HTC711-12-R-C002-0006.pdf

PDF 19 KB Posted

Attached to
Category A Federal contract opportunity
Solicitation number
HTC711-12-R-C002
Issued by
Department of Defense United States Transportation Command

About this file

Amendment 0006 to HTC711-12-R-C002

View the file

Other files for this federal contract opportunity

Other files attached to Category A, newest first.
File Type Posted
r_08.22.11_-_Class_J A_(_11-03)_LPL_Requirements.pdf PDF
HTC711-12-R-C002-0007.pdf PDF
RFP Question and Answers V —
Attachment 2 CAT A CLIN Structure Amendment 0007.xlsx XLSX spreadsheet
RFP Question and Answers V —
RFP Question and Answers V —
Attachment 2 CLIN Matrix —
Attachment 3 Estimated Volume —
HTC711-12-R-C002-0005.pdf PDF
RFP Question and Answers V —
Attachment 2 CLIN Matrix —
Attachment 1 Performance Work Statement —
Attachment 5 Past Performance Questionnaire —
Notice of Forthcoming Amendment to HTC711-12-R-C002 Clarification.docx DOCX document
Notice of Forthcoming Amendment to HTC711-12-R-C002.docx DOCX document
RFP Question and Answers IV —
HTC711-12-R-C002-0004.pdf PDF
Attachment 2 CAT A CLIN Structure with Corrected Formula.xlsx XLSX spreadsheet
Attachment 2 CLIN Matrix —
Performance work statement final 25 June 12.pdf PDF
HTC711-12-R-C002-0003.pdf PDF
Attachment 2 CAT A CLIN Structure with Corrected Formula.xlsx XLSX spreadsheet
Attachment 5 Past Perf Questionnaire.docx DOCX document
RFP Question and Answers III —
Attachment 5 Past Perf Questionnaire v2.pdf PDF
Attachment 4 Wage Determination.pdf PDF
HTC711-12-R-C002-0002.pdf PDF
RFP Question and Answers II —
RFP Question and Answers.docx DOCX document
Attachment 2 CAT A CLIN Structure for FBO Per Amendment 1.xlsx XLSX spreadsheet
HTC711-12-R-C002-0001.pdf PDF
Attachment 2 CLIN Matrix —
Attachment 3 Estimated Volume —
Appendix 6.1 Definitions.pdf PDF
Attachment 1 Performance Work Statement —
Question and Answers for Posting IV.docx DOCX document
Attachment 5 Past Perf Questionnaire.docx DOCX document
Attachment 2 CAT A CLIN Structure for FBO.xlsx XLSX spreadsheet
RFP HTC711-12-R-C002.pdf PDF
Question and Answers for Posting III 31 May 12.docx DOCX document
Question and Answers for Posting II.docx DOCX document
Question and Answers for Posting.docx DOCX document
Draft PWS Appendix.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

A.) Revise Attachment 2, CLIN Matrix to delete column E under CLIN X003 (AMCOM).

POC for this amendment is Ana Fife at ana.fife@ustranscom.mil or 618-220-6717.

1. CONTRACT ID CODE PAGE OF PAGES

K 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Jul-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HTC711-12-R-C002

X 9B. DATED (SEE ITEM 11)

04-Jun-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jul-2012

CODE

USTRANSCOM-AQ - HTC711

508 SCOTT DR

SCOTT AFB IL 62225-5357

HTC711 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HTC711-12-R-C002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

LIST OF ATTACHMENTS

Attachment Table of Contents Document Type Description Pages Date Attachment 1 Performance Work Statement 16 09 July 2012 Attachment 2 CLIN Matrix 94 18 July 2012 Attachment 3 Estimated Volume 12 09 July 2012 Attachment 4 Wage Determination 7 19 June 2012 Attachment 5 Past Performance Questionnaire 6 09 July 2012

NOTE 1: Attachment 3, Estimated Volume, is for reference only. The Government cannot guarantee the same city-pair location and quantities will be shipped in the future. It is anticipated that there could be significant variances due to changing mission requirements.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .