UNCLASSIFIED
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
UNITED STATES TRANSPORTATION COMMAND
(USTRANSCOM) COMMAND, CONTROL,
COMMUNICATIONS & CYBER SYSTEMS
DIRECTORATE (TCJ6)
INFORMATION TECHNOLOGY SERVICE
MANAGEMENT (ITSM) ENTERPRISE SUPPORT
8 March 2016
APPROVED:
TBD DAVID Q. SWANEY
Contracting Officer’s Representative Contracting Officer
TCJ6-O TCAQ-D
Quality Assurance Surveillance Plan 20 January 2016 ii
Table of Contents
1. INTRODUCTION
2. PURPOSE
3. ROLES AND RESPONSIBILITIES
3.1 Contracting Officer (CO)
3.2 Contract Specialist (CS)
3.3 Contracting Officer’s Representative (COR)
4. METHODS OF SURVEILLANCE
4.1 Service Delivery Summary (SDS)
4.1.1 Sampling
4.1.2. Third Party Audits
4.1.3 Inspection/Review
4.1.4 Customer/Government Inputs
4.1.5 Management Review
4.1.6 Non-SDS Items
5. EVALUATION METHODOLOGY
5.1 Established Procedures
6. DOCUMENTATION
7. ACRONYMS
APPENDIX A – QUALITY ASSURANCE SURVEILLANCE SUMMARY AND
METHOD
APPENDIX B – DISCREPANCY STATUS REPORT
UNCLASSIFIED
1. INTRODUCTION
This QASP was developed in accordance with USTCI 63-5, Contracting Officer’s Representative (COR)
Program, for work performed to provide technical and functional support services for the
USTRANSCOM, Scott Air Force Base, IL as well as for its Army and Air Force Service Components.
This QASP sets forth the procedures and guidelines to be used by the Government to ensure that the contractor achieves the required performance standards as specified in the Information Technology
Service Management (ITSM) Enterprise Support Performance Work Statement (PWS). The PWS contains a Service Delivery Summary (SDS) that summarizes performance objectives (service required) and performance thresholds (specific standard) contained within the body of the PWS. The SDS does not identify every service required, but only those services considered most important for mission accomplishment. This QASP is based on the premise that the contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The SDS recognizes that the contractor is not a perfect manager and that unforeseen and uncontrollable problems do occur. Good management and use of an adequate quality control plan will allow the contractor to meet or exceed the performance standards specified in the PWS.
2. PURPOSE
This QASP is designed to accomplish the following:
a. Provide a systematic method to survey and evaluate contractor services to determine conformity with the technical requirements of the contract.
b. Define the roles and responsibilities of participating Government officials.
c. Describe the evaluation methods that will be employed by the Government in assessing the contractor’s performance.
d. Describe the process of performance documentation.
e. Provide copies of the Quality Assurance (QA) monitoring report format that will be used by the
Government in documenting and evaluating contractor’s performance.
3. ROLES AND RESPONSIBILITIES
The Government monitors contractor performance on a continuing basis through the services of a surveillance team. The surveillance team consists of the following members: Contracting Officer (CO), Contract Specialist (CS) and Contracting Officer’s Representative (COR).
3.1 Contracting Officer (CO)
The CO has overall responsibility for contract administration. The CO is responsible for monitoring contract compliance and resolving any and all disagreements regarding interpretation of contract terms and conditions. Payment is authorized based on documented objective evidence provided by the COR that contractor performance meets the performance standards specified. The CO is the only Government official authorized to revise the contract.
3.2 Contract Specialist (CS)
The CS acts as an acquisition consultant and serves as liaison between the Contracting Office and the
Command, Control, Communications & Cyber Systems Directorate (TCJ6) COR.
3.3 Contracting Officer’s Representative (COR)
The COR:
Quality Assurance Surveillance Plan 2 July 2014
UNCLASSIFIED
Serves as a functional expert and is responsible for monitoring, assessing, recording and reporting the technical performance of the Contractor on a continuous basis.
Schedules surveillance activities; evaluates and documents performance by the Contractor;
initiates requests for and evaluates adequacy of the corrective action and reports Contractor performance of contractor requirements.
Is sufficiently trained to perform the required duties and to ensure their knowledge of the terms and conditions of the contract
Is to be objective, fair, and consistent in evaluating contractor performance against standards
Will notify the CO immediately when an evaluation shows that performance does not meet the standards identified in this QASP
Is required to ensure changes in work are not initiated before a written authorization or modification is issued by the CO
Is required to accept delivery of services
Must ensure that all services have been performed before entering the quantity received and digitally signing the receiving report/invoice in Wide Area Work Flow (WAWF)
Has a maximum of seven days after the contractor’s submission of a properly documented receiving report/invoice to accept the quantity and digitally sign the document in WAWF.
Prompt processing of receiving reports/invoices in WAWF increases the Government’s ability to take discounts offered and decreases the likelihood of the Government incurring interest expense for late payment. After digital signature, the signed receiving report/invoice will be routed to
Defense Finance and Accounting Service (DFAS) for scheduling of payment.
Is required to provide an assessment of contractor performance to the CO for input into
Contractor Performance Assessment Report.
4. METHODS OF SURVEILLANCE
4.1 Service Delivery Summary (SDS)
The SDS summarizes the expected service objectives (outcomes) and identifies the metrics that will be tracked to determine whether the outcomes are being achieved at the appropriate levels of performance.
The USTRANSCOM, through the COR, will monitor contractor performance using the surveillance methods described below. In determining the evaluation criteria, USTRANSCOM has considered what the contract specifically calls for, how performance can be surveyed, and if the proposed method of surveillance is adequate to assure the required level of performance has been achieved. Additionally, contractor performance will be a factor affecting application of the plan, i.e., surveillance frequency may be increased or decreased based on contractor demonstrated and documented performance. One or a combination of the following surveillance methods will be used to produce a well-rounded indication of contractor conformance:
a. Sampling (Spot, Periodic and Random Sampling)
b. Third Party Audit
c. Inspection/Review (verification of specific tasks, weekly, monthly, quarterly, semi-annual, annual)
d. Customer/Government Input
4.1.1 Sampling
This is the most appropriate method for frequently recurring tasks. Random sampling is done to determine whether to accept or reject the contractor’s performance of the total lot of a particular task for a given period of time, using the premise that the statistically selected sample is representative of the entire lot. Sampling may be spot, periodic or random.
UNCLASSIFIED
4.1.2. Third Party Audits
Third Party Audits will be conducted by an authorized agent of the Government, federal, state and local agencies (i.e. OSHA, DMV, EPA, Environmental Management etc.).
4.1.3 Inspection/Review
This surveillance type is preferred for those tasks that occur infrequently. It is also used frequently for those tasks having very stringent performance requirements. When this type of surveillance is used, COR must inspect and evaluate the contractor’s performance each time it is performed to determine acceptability.
This type of surveillance consists of the evaluation of samples selected on other than a 100% or statistically random basis. The results of periodic surveillance inspections may be used as the basis for actions against the Contractor. In such cases the Inspection of Services clause becomes the basis for the contracting officer’s actions. This will be done more frequently at the beginning of the contract, and is expected to decrease as standards are consistently met, but may increase if performance falls below standard.
The planned surveillance methods and standards are documented in Appendix A. Contractual requirements are in accordance with (IAW) the PWS.
4.1.4 Customer/Government Inputs
The COR may use customer input to document discrepancies in contractor performance. The CO may use validated customer complaints as the basis for actions against the contractor. In such cases the
Inspection of Services clause becomes the basis for the CO’s actions. It is expected that some customer’s will file complaints directly with the Contractor. The Contractor should attempt to resolve complaints/issues at the lowest level possible. However, the Government acknowledges that some issues require government intervention. In such cases, the Contractor shall request assistance from the COR or
CO.
4.1.5 Management Review
Methods of surveillance can change after contract award based on acceptance of a Contractor’s proposed quality control program or agreement that establishes the metrics to be used. When metrics are used as a method of surveillance through the partnering process, they may be developed after contract award, but prior to the performance start date.
4.1.6 Non-SDS Items
For required tasks not shown on the SDS, including all other tasks in the PWS and any referenced documents, the Government still retains the right to inspect any item included in the contract in accordance with Federal Acquisition Regulation (FAR) Part 46, Inspection of Services clauses.
Inspection of these services will be performed in the same general manner as periodic surveillance items mentioned above. The results of these inspections are documented and, if necessary, are provided to the
CO for action. Should a discrepancy be observed, the CO will handle each documented discrepancy on a case-by-case basis.
5. EVALUATION METHODOLOGY
This QASP comprehensively guides the surveillance team’s activities and has been developed in a format to ensure ease of understanding and implementation. For each performance objective (service required) in the SDS, the specific methods of surveillance and performance thresholds are shown in Appendix A.
The methodology described in the chart shall be used as the basis for performing surveillance of the
UNCLASSIFIED
respective performance objectives.
5.1 Established Procedures
Each Contractor assessment shall follow an established procedure for surveillance, recording, reporting and follow-up, outlined as follows:
Frequency of surveillance will be IAW the COR’s schedule.
Surveillance will be performed IAW Appendix A and results/comments recorded.
Performance/non-performance for a particular task will be entered chronologically by the COR on a historical log of surveyed performance. If no deficiency exists in Contractor performance for this element, no further action is required.
If Contractor performance is deficient, the course of action is dependent on the severity/impact/frequency of the non-performance.
o Re-performance is the first action to resolve deficiencies.
o When the COR determines a deficiency is not Government caused, a Contract
Discrepancy Report (CDR) is initiated.
COR completes the form and sends it to the CO.
CO must evaluate the CDR and, if appropriate, sign and send it to the Contractor.
Contractor must complete blocks 9 and 10 according to the requirements of the contract and return it to the CO within 5 calendar days of receipt.
Upon receipt of the Contractor’s response, the CO, in consultation with the COR, must evaluate the Contractor’s response and take the appropriate action.
CO must document the evaluation (in block 11) and action taken (in block 12) on the CDR.
COR shall submit a Discrepancy Status Report (see attachment 2) and attach a copy of all CDRs for the reporting period.
o When corrective action is reported by the Contractor, the COR will follow up with additional surveillance to verify implementation.
6. DOCUMENTATION
All surveillance activities must be documented to provide the required audit trail to justify Government acceptance and payment. The documented audit trail of the surveillance (DAS) activities is required by
FAR 46.104(c), Contract Administration Office Responsibilities, which states, “Maintain, as part of the performance records of the contract, suitable records reflecting, (1) The nature of Government contract quality assurance actions, including, when appropriate, the number of observations made and the number and type of defects; and (2) Decisions regarding the acceptability of the products, the processes, and the requirements, as well as action to correct defects.”
All documentation resulting from surveillance is made a permanent part of the contract file. The COR must keep the documentation files during the term of the contract and either monthly or at the conclusion of the contract (as directed by the CO); transfer the files to the CO for inclusion in the official contract file. It is the responsibility of the COR to establish and maintain this information in a DAS Folder. The surveillance folder(s) should include as a minimum:
a. Contract including Modifications
b. Task Orders including Modifications
c. QASP
UNCLASSIFIED
d. COR Letter of Designation
e. Invoices
f. Surveillance Records
Written report of all inspections and timelines of deliverables
Written report of any deficiency
Any other written documentation relation to contract performance
g. General Correspondence
7. ACRONYMS
Acronym Definition
CDR Contract Discrepancy Report
CO Contracting Officer
COR Contracting Officer’s Representative
CS Contract Specialist
DAS Document Audit Surveillance
DFAS Defense Finance and Accounting Service
DMV Division of Motor Vehicles
EPA Environment Protection Agency
FAR Federal Acquisition Regulation
O&M Operations and Maintenance
OSHA Occupational Safety and Health Administration
PWS Performance Work Statement
QA Quality Assurance
QASP Quality Assurance Surveillance Plan
SDS Service Delivery Summary
USTCI United States Transportation Command Instruction
USTRANSCOM United States Transportation Command
WAWF Wide Area Work Flow
UNCLASSIFIED
APPENDIX A – QUALITY ASSURANCE SURVEILLANCE SUMMARY and METHOD
The following items will be utilized for evaluation of performance during the duration of this contract.
Performance
Objective PWS Para Performance Threshold
Surveillance Method
Trip Reports 1.3.1.5
95% of the time Trip Reports are received within five (5) business days after completion of travel and contains all details related to the trip and information on the traveler
Customer/Government
Input
Meeting/Conference
Minutes 1.3.1.6
95% of the time minutes are provided within two (2) business days upon request by the Government and contain all results and impacts of the meeting/conference
Customer/Government
Input
Ticket
Acknowledgement 1.3.2
95% of the time tickets are acknowledged IAW paragraph Error!
Reference source not found. of PWS
Sampling
Ticket Resolution 1.3.2
95% of the time tickets are resolved IAW paragraph Error! Reference source not found. of PWS
Sampling
Ticket Assignment 1.3.2
95% of the time tickets are assigned appropriately IAW paragraph Error!
Reference source not found. of PWS
Sampling
Ticket Missed
Acknowledgment 1.3.2
95% of the time missed acknowledgements notifications are handled IAW paragraph Error!
Reference source not found. of PWS
Sampling
Ticket Proactive
Notification 1.3.2
95% of the time proactive notifications are provided IAW paragraph Error!
Reference source not found. of PWS
Sampling
Ticket Missed
Resolution 1.3.2
95% of the time missed resolutions are escalated IAW paragraph Error!
Reference source not found. of PWS
Sampling
Ticket Escalation 1.3.2
95% of the time tickets are escalated appropriately IAW paragraph Error!
Reference source not found. of PWS
Sampling
Ticket Notification 1.3.2
95% of the time the Government is properly notified IAW paragraph Error!
Reference source not found. of PWS
Inspection/Review
On-call Support 1.3.2
IT Ops Center is able to contact the on-call technician nine (9) of every ten (10) attempts made outside of normal duty hours
Customer/Government
Input
Process and Procedure
Documentation 1.3.2
95% of the time, documentation accurately reflects current operational processes and procedures; tool and system references; organizational
Inspection/Review
UNCLASSIFIED
Performance
Objective PWS Para Performance Threshold
Surveillance Method references and contact information; and policy references.
Process and Procedure
Documentation 1.3.2
No more than 1 late document per month and no more than 5 days late. For final deliverables, no more than two sets of corrections/edits and all corrections must be accomplished within 2 days or other such time periods as mutually determined between the government and the tasked contractor.
Inspection/Review
Unplanned Outage
Notification 1.3.2
100% of the time, provide notification to the IT Ops Center for unplanned outages within 15 minutes of detection.
Inspection/Review
On-Call Response Time 1.3.2
95% of the time, on call personnel will begin work within two (2) hour of contact
Inspection/Review
ADPE EC Duties 1.3.2
100% of the time ADPE is properly accounted and controlled in accordance with established policies
Inspection/Review
Service Desk
Performance Metrics
Report
1.3.2.1 95% of the time, reports accurately reflects status.
Inspection/Review
Account issuance and password resets 1.3.2.1.2
95% of the time issued within one (1) business day.
Sampling
First contact resolution by the Service Desk 1.3.2.1.2.1
68% of the time, technicians will resolve issues at first notification (phones, email, chat, etc.)
Inspection/Review
Self-help site resolution 1.3.2.1.2.3 Reduce the number of incidents and service requests a minimum of 25%
Sampling
Known error records updates 1.3.2.3.3
98% of the time updates will be accurate and on-time
Sampling
Hardware and Software
Problem Response 1.3.2.4.4.2
During on-site hours: within 15 minutes of initial report during on-site hours
After duty hours on an on-call basis with a 2-hour response time
Sampling
Workstation Transport to Customers 1.3.2.4.6.2.1
On-site: 1 business day
Off-site: 2 business days
Sampling
Key IT Staff Support 1.3.2.4.7 On-call periods shall be no more than two (2) hours to begin work on-site
Inspection/Review
Availability Rate 1.3.2.5.1.3 99.75% annualized availability rate. Sampling
Implement Approved solutions 1.3.2.5.1.3
90% of the time approved solutions are implemented within ten (10) business days of approval, provided necessary hardware is available
Sampling
Provide Technical
Solutions and Costing
(TS&C) to requests
1.3.2.5.1.3
90% of the time TS&C is provided within three (3) business days of request
Sampling
Trouble Ticket 1.3.2.5.1.3 95% of the time response is received Sampling
UNCLASSIFIED
Performance
Objective PWS Para Performance Threshold
Surveillance Method
Response within 15 minutes of initial problem notification during normal duty hours and within two (2) hours if on-site response is required during non-duty hours
On-site AV support for
TCCC, TCDC, and
TCCS
1.3.2.6.1.1
100% of the time support is provided on-site for TCCC, TCDC, and TCCS attended briefing events.
Customer/Government
Input
On-site VTC support for TCCC, TCDC, and
TCCS
1.3.2.6.1.2
100% of the time support is provided on-site for TCCC, TCDC, and TCCS attended briefing events.
Customer/Government
Input
Response and on-site correction of system failures
1.3.2.6.1.2
Respond within 30 minutes of notification and provide hourly updates until an agreed upon plan to restore is identified
Sampling
CRO Duties 1.3.2.6.1.4
100% of the time COMSEC materials are properly accounted and controlled in accordance with established policies
Sampling
AV Operator level instructions 1.3.2.6.2.1
95% of the time instructions are published within 20 business days of any changes or upgrades and are 100% error free
Inspection/Review
Preventative maintenance as prescribed by the equipment manufacturer
1.3.2.6.2.1
98% of the time preventative maintenance is accomplished in accordance with the manufacturer’s instructions.
Sampling
Preventative maintenance as prescribed by the equipment manufacturer
1.3.2.6.2.1
98% of the time preventative maintenance is accomplished in accordance with the manufacturer’s instructions.
Sampling
Successful install and programming of
AV/VTC equipment
1.3.2.6.2.1
95% of the time installs are completed as scheduled and are 100% error free
Inspection/Review
VTC Operator level instructions 1.3.2.6.2.1
95% of the time instructions are published within 20 business days of any changes or upgrades and are 100% error free
Inspection/Review
Accurate and timely configuration of test environment resources as required by test plans and customer test requirement
1.3.3.9.3.1
No more than 3 total days delay per month to all customer test activities attributable to improper or late configuration of test environments. All improper configurations identified and corrected within one (1) workday
Customer/Government
Input
Software Failure
Notification 1.3.3.9.3.1
95% of the time notification occurs no later than one (1) business day after failure occurs
UNCLASSIFIED
Performance
Objective PWS Para Performance Threshold
Surveillance Method
Effective operation and system administration of test systems, computer and telecommunications
Administrative, and test network environments
1.3.3.9.3.2
No more than 15 hours of unplanned network downtime per month due to internal administrative or test network problems (not to include downtime awaiting replacement parts). No more than two minor non-recoverable data losses per year. System Availability will be 98% or better.
Inspection/Review
Negative Impacts to
Operational Status 1.3.4.4
95% of the time the Government is notified within one (1) hour of any negative impacts to operational status
Inspection/Review
Outage/Restoral
Messages 1.3.4.5
95% of the time the IT Operations
Management is notified within one (1) hour of awareness of outage/restoral
Sampling
Security Operations 1.3.5.1.1, 1.3.5.1.2
100% of the time, no successful intrusions into the networks under the contractor’s control due to negligence or deviation from established procedures in performing actions specified by this task.
Customer/Government
Input
Software and Operating
System Versions
1.3.5.1.1, 1.3.5.1.2
100% of the time security mechanisms are running supported software versions and are up to date on security vulnerability patches with any exceptions approved by government in writing
Sampling
Uptime for
Cyber/Information
Security Infrastructure
Mechanisms
1.3.5.1.1, 1.3.5.1.2
99.9% availability must be maintained for all cyber security defense, and intrusion detection monitoring and incident management services (e.g.
firewall protection service for a specific area of coverage must be operational
99.9% of the time)
Inspection/Review
Unplanned Outage
Notification
1.3.5.1.1, 1.3.5.1.2, 1.3.5.1.4
100% of the time, provide notification to the CyOC for unplanned outages within
15 minutes of detection.
Sampling
On-call Support
1.3.5.1.1, 1.3.5.1.3, 1.3.5.1.4
USTRANSCOM Cyber Operations
Center (CyOC) is able to contact the on-call technician nine (9) of every ten (10) attempts made outside of normal duty hours
Inspection/Review
On-call Response Time 1.3.5.1.1, 1.3.5.1.4
100% of the time, on call personnel will begin work within one (1) hour of contact
Inspection/Review
Incident Detection 1.3.5.1.2
99% of the time, detect all incidents and events identified within available audit logs or by network sensors in the networks under their control.
Sampling
Incident Response 1.3.5.1.2 95% of the time, review all incidents flagged by monitors within 30 minutes of
UNCLASSIFIED
Performance
Objective PWS Para Performance Threshold
Surveillance Method detection.
COMSEC Equipment
Accountability 1.3.5.1.4
100% accountability for
USTRANSCOM Controlled
Cryptographic Items (CCI)
Inspection/Review
COMSEC Practice
Dangerous to Security
(PDS) Notification
1.3.5.1.4
100% of the time, provide notification to the Government of any COMSEC PDS within 1 hour of detection
Inspection/Review
COMSEC Training 1.3.5.1.4 100% training accomplished for all
CROs/SVROs
Inspection/Review
Process and Procedure
Documentation 1.3.5.2
95% of the time, documentation accurately reflects current operational processes and procedures; tool and system references; organizational references and contact information; and policy references.
Customer/Government
Input
Process and Procedure
Documentation 1.3.5.2
No more than 1 late document per month and no more than 5 days late. For final deliverables, no more than two sets of corrections/edits and all corrections must be accomplished within 2 days or other such time periods as mutually determined between the government and the tasked contractor.
Customer/Government
Input
Reporting Accuracy and Timeliness: Prepare written products
(letters, plans, vulnerability/scanning reports, briefings, presentations, schedules, and other documentation) in an accurate and timely manner.
1.3.5.2
No more than 1 late document per month and no more than 5 days late. For final deliverables, no more than two sets of corrections/edits and all corrections must be accomplished within 2 days or other such time periods as mutually determined between the government and the tasked contractor. All draft material provided at least 2 working days prior to meetings or review boards. Final, security reviewed copies of all briefings/ presentations provided at least 1 working day prior to presentation
Customer/Government
Input
Security Assessments of USTRANSCOM 1.3.5.2
100% of the time, satisfactory ratings are achieved during assessments of
USTRANSCOM security on all activities defined within this task
Inspection/Reviews
Accurate and timely security assessments, in prescribed format, in accordance with the engineering principles outlined in NIST SP
800-27 and requirements of the
1.3.5.2.1
Content: No more than 1 deviation per month from established principles and directives. 100% of assessments will address all required elements and consider security functionality from existing DoD and USTRANSCOM layered architectures.
Format: No more than 1 late document
Inspection/Reviews
UNCLASSIFIED
Performance
Objective PWS Para Performance Threshold
Surveillance Method
DoD RMF per month and no more than 5 days late.
For final deliverables, no more than two sets of corrections/edits and all corrections must be accomplished within
2 days or other such time periods as mutually determined between the government and the tasked contractor
Security Support for
TCCs and Cyber
Security Service
Provider Subscribers
1.3.5.2.1.1
Optional
100% of the time, for incident response, contractor FTE is on site within 24 hours of notification. Assessments/incident response activities accomplished in accordance with DoD directives and standard accepted practices of security engineering
Customer/Government
Input
Accurate and timely configuration of vulnerability management and scanning environment resources as required by vulnerability management plan and government requirement
1.3.5.2.2
No more than 3 total days delay per month to all vulnerability management activities attributable to improper or late configuration of environments. All improper configurations identified and corrected within 1 workday
Inspection/Reviews
Effective operation and system administration of scanning and vulnerability management systems
1.3.5.2.2
Timeliness: No more than 12 hours of unplanned network downtime per month due to due to negligence or deviation from established procedures in performing actions specified by this task.
(not to include downtime awaiting replacement parts). No more than one minor non-recoverable data loss per year.
System availability will be 98% or better.
Inspection/Reviews
Security Operations 1.3.5.2.2
100% of the time, no successful intrusions into the networks under the contractor’s control due to negligence or deviation from established procedures in performing actions specified by this task.
Customer/Government
Input
Software and Operating
System Versions 1.3.5.2.2
100% of the time security mechanisms are running supported software versions and are up to date on security vulnerability patches with any exceptions approved by government in writing
Customer/Government
Input
Unplanned Outage
Notification 1.3.5.2.2
100% of the time, provide notification to the CyOC for unplanned outages within
15 minutes of detection.
DoD PPSM 1.3.5.2.3 98% of the time, required Inspection/Reviews
UNCLASSIFIED
Performance
Objective PWS Para Performance Threshold
Surveillance Method
USTRANSCOM DoD PPSM actions are accomplished by the suspense date established by the government; 100% of
PPSM actions completed in accordance with DoD policy eMASS Entries 1.3.5.2.3 98% of the time, eMASS entries are accurate and complete.
Inspection/Reviews
Accurate and timely production of materials required to obtain AO approval of SIPRNET burn documentation
1.3.5.2.4
No more than 1 late document per quarter and no more than 5 days late.
For final deliverables, no more than two sets of corrections/edits and all corrections must be accomplished within
2 days or other such time periods as mutually determined between the government and the tasked contractor.
All documentation submitted in accordance with timelines established by
AF AO for approvals
Customer/Government
Input
Accurate and timely production of materials required to assess software security posture of
USTRANSCOM
applications and software.
1.3.5.2.5
Content: No more than 1 deviation per month from established principles of secure software engineering
Format: No more than 1 late document per quarter and no more than 5 days late.
For final deliverables, no more than two sets of corrections/edits and all corrections must be accomplished within
2 days or other such time periods as mutually determined between the government and the tasked contractor.
All documentation submitted in accordance with timelines established by
USTRANSCOM authorizing official
(AO) for approvals
Customer/Government
Input
Technical and application support to configure primary and secondary services supporting Web shop managed portals (both development and production); for classified and unclassified networks;
for public and private domains.
1.3.6.3
The contractor shall ensure 96% availability.
Inspection/Reviews
APPENDIX B – DISCREPANCY STATUS REPORT
DISCREPANCY STATUS REPORT
MEMORANDUM FOR: USTRANSCOM/TCAQ-DPO
Attn: _______________Contracting Officer
FROM: USTRANSCOM/TCAQ-M
Building 1990, 508 Scott Drive
Scott Air Force Base
IL, 62225
SUBJ: USTRANSCOM/ITSM - HTC711-16-R-D001 (Month)
1. Period Covered: (First to last day of the reporting period, i.e. 1-31 October 2016)
2. Area Covered: (Performance Objective, PWS paragraph, Task Descriptor, i.e. Support Desk, 1.2.1.1.)
3. Overview of Performance:
a. Summary - (Summary of what was done by the COR to assure contract compliance, i.e. audits, data review, and surveillance)
b. Contract Discrepancy Reports (CDRs) - List all CDRs documented during the reporting period.
Provide status of all open CDRs. Attach copies of CDRs to the monthly report.)
c. Corrective Action Follow Up - (Report any follow-up actions performed during the reporting period.)
4. Performance Analysis: (State your analysis of the contractor's performance.) Include positive and negative areas.
5. Areas of Concern: (Identify in narrative form ANY problem(s) or potential problem areas which may impact contract performance to PWS requirements or any aspect of the program.)
6. COR O&M Status: (Indicate current COR listing and their O&M status - Phases I and II; and any information regarding COR changes planned - new personnel requiring training, etc.)
JOHN Q. PUBLIC
Contracting Officer’s Representative (COR)
Attachment:
CDRs