Atch_1_IDIQ_PWS_Traffic.pdf

PDF 67 KB Posted

Attached to
SDDC/TEA Traffic Engineering Services
Solicitation number
HTC711-15-R-D003
Issued by

About this file

Atch 1 Performance Work Statement (PWS) IDIQ

View the file

Other files

File Type Posted
Questions_and_Answers_26_Mar_15.pdf PDF
0003.pdf PDF
0002.pdf PDF
Questions_and_Answers_24_Mar_15.pdf PDF
Questions_and_Answers_23_Mar_15.pdf PDF
Amended_Atch_3 _Sample_Task_Order_2.pdf PDF
Amended_Atch_10_CLIN_Structure.docx DOCX document
0001.pdf PDF
Questions_and_Answers_11_Mar_15.docx DOCX document
Atch_12_SF1407.pdf PDF
Atch_5_PP_Reference.docx DOCX document
Atch_8_Labor_Categories.pdf PDF
Atch_2 _Sample_Task_Order_1.pdf PDF
Atch_6_PPQ.doc DOC document
Atch_11_QASP.pdf PDF
Attach_9-Labor_Categories_ _Rates.xls XLS spreadsheet
Atch_3 _Sample_Task_Order_2.pdf PDF
Atch_4_Quick_Studies_PWS_Task_Order_1.pdf PDF
HTC711-15-R-D003.pdf PDF
Atch_10_CLIN_Structure.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTC711-15-R-D003

Attachment 1

PERFORMANCE WORK STATEMENT

FOR

Surface Deployment Distribution Command (SDDC)/Transportation Engineering Agency (TEA) Traffic Engineering Services

6 Oct 14

1. BACKGROUND

The Surface Deployment and Distribution Command (SDDC) mission is to provide global surface deployment and distribution services to meet the nation’s objectives. SDDC is the Army component of the United States Transportation Command (USTRANSCOM) Transportation Component Commands (TCCs), which includes Military Sealift Command (MSC), and HQ Air Mobility Command (AMC).

2. SCOPE OF WORK

The contractor shall provide Traffic Engineering Services to SDDCTEA supporting Traffic Engineering Branch requirements in accordance with the details and specifications outlined in this PWS. This includes Traffic Engineering Services and Analysis, Traffic Engineering Publications, Training Materials, and Tools, and Traffic Engineering Studies. The contractor shall provide all personnel, management, supervision, equipment, tools, supplies, materials, transportation, and any other items and services necessary to perform the engineering services outlined in this PWS except those which are made available by the Government and specified in this document. Specific expertise is required in the areas of: transportation engineering, planning, and design, traffic engineering studies, transportation management plans, Origin-Destination studies, traffic circulation studies, highway capacity analysis, signal operation, access control point design, crash studies, roadway safety audits, and pedestrian safety studies. All requirements and engineering services identified in the PWS shall be the property of SDDCTEA upon final acceptance and approval.

3. GENERAL TASKS

The contractor shall provide Traffic Engineering Services and Support to the Traffic Engineering mission. Requirements consist of the following:

3.1. TASK 1 - LIMITED SCOPE TRAFFIC ENGINEERING SERVICES AND ANALYSIS

The contractor shall provide limited-scope traffic engineering studies. Each study may include, but not be limited to, site visit(s), briefings, surveys, safety reviews, analyses, data collection, professional recommendations and development of a study report with Computer Aided Drafting and Design (CADD) exhibits. Examples of typical studies:

Traffic Data Collection; Automatic Traffic Recorder (ATR) and manual Entry Control Facility recommendations

Installation technical support Roadside safety assessments Intersection and network capacity analysis Traffic Calming Localized Traffic Impact Study Master Plan review/assistance Traffic signing recommendations Guardrail warrant analysis Traffic Signal warrant analysis Pedestrian Studies Parking Studies Conceptual CADD based geometric details and concepts Conduct plan reviews of DOD installation projects to include entry gate designs, signing and pavement marking plans, traffic signal designs, safety improvement projects, roadway design, traffic control plans, roadway lighting, and force protection and security designs. Data provided in support of the project may also be analyzed and/or reviewed. This may include traffic impact studies, design calculations, master planning studies, speed studies, and force protection guidelines.

Provide guidance on an as-needed basis to DOD installations as directed by SDDCTEA.

Telephone, email and written guidance shall be provided in the general areas of traffic operations and traffic control devices, force protection as it relates to the control of traffic, entry gate design parameters, roadway lighting, and safety.

At the request of SDDCTEA, the contractor may attend meetings that may include DOD agencies, state departments of transportation, federal agencies, or local municipal Government officials. Deliverables may include meeting minutes and tasks.

Assist with Traffic Engineering Workshop material development.

Task 1 required practices and deliverables are described below. Specific requirements will be identified in task orders:

Coordinate with the installation Point-of-Contact (POC) to schedule and conduct an on-site in-brief, with installation stakeholders, to review the scope of work, obtain necessary approvals and discuss data collection activities and outcomes.

Calculate future traffic demand projections utilizing Institute of Transportation Engineers (ITE) trip generation analysis, and independent forecasting based on known Base Realignment and Closure (BRAC), Grow the Army, and/or other known re-stationing. All stationing information shall be obtained through interview with the installation POC and through independent research.

The traffic forecast design year shall be full build out year of all known improvements.

For studies involving Entry Control Facilities (ECFs), calculate the new lane requirements based on SDDCTEA Pamphlet 55-15, UFC 4-022-01, The Army Standard (AS) for Access Control Points (ACPs), and all other applicable service related requirements, latest versions. Utilize the SMART Decision Evaluator software (available on SDDCTEA’s website) to assist in identifying the existing, short-term, and long-term impacts of security, manpower, automation, and traffic.

For studies involving ECFs, interview the installation force protection and ID check personnel to query additional information concerning the current operations of internal and external access control points.

Provide conceptual scaled drawings of recommendations for new and modified ECFs. When applicable (sight distance triangle requirements, geometric adjustments, striping adjustments, design vehicle accommodations, sidewalks, etc.), provide conceptual scaled drawings of recommendations for intersections and/or roadways that are included as part of this study. This shall include all geometric data used in the roadway alignment, recommended lane configuration, active & passive vehicle barrier placement, striping, signing, environmental constraints, and a statement of feasibility of design. (This is intended to be 11” x 17” foldouts graphically identifying all recommendations - prepared in color to scale with MicroStation CAD software, and overlaid onto an aerial photograph).

Traffic and speed data collection, both manually and with automatic data collectors, shall be collected on a 15-minute period basis. The counting duration shall be subject to the requirements of the specific call order.

Provide existing and future intersection capacity and network analysis utilizing HCS, or SYNCHRO, traffic capacity software. Provide a summary of results and recommendations based on Level of Service (LOS), with consideration of traffic flow and safety. Intersection summary shall include discussion of lane group LOS as well as intersection LOS. Analysis shall include queuing analysis for all intersection lane groups to identify congestion.

Road Safety Assessments shall, at a minimum, address the following items:

o Traffic control o Lane configuration o Signing o Striping o Design vehicle accommodation o Operational concerns o Roadside hazards o Improper traffic control devices o Bicycle and pedestrian access o Analysis of most recent five years of crash data, if available.

Categorize short-term and intermediate-term, recommendations Short-term recommendations are improvements that can be executed within six months utilizing normal installation maintenance resources that will provide immediate improvements to capacity, safety, and/or operations.

Intermediate-term recommendations will are improvements that can be executed within one to two years and require some planning, design, and repair/construction authority to execute.

Typically, intermediate-term recommendations can be implemented in stages with minimal impacts.

Provide construction and preliminary engineering cost estimates for all recommendations.

Provide a photographic record of all deficiencies and recommendations, where applicable.

Locate them in the report.

Perform desktop analysis of specific safety or traffic engineering related roadway issues based on information and data provided by others.

This task requires responsiveness to Agency needs that arise from high priority issues and will require the contractor to respond in a specified timeframe to the agency call order. In order to meet SDDCTEA’s Task 1 mission, the contractor shall meet the criteria identified in the Deliverables schedule when a call order is issued.

3.2. TASK 2 - TRAFFIC ENGINEERING PUBLICATIONS, TRAINING MATERIALS, AND

TOOLS

The contractor shall prepare engineering/technical publications, training materials, and tools to assist installation engineers with traffic engineering analysis. Example topics may include: Better Military Traffic Engineering, Traffic and Safety Engineering for Better Entry Control facilities, Inclusion of Roundabouts in Planning and Design, FHWA Retro-Reflectivity Standards, and Sign Inventory and Management Systems. Required mediums include documents, slides, published pamphlets, published bulletins, and web-based analysis tools.

3.2.1 Engineering/Technical Publications. SDDCTEA has the responsibility of producing

Pamphlets. The pamphlets reflect applicable traffic policies and standards affecting military roadways, including traffic control devices, signing, pavement markings, and elements of highway design or access control point design, etc. The contractor may be asked to assist in addressing comments, errata, and needed changes to the following SDDCTEA pamphlets:

Pamphlet 55-8 (Transportation and Travel) Pamphlet 55-10 (Traffic Engineering for Better Roads) Pamphlet 55-14 (Traffic Engineering for Better Signs and Markings) Pamphlet 55-15 (Traffic and Safety Engineering for Better Entry Control Facilities) Pamphlet 55-17 (Better Military Traffic Engineering)

3.2.2 Engineering/Technical Publications. SDDCTEA has the responsibility of producing

Bulletins. Traffic Engineering and Highway Safety Bulletins feature important, significant, and timely issues, practices, and topics that are beneficial to Department of Defense installation management, planning, engineering, emergency services, and AT/FP staff. Specific bulletin topics will be identified by task order.

3.2.3 Training Materials. Training materials are generated by SDDCTEA to support training of installation personnel in traffic engineering and safety concepts. Materials include documents, slides, visual aids, and videos. The contractor must have a capability to assist in the production of these training materials.

3.2.4 Tools. Web-based analysis tools are produced used by SDDCTEA. These include the SMART decision evaluator used in evaluating changes to Access Control Point/Entry Control Facilities (ACPs/ECF) and Better Military Traffic Engineering (BMTE) used to convey basic traffic engineering calculators and provide online calculators for typical traffic engineering analysis. The contractor must be capable of enhancing/upgrading these tools in support of the Traffic Engineering mission.

3.3 TASK 3 - TRAFFIC ENGINEERING STUDIES

As directed by SDDCTEA, the contractor shall conduct traffic engineering study support to DOD installations. Generic study types may include:

Comprehensive Traffic Engineering Study

Gate/Entry Control Facility Study Sign Management Study Parking Study Pedestrian Study Road Safety Assessment Signal Coordination and Timing (SCAT) Study Transportation Management Plan

General practices and requirements are described below. Specific requirements will be identified in task orders:

Coordinate with the installation Point-of-Contact (POC) to schedule and conduct an on-site in-brief, with installation stakeholders, to review the scope of work, obtain necessary approvals and discuss data collection activities and outcomes.

Calculate future traffic demand projections utilizing Institute of Transportation Engineers (ITE) trip generation analysis, and independent forecasting based on known Base Realignment and Closure (BRAC), Grow the Army, and/or other known re-stationing. All stationing information shall be obtained through interview with the installation POC and through independent research. The traffic forecast design year shall be full build out year of all known improvements.

For studies involving Entry Control Facilities (ECFs), calculate the new lane requirements based on SDDCTEA Pamphlet 55-15, UFC 4-022-01, The Army Standard (AS) for Access Control Points (ACPs), and all other applicable service related requirements, latest versions. Utilize the SMART Decision Evaluator software (available on SDDCTEA’s website) to assist in identifying the existing, short-term, and long-term impacts of security, manpower, automation, and traffic.

For studies involving ECFs, interview the installation force protection and ID check personnel to query additional information concerning the current operations of internal and external access control points.

Provide conceptual scaled drawings of recommendations for new and modified ECFs.

When applicable (sight distance triangle requirements, geometric adjustments, striping adjustments, design vehicle accommodations, sidewalks, etc.), provide conceptual scaled drawings of recommendations for intersections and/or roadways that are included as part of this study. This shall include all geometric data used in the roadway alignment, recommended lane configuration, active & passive vehicle barrier placement, striping, signing, environmental constraints, and a statement of feasibility of design. (This is intended to be 11” x 17” foldouts graphically identifying all recommendations - prepared in color to scale with MicroStation CAD software, and overlaid onto an aerial photograph).

Traffic and speed data collection, both manually and with automatic data collectors, shall be collected on a 15-minute period basis.

Provide existing and future intersection capacity and network analysis utilizing HCS, or SYNCHRO, traffic capacity software. Network analysis may involve large intersection networks; greater than 10 intersections. Provide a summary of results and recommendations based on Level of Service (LOS), with consideration of traffic flow and safety. Intersection summary shall include discussion of lane group LOS as well as intersection LOS. Analysis shall include queuing analysis for all intersection lane groups to identify congestion.

Road Safety Assessments shall address, but not be limited to, the following items:

o Traffic control o Lane configuration o Signing o Striping o Design vehicle accommodation o Operational concerns o Roadside hazards o Improper traffic control devices o Bicycle and pedestrian access o Analysis of most recent five years of crash data, if available.

Categorize short-term, intermediate-term, and long-term recommendations.

Short-term recommendations are improvements that can be executed within six months utilizing normal installation maintenance resources that will provide immediate improvements to capacity, safety, and/or operations. Intermediate-term recommendations are improvements that can be executed within one to two years and require some planning, design, and repair/construction authority to execute. Typically, intermediate-term recommendations can be implemented in stages with minimal impacts. Long term recommendations are improvements that can be implemented in three to five years and require extensive planning, design, and construction authority (i.e. MILCON) to execute.

Provide construction and preliminary engineering cost estimates for all recommendations.

Provide a photographic record of all deficiencies and recommendations, where applicable.

Locate them in the report.

Perform desktop analysis of specific safety or traffic engineering related roadway issues based on information and data provided by others.

Sign Management Studies shall include, but not be limited to, the following items:

o Sign Identification Number (i.e. a unique number identifying the sign panel), developed in coordination with the installation POC o GPS coordinates (i.e. GPS latitude and longitude) o Roadway Name (i.e. route name on which the sign is located) o Installation Date (i.e. date when sign installed) o Sign photo o Sign code (i.e. the MUTCD designation) o Sign message (if unique) o Direction of travel (i.e. northbound, southbound, eastbound, westbound) o Sign Position (i.e. Location of sign relative to road – left, right, overhead) o Lateral offset (i.e. distance from the edge of the traveled way to the near edge of sign panel) o Sign dimensions (i.e. width and height of sign panel) o Mounting Height (i.e. height measured vertically from the bottom of the sign to the top of the curb, or in the absence of curb, to the elevation of the near edge of the traveled way) o ASTM D4956 “Type” and manufacturer of sheeting material (i.e. grade of retroreflective material) o Sign retroreflectivity (Sign retroreflectivity shall be measured using one of the approved MUTCD methods with the chosen method identified within the PWS.)

o Number of sign supports o Type of sign support (i.e. wood post, U-channel steel post, square or round tube steel post, I-beam steel post, etc.)

o Physical condition of sign face (Comment on condition [e.g. cracking, delamination, etc.], fading or discoloration, contrast, retroreflectivity, and damage due to vandalism) o Rating of the physical condition of sign face (e.g. good, marginal, poor) o Rating of the physical condition of mounting (e.g. good, marginal, poor) o Additional field and desktop observations:

Is the sign the correct one in accordance with the 2009 Edition of the MUTCD? (i.e. proper application) Is the sign the correct size?

Is the sign needed per the 2009 version of the MUTCD? (Provide only the required signage, eliminating redundant and unnecessary signs.)

Is the sign correctly positioned with respect to lateral clearance?

Is the sign correctly positioned with respect to height above ground?

Is the sign correctly positioned with respect to longitudinal placement along road?

Is the sign visible, both day and night, at the required distance? If not, indicate cause of problem (e.g. blocked by vegetation, other signs, etc.)

Is sign support crashworthy (e.g. breakaway, yielding, or shielded with a longitudinal barrier)? If not, are sign supports located outside the clear zone?

4. GENERAL INFORMATION

4.1. REFERENCES. The contractor shall fully consider and ensure studies and plans comply with the country, federal, state, and local laws and regulations, and SDDCTEA directives and instructions.

Examples include:

SDDCTEA Pamphlet 55-14, Traffic Engineering for Better Signs and Markings

SDDCTEA Pamphlet 55-15, Traffic and Safety Engineering for Better Entry Control Facilities

SDDCTEA Pamphlet 55-17, Better Military Traffic Engineering.

American Association of State Highway and Transportation Officials (AASHTO) - A Policy on Geometric Design of Highways and Streets, 2004.

AASHTO - Roadside Design Guide, 3rd Edition, 2006.

Institute of Transportation Engineers (ITE) - Traffic Engineering Handbook - Washington D.C., 2009.

U.S. Department of Transportation, Federal Highway Administration (FHWA) - Manual on Uniform Traffic Control Devices (MUTCD) Washington, D.C., 2009

Transportation Research Board - Highway Capacity Manual, 2000.

ITE - Manual of Traffic Signal Design

ITE - Design and Safety of Pedestrian Facilities

ITE - Traffic Calming, State of the Practice

ITE - Parking Generation

All applicable Unified Facilities Criteria (UFCs)

State and Department MUTCD Supplements

4.2 TRAVEL

This Performance Work Statement (PWS) describes the performance requirements for SDDCTEA Traffic Engineering Services at Continental United States (CONUS) and Outside the Continental United States (OCONUS) locations. The contractor shall be available to work CONUS and OCONUS at military installations. Contractor personnel may be required to travel within the U.S.

and overseas to perform tasks required in this PWS. The Government shall reimburse the contractor for travel expenses in accordance with the Federal Acquisition Regulations (FAR) subject to the current Joint Travel Regulations (JTR) and Federal Travel Regulation (FTR). The Government shall not reimburse local travel and related expenses to the contractor for daily travel to or from the place of performance. For each Task Order on this contract, travel and Other Direct Cost (ODC) Not to Exceed (NTE) estimates will be provided.

4.3 HISTORICAL HOURS

Following are historical level of effort estimates for required tasks:

Requirement Hours Per Requirement Annual Number

Quick Study 150 8 TE Publications 700 2 Sign Management Study 1350 4 Access Control Point Study 750 5 Traffic Engineering Study 750 6 Comprehensive Study 1500 6 Parking Study 450 3 Pedestrian Study 500 4 Roadside Safety Assessment 250 4 Signal Control and Timing Study 150 2 Transportation Management Plan 2500 1

4.4 PERSONNEL

The contractor shall furnish fully trained managerial, supervisory, engineering, technical, administrative, clerical, and direct labor personnel, sufficient in number and qualifications to accomplish all work identified in specific task orders. Contractor personnel shall be able to speak, read, write and understand the English language especially including unique technical terminology required for the performance of these duties and functions. Contractor personnel shall obtain and maintain in good standing all certifications, inspections, and licenses necessary or appropriate to perform all work contained in this PWS. The contractor shall maintain the training skills and qualifications of all personnel throughout the award period.

Contractor Point(s) of Contact

The contractor shall provide primary and alternate on-site points of contact (POC), to the Government contracting officer’s representative (COR), during normal operating hours. The contact number(s), to be furnished prior to beginning contract performance, shall not be changed without reasonable prior notice to the COR.

4.5 OPERATING HOURS, FEDERAL HOLIDAY, AND PERIOD OF PERFORMANCE

4.5.1. Hours. Hours will vary depending on worksite location. Some work will be required to be performed on-site.

4.5.2. Holidays. Federal Holidays are to be observed as follows:

New Years Day January 1

M.L. King Birthday Third Monday in January Presidents Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

4.5.3. PERIOD OF PERFORMANCE. The period of performance for this contract shall consist of a base period with two (2) optional periods. Exercise of options periods are at the sole discretion of the Government:

Base Period: 1 August 2015 to 31 July 2016 Option Period 1: 1 August 2016 to 31 July 2017 Option Period 2: 1 August 2017 to 31 July 2018

4.6 QUALITY CONTROL AND ASSURANCE

IAW the FAR 52.246-1, contractor Inspection Requirements, and applicable additional requirements, each phase of the requirements rendered under this award is subject to Government inspection. This will occur either during the contractor’s operations or upon completion of the tasks.

The Government will evaluate the effectiveness of the contractor’s performance at its discretion, IAW the Quality Assurance Surveillance Plan (QASP). The Government’s QASP is not a substitute for Quality Control by the contractor. All costs associated with rework are the responsibility of the contractor. The Government reserves the right to choose the inspection methods to implement the

QASP and to vary the inspection methods utilized during the work, without notice to the contractor.

The QASP will be provided for each task order for informational purposes

5. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

5.1. GOVERNMENT FURNISHED MATERIALS

The Government may supply documents, data, or other materials for requirements identified in specific task orders. These materials may include data collected by the government, data collected by another contractor on behalf of the Government, analysis conducted by or on behalf of the Government and draft/final reports and documents. The contractor shall be responsible for providing or acquiring all other materials and data required to meet the specified requirement.

6. SECURITY

The majority of work associated with this contract is UNCLASSIFIED. Contract personnel conducting work under this contract will require access to unclassified/For Official Use Only (FOUO) information.

A DD Form 254 is not required.

6.1.1. Personnel Investigation Requirement:

6.1.2. Personnel assigned to a task order under this contract who may require access to non-secure internet protocol router network (NIPRNET) applications, UNCLASSIFIED government systems, and/or require common access cards (CAC), must successfully complete a National Agency Check with Inquiries (NACI) or suitable investigation meeting the NACI or higher level, resulting in favorable suitability for Public Trust eligibility. NACI investigations must be opened with fingerprint, name and criminal records checks returned favorably before contractors are cleared to begin work on the contract.

6.1.3. Favorable NACI or higher investigation results must be posted in the Joint Personnel Adjudication System (JPAS) before a contractor is granted a CAC or have access to UNCLASSIFIED government systems.

6.1.4. NACI requests will be submitted by SDDC Security Office, via a Personnel Security Investigation Program (PSIP) form, for processing as soon as the employees are identified.

6.1.5. SDDC will process NACI/Position of Trust investigations, if required/necessary. It is incumbent upon the contractor to have the appropriate investigations completed upon start of the task order if required/necessary.

6.2. Upon award of this contract, all names of contract employees supporting this contract will be submitted to SDDC Security Office through the COR/contracting officer for vetting in the Joint Personnel Adjudication System (JPAS) to ensure investigative and clearance requirements have been obtained before contract start date. This requirement will be completed prior to the COR/Trusted Agent (TA) submitting contract employees for their Common Access Card(s) (CAC) in the DoD Trusted Associate Sponsorship System (TASS). If a contract member does not have the appropriate investigative or security clearance requirement to support this contract, the employee will be denied the ability to work in support of this PWS.

6.3. Upon notification by the SDDC Security Office that contract personnel meet the required investigative or clearance level, personnel will be loaded in TASS by the COR/TA (If necessary).

Once approved in TASS, the contractor employees shall go to the nearest Real-Time Automated Personnel Identification System (RAPIDS)/Defense Enrollment Eligibility Reporting System office for CAC issuance.

6.4. Upon termination or completion of this BPA and/or a task order, the contractor employee will surrender all Government supplies, materials, and equipment to the COR. This will be accomplished on the last day of the contract or upon any termination/reassignment of a contract employee. CORs who obtain CAC and security badges due to short notice terminations or release of contract employees will revoke access in TASS and return the CAC to the nearest RAPIDS issuing facility.

6.5. The Government will provide unrestricted access to facilities, consistent with the appropriate investigation or security clearance and need to know, necessary for the on-site personnel to perform their work in accordance with the contract or task order.

6.6. Upon termination or completion of this BPA and/or a task order, the contractor employee will surrender all Government supplies, materials, and equipment to the COR. Off-site contractors will return the CAC to the COR. This will be accomplished on the last day of the contract or upon any termination/reassignment of a contract employee. CORs who obtain CAC due to short notice terminations or release of contract employees will revoke access in TASS and return the return the CAC to the nearest RAPIDS issuing facility.

6.7. Security Training: Contractors requiring NIPRNET access will/must complete Information Assurance (IA) Training required for specific computing platforms and applications. IA training must be completed prior to having NIPRNET access. Use the following link to access/complete the Information Assurance (IA) training https://ia.signal.army.mil/DoDIAA/default.asp. Use the following link to access/complete the Operations Security (OPSEC) training http://www.cdse.edu/catalog/operations-security.html.

6.8. Contractor employees will report training completion to the COR.

6.9. Security Permissions on DOD Systems. The Government shall ensure roles/privileges assigned to contract employees on the Government computing platforms are limited to those required for that individual’s performance of their assignments. These roles/privileges can be limited or revoked by the Government for any reason.

6.10. If the Government notifies the contractor that the employment or the continued employment of any contractor personnel is prejudicial to the interests or endangers the security of the United States of America, that employee shall be removed and barred from the worksite. This includes security deviations/incidents and credible derogatory information on contractor personnel during the course of the contract's period of performance. The contractor shall make any changes necessary in the appointment(s).

6.11. Contracting Officers or Contracting Officer Representatives will ensure Army contractors with security clearances comply with threat awareness and reporting requirements specified in AR 381-12.

Additionally, persons employed by Army contractors will report threat-related incidents, behavioral indicators, and other matters of Counter-Intelligence (CI) interest specified in AR 381-12, Chapter 3, to the Facility Security Officer, the nearest military CI Office, the Federal Bureau of Investigation, or the Defense Security Service.

6.12. Contractor employees shall comply with base access and control procedures.

6.13. Operations Security (OPSEC): All information furnished to the Contractor is to be used FOR OFFICIAL USE ONLY (FOUO). The Contractor shall be aware of OPSEC requirements.

6.14. All information, research, analysis, technical and support services covered in this PWS and any other related material gathered by the contractors for this study shall not be published on non government computer systems. Information produced for this PWS is covered under OPSEC regulation (AR-530-1) and For Official Use Only (FOUO) all unclassified material. Reference DODM 5200.01, V4. for specific guidance on the handling and safeguarding of FOUO information.

Also see AR 530-1, Chapter 2-19 for specifics regarding the OPSEC requirements for contractor and government personnel associated with this contract. Information will be transmitted via AKO or other .mil domains to protect Controlled Unclassified Information (CUI)/FOUO information from compromise and unauthorized release.

6.15. Contract Officer Representative (COR) is responsible for verifying these requirements for safeguarding CUI/FOUO information by the personnel associated with this contract. Failure to safeguard CUI and FOUO information as outlined by the COR and the Government activity Security Office could result in punitive damages remanded by the U.S. Government IAW DA and DOD OPSEC regulations and directives.

6.16. FPCON Impact on Work Levels (US Installations Only). Contractors are not considered mission essential in this PWS; therefore, access to an installation during increased Force Protection Condition (FPCON) CHARLIE and DELTA is not authorized.

6.17. Security regulation compliance. The contractor shall be required to comply with all security regulations and directives as identified herein and other security requirements in this BPA or associated task order. The contractor shall not divulge any financial, planning, programming, or budgeting information without the express consent of the Government as outlined in OPSEC and Information Security regulations.

6.18. Security Regulation Guidance:

Department of Defense (DOD):

2000.16 (DOD Antiterrorism Standards)

2000.12 (DOD Antiterrorism Program) 5200.01- Volumes 1-4 (DODM Information Security Program) 5200.2-R (DOD Personnel Security Program) 5200.08-R (DOD Physical Security Program) 5220.22-R (National Industrial Security Program)

8500.1 (DODI Cyber Security)

DOD regulations found at: http://www.dtic.mil/whs/directives/corres/pub1.html Army:

AR 25-2 (Information Assurance) AR 190-13 (Physical Security Program) AR 380-5 (Department of the Army Information Security Program) AR 380-20 (Restricted Areas) AR 380-49 (Industrial Security Program) AR 380-67 (Department of the Army Personnel Security Program) AR 381-12 (Threat Awareness and Reporting Program) AR 525-13 (Antiterrorism) AR 530-1 (Operations Security)

Army regulations found at: http://www.army.mil/usapa/epubs/

SDDC:

SDDC Regulation 190-13 (SDDC Physical Security Program) SDDC Regulation 380-2 (SDDC Operations Security Program) SDDC Regulation 380-5 (SDDC Information Security Program) (Provided upon request from SDDC G2 at SAFB)

Forms:

DOD forms found at: http://www.dtic.mil/whs/directives/infomgt/forms/

HQ SDDC Industrial Security Point of Contact:

Standa “Tony” Cameron 1 Soldier Way

SDDC G-2

Scott AFB, IL. 62225 Commercial: 618-220-6559 Email at standa.t.cameron.civ@mail.mil

Approval: 14 Oct 2014 DD Form 254 not required SDDC Tracking #: HQSDDCG2-108-14

7. SAFETY

Contractor personnel shall conform to Occupational Safety and Health Administration (OSHA) requirements when exposed to the risks of moving roadway traffic, inclusive of high visibility safety apparel that meets federal standards.

8. INSPECTION AND ACCEPTANCE. A deliverable is a specific measurable, tangible, and verifiable activity, outcome, result, item, or product that the Contractor shall provide and that will require formal Government acceptance and approval. The Government will review, assess and provide comment, as required.

8.1. Unless otherwise specified within an individual task order, final inspection and acceptance of all work performed, reports, or other deliverables shall be performed at the place of delivery. The COR will notify the Contractor of deliverable acceptance or provide comments in writing. After receipt of Government comments, the Contractor, if necessary, shall revise and resubmit the final deliverable to the COR within 5 business days of receipt of written comments.

9. CONTRACTOR MANPOWER REPORTING

The Contractor shall report ALL direct Contractor labor hours (including subContractor labor hours) required for performance of services provided under this contract for the U.S.

Transportation Command via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at:

http://www.ecmra.mil/

The eCMRA site associated with this contract is: U.S. Army

Command of the Requiring Activity is: Army Material Command

The Unit Identification Code (UIC) for this requirement is: W0ZAAA

The Federal Service Code for this contract is: B599

APPENDIX A

NONDISCLOSURE AGREEMENT AND AGREEMENT TO DISCLOSE POTENTIAL

CONFLICTS OF INTEREST

FOR CONTRACTOR EMPLOYEES ON USTRANSCOM CONTRACTS

NOTE: This Agreement is a standard agreement designed for use by contractor (including sub-contractor) employees assigned to work on USTRANSCOM contracts. Its use is designed to protect non-public Government information from disclosure, identify potential conflicts of interest, and prevent violations of federal statutes/regulations. The restrictions contained in this agreement also serve contractors by promoting compliant behavior that keeps contractors eligible to compete for Government contracts. In addition to the potential impact on future business opportunities, failure to abide by this agreement could result in administrative, civil, or criminal penalties specified by statute or regulation.

1. I, , currently an employee of , hereby agree to the terms and conditions set forth below.

2. I understand that I may have access to confidential business information, contractor bid or proposal information (as defined by FAR 3.104-1), and/or source selection information (as defined by FAR 2.101) either for contract performance, as a result of working in a USTRANSCOM facility, or of working near USTRANSCOM personnel, contractors, visitors, etc. I fully understand that such information is sensitive and must be protected in accordance with 41 US Code Section 423 and FAR SubPart 3.1.

3. In the course of performing under contract/order # or some other contract or sub-contract for USTRANSCOM, I agree to:

a) Use only for Government purpose any and all confidential business information, contractor bid or proposal information, and/or source selection sensitive information to which I am given access. I agree not to disclose “non-public information” by any means (in whole or in part, alone or in combination with other information, directly, indirectly, or derivatively) to any person except to a US Government official with a need to know or to a non-Government person (including, but not limited to, a person in my company, affiliated companies, sub-contractors, etc.) who has a need to know related to the immediate contract/order, has executed a valid form of this non-disclosure agreement, and receives prior clearance by the Contracting Officer. All distribution of the documents will be controlled with the concurrence of the Contracting Officer.

b) “Non-public information,” as used herein includes trade secrets; confidential or proprietary business information (as defined for Government employees in 18 USC 1905); advance procurement information (future requirements, acquisition strategies, statements of work, budget/program/planning data, etc.); source selection information (proposal rankings, source selection plans, contractor bid or proposal information); information protected by the Privacy Act (social security numbers, home addresses, etc.); sensitive information protected from release under the Freedom of Information Act (pre-decisional deliberations, litigation materials, privileged material, etc.); and information that has not been released to the general public and has not been authorized for such release (as defined for Government employees in 5 CFR 2635.703).

c) Not use such information for any non-Governmental purposes, including, but not limited to, the preparation of bids or proposals, or the development or execution of other business or commercial ventures.

d) Store the information in such a manner as to prevent inadvertent disclosure or releases to individuals who have not been authorized access to it.

4. I understand that I must never make an unauthorized disclosure or use of confidential business information, contractor bid or proposal information, and/or source selection sensitive information unless:

a) The information has otherwise been made available without restriction to the Government, to a competing contractor or to the public.

b) The Contracting Officer determines that such information is not subject to protection from release.

5. I agree that I shall not seek access to “non-public information” beyond what is required for the performance of the services I am contracted to perform. I agree that when I seek access to such information, attend meetings, or communicate with other parties about such information, I will identify myself as a contractor. Should I become aware of any improper or unintentional release or disclosure of “non-public information,” I will immediately report it to the Contracting Officer in writing. I agree that I will return all forms (including copies or reproduction of original documents) of any “non-public information” provided to me by the Government for use in performing my duties to the control of the Government when my duties no longer require this information.

6. Because the Government expects unbiased judgment and recommendations from contractors performing work under its contracts and orders, I agree to advise the Contracting Officer of any actual or potential personal conflicts of interest I may have related to any work I perform under this contract/order with the government. Personal conflicts of interest include any matter in which I or my spouse, minor child, or household member has a financial interest. A financial interest is any interest in, or affiliation with, a prime contractor, subcontractor to a prime contractor, any offerors, or any prospective subcontractor to any offeror for the program, contract, or other matter for which I am performing a support task under this contract. The financial interest can take the form of any ownership interest (including but not limited to: stock;

ownership of bonds; vested or unvested retirement benefits; a loan or other financial arrangement that is other than an arm’s-length transaction; employment, or an arrangement concerning prospective employment including negotiations therefore; or any non arm’s length loan, any gift from or other non arm’s length financial arrangement with any person who is directly communicating with the government on behalf of the prime contractor, subcontractor, or any prospective subcontractor or offeror). With respect to conflict of interest disclosures required under this agreement, a financial interest in, or affiliation with, the prime contractor that is my employer under this contract does not have to be disclosed to the Contracting Officer. If any potential conflicts of interest, real or otherwise, do present themselves, then I shall immediately disclose the pertinent information to the Contracting Officer.

By signing below, I certify that I have read and understand the terms of this Non-Disclosure Agreement and Agreement to Disclose Potential Conflicts of Interest, and voluntarily agree to be bound by its terms.

Signature of Contractor Employee Date

Printed Contractor Employee Name

Government Contracting Officer’s Representative Date

Contracting Officer

File details come from the government source that posted it. Updated .