
Information Systems Training Specialist – Associate
AV Fabrication Engineer – Senior
AV Fabrication Engineer – Intermediate
AV Fabrication Engineer – Associate
Audio Visual Programmer – Senior
Audio Visual Programmer – Intermediate
Audio Visual Programmer – Associate
Other
Other
Other
Other
Other

HTC711-16-R-D001 &P of &N Confidential Information

Prime Base Onsite Tasks-Lbr Hr

[Offeror Name] Prime Contractor Base Period - Onsite Labor Hours by TaskPrime Contractor Onsite Fringe Benefit %0.00%Proposed Profit % on FFP CLINS0.00%
Prime Contractor Onsite Overhead %0.00%Proposed Profit % on CPFF CLINS0.00%
Prime Contractor Onsite G&A %0.00%
PROGRAM MANAGEMENTPROJECT MANAGEMENTQUALITY ASSURANCEIT SYSTEMS ARCHITECTUREAPPLICATION SYSTEMSOPERATIONS AND LOGISTICSINFORMATION ASSURANCE
Program Manager – SeniorProgram Manager – IntermediateProgram Manager – AssociateAdministrator – SeniorAdministrator – IntermediateAdministrator – AssociateProject Manager – SeniorProject Manager – IntermediateProject Manager – AssociateProject Engineer – SeniorProject Engineer – IntermediateProject Engineer – AssociateQuality Assurance Analyst – SeniorQuality Assurance Analyst – IntermediateQuality Assurance Analyst – AssociateQuality Professional Staff – SeniorQuality Professional Staff – IntermediateQuality Professional Staff – AssociateClient/Server Network ArchitectSystems Engineer – SeniorSystems Engineer – IntermediateSystems Engineer – AssociateManaged System Engineer – SeniorManaged Systems Engineer – IntermediateManaged Systems Engineer – AssociateApplications Systems Analyst – SeniorApplications Systems Analyst – IntermediateApplications Systems Analyst – AssociateApplications Programmer – SeniorApplications Programmer – IntermediateApplications Programmer – AssociateIT Certified Professional – SeniorIT Certified Professional – IntermediateIT Certified Professional – AssociateConfiguration Management (CM) Specialist – SeniorConfiguration Management (CM) Specialist – IntermediateConfiguration Management (CM) Specialist – AssociateInformation Assurance Engineer – SeniorInformation Assurance Engineer – IntermediateInformation Assurance Engineer – AssociateInformation Systems Auditor – SeniorInformation Systems Auditor – IntermediateInformation Systems Auditor – AssociateInformation Security Specialist – SeniorInformation Security Specialist – Intermediate
Unburdened Onsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Burdened Onsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLINTypeTask 1Contract Level and Contract Management
0001FFPTask 1Subtask 9Transition-In (Optional)

Total Hours

Estimated FTE's

HTC711-16-R-D001 &P of &N Confidential Information

Prime Base Offsite Tasks-LbrHr

[Offeror Name] Prime Contractor Base Period - Offsite Labor Hours by TaskPrime Contractor Onsite Fringe Benefit %0.00%Proposed Profit % on FFP CLINS0.00%
Prime Contractor Onsite Overhead %0.00%Proposed Profit % on CPFF CLINS0.00%
Prime Contractor Onsite G&A %0.00%
PROGRAM MANAGEMENTPROJECT MANAGEMENTQUALITY ASSURANCEIT SYSTEMS ARCHITECTUREAPPLICATION SYSTEMSOPERATIONS AND LOGISTICSINFORMATION ASSURANCE
Program Manager – SeniorProgram Manager – IntermediateProgram Manager – AssociateAdministrator – SeniorAdministrator – IntermediateAdministrator – AssociateProject Manager – SeniorProject Manager – IntermediateProject Manager – AssociateProject Engineer – SeniorProject Engineer – IntermediateProject Engineer – AssociateQuality Assurance Analyst – SeniorQuality Assurance Analyst – IntermediateQuality Assurance Analyst – AssociateQuality Professional Staff – SeniorQuality Professional Staff – IntermediateQuality Professional Staff – AssociateClient/Server Network ArchitectSystems Engineer – SeniorSystems Engineer – IntermediateSystems Engineer – AssociateManaged System Engineer – SeniorManaged Systems Engineer – IntermediateManaged Systems Engineer – AssociateApplications Systems Analyst – SeniorApplications Systems Analyst – IntermediateApplications Systems Analyst – AssociateApplications Programmer – SeniorApplications Programmer – IntermediateApplications Programmer – AssociateIT Certified Professional – SeniorIT Certified Professional – IntermediateIT Certified Professional – AssociateConfiguration Management (CM) Specialist – SeniorConfiguration Management (CM) Specialist – IntermediateConfiguration Management (CM) Specialist – AssociateInformation Assurance Engineer – SeniorInformation Assurance Engineer – IntermediateInformation Assurance Engineer – AssociateInformation Systems Auditor – SeniorInformation Systems Auditor – IntermediateInformation Systems Auditor – AssociateInformation Security Specialist – SeniorInformation Security Specialist – Intermediate
Unburdened Onsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Burdened Offsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLINTypeTask 1Contract Level and Contract Management
0001FFPTask 1Subtask 9Transition-In (Optional)

Total Hours

Estimated FTE's

HTC711-16-R-D001 &P of &N Confidential Information

Prime OP1 Onsite Tasks-Lbr Hrs

[Offeror Name] Prime Contractor Option Period 1 - Onsite Labor Hours by TaskPrime Contractor Onsite Fringe Benefit %0.00%Proposed Profit % on FFP CLINS0.00%Option Period 2 Proposed 12 Month Escalation0.00%
Prime Contractor Onsite Overhead %0.00%Proposed Profit % on CPFF CLINS0.00%Option Period 3 Proposed 12 Month Escalation0.00%
Prime Contractor Onsite G&A %0.00%Option Period 4 Proposed 12 Month Escalation0.00%
Option Period 5 Proposed 12 Month Escalation0.00%
PROGRAM MANAGEMENTPROJECT MANAGEMENTQUALITY ASSURANCEIT SYSTEMS ARCHITECTUREAPPLICATION SYSTEMSOPERATIONS AND LOGISTICSINFORMATION ASSURANCE
Program Manager – SeniorProgram Manager – IntermediateProgram Manager – AssociateAdministrator – SeniorAdministrator – IntermediateAdministrator – AssociateProject Manager – SeniorProject Manager – IntermediateProject Manager – AssociateProject Engineer – SeniorProject Engineer – IntermediateProject Engineer – AssociateQuality Assurance Analyst – SeniorQuality Assurance Analyst – IntermediateQuality Assurance Analyst – AssociateQuality Professional Staff – SeniorQuality Professional Staff – IntermediateQuality Professional Staff – AssociateClient/Server Network ArchitectSystems Engineer – SeniorSystems Engineer – IntermediateSystems Engineer – AssociateManaged System Engineer – SeniorManaged Systems Engineer – IntermediateManaged Systems Engineer – AssociateApplications Systems Analyst – SeniorApplications Systems Analyst – IntermediateApplications Systems Analyst – AssociateApplications Programmer – SeniorApplications Programmer – IntermediateApplications Programmer – AssociateIT Certified Professional – SeniorIT Certified Professional – IntermediateIT Certified Professional – AssociateConfiguration Management (CM) Specialist – SeniorConfiguration Management (CM) Specialist – IntermediateConfiguration Management (CM) Specialist – AssociateInformation Assurance Engineer – SeniorInformation Assurance Engineer – IntermediateInformation Assurance Engineer – AssociateInformation Systems Auditor – SeniorInformation Systems Auditor – IntermediateInformation Systems Auditor – AssociateInformation Security Specialist – SeniorInformation Security Specialist – Intermediate
Unburdened Onsite Labor Rate
Fringe Benefits
Overhead
G&A
Burdened Onsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLINTypeTask 1Contract Level and Contract Management
1002FPIFTask 1Subtask 1Contract Mgmt Plan
1002FPIFTask 1Subtask 2Weekly Activity Report (WAR)
1002FPIFTask 1Subtask 3Monthly Status Report (MSR)
1002FPIFTask 1Subtask 4In-Process Reviews (IPRs)
1002FPIFTask 1Subtask 5Trip Report
1002FPIFTask 1Subtask 6Meeting/Conference Minutes
1002FPIFTask 1Subtask 7Subject Matter Expertise (SME)
1002FPIFTask 1Subtask 8Personnel Status Report
1002FPIFTask 1Subtask 10Transition-Out
1002FPIFTask 1Subtask 11Contractor Manpower Reporting
CLINTask 2Task 2Service Operations
1002FPIFTask 2Subtask 1.1IT Ops Mgmt - Duty Controller
1002FPIFTask 2Subtask 1.2USTRANSCOM Service Desk
1002FPIFTask 2Subtask 2C2 System Support
1002FPIFTask 2Subtask 2.1GCCS Program Support
1002FPIFTask 2Subtask 2.2TRAC2ES Program Support
1002FPIFTask 2Subtask 3Problem Mgmt
1002FPIFTask 2Subtask 4.1System Admin
1002FPIFTask 2Subtask 4.1.1FAA Data Feed System Support
1002FPIFTask 2Subtask 4.2Database Administration and Support
1002FPIFTask 2Subtask 4.3Virtual Environment and Network Storage
1002FPIFTask 2Subtask 4.4.1DoD Enterprise Email (DEE) Spt
1002FPIFTask 2Subtask 4.4.2Collaboration Tools Spt
1002FPIFTask 2Subtask 4.4.2.1OCS/Lync
1006FFPTask 2Subtask 4.4.2.2SharePoint Sustainment (Optional)
1002FPIFTask 2Subtask 4.5Directory Services & Identify Access Mgmt
1002FPIFTask 2Subtask 4.6End User IT System Support
1002FPIFTask 2Subtask 4.6.1End User Service Provisioning
1002FPIFTask 2Subtask 4.6.2End-User Device O&M (Includes FACCSM)
1002FPIFTask 2Subtask 4.6.3Virtual Desktop Infrastructure (VDI) Support
1002FPIFTask 2Subtask 4.6.4Service Design and Transition Support
1002FPIFTask 2Subtask 4.7.1USTRANSCOM Key Information Technology (IT) Service Support (KITSS)
1002FPIFTask 2Subtask 5.1Network Infrastructure Support
1002FPIFTask 2Subtask 5.2JTEN Support
1002FPIFTask 2Subtask 5.3Telephone Support Services
1002FPIFTask 2Subtask 5.4Long Haul Comm
1002FPIFTask 2Subtask 6.1USTRANSCOM AV/VTC Ops Spt
1002FPIFTask 2Subtask 6.1.2VTC Support
1002FPIFTask 2Subtask 6.1.3Server & Multipoint Controller Unit (MCU) Support
1002FPIFTask 2Subtask 6.1.4COMSEC Spt
1003CPFFTask 2Subtask 6.2.1USTRANSCOM AV/VTC Maintenance & Engineering Spt
1003CPFFTask 2Subtask 6.2.2SDDC AV/VTC Maintenance & Engineering Spt
1003CPFFTask 2Subtask 6.2.3JECC AV/VTC Maintenance & Engineering Spt
CLINTask 3Service Support
1002FPIFTask 3Subtask 1.1IT Service Portfolio Mgmt
1002FPIFTask 3Subtask 1.2Business Relationship Mgmt
1007FFPTask 3Subtask 1.3Demand Mgmt (Optional)
1002FPIFTask 3Subtask 2.1Enterprise Procurement Mgmt Spt
1002FPIFTask 3Subtask 3.1Service Asset & Configuration Mgmt
1002FPIFTask 3Subtask 3.2Application Portfolio Management
1008FPIFTask 3Subtask 3.2.3TWCF Enterprisie S/W APfM (Optional)
1002FPIFTask 3Subtask 3.3H/W Asset Mgmt - ADPE Mgmt
1002FPIFTask 3Subtask 4.1.1Service Catalog Mgmt
1014FFPTask 3Subtask 4.1.2Requirements Processing Oversight Management (Optional)
1003CPFFTask 3Subtask 4.2.1Project Portfolio Mgmt
1003CPFFTask 3Subtask 4.2.2IT Project Mgmt
1009FFPTask 3Subtask 4.3Service Level Mgmt (Optional)
1010FFPTask 3Subtask 5Availability Mgmt (Optional)
1011FFPTask 3Subtask 6Capacity Mgmt (Optional)
1012FFPTask 3Subtask 7IT Service Continuity Mgmt (Optional)
1002FPIFTask 3Subtask 8Change Mgmt
1003CPFFTask 3Subtask 9.1Design & Tranistion Planning & Spt
1003CPFFTask 3Subtask 9.2Release and Deployment Mgmt
1002FPIFTask 3Subtask 9.3.1Service Design Config Support
1002FPIFTask 3Subtask 9.3.2-4Test Lab & Environment O&M
1002FPIFTask 3Subtask 9.3.5New Technology Integration
1003CPFFTask 3Subtask 9.4.1Tools Portfolio Mgmt & Support
1003CPFFTask 3Subtask 9.4.2.1ITSM Tool Suite Support
1003CPFFTask 3Subtask 9.4.2.2CSM & BAM Support
1002FPIFTask 3Subtask 9.5Knowledge Mgmt
1002FPIFTask 3Subtask 10CSI Process Spt
CLINTask 4Exercise and Contingency Operations Support
1002FPIFTask 4Subtask 1Readiness & Joint Tng
1002FPIFTask 4Subtask 2Communications, Cyberspace, and Exercise Planning
1002FPIFTask 4Subtask 3Communications Spectrum Management
1002FPIFTask 4Subtask 4SATCOM Management and Planning
1002FPIFTask 4Subtask 5MILSTAR Operations and Management
1002FPIFTask 4Subtask 6Airborne Communications Task Management
1002FPIFTask 4Subtask 7Tactical Communications Task Management
1003CPFFTask 4Subtask 8Contingency, Emergency, Exercise Operations Support
CLINTask 5Security
1002FPIFTask 5Subtask 1Security Ops
1002FPIFTask 5Subtask 1.1Cyber Security Defense
1002FPIFTask 5Subtask 1.2Intrusion Detection
1002FPIFTask 5Subtask 1.3Cyber Threat Analysis
1002FPIFTask 5Subtask 1.4COMSEC Mgmt
1013FFPTask 5Subtask 1.4.5Sensistive Compartmented Information Facility (SCIF) Rep (Optional)
1002FPIFTask 5Subtask 1.5EMSEC
1003CPFFTask 5Subtask 2Risk Management
1003CPFFTask 5Subtask 2.1Info Sys security Engineering
1015CPFFTask 5Subtask 2.1.1Cyber security support for USTRANSCOM Component Commands and Cyber Security Service Provider Subscribers (Optional)
1003CPFFTask 5Subtask 2.2Security Auditing, Config, Vuln Mgmt
1003CPFFTask 5Subtask 2.3.1Authorization Spt for Physical & Virtual
1003CPFFTask 5Subtask 2.3.2Authorization Spt for SCA and OA
1003CPFFTask 5Subtask 2.4Insider Threat Risk Mitigation
1003CPFFTask 5Subtask 2.5Software Assurance
CLINTask 6Web Applications and Support
1003CPFFTask 6Subtask 1Web Development
1003CPFFTask 6Subtask 2Customer Support & Content Admin
1003CPFFTask 6Subtask 3Web Dev Support
1004FFPTask 6Subtask 4Electronically Stored Information (ESI) Search Support - eDiscovery
CLINTask 7C4S Training (Optional)
1005CPFFTask 7Subtask 1Training Support (Optional)
1005CPFFTask 7Subtask 2Support for New Training Requirements (Optional)
1005CPFFTask 7Subtask 3Training Videos and Computer Based Training (CBT) Development (Optional)
CLINTask 8JOSAC Support
1002FPIFTask 8Subtask 1JOSAC Data Entry Support
1002FPIFTask 8Subtask 2JOSAC Scheduling System Support
1002FPIFTask 8Subtask 3JOSAC FACCSM & Gatekeeper Support

Total Hours

Estimated FTE's

HTC711-16-R-D001 &P of &N Confidential Information

Prime OP1 Offsite Tasks-Lbr Hrs

[Offeror Name] Prime Contractor Option Period 1 - Offsite Labor Hours by TaskPrime Contractor Onsite Fringe Benefit %0.00%Proposed Profit % on FFP CLINS0.00%
Prime Contractor Onsite Overhead %0.00%Proposed Profit % on CPFF CLINS0.00%
Prime Contractor Onsite G&A %0.00%
PROGRAM MANAGEMENTPROJECT MANAGEMENTQUALITY ASSURANCEIT SYSTEMS ARCHITECTUREAPPLICATION SYSTEMSOPERATIONS AND LOGISTICSINFORMATION ASSURANCE
Program Manager – SeniorProgram Manager – IntermediateProgram Manager – AssociateAdministrator – SeniorAdministrator – IntermediateAdministrator – AssociateProject Manager – SeniorProject Manager – IntermediateProject Manager – AssociateProject Engineer – SeniorProject Engineer – IntermediateProject Engineer – AssociateQuality Assurance Analyst – SeniorQuality Assurance Analyst – IntermediateQuality Assurance Analyst – AssociateQuality Professional Staff – SeniorQuality Professional Staff – IntermediateQuality Professional Staff – AssociateClient/Server Network ArchitectSystems Engineer – SeniorSystems Engineer – IntermediateSystems Engineer – AssociateManaged System Engineer – SeniorManaged Systems Engineer – IntermediateManaged Systems Engineer – AssociateApplications Systems Analyst – SeniorApplications Systems Analyst – IntermediateApplications Systems Analyst – AssociateApplications Programmer – SeniorApplications Programmer – IntermediateApplications Programmer – AssociateIT Certified Professional – SeniorIT Certified Professional – IntermediateIT Certified Professional – AssociateConfiguration Management (CM) Specialist – SeniorConfiguration Management (CM) Specialist – IntermediateConfiguration Management (CM) Specialist – AssociateInformation Assurance Engineer – SeniorInformation Assurance Engineer – IntermediateInformation Assurance Engineer – AssociateInformation Systems Auditor – SeniorInformation Systems Auditor – IntermediateInformation Systems Auditor – AssociateInformation Security Specialist – SeniorInformation Security Specialist – Intermediate
Unburdened Onsite Labor Rate
Fringe Benefits
Overhead
G&A
Burdened Offsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLINTypeTask 1Contract Level and Contract Management
1002FPIFTask 1Subtask 1Contract Mgmt Plan
1002FPIFTask 1Subtask 2Weekly Activity Report (WAR)
1002FPIFTask 1Subtask 3Monthly Status Report (MSR)
1002FPIFTask 1Subtask 4In-Process Reviews (IPRs)
1002FPIFTask 1Subtask 5Trip Report
1002FPIFTask 1Subtask 6Meeting/Conference Minutes
1002FPIFTask 1Subtask 7Subject Matter Expertise (SME)
1002FPIFTask 1Subtask 8Personnel Status Report
1002FPIFTask 1Subtask 10Transition-Out
1002FPIFTask 1Subtask 11Contractor Manpower Reporting
CLINTask 2Task 2Service Operations
1002FPIFTask 2Subtask 1.1IT Ops Mgmt - Duty Controller
1002FPIFTask 2Subtask 1.2USTRANSCOM Service Desk
1002FPIFTask 2Subtask 2C2 System Support
1002FPIFTask 2Subtask 2.1GCCS Program Support
1002FPIFTask 2Subtask 2.2TRAC2ES Program Support
1002FPIFTask 2Subtask 3Problem Mgmt
1002FPIFTask 2Subtask 4.1System Admin
1002FPIFTask 2Subtask 4.1.1FAA Data Feed System Support
1002FPIFTask 2Subtask 4.2Database Administration and Support
1002FPIFTask 2Subtask 4.3Virtual Environment and Network Storage
1002FPIFTask 2Subtask 4.4.1DoD Enterprise Email (DEE) Spt
1002FPIFTask 2Subtask 4.4.2Collaboration Tools Spt
1002FPIFTask 2Subtask 4.4.2.1OCS/Lync
1006FFPTask 2Subtask 4.4.2.2SharePoint Sustainment (Optional)
1002FPIFTask 2Subtask 4.5Directory Services & Identify Access Mgmt
1002FPIFTask 2Subtask 4.6End User IT System Support
1002FPIFTask 2Subtask 4.6.1End User Service Provisioning
1002FPIFTask 2Subtask 4.6.2End-User Device O&M (Includes FACCSM)
1002FPIFTask 2Subtask 4.6.3Virtual Desktop Infrastructure (VDI) Support
1002FPIFTask 2Subtask 4.6.4Service Design and Transition Support
1002FPIFTask 2Subtask 4.7.1USTRANSCOM Key Information Technology (IT) Service Support (KITSS)
1002FPIFTask 2Subtask 5.1Network Infrastructure Support
1002FPIFTask 2Subtask 5.2JTEN Support
1002FPIFTask 2Subtask 5.3Telephone Support Services
1002FPIFTask 2Subtask 5.4Long Haul Comm
1002FPIFTask 2Subtask 6.1USTRANSCOM AV/VTC Ops Spt
1002FPIFTask 2Subtask 6.1.2VTC Support
1002FPIFTask 2Subtask 6.1.3Server & Multipoint Controller Unit (MCU) Support
1002FPIFTask 2Subtask 6.1.4COMSEC Spt
1003CPFFTask 2Subtask 6.2.1USTRANSCOM AV/VTC Maintenance & Engineering Spt
1003CPFFTask 2Subtask 6.2.2SDDC AV/VTC Maintenance & Engineering Spt
1003CPFFTask 2Subtask 6.2.3JECC AV/VTC Maintenance & Engineering Spt
CLINTask 3Service Support
1002FPIFTask 3Subtask 1.1IT Service Portfolio Mgmt
1002FPIFTask 3Subtask 1.2Business Relationship Mgmt
1007FFPTask 3Subtask 1.3Demand Mgmt (Optional)
1002FPIFTask 3Subtask 2.1Enterprise Procurement Mgmt Spt
1002FPIFTask 3Subtask 3.1Service Asset & Configuration Mgmt
1002FPIFTask 3Subtask 3.2Application Portfolio Management
1008FPIFTask 3Subtask 3.2.3TWCF Enterprisie S/W APfM (Optional)
1002FPIFTask 3Subtask 3.3H/W Asset Mgmt - ADPE Mgmt
1002FPIFTask 3Subtask 4.1.1Service Catalog Mgmt
1014FFPTask 3Subtask 4.1.2Requirements Processing Oversight Management (Optional)
1003CPFFTask 3Subtask 4.2.1Project Portfolio Mgmt
1003CPFFTask 3Subtask 4.2.2IT Project Mgmt
1009FFPTask 3Subtask 4.3Service Level Mgmt (Optional)
1010FFPTask 3Subtask 5Availability Mgmt (Optional)
1011FFPTask 3Subtask 6Capacity Mgmt (Optional)
1012FFPTask 3Subtask 7IT Service Continuity Mgmt (Optional)
1002FPIFTask 3Subtask 8Change Mgmt
1003CPFFTask 3Subtask 9.1Design & Tranistion Planning & Spt
1003CPFFTask 3Subtask 9.2Release and Deployment Mgmt
1002FPIFTask 3Subtask 9.3.1Service Design Config Support
1002FPIFTask 3Subtask 9.3.2-4Test Lab & Environment O&M
1002FPIFTask 3Subtask 9.3.5New Technology Integration
1003CPFFTask 3Subtask 9.4.1Tools Portfolio Mgmt & Support
1003CPFFTask 3Subtask 9.4.2.1ITSM Tool Suite Support
1003CPFFTask 3Subtask 9.4.2.2CSM & BAM Support
1002FPIFTask 3Subtask 9.5Knowledge Mgmt
1002FPIFTask 3Subtask 10CSI Process Spt
CLINTask 4Exercise and Contingency Operations Support
1002FPIFTask 4Subtask 1Readiness & Joint Tng
1002FPIFTask 4Subtask 2Communications, Cyberspace, and Exercise Planning
1002FPIFTask 4Subtask 3Communications Spectrum Management
1002FPIFTask 4Subtask 4SATCOM Management and Planning
1002FPIFTask 4Subtask 5MILSTAR Operations and Management
1002FPIFTask 4Subtask 6Airborne Communications Task Management
1002FPIFTask 4Subtask 7Tactical Communications Task Management
1003CPFFTask 4Subtask 8Contingency, Emergency, Exercise Operations Support
CLINTask 5Security
1002FPIFTask 5Subtask 1Security Ops
1002FPIFTask 5Subtask 1.1Cyber Security Defense
1002FPIFTask 5Subtask 1.2Intrusion Detection
1002FPIFTask 5Subtask 1.3Cyber Threat Analysis
1002FPIFTask 5Subtask 1.4COMSEC Mgmt
1013FFPTask 5Subtask 1.4.5Sensistive Compartmented Information Facility (SCIF) Rep (Optional)
1002FPIFTask 5Subtask 1.5EMSEC
1003CPFFTask 5Subtask 2Risk Management
1003CPFFTask 5Subtask 2.1Info Sys security Engineering
1015CPFFTask 5Subtask 2.1.1Cyber security support for USTRANSCOM Component Commands and Cyber Security Service Provider Subscribers (Optional)
1003CPFFTask 5Subtask 2.2Security Auditing, Config, Vuln Mgmt
1003CPFFTask 5Subtask 2.3.1Authorization Spt for Physical & Virtual
1003CPFFTask 5Subtask 2.3.2Authorization Spt for SCA and OA
1003CPFFTask 5Subtask 2.4Insider Threat Risk Mitigation
1003CPFFTask 5Subtask 2.5Software Assurance
CLINTask 6Web Applications and Support
1003CPFFTask 6Subtask 1Web Development
1003CPFFTask 6Subtask 2Customer Support & Content Admin
1003CPFFTask 6Subtask 3Web Dev Support
1004FFPTask 6Subtask 4Electronically Stored Information (ESI) Search Support - eDiscovery
CLINTask 7C4S Training (Optional)
1005CPFFTask 7Subtask 1Training Support (Optional)
1005CPFFTask 7Subtask 2Support for New Training Requirements (Optional)
1005CPFFTask 7Subtask 3Training Videos and Computer Based Training (CBT) Development (Optional)
CLINTask 8JOSAC Support
1002FPIFTask 8Subtask 1JOSAC Data Entry Support
1002FPIFTask 8Subtask 2JOSAC Scheduling System Support
1002FPIFTask 8Subtask 3JOSAC FACCSM & Gatekeeper Support

Total Hours

Estimated FTE's

HTC711-16-R-D001 &P of &N Confidential Information

Prime OP2 Onsite Tasks-Lbr Hrs

[Offeror Name] Prime Contractor Option Period 2 - Onsite Labor Hours by TaskPrime Contractor Onsite Fringe Benefit %0.00%Proposed Profit % on FFP CLINS0.00%
Prime Contractor Onsite Overhead %0.00%Proposed Profit % on CPFF CLINS0.00%
Prime Contractor Onsite G&A %0.00%
0.00%Option Period 2 Escalation RatePROGRAM MANAGEMENTPROJECT MANAGEMENTQUALITY ASSURANCEIT SYSTEMS ARCHITECTUREAPPLICATION SYSTEMSOPERATIONS AND LOGISTICSINFORMATION ASSURANCE
Program Manager – SeniorProgram Manager – IntermediateProgram Manager – AssociateAdministrator – SeniorAdministrator – IntermediateAdministrator – AssociateProject Manager – SeniorProject Manager – IntermediateProject Manager – AssociateProject Engineer – SeniorProject Engineer – IntermediateProject Engineer – AssociateQuality Assurance Analyst – SeniorQuality Assurance Analyst – IntermediateQuality Assurance Analyst – AssociateQuality Professional Staff – SeniorQuality Professional Staff – IntermediateQuality Professional Staff – AssociateClient/Server Network ArchitectSystems Engineer – SeniorSystems Engineer – IntermediateSystems Engineer – AssociateManaged System Engineer – SeniorManaged Systems Engineer – IntermediateManaged Systems Engineer – AssociateApplications Systems Analyst – SeniorApplications Systems Analyst – IntermediateApplications Systems Analyst – AssociateApplications Programmer – SeniorApplications Programmer – IntermediateApplications Programmer – AssociateIT Certified Professional – SeniorIT Certified Professional – IntermediateIT Certified Professional – AssociateConfiguration Management (CM) Specialist – SeniorConfiguration Management (CM) Specialist – IntermediateConfiguration Management (CM) Specialist – AssociateInformation Assurance Engineer – SeniorInformation Assurance Engineer – IntermediateInformation Assurance Engineer – AssociateInformation Systems Auditor – SeniorInformation Systems Auditor – IntermediateInformation Systems Auditor – AssociateInformation Security Specialist – SeniorInformation Security Specialist – Intermediate
Unburdened Onsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Burdened Onsite Labor Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLINTypeTask 1Contract Level and Contract Management
2002FPIFTask 1Subtask 1Contract Mgmt Plan
2002FPIFTask 1Subtask 2Weekly Activity Report (WAR)
2002FPIFTask 1Subtask 3Monthly Status Report (MSR)
2002FPIFTask 1Subtask 4In-Process Reviews (IPRs)
2002FPIFTask 1Subtask 5Trip Report
2002FPIFTask 1Subtask 6Meeting/Conference Minutes
2002FPIFTask 1Subtask 7Subject Matter Expertise (SME)
2002FPIFTask 1Subtask 8Personnel Status Report
2002FPIFTask 1Subtask 10Transition-Out
2002FPIFTask 1Subtask 11Contractor Manpower Reporting
CLINTask 2Task 2Service Operations
2002FPIFTask 2Subtask 1.1IT Ops Mgmt - Duty Controller
2002FPIFTask 2Subtask 1.2USTRANSCOM Service Desk
2002FPIFTask 2Subtask 2C2 System Support
2002FPIFTask 2Subtask 2.1GCCS Program Support
2002FPIFTask 2Subtask 2.2TRAC2ES Program Support
2002FPIFTask 2Subtask 3Problem Mgmt
2002FPIFTask 2Subtask 4.1System Admin
2002FPIFTask 2Subtask 4.1.1FAA Data Feed System Support
2002FPIFTask 2Subtask 4.2Database Administration and Support
2002FPIFTask 2Subtask 4.3Virtual Environment and Network Storage
2002FPIFTask 2Subtask 4.4.1DoD Enterprise Email (DEE) Spt
2002FPIFTask 2Subtask 4.4.2Collaboration Tools Spt
2002FPIFTask 2Subtask 4.4.2.1OCS/Lync
2006FFPTask 2Subtask 4.4.2.2SharePoint Sustainment (Optional)
2002FPIFTask 2Subtask 4.5Directory Services & Identify Access Mgmt
2002FPIFTask 2Subtask 4.6End User IT System Support
2002FPIFTask 2Subtask 4.6.1End User Service Provisioning
2002FPIFTask 2Subtask 4.6.2End-User Device O&M (Includes FACCSM)
2002FPIFTask 2Subtask 4.6.3Virtual Desktop Infrastructur

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .