270 DS IDIQ Est R4_Blank 110410 Issued.pdf
PDF 122 KB Posted
- Solicitation number
- HSCG80-10-R-P45GK4
About this file
270 A B Class (WMEC) Dockside - Schedule - Supplies/Services Pricing Sheet Rev. 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND A0009 PAGE 2.doc | DOC document | |
| 270 DS IDIQ SPEC R4 111910 Issued.pdf | ||
| Amend A0009.pdf | ||
| 270 DS IDIQ Est R5_BLANK 111910 Issued.pdf | ||
| Amend A0008.pdf | ||
| Amend A0007.pdf | ||
| 270 DS IDIQ SPEC R3 110410 Issued.pdf | ||
| Amend A0006.pdf | ||
| 270 DS IDIQ Est R3_Blank 102110.pdf | ||
| Amend A0005.pdf | ||
| 270 DS IDIQ Est R3_Blank 102110.pdf | ||
| Amend A0004.pdf | ||
| AMEND A0003 PAGE 2.doc | DOC document | |
| 270 IDIQ DS CUTTER CONTACTS.pdf | ||
| 270 DS IDIQ SPEC R2 092410 | — | |
| Amend A0003.pdf | ||
| SOSS.pdf | ||
| AMEND 0002.pdf | ||
| AMEND A0001.pdf | ||
| HSCG80-10-R-P45GK4 SOLICITATION.doc | DOC document | |
| SF33.pdf | ||
| 270 DS IDIQ SPEC R1 Issue TEF 072910.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM DESCRIPTION UNIT YR 1 ITEM
QTY
YR 2 ITEM
QTY
YR 3 ITEM
QTY
YR 4 ITEM
QTY
YR 5 ITEM
QTY
1 Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1 1 1 1 1
2 Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 1 1 1 1 1
3 Chain Lockers, Inspect JOB 1 1 1 1 1
4 Sea Water Piping, Renew 1 LF - - - - -
4.1 1"-2-3/4" O.D. 1 LF 1 1 1 1 1
4 2 3" - 4-3/4" O D 1 LF 1 1 1 1 1
US COAST GUARD WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS
SCHEDULE OF SUPPLIES & SERVICES (SOS&S)
DOCKSIDE AVAILABILITY IDIQ - SUMMARY
This is an IDIQ contract pursuant to Federal Acquisition Regulation (FAR) 16.504 and 52.216-22. The minimum quantity guaranteed to be ordered is $250,000 over the duration of the contract, and the maximum quantity is $8,000,000, also over the duration of the contract. The duration of the contract includes any option periods, if options to extend the term of the contract are exercised.
4.2 3" - 4-3/4" O.D. 1 LF 1 1 1 1 1
4.3 5" - 7-3/4" O.D. 1 LF 1 1 1 1 1
4.4 8" - 10" O.D. 1 LF 1 1 1 1 1
5 Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1 1 1 1 1
6 Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1 1 1 1 1
7 Vent Ducts (Engine Room), Commercial Cleaning JOB 1 1 1 1 1
8 Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1 1 1 1 1
9 Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1 1 1 1 1
10 Chill Water Piping, Renew 1 LF - - - - -
10.1 1"-2-3/4" O.D. 1 LF 1 1 1 1 1
10.2 3" - 4-3/4" O.D. 1 LF 1 1 1 1 1
10.3 5" - 7-3/4" O.D. 1 LF 1 1 1 1 1
11 Feed/Jacket Water Piping, Renew 1 LF - - - - -
11.1 1"-2-3/4" O.D. 1 LF 1 1 1 1 1
11.2 3" - 4-3/4" O.D. 1 LF 1 1 1 1 1
11.3 5" - 7-3/4" O.D. 1 LF 1 1 1 1 1
12 Potable Water Piping, Renew 1 LF - - - - -
270 DS IDIQ Est R4_BLANK 110410 Issued Page 1
12.1 1"-2-3/4" O.D. 1 LF 1 1 1 1 1
12.2 3" - 4-3/4" O.D. 1 LF 1 1 1 1 1
12.3 5" - 7-3/4" O.D. 1 LF 1 1 1 1 1
13 Potable Water Pneumatic Tank, Clean and Inspect JOB 1 1 1 1 1
14 Fuel Piping, Renew 1 LF - - - - -
14.1 1"-2-3/4" O.D. 1 LF 1 1 1 1 1
14.2 3" - 4-3/4" O.D. 1 LF 1 1 1 1 1
14.3 5" - 7-3/4" O.D. 1 LF 1 1 1 1 1
15 Fin Stabilizers, General Maintenance JOB 1 1 1 1 1
16 Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1 1 1 1 1
17 Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1 1 1 1 1
181 Warping Capstan, Perform Level 2 Maintenance JOB 1 1 1 1 1
19 Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1 1 1 1 1
20 Helo Talon Grid, Inspect and Test JOB 1 1 1 1 1
21 Grey Water Holding Tanks, Clean and Inspect JOB 1 1 1 1 1
22 Sewage Collection and Holding Tanks, Clean and Inspect JOB 1 1 1 1 1
23 Work Item Deleted Job 1 1 1 1 1
24 Grey Water Piping, Clean and Flush 10 LF 1 1 1 1 1
25 Sewage Piping, Renew 1 LF - - - - -25 Sewage Piping, Renew 1 LF - - - - -
25.1 1"-2-3/4" O.D. 1 LF 1 1 1 1 1
25.2 3" - 4-3/4" O.D. 1 LF 1 1 1 1 1
25.3 5" - 7-3/4" O.D. 1 LF 1 1 1 1 1
26 Sewage Piping, Clean and Flush 10 LF 1 1 1 1 1
27 Tanks (Ballast), Preserve “100%” EA - - - - -
27.1 Ballast, 3-B-0-W EA 1 1 1 1 1
27.2 Ballast, 4-75-1-W EA 1 1 1 1 1
27.3 Ballast, 4-75-2-W EA 1 1 1 1 1
27.4 Ballast, 4-103-1-W EA 1 1 1 1 1
27.5 Ballast, 4-103-2-W EA 1 1 1 1 1
27.6 Ballast,4-169-0-W EA 1 1 1 1 1
27.7 Ballast, 4-228-1-W EA 1 1 1 1 1
27.8 Ballast, 4-228-2-W EA 1 1 1 1 1
27.9 Ballast, 4-242-0-W EA 1 1 1 1 1
28 Tank (Dirty Oil and Waste), Preserve “100%” JOB 1 1 1 1 1
29 Tanks (Potable Water), Preserve “100%” - - - - - -
270 DS IDIQ Est R4_BLANK 110410 Issued Page 2
29.1 Potable Water, 4-78-1-W EA 1 1 1 1 1
29.2 Potable Water, 4-78-2-W EA 1 1 1 1 1
29.3 Potable Water, 4-94-1-W EA 1 1 1 1 1
30 Tanks (Sewage and Vacuum Collection), Preserve “100%” - - - - - -
30.1 Sewage Tank, 3-82-0-E EA 1 1 1 1 1
30.2 Vacuum Collection Tank, 2-82-0-E EA 1 1 1 1 1
31 Tanks (Grey Water Holding), Preserve “100% - 1 1 1 1 1
31.1 Aft, 3-103-0-E EA 1 1 1 1 1
31.2 FWD, 3.82-0-E EA 1 1 1 1 1
31.3 Seal Water Tank EA 1 1 1 1 1
32 Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - - - -
32.1 Watertight Door, 12" x 18" EA 1 1 1 1 1
32.2 Watertight Door, 18" x 36" EA 1 1 1 1 1
32.3 Watertight Door, 33" x 66" EA 1 1 1 1 1
32.4 Scuttle, Round, 12" Dia. EA 1 1 1 1 1
32.5 Scuttle, Round, 14" Dia. EA 1 1 1 1 1
32.6 Scuttle, Round, 18" Dia. EA 1 1 1 1 1
32.7 Scuttle, Round, 21" Dia. EA 1 1 1 1 1
32.8 Scuttle, Round, 24" Dia. EA 1 1 1 1 132.8 Scuttle, Round, 24 Dia. EA 1 1 1 1 1
33 Watertight Doors and Scuttles (External), Renew - - - - - -
33.1 Watertight Door, 12" x 18" EA 1 1 1 1 1
33.2 Watertight Door, 18" x 36" EA 1 1 1 1 1
33.4 Watertight Door, 33" x 66" EA 1 1 1 1 1
33.5 Scuttle, Round, 12" Dia. EA 1 1 1 1 1
33.6 Scuttle, Round, 14" Dia. EA 1 1 1 1 1
33.7 Scuttle, Round, 18" Dia. EA 1 1 1 1 1
33.8 Scuttle, Round, 21" Dia. EA 1 1 1 1 1
33.9 Scuttle, Round, 24" Dia. EA 1 1 1 1 1
34 Piping Insulation, Renew - - - - - -
34.1 For interior gas, steam, hot water (jacket water only), and oil piping systems: - 1 1 1 1 1
34.2 3/4" - 2" O.D. pipe dia. 10 LF 1 1 1 1 1
34.3 2-1/4" - 4" O.D. pipe dia. 10 LF 1 1 1 1 1
34.4 4-1/4" - 6" O.D. pipe dia. 10 LF 1 1 1 1 1
34.5 For interior refrigerant (LP side only), hot water, cold water, and chill water piping s stems:
34.6 3/4" - 2" O.D. pipe dia. 10 LF 1 1 1 1 1
270 DS IDIQ Est R4_BLANK 110410 Issued Page 3
34.7 2-1/4" - 4" O.D. pipe dia. 10 LF 1 1 1 1 1
34.8 4-1/4" - 6" O.D. pipe dia. 10 LF 1 1 1 1 1
35 Compressed Air Receivers, Clean, Inspect, and Test JOB 1 1 1 1 1
36 Tanks (Ballast), Preserve, "Partial" - - - - - -
36.1 Ballast, 3-B-0-W EA 1 1 1 1 1
36.2 Ballast, 4-75-1-W EA 1 1 1 1 1
36.3 Ballast, 4-75-2-W EA 1 1 1 1 1
36.4 Ballast, 4-103-1-W EA 1 1 1 1 1
36.5 Ballast, 4-103-2-W EA 1 1 1 1 1
36.6 Ballast,4-169-0-W EA 1 1 1 1 1
36.7 Ballast, 4-228-1-W EA 1 1 1 1 1
36.8 Ballast, 4-228-2-W EA 1 1 1 1 1
36.9 Ballast, 4-242-0-W EA 1 1 1 1 1
37 Tank (Dirty Oil and Waste), Preserve, “Partial” Job 1 1 1 1 1
38 Tanks (Potable Water), Preserve “Partial” - - - - - -
38.1 Potable Water, 4-78-1-W EA 1 1 1 1 1
38.2 Potable Water, 4-78-2-W EA 1 1 1 1 1
38.3 Potable Water, 4-94-1-W EA 1 1 1 1 1
39 Tanks (Sewage Holding), Preserve, “Partial” - - - - - -39 Tanks (Sewage Holding), Preserve, Partial - - - - - -
39.1 Sewage Tank, 3-82-0-E EA 1 1 1 1 1
39.2 Vacuum Collection Tank, 2-82-0-E EA 1 1 1 1 1
40 Tanks (Grey Water Holding), Preserve, “Partial” - - - - - -
40.1 Aft, 3-103-0-E EA 1 1 1 1 1
40.2 FWD, 3.82-0-E EA 1 1 1 1 1
40.3 Seal Water Tank EA 1 1 1 1 1
41 Tanks (Ballast), Clean and Inspect - - - - - -
41.1 3-B-0-W EA 1 1 1 1 1
41.2 4-75-1-W EA 1 1 1 1 1
41.3 4-75-2-W EA 1 1 1 1 1
41.4 4-103-1-W EA 1 1 1 1 1
41.5 4-103-2-W EA 1 1 1 1 1
41.6 4-169-0-W EA 1 1 1 1 1
41.7 4-228-1-W EA 1 1 1 1 1
41.8 4-228-2-W EA 1 1 1 1 1
41.9 4-242-0-W EA 1 1 1 1 1
270 DS IDIQ Est R4_BLANK 110410 Issued Page 4
42 Tanks (Dirty Oil and Waste), Clean and Inspect - - - - - -
42.1 4-165-1-F EA 1 1 1 1 1
42.2 4-169-1-F EA 1 1 1 1 1
43 Tanks (Lube Oil), Clean and Inspect EA 1 1 1 1 1
44 Tanks (MP Fuel Service), Clean and Inspect - - - - - -
44.1 2-228-1-F EA 1 1 1 1 1
44.2 4-165-3-F EA 1 1 1 1 1
44.3 4-165-4-F EA 1 1 1 1 1
45 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - - - - - -
45.1 4-26-1-F EA 1 1 1 1 1
45.2 4-26-1-F EA 1 1 1 1 1
45.3 4-47-1-F EA 1 1 1 1 1
45.4 4-47-2-F EA 1 1 1 1 1
45.5 4-82-0-F EA 1 1 1 1 1
45.6 4-82-1-F EA 1 1 1 1 1
45.7 4-82-2-F EA 1 1 1 1 1
45.8 4-96-0-F EA 1 1 1 1 1
45.9 4-103-0-F EA 1 1 1 1 1
45.10 4-165-2-F EA 1 1 1 1 145.10 4-165-2-F EA 1 1 1 1 1
45.11 4-207-0-F EA 1 1 1 1 1
45.12 4-207-1-F EA 1 1 1 1 1
45.13 4-207-2-F EA 1 1 1 1 1
46 Tanks (MP Fuel), Preserve "100%" - - - - - -
46.1 2-228-1-F EA 1 1 1 1 1
46.2 4-26-1-F EA 1 1 1 1 1
46.3 4-26-1-F EA 1 1 1 1 1
46.4 4-47-1-F EA 1 1 1 1 1
46.5 4-47-2-F EA 1 1 1 1 1
46.6 4-82-0-F EA 1 1 1 1 1
46.7 4-82-1-F EA 1 1 1 1 1
46.8 4-82-2-F EA 1 1 1 1 1
46.9 4-96-0-F EA 1 1 1 1 1
46.10 4-103-0-F EA 1 1 1 1 1
46.11 4-165-2-F EA 1 1 1 1 1
46.12 4-165-3-F EA 1 1 1 1 1
270 DS IDIQ Est R4_BLANK 110410 Issued Page 5
46.13 4-165-4-F EA 1 1 1 1 1
46.14 4-207-0-F EA 1 1 1 1 1
46.15 4-207-1-F EA 1 1 1 1 1
46.16 4-207-2-F EA 1 1 1 1 1
47 Tanks (Hydraulic Oil), Clean and Inspect EA 1 1 1 1 1
48 Tanks (Aviation Fuel Service), Clean and Inspect - - - - - -
48.1 3-190-1-J EA 1 1 1 1 1
48.2 3-190-2-J EA 1 1 1 1 1
49 Tanks (Aviation Fuel Service), Preserve"100%" - - - - - -
49.1 3-190-1-J EA 1 1 1 1 1
49.2 3-190-2-J EA 1 1 1 1 1
50 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect - - - - - -
50.1 4-186-1-J EA 1 1 1 1 1
50.2 4-186-2-J EA 1 1 1 1 1
50.3 4-190-1-J EA 1 1 1 1 1
50.4 4-190-2-J EA 1 1 1 1 1
51 Tanks (Aviation Fuel Stowage and Overflow), Preserve "100%" - - - - - -
51.1 4-186-1-J EA 1 1 1 1 1
51.2 4-186-2-J EA 1 1 1 1 151.2 4-186-2-J EA 1 1 1 1 1
51.3 4-190-1-J EA 1 1 1 1 1
51.4 4-190-2-J EA 1 1 1 1 1
52 Insulation, Ventillation Ducting, Renew 10 SQ-FT 1 1 1 1 1
53 Insulation, Bulkhead / Overhead, Renew 10 SQ-FT 1 1 1 1 1
54 Insulation, MDE Exhaust Blankets, Fabricate and Install 10 SQ-FT 1 1 1 1 1
A-O Composite Labor Rate HOUR 1 1 1 1 1
270 DS IDIQ Est R4_BLANK 110410 Issued Page 6
ITEM DESCRIPTION UNIT PRICE UNIT ITEM QTY BASE YEAR EXTENDED
PRICE (FY'11)
1 Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1
2 Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 1
3 Chain Lockers, Inspect JOB 1
4 Sea Water Piping, Renew - - - -
4.1 1"-2-3/4" O.D. 1 LF 1
4.2 3" - 4-3/4" O.D. 1 LF 1
4.3 5" - 7-3/4" O.D. 1 LF 1
4.4 8" - 10" O.D. 1 LF 1
5 Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1
6 Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1
7 Vent Ducts (Engine Room), Commercial Cleaning JOB 1
8 Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1
9 Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1
10 Chill Water Piping, Renew - - - -
10.1 1"-2-3/4" O.D. 1 LF 1
10.2 3" - 4-3/4" O.D. 1 LF 1
10.3 5" - 7-3/4" O.D. 1 LF 1
11 Feed/Jacket Water Piping, Renew - - - -
11.1 1"-2-3/4" O.D. 1 LF 1
11.2 3" - 4-3/4" O.D. 1 LF 1
11.3 5" - 7-3/4" O.D. 1 LF 1
12 Potable Water Piping, Renew - - - -
12 1 1"-2-3/4" O D 1 LF 1
SCHEDULE OF SUPPLIES & SERVICES (SOS&S)
270 DOCKSIDE AVAILABILITY IDIQ - 2011, BASE YEAR
(4 Availabilities Projected for 2011)
US COAST GUARD WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS
12.1 1"-2-3/4" O.D. 1 LF 1
12.2 3" - 4-3/4" O.D. 1 LF 1
12.3 5" - 7-3/4" O.D. 1 LF 1
13 Potable Water Pneumatic Tank, Clean and Inspect JOB 1
14 Fuel Piping, Renew - - - -
14.1 1"-2-3/4" O.D. 1 LF 1
14.2 3" - 4-3/4" O.D. 1 LF 1
14.3 5" - 7-3/4" O.D. 1 LF 1
15 Fin Stabilizers, General Maintenance JOB 1
16 Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1
17 Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1
18 Warping Capstan, Perform Level 2 Maintenance JOB 1
19 Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1
20 Helo Talon Grid, Inspect and Test JOB 1
21 Grey Water Holding Tanks, Clean and Inspect JOB 1
22 Sewage Collection and Holding Tanks, Clean and Inspect JOB 1
23 Work Item Deleted - Job 1 -
24 Grey Water Piping, Clean and Flush 10 LF 1
25 Sewage Piping, Renew - - - -
25.1 1"-2-3/4" O.D. 1 LF 1
25.2 3" - 4-3/4" O.D. 1 LF 1
25.3 5" - 7-3/4" O.D. 1 LF 1
26 Sewage Piping, Clean and Flush 10 LF 1
27 Tanks (Ballast), Preserve “100%” - - - -
27.1 Ballast, 3-B-0-W EA 1
27.2 Ballast, 4-75-1-W EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued14
27.3 Ballast, 4-75-2-W EA 1
27.4 Ballast, 4-103-1-W EA 1
27.5 Ballast, 4-103-2-W EA 1
27.6 Ballast,4-169-0-W EA 1
27.7 Ballast, 4-228-1-W EA 1
27.8 Ballast, 4-228-2-W EA 1
27.9 Ballast, 4-242-0-W EA 1
28 Tank (Dirty Oil and Waste), Preserve “100%” JOB 1
29 Tanks (Potable Water), Preserve “100%” - - - -
29.1 Potable Water, 4-78-1-W EA 1
29.1 Potable Water, 4-78-2-W EA 1
29.3 Potable Water, 4-94-1-W EA 1
30 Tanks (Sewage and Vacuum Collection), Preserve “100%” - -
30.1 Sewage Tank, 3-82-0-E EA 1
30.2 Vacuum Collection Tank, 2-82-0-E EA 1
31 Tanks (Grey Water Holding), Preserve “100% - - 1 -
31.1 Aft, 3-103-0-E EA 1
31.2 FWD, 3.82-0-E EA 1
31.3 Seal Water Tank EA 1
32 Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - -
32.1 Watertight Door, 12" x 18" EA 1
32.2 Watertight Door, 18" x 36" EA 1
32.3 Watertight Door, 33" x 66" EA 1
32.4 Scuttle, Round, 12" Dia. EA 1
32.5 Scuttle, Round, 14" Dia. EA 1
32.6 Scuttle, Round, 18" Dia. EA 1
32.7 Scuttle, Round, 21" Dia. EA 1
32.8 Scuttle, Round, 24" Dia. EA 1
33 Watertight Doors and Scuttles (External), Renew - - - -
33.1 Watertight Door, 12" x 18" EA 1
33 2 Watertight Door 18" x 36" EA 133.2 Watertight Door, 18" x 36" EA 1
33.4 Watertight Door, 33" x 66" EA 1
33.5 Scuttle, Round, 12" Dia. EA 1
33.6 Scuttle, Round, 14" Dia. EA 1
33.7 Scuttle, Round, 18" Dia. EA 1
33.8 Scuttle, Round, 21" Dia. EA 1
33.9 Scuttle, Round, 24" Dia. EA 1
34 Piping Insulation, Renew - - - -
34.1 For interior gas, steam, hot water (jacket water only), and oil piping systems: - - 1 -
34.2 3/4" - 2" O.D. pipe dia. 10 LF 1
34.3 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.4 4-1/4" - 6" O.D. pipe dia. 10 LF 1
34.5 For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems:
34.6 3/4" - 2" O.D. pipe dia. 10 LF 1
34.7 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.8 4-1/4" - 6" O.D. pipe dia. 10 LF 1
35 Compressed Air Receivers, Clean, Inspect, and Test JOB 1
36 Tanks (Ballast), Preserve, “Partial” - - - -
36.1 Ballast, 3-B-0-W EA 1
36.2 Ballast, 4-75-1-W EA 1
36.3 Ballast, 4-75-2-W EA 1
36.4 Ballast, 4-103-1-W EA 1
36.5 Ballast, 4-103-2-W EA 1
36.6 Ballast,4-169-0-W EA 1
36.7 Ballast, 4-228-1-W EA 1
36.8 Ballast, 4-228-2-W EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued24
36.9 Ballast, 4-242-0-W EA 1
37 Tank (Dirty Oil and Waste), Preserve, “Partial” Job 1
38 Tanks (Potable Water), Preserve “Partial” - - - -
38.1 Potable Water, 4-78-1-W EA 1
38.2 Potable Water, 4-78-2-W EA 1
38.3 Potable Water, 4-94-1-W EA 1
39 Tanks (Sewage Holding), Preserve, “Partial” - - - -
39.1 Sewage Tank, 3-82-0-E EA 1
39.2 Vacuum Collection Tank, 2-82-0-E EA 1
40 Tanks (Grey Water Holding), Preserve, “Partial” - - - -
40.1 Aft, 3-103-0-E EA 1
40.2 FWD, 3.82-0-E EA 1
40.3 Seal Water Tank EA 1
41 Tanks (Ballast), Clean and Inspect - - - -
41.1 3-B-0-W EA 1
41.2 4-75-1-W EA 1
41.3 4-75-2-W EA 1
41.4 4-103-1-W EA 1
41.5 4-103-2-W EA 1
41.6 4-169-0-W EA 1
41.7 4-228-1-W EA 1
41.8 4-228-2-W EA 1
41.9 4-242-0-W EA 1
42 Tanks (Dirty Oil and Waste), Clean and Inspect - - - -
42.1 4-165-1-F EA 1
42.2 4-169-1-F EA 1
43 Tanks (Lube Oil), Clean and Inspect EA 1
44 Tanks (MP Fuel Service), Clean and Inspect - - - -
44.1 2-228-1-F EA 1
44.2 4-165-3-F EA 1
44 3 4-165-4-F EA 144.3 4-165-4-F EA 1
45 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - - - -
45.1 4-26-1-F EA 1
45.2 4-26-1-F EA 1
45.3 4-47-1-F EA 1
45.4 4-47-2-F EA 1
45.5 4-82-0-F EA 1
45.6 4-82-1-F EA 1
45.7 4-82-2-F EA 1
45.8 4-96-0-F EA 1
45.9 4-103-0-F EA 1
45.10 4-165-2-F EA 1
45.11 4-207-0-F EA 1
45.12 4-207-1-F EA 1
45.13 4-207-2-F EA 1
46 Tanks (MP Fuel), Preserve "100%" - - - -
46.1 2-228-1-F EA 1
46.2 4-26-1-F EA 1
46.3 4-26-1-F EA 1
46.4 4-47-1-F EA 1
46.5 4-47-2-F EA 1
46.6 4-82-0-F EA 1
46.7 4-82-1-F EA 1
46.8 4-82-2-F EA 1
46.9 4-96-0-F EA 1
46.10 4-103-0-F EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued34
46.11 4-165-2-F EA 1
46.12 4-165-3-F EA 1
46.13 4-165-4-F EA 1
46.14 4-207-0-F EA 1
46.15 4-207-1-F EA 1
46.16 4-207-2-F EA 1
47 Tanks (Hydraulic Oil), Clean and Inspect EA 1
48 Tanks (Aviation Fuel Service), Clean and Inspect - - - -
48.1 3-190-1-J EA 1
48.2 3-190-2-J EA 1
49 Tanks (Aviation Fuel Service), Preserve"100%" - - - -
49.1 3-190-1-J EA 1
49.2 3-190-2-J EA 1
50 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect - - - -
50.1 4-186-1-J EA 1
50.2 4-186-2-J EA 1
50.3 4-190-1-J EA 1
50.4 4-190-2-J EA 1
51 Tanks (Aviation Fuel Stowage and Overflow), Preserve "100%" - - - -
51.1 4-186-1-J EA 1
51.2 4-186-2-J EA 1
51.3 4-190-1-J EA 1
51.4 4-190-2-J EA 1
52 Insulation, Ventillation Ducting, Renew 10 SQ-FT 1
53 Insulation, Bulkhead / Overhead, Renew 10 SQ-FT 1
54 Insulation, MDE Exhaust Blankets, Fabricate and Install 10 SQ-FT 1
A-O Composite Labor Rate HOUR 1
B-D GFP Report NSP EA 1 NSP
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Option ItemsTotal Price of Definite and Option Items
270 DS IDIQ Est R4_BLANK 110410 Issued44
ITEM DESCRIPTION UNIT PRICE UNIT ITEM QTY EXTENDED PRICE
(FY'12)
1 Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1
2 Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 1
3 Chain Lockers, Inspect JOB 1
4 Sea Water Piping, Renew - - - -
4.1 1"-2-3/4" O.D. 1 LF 1
4.2 3" - 4-3/4" O.D. 1 LF 1
4.3 5" - 7-3/4" O.D. 1 LF 1
4.4 8" - 10" O.D. 1 LF 1
5 Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1
6 Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1
7 Vent Ducts (Engine Room), Commercial Cleaning JOB 1
8 Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1
9 Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1
10 Chill Water Piping, Renew - - - -
10.1 1"-2-3/4" O.D. 1 LF 1
10.2 3" - 4-3/4" O.D. 1 LF 1
10.3 5" - 7-3/4" O.D. 1 LF 1
11 Feed/Jacket Water Piping, Renew - - - -
11.1 1"-2-3/4" O.D. 1 LF 1
11.2 3" - 4-3/4" O.D. 1 LF 1
11.3 5" - 7-3/4" O.D. 1 LF 1
12 Potable Water Piping, Renew - - - -
12.1 1"-2-3/4" O.D. 1 LF 1
SCHEDULE OF SUPPLIES & SERVICES (SOS&S)
270 DOCKSIDE AVAILABILITY IDIQ - 2012, YEAR 2
(2 Availabilities Projected for 2012)
US COAST GUARD WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS
270 DS IDIQ Est R4_BLANK 110410 Issued
12.2 3" - 4-3/4" O.D. 1 LF 1
12.3 5" - 7-3/4" O.D. 1 LF 1
13 Potable Water Pneumatic Tank, Clean and Inspect JOB 1
14 Fuel Piping, Renew - - - -
14.1 1"-2-3/4" O.D. 1 LF 1
14.2 3" - 4-3/4" O.D. 1 LF 1
14.3 5" - 7-3/4" O.D. 1 LF 1
15 Fin Stabilizers, General Maintenance JOB 1
16 Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1
17 Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1
18 Warping Capstan, Perform Level 2 Maintenance JOB 1
19 Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1
20 Helo Talon Grid, Inspect and Test JOB 1
21 Grey Water Holding Tanks, Clean and Inspect JOB 1
22 Sewage Collection and Holding Tanks, Clean and Inspect JOB 1
23 Work Item Deleted - Job 1 -
24 Grey Water Piping, Clean and Flush 10 LF 1
25 Sewage Piping, Renew - - - -
25.1 1"-2-3/4" O.D. 1 LF 1
25.2 3" - 4-3/4" O.D. 1 LF 1
25.3 5" - 7-3/4" O.D. 1 LF 1
26 Sewage Piping, Clean and Flush 10 LF 1
27 Tanks (Ballast), Preserve “100%” - -
27.1 Ballast, 3-B-0-W EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
27.5 Ballast, 4-103-2-W EA 1
27.6 Ballast,4-169-0-W EA 1
27.7 Ballast, 4-228-1-W EA 1
27.8 Ballast, 4-228-2-W EA 1
27.9 Ballast, 4-242-0-W EA 1
28 Tank (Dirty Oil and Waste), Preserve “100%” JOB 1
29 Tanks (Potable Water), Preserve “100%” - -
29.1 Potable Water, 4-78-1-W EA 1
29.1 Potable Water, 4-78-2-W EA 1
29.3 Potable Water, 4-94-1-W EA 1
30 Tanks (Sewage and Vacuum Collection), Preserve “100%” - -
30.1 Sewage Tank, 3-82-0-E EA 1
30.2 Vacuum Collection Tank, 2-82-0-E EA 1
31 Tanks (Grey Water Holding), Preserve “100% - 1
31.1 Aft, 3-103-0-E EA 1
31.2 FWD, 3.82-0-E EA 1
31.3 Seal Water Tank EA 1
32 Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - -
32.1 Watertight Door, 12" x 18" EA 1
32.2 Watertight Door, 18" x 36" EA 1
32.3 Watertight Door, 33" x 66" EA 1
32.4 Scuttle, Round, 12" Dia. EA 1
32.5 Scuttle, Round, 14" Dia. EA 1
32.6 Scuttle, Round, 18" Dia. EA 1
32.7 Scuttle, Round, 21" Dia. EA 1
32.8 Scuttle, Round, 24" Dia. EA 1
33 Watertight Doors and Scuttles (External), Renew - - -
33.1 Watertight Door, 12" x 18" EA 1
33 2 Watertight Door 18" x 36" EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
33.2 Watertight Door, 18" x 36" EA 1
33.4 Watertight Door, 33" x 66" EA 1
33.5 Scuttle, Round, 12" Dia. EA 1
33.6 Scuttle, Round, 14" Dia. EA 1
33.7 Scuttle, Round, 18" Dia. EA 1
33.8 Scuttle, Round, 21" Dia. EA 1
33.9 Scuttle, Round, 24" Dia. EA 1
34 Piping Insulation, Renew - - - -
34.1 For interior gas, steam, hot water (jacket water only), and oil piping systems: - - 1 -
34.2 3/4" - 2" O.D. pipe dia. 10 LF 1
34.3 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.4 4-1/4" - 6" O.D. pipe dia. 10 LF 1
34.5 For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems:
34.6 3/4" - 2" O.D. pipe dia. 10 LF 1
34.7 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.8 4-1/4" - 6" O.D. pipe dia. 10 LF 1
35 Compressed Air Receivers, Clean, Inspect, and Test JOB 1
36 Tanks (Ballast), Preserve, “Partial” - -
36.1 Ballast, 3-B-0-W EA 1
36.2 Ballast, 4-75-1-W EA 1
36.3 Ballast, 4-75-2-W EA 1
36.4 Ballast, 4-103-1-W EA 1
36.5 Ballast, 4-103-2-W EA 1
36.6 Ballast,4-169-0-W EA 1
36.7 Ballast, 4-228-1-W EA 1
38 Tanks (Potable Water), Preserve “Partial” - -
38.1 Potable Water, 4-78-1-W EA 1
38.2 Potable Water, 4-78-2-W EA 1
38.3 Potable Water, 4-94-1-W EA 1
39 Tanks (Sewage Holding), Preserve, “Partial” - -
39.1 Sewage Tank, 3-82-0-E EA 1
39.2 Vacuum Collection Tank, 2-82-0-E EA 1
40 Tanks (Grey Water Holding), Preserve, “Partial” - -
40.1 Aft, 3-103-0-E EA 1
40.2 FWD, 3.82-0-E EA 1
40.3 Seal Water Tank EA 1
41 Tanks (Ballast), Clean and Inspect - - - -
41.1 3-B-0-W EA 1
41.2 4-75-1-W EA 1
41.3 4-75-2-W EA 1
41.4 4-103-1-W EA 1
41.5 4-103-2-W EA 1
41.6 4-169-0-W EA 1
41.7 4-228-1-W EA 1
41.8 4-228-2-W EA 1
41.9 4-242-0-W EA 1
42 Tanks (Dirty Oil and Waste), Clean and Inspect - - - -
42.1 4-165-1-F EA 1
42.2 4-169-1-F EA 1
43 Tanks (Lube Oil), Clean and Inspect EA 1
44 Tanks (MP Fuel Service), Clean and Inspect - - - -
44.1 2-228-1-F EA 1
44.2 4-165-3-F EA 1
44 3 4-165-4-F EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
44.3 4-165-4-F EA 1
45 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - - - -
45.1 4-26-1-F EA 1
45.2 4-26-1-F EA 1
45.3 4-47-1-F EA 1
45.4 4-47-2-F EA 1
45.5 4-82-0-F EA 1
45.6 4-82-1-F EA 1
45.7 4-82-2-F EA 1
45.8 4-96-0-F EA 1
45.9 4-103-0-F EA 1
45.10 4-165-2-F EA 1
45.11 4-207-0-F EA 1
45.12 4-207-1-F EA 1
45.13 4-207-2-F EA 1
46 Tanks (MP Fuel), Preserve "100%" - - - -
46.1 2-228-1-F EA 1
46.2 4-26-1-F EA 1
46.3 4-26-1-F EA 1
46.4 4-47-1-F EA 1
46.5 4-47-2-F EA 1
46.6 4-82-0-F EA 1
46.7 4-82-1-F EA 1
46.8 4-82-2-F EA 1
46.9 4-96-0-F EA 1
46.13 4-165-4-F EA 1
46.14 4-207-0-F EA 1
46.15 4-207-1-F EA 1
46.16 4-207-2-F EA 1
47 Tanks (Hydraulic Oil), Clean and Inspect EA 1
48 Tanks (Aviation Fuel Service), Clean and Inspect - - - -
48.1 3-190-1-J EA 1
48.2 3-190-2-J EA 1
49 Tanks (Aviation Fuel Service), Preserve"100%" - - - -
49.1 3-190-1-J EA 1
49.2 3-190-2-J EA 1
50 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect - - - -
50.1 4-186-1-J EA 1
50.2 4-186-2-J EA 1
50.3 4-190-1-J EA 1
50.4 4-190-2-J EA 1
51 Tanks (Aviation Fuel Stowage and Overflow), Preserve "100%" - - - -
51.1 4-186-1-J EA 1
51.2 4-186-2-J EA 1
51.3 4-190-1-J EA 1
51.4 4-190-2-J EA 1
52 Insulation, Ventillation Ducting, Renew 10 SQ-FT 1
53 Insulation, Bulkhead / Overhead, Renew 10 SQ-FT 1
54 Insulation, MDE Exhaust Blankets, Fabricate and Install 10 SQ-FT 1
A-O Composite Labor Rate HOUR 1
B-D GFP Report NSP EA 1 NSP
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Option Items
270 DS IDIQ Est R4_BLANK 110410 Issued
Total Price of Definite and Option Items
(FY'13)
1 Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1
2 Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 1
3 Chain Lockers, Inspect JOB 1
4 Sea Water Piping, Renew - - - -
4.1 1"-2-3/4" O.D. 1 LF 1
4.2 3" - 4-3/4" O.D. 1 LF 1
4.3 5" - 7-3/4" O.D. 1 LF 1
4.4 8" - 10" O.D. 1 LF 1
5 Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1
6 Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1
7 Vent Ducts (Engine Room), Commercial Cleaning JOB 1
8 Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1
9 Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1
10 Chill Water Piping, Renew - - - -
10.1 1"-2-3/4" O.D. 1 LF 1
10.2 3" - 4-3/4" O.D. 1 LF 1
10.3 5" - 7-3/4" O.D. 1 LF 1
11 Feed/Jacket Water Piping, Renew - - - -
11.1 1"-2-3/4" O.D. 1 LF 1
11.2 3" - 4-3/4" O.D. 1 LF 1
11.3 5" - 7-3/4" O.D. 1 LF 1
12 Potable Water Piping, Renew - - - -
12.1 1"-2-3/4" O.D. 1 LF 1
SCHEDULE OF SUPPLIES & SERVICES (SOS&S)
270 DOCKSIDE AVAILABILITY IDIQ - 2013, YEAR 3
(1 Availabilities Projected for 2013)
US COAST GUARD WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS
270 DS IDIQ Est R4_BLANK 110410 Issued
12.2 3" - 4-3/4" O.D. 1 LF 1
12.3 5" - 7-3/4" O.D. 1 LF 1
13 Potable Water Pneumatic Tank, Clean and Inspect JOB 1
14 Fuel Piping, Renew - - - -
14.1 1"-2-3/4" O.D. 1 LF 1
14.2 3" - 4-3/4" O.D. 1 LF 1
14.3 5" - 7-3/4" O.D. 1 LF 1
15 Fin Stabilizers, General Maintenance JOB 1
16 Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1
17 Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1
18 Warping Capstan, Perform Level 2 Maintenance JOB 1
19 Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1
20 Helo Talon Grid, Inspect and Test JOB 1
21 Grey Water Holding Tanks, Clean and Inspect JOB 1
22 Sewage Collection and Holding Tanks, Clean and Inspect JOB 1
23 Work Item Deleted - Job 1 -
24 Grey Water Piping, Clean and Flush 10 LF 1
25 Sewage Piping, Renew - - - -
25.1 1"-2-3/4" O.D. 1 LF 1
25.2 3" - 4-3/4" O.D. 1 LF 1
25.3 5" - 7-3/4" O.D. 1 LF 1
26 Sewage Piping, Clean and Flush 10 LF 1
27 Tanks (Ballast), Preserve “100%” - - - -
27.1 Ballast, 3-B-0-W EA 1
27.5 Ballast, 4-103-2-W EA 1
27.6 Ballast,4-169-0-W EA 1
27.7 Ballast, 4-228-1-W EA 1
27.8 Ballast, 4-228-2-W EA 1
27.9 Ballast, 4-242-0-W EA 1
28 Tank (Dirty Oil and Waste), Preserve “100%” JOB 1
29 Tanks (Potable Water), Preserve “100%” - - - -
29.1 Potable Water, 4-78-1-W EA 1
29.1 Potable Water, 4-78-2-W EA 1
29.3 Potable Water, 4-94-1-W EA 1
30 Tanks (Sewage and Vacuum Collection), Preserve “100%” - -
30.1 Sewage Tank, 3-82-0-E EA 1
30.2 Vacuum Collection Tank, 2-82-0-E EA 1
31 Tanks (Grey Water Holding), Preserve “100% - - 1 -
31.1 Aft, 3-103-0-E EA 1
31.2 FWD, 3.82-0-E EA 1
31.3 Seal Water Tank EA 1
32 Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - -
32.1 Watertight Door, 12" x 18" EA 1
32.2 Watertight Door, 18" x 36" EA 1
32.3 Watertight Door, 33" x 66" EA 1
32.4 Scuttle, Round, 12" Dia. EA 1
32.5 Scuttle, Round, 14" Dia. EA 1
32.6 Scuttle, Round, 18" Dia. EA 1
32.7 Scuttle, Round, 21" Dia. EA 1
32.8 Scuttle, Round, 24" Dia. EA 1
33 Watertight Doors and Scuttles (External), Renew - - - -
33.1 Watertight Door, 12" x 18" EA 1
33 2 Watertight Door 18" x 36" EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
33.2 Watertight Door, 18" x 36" EA 1
33.4 Watertight Door, 33" x 66" EA 1
33.5 Scuttle, Round, 12" Dia. EA 1
33.6 Scuttle, Round, 14" Dia. EA 1
33.7 Scuttle, Round, 18" Dia. EA 1
33.8 Scuttle, Round, 21" Dia. EA 1
33.9 Scuttle, Round, 24" Dia. EA 1
34 Piping Insulation, Renew - - - -
34.1 For interior gas, steam, hot water (jacket water only), and oil piping systems: - - 1 -
34.2 3/4" - 2" O.D. pipe dia. 10 LF 1
34.3 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.4 4-1/4" - 6" O.D. pipe dia. 10 LF 1
34.5 For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems:
34.6 3/4" - 2" O.D. pipe dia. 10 LF 1
34.7 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.8 4-1/4" - 6" O.D. pipe dia. 10 LF 1
35 Compressed Air Receivers, Clean, Inspect, and Test JOB 1
36 Tanks (Ballast), Preserve, “Partial” - - - -
36.1 Ballast, 3-B-0-W EA 1
36.2 Ballast, 4-75-1-W EA 1
36.3 Ballast, 4-75-2-W EA 1
36.4 Ballast, 4-103-1-W EA 1
36.5 Ballast, 4-103-2-W EA 1
36.6 Ballast,4-169-0-W EA 1
36.7 Ballast, 4-228-1-W EA 1
38 Tanks (Potable Water), Preserve “Partial” - - - -
38.1 Potable Water, 4-78-1-W EA 1
38.2 Potable Water, 4-78-2-W EA 1
38.3 Potable Water, 4-94-1-W EA 1
39 Tanks (Sewage Holding), Preserve, “Partial” - - - -
39.1 Sewage Tank, 3-82-0-E EA 1
39.2 Vacuum Collection Tank, 2-82-0-E EA 1
40 Tanks (Grey Water Holding), Preserve, “Partial” - - - -
40.1 Aft, 3-103-0-E EA 1
40.2 FWD, 3.82-0-E EA 1
40.3 Seal Water Tank EA 1
41 Tanks (Ballast), Clean and Inspect - - - -
41.1 3-B-0-W EA 1
41.2 4-75-1-W EA 1
41.3 4-75-2-W EA 1
41.4 4-103-1-W EA 1
41.5 4-103-2-W EA 1
41.6 4-169-0-W EA 1
41.7 4-228-1-W EA 1
41.8 4-228-2-W EA 1
41.9 4-242-0-W EA 1
42 Tanks (Dirty Oil and Waste), Clean and Inspect - - - -
42.1 4-165-1-F EA 1
42.2 4-169-1-F EA 1
43 Tanks (Lube Oil), Clean and Inspect EA 1
44 Tanks (MP Fuel Service), Clean and Inspect - - - -
44.1 2-228-1-F EA 1
44.2 4-165-3-F EA 1
44 3 4-165-4-F EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
44.3 4-165-4-F EA 1
45 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - - - -
45.1 4-26-1-F EA 1
45.2 4-26-1-F EA 1
45.3 4-47-1-F EA 1
45.4 4-47-2-F EA 1
45.5 4-82-0-F EA 1
45.6 4-82-1-F EA 1
45.7 4-82-2-F EA 1
45.8 4-96-0-F EA 1
45.9 4-103-0-F EA 1
45.10 4-165-2-F EA 1
45.11 4-207-0-F EA 1
45.12 4-207-1-F EA 1
45.13 4-207-2-F EA 1
46 Tanks (MP Fuel), Preserve "100%" - - - -
46.1 2-228-1-F EA 1
46.2 4-26-1-F EA 1
46.3 4-26-1-F EA 1
46.4 4-47-1-F EA 1
46.5 4-47-2-F EA 1
46.6 4-82-0-F EA 1
46.7 4-82-1-F EA 1
46.8 4-82-2-F EA 1
46.9 4-96-0-F EA 1
46.13 4-165-4-F EA 1
46.14 4-207-0-F EA 1
46.15 4-207-1-F EA 1
46.16 4-207-2-F EA 1
47 Tanks (Hydraulic Oil), Clean and Inspect EA 1
48 Tanks (Aviation Fuel Service), Clean and Inspect - - - -
48.1 3-190-1-J EA 1
48.2 3-190-2-J EA 1
49 Tanks (Aviation Fuel Service), Preserve"100%" - - - -
49.1 3-190-1-J EA 1
49.2 3-190-2-J EA 1
50 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect - - - -
50.1 4-186-1-J EA 1
50.2 4-186-2-J EA 1
50.3 4-190-1-J EA 1
50.4 4-190-2-J EA 1
51 Tanks (Aviation Fuel Stowage and Overflow), Preserve "100%" - - - -
51.1 4-186-1-J EA 1
51.2 4-186-2-J EA 1
51.3 4-190-1-J EA 1
51.4 4-190-2-J EA 1
52 Insulation, Ventillation Ducting, Renew 10 SQ-FT 1
53 Insulation, Bulkhead / Overhead, Renew 10 SQ-FT 1
54 Insulation, MDE Exhaust Blankets, Fabricate and Install 10 SQ-FT 1
A-O Composite Labor Rate HOUR 1
B-D GFP Report NSP EA 1 NSP
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Option Items
270 DS IDIQ Est R4_BLANK 110410 Issued
(FY'14)
1 Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1
2 Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 1
3 Chain Lockers, Inspect JOB 1
4 Sea Water Piping, Renew - - - -
4.1 1"-2-3/4" O.D. 1 LF 1
4.2 3" - 4-3/4" O.D. 1 LF 1
4.3 5" - 7-3/4" O.D. 1 LF 1
4.4 8" - 10" O.D. 1 LF 1
5 Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1
6 Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1
7 Vent Ducts (Engine Room), Commercial Cleaning JOB 1
8 Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1
9 Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1
10 Chill Water Piping, Renew - - - -
10.1 1"-2-3/4" O.D. 1 LF 1
10.2 3" - 4-3/4" O.D. 1 LF 1
10.3 5" - 7-3/4" O.D. 1 LF 1
11 Feed/Jacket Water Piping, Renew - - - -
11.1 1"-2-3/4" O.D. 1 LF 1
11.2 3" - 4-3/4" O.D. 1 LF 1
11.3 5" - 7-3/4" O.D. 1 LF 1
12 Potable Water Piping, Renew - - - -
12.1 1"-2-3/4" O.D. 1 LF 1
SCHEDULE OF SUPPLIES & SERVICES (SOS&S)
270 DOCKSIDE AVAILABILITY IDIQ - 2014, YEAR 4
(3 Availabilities Projected for 2014)
US COAST GUARD WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS
270 DS IDIQ Est R4_BLANK 110410 Issued
12.2 3" - 4-3/4" O.D. 1 LF 1
12.3 5" - 7-3/4" O.D. 1 LF 1
13 Potable Water Pneumatic Tank, Clean and Inspect JOB 1
14 Fuel Piping, Renew - - - -
14.1 1"-2-3/4" O.D. 1 LF 1
14.2 3" - 4-3/4" O.D. 1 LF 1
14.3 5" - 7-3/4" O.D. 1 LF 1
15 Fin Stabilizers, General Maintenance JOB 1
16 Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1
17 Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1
18 Warping Capstan, Perform Level 2 Maintenance JOB 1
19 Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1
20 Helo Talon Grid, Inspect and Test JOB 1
21 Grey Water Holding Tanks, Clean and Inspect JOB 1
22 Sewage Collection and Holding Tanks, Clean and Inspect JOB 1
23 Work Item Deleted - Job 1 -
24 Grey Water Piping, Clean and Flush 10 LF 1
25 Sewage Piping, Renew - - - -
25.1 1"-2-3/4" O.D. 1 LF 1
25.2 3" - 4-3/4" O.D. 1 LF 1
25.3 5" - 7-3/4" O.D. 1 LF 1
26 Sewage Piping, Clean and Flush 10 LF 1
27 Tanks (Ballast), Preserve “100%” - - - -
27.1 Ballast, 3-B-0-W EA 1
27.5 Ballast, 4-103-2-W EA 1
27.6 Ballast,4-169-0-W EA 1
27.7 Ballast, 4-228-1-W EA 1
27.8 Ballast, 4-228-2-W EA 1
27.9 Ballast, 4-242-0-W EA 1
28 Tank (Dirty Oil and Waste), Preserve “100%” JOB 1
29 Tanks (Potable Water), Preserve “100%” - - - -
29.1 Potable Water, 4-78-1-W EA 1
29.1 Potable Water, 4-78-2-W EA 1
29.3 Potable Water, 4-94-1-W EA 1
30 Tanks (Sewage and Vacuum Collection), Preserve “100%” - -
30.1 Sewage Tank, 3-82-0-E EA 1
30.2 Vacuum Collection Tank, 2-82-0-E EA 1
31 Tanks (Grey Water Holding), Preserve “100% - - 1 -
31.1 Aft, 3-103-0-E EA 1
31.2 FWD, 3.82-0-E EA 1
31.3 Seal Water Tank EA 1
32 Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - -
32.1 Watertight Door, 12" x 18" EA 1
32.2 Watertight Door, 18" x 36" EA 1
32.3 Watertight Door, 33" x 66" EA 1
32.4 Scuttle, Round, 12" Dia. EA 1
32.5 Scuttle, Round, 14" Dia. EA 1
32.6 Scuttle, Round, 18" Dia. EA 1
32.7 Scuttle, Round, 21" Dia. EA 1
32.8 Scuttle, Round, 24" Dia. EA 1
33 Watertight Doors and Scuttles (External), Renew - - - -
33.1 Watertight Door, 12" x 18" EA 1
33 2 Watertight Door 18" x 36" EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
33.2 Watertight Door, 18" x 36" EA 1
33.4 Watertight Door, 33" x 66" EA 1
33.5 Scuttle, Round, 12" Dia. EA 1
33.6 Scuttle, Round, 14" Dia. EA 1
33.7 Scuttle, Round, 18" Dia. EA 1
33.8 Scuttle, Round, 21" Dia. EA 1
33.9 Scuttle, Round, 24" Dia. EA 1
34 Piping Insulation, Renew - - - -
34.1 For interior gas, steam, hot water (jacket water only), and oil piping systems: - - 1 -
34.2 3/4" - 2" O.D. pipe dia. 10 LF 1
34.3 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.4 4-1/4" - 6" O.D. pipe dia. 10 LF 1
34.5 For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems:
34.6 3/4" - 2" O.D. pipe dia. 10 LF 1
34.7 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.8 4-1/4" - 6" O.D. pipe dia. 10 LF 1
35 Compressed Air Receivers, Clean, Inspect, and Test JOB 1
36 Tanks (Ballast), Preserve, “Partial” - - - -
36.1 Ballast, 3-B-0-W EA 1
36.2 Ballast, 4-75-1-W EA 1
36.3 Ballast, 4-75-2-W EA 1
36.4 Ballast, 4-103-1-W EA 1
36.5 Ballast, 4-103-2-W EA 1
36.6 Ballast,4-169-0-W EA 1
36.7 Ballast, 4-228-1-W EA 1
38 Tanks (Potable Water), Preserve “Partial” - - - -
38.1 Potable Water, 4-78-1-W EA 1
38.2 Potable Water, 4-78-2-W EA 1
38.3 Potable Water, 4-94-1-W EA 1
39 Tanks (Sewage Holding), Preserve, “Partial” - - - -
39.1 Sewage Tank, 3-82-0-E EA 1
39.2 Vacuum Collection Tank, 2-82-0-E EA 1
40 Tanks (Grey Water Holding), Preserve, “Partial” - - - -
40.1 Aft, 3-103-0-E EA 1
40.2 FWD, 3.82-0-E EA 1
40.3 Seal Water Tank EA 1
41 Tanks (Ballast), Clean and Inspect - - - -
41.1 3-B-0-W EA 1
41.2 4-75-1-W EA 1
41.3 4-75-2-W EA 1
41.4 4-103-1-W EA 1
41.5 4-103-2-W EA 1
41.6 4-169-0-W EA 1
41.7 4-228-1-W EA 1
41.8 4-228-2-W EA 1
41.9 4-242-0-W EA 1
42 Tanks (Dirty Oil and Waste), Clean and Inspect - - - -
42.1 4-165-1-F EA 1
42.2 4-169-1-F EA 1
43 Tanks (Lube Oil), Clean and Inspect EA 1
44 Tanks (MP Fuel Service), Clean and Inspect - - - -
44.1 2-228-1-F EA 1
44.2 4-165-3-F EA 1
44 3 4-165-4-F EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
44.3 4-165-4-F EA 1
45 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - - - -
45.1 4-26-1-F EA 1
45.2 4-26-1-F EA 1
45.3 4-47-1-F EA 1
45.4 4-47-2-F EA 1
45.5 4-82-0-F EA 1
45.6 4-82-1-F EA 1
45.7 4-82-2-F EA 1
45.8 4-96-0-F EA 1
45.9 4-103-0-F EA 1
45.10 4-165-2-F EA 1
45.11 4-207-0-F EA 1
45.12 4-207-1-F EA 1
45.13 4-207-2-F EA 1
46 Tanks (MP Fuel), Preserve "100%" - - - -
46.1 2-228-1-F EA 1
46.2 4-26-1-F EA 1
46.3 4-26-1-F EA 1
46.4 4-47-1-F EA 1
46.5 4-47-2-F EA 1
46.6 4-82-0-F EA 1
46.7 4-82-1-F EA 1
46.8 4-82-2-F EA 1
46.9 4-96-0-F EA 1
46.13 4-165-4-F EA 1
46.14 4-207-0-F EA 1
46.15 4-207-1-F EA 1
46.16 4-207-2-F EA 1
47 Tanks (Hydraulic Oil), Clean and Inspect EA 1
48 Tanks (Aviation Fuel Service), Clean and Inspect - - - -
48.1 3-190-1-J EA 1
48.2 3-190-2-J EA 1
49 Tanks (Aviation Fuel Service), Preserve"100%" - - - -
49.1 3-190-1-J EA 1
49.2 3-190-2-J EA 1
50 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect - - - -
50.1 4-186-1-J EA 1
50.2 4-186-2-J EA 1
50.3 4-190-1-J EA 1
50.4 4-190-2-J EA 1
51 Tanks (Aviation Fuel Stowage and Overflow), Preserve "100%" - - - -
51.1 4-186-1-J EA 1
51.2 4-186-2-J EA 1
51.3 4-190-1-J EA 1
51.4 4-190-2-J EA 1
52 Insulation, Ventillation Ducting, Renew 10 SQ-FT 1
53 Insulation, Bulkhead / Overhead, Renew 10 SQ-FT 1
54 Insulation, MDE Exhaust Blankets, Fabricate and Install 10 SQ-FT 1
A-O Composite Labor Rate HOUR 1
B-D GFP Report NSP EA 1 NSP
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Option Items
270 DS IDIQ Est R4_BLANK 110410 Issued
(FY'15)
1 Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1
2 Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 1
3 Chain Lockers, Inspect JOB 1
4 Sea Water Piping, Renew - - - -
4.1 1"-2-3/4" O.D. 1 LF 1
4.2 3" - 4-3/4" O.D. 1 LF 1
4.3 5" - 7-3/4" O.D. 1 LF 1
4.4 8" - 10" O.D. 1 LF 1
5 Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1
6 Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1
7 Vent Ducts (Engine Room), Commercial Cleaning JOB 1
8 Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1
9 Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1
10 Chill Water Piping, Renew - - - -
10.1 1"-2-3/4" O.D. 1 LF 1
10.2 3" - 4-3/4" O.D. 1 LF 1
10.3 5" - 7-3/4" O.D. 1 LF 1
11 Feed/Jacket Water Piping, Renew - - - -
11.1 1"-2-3/4" O.D. 1 LF 1
11.2 3" - 4-3/4" O.D. 1 LF 1
11.3 5" - 7-3/4" O.D. 1 LF 1
12 Potable Water Piping, Renew - - - -
12.1 1"-2-3/4" O.D. 1 LF 1
SCHEDULE OF SUPPLIES & SERVICES (SOS&S)
270 DOCKSIDE AVAILABILITY IDIQ - 2015, YEAR 5
(6 Availabilities Projected for 2015)
US COAST GUARD WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS
270 DS IDIQ Est R4_BLANK 110410 Issued
12.2 3" - 4-3/4" O.D. 1 LF 1
12.3 5" - 7-3/4" O.D. 1 LF 1
13 Potable Water Pneumatic Tank, Clean and Inspect JOB 1
14 Fuel Piping, Renew - - - -
14.1 1"-2-3/4" O.D. 1 LF 1
14.2 3" - 4-3/4" O.D. 1 LF 1
14.3 5" - 7-3/4" O.D. 1 LF 1
15 Fin Stabilizers, General Maintenance JOB 1
16 Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1
17 Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1
18 Warping Capstan, Perform Level 2 Maintenance JOB 1
19 Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1
20 Helo Talon Grid, Inspect and Test JOB 1
21 Grey Water Holding Tanks, Clean and Inspect JOB 1
22 Sewage Collection and Holding Tanks, Clean and Inspect JOB 1
23 Work Item Deleted - Job 1 -
24 Grey Water Piping, Clean and Flush 10 LF 1
25 Sewage Piping, Renew - - - -
25.1 1"-2-3/4" O.D. 1 LF 1
25.2 3" - 4-3/4" O.D. 1 LF 1
25.3 5" - 7-3/4" O.D. 1 LF 1
26 Sewage Piping, Clean and Flush 10 LF 1
27 Tanks (Ballast), Preserve “100%” - - - -
27.1 Ballast, 3-B-0-W EA 1
27.5 Ballast, 4-103-2-W EA 1
27.6 Ballast,4-169-0-W EA 1
27.7 Ballast, 4-228-1-W EA 1
27.8 Ballast, 4-228-2-W EA 1
27.9 Ballast, 4-242-0-W EA 1
28 Tank (Dirty Oil and Waste), Preserve “100%” JOB 1
29 Tanks (Potable Water), Preserve “100%” - - - -
29.1 Potable Water, 4-78-1-W EA 1
29.1 Potable Water, 4-78-2-W EA 1
29.3 Potable Water, 4-94-1-W EA 1
30 Tanks (Sewage and Vacuum Collection), Preserve “100%” - -
30.1 Sewage Tank, 3-82-0-E EA 1
30.2 Vacuum Collection Tank, 2-82-0-E EA 1
31 Tanks (Grey Water Holding), Preserve “100% - - 1 -
31.1 Aft, 3-103-0-E EA 1
31.2 FWD, 3.82-0-E EA 1
31.3 Seal Water Tank EA 1
32 Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - -
32.1 Watertight Door, 12" x 18" EA 1
32.2 Watertight Door, 18" x 36" EA 1
32.3 Watertight Door, 33" x 66" EA 1
32.4 Scuttle, Round, 12" Dia. EA 1
32.5 Scuttle, Round, 14" Dia. EA 1
32.6 Scuttle, Round, 18" Dia. EA 1
32.7 Scuttle, Round, 21" Dia. EA 1
32.8 Scuttle, Round, 24" Dia. EA 1
33 Watertight Doors and Scuttles (External), Renew - - - -
33.1 Watertight Door, 12" x 18" EA 1
33 2 Watertight Door 18" x 36" EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
33.2 Watertight Door, 18" x 36" EA 1
33.4 Watertight Door, 33" x 66" EA 1
33.5 Scuttle, Round, 12" Dia. EA 1
33.6 Scuttle, Round, 14" Dia. EA 1
33.7 Scuttle, Round, 18" Dia. EA 1
33.8 Scuttle, Round, 21" Dia. EA 1
33.9 Scuttle, Round, 24" Dia. EA 1
34 Piping Insulation, Renew - - - -
34.1 For interior gas, steam, hot water (jacket water only), and oil piping systems: - - 1 -
34.2 3/4" - 2" O.D. pipe dia. 10 LF 1
34.3 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.4 4-1/4" - 6" O.D. pipe dia. 10 LF 1
34.5 For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems:
34.6 3/4" - 2" O.D. pipe dia. 10 LF 1
34.7 2-1/4" - 4" O.D. pipe dia. 10 LF 1
34.8 4-1/4" - 6" O.D. pipe dia. 10 LF 1
35 Compressed Air Receivers, Clean, Inspect, and Test JOB 1
36 Tanks (Ballast), Preserve, “Partial” - - - -
36.1 Ballast, 3-B-0-W EA 1
36.2 Ballast, 4-75-1-W EA 1
36.3 Ballast, 4-75-2-W EA 1
36.4 Ballast, 4-103-1-W EA 1
36.5 Ballast, 4-103-2-W EA 1
36.6 Ballast,4-169-0-W EA 1
36.7 Ballast, 4-228-1-W EA 1
38 Tanks (Potable Water), Preserve “Partial” - - - -
38.1 Potable Water, 4-78-1-W EA 1
38.2 Potable Water, 4-78-2-W EA 1
38.3 Potable Water, 4-94-1-W EA 1
39 Tanks (Sewage Holding), Preserve, “Partial” - - - -
39.1 Sewage Tank, 3-82-0-E EA 1
39.2 Vacuum Collection Tank, 2-82-0-E EA 1
40 Tanks (Grey Water Holding), Preserve, “Partial” - - - -
40.1 Aft, 3-103-0-E EA 1
40.2 FWD, 3.82-0-E EA 1
40.3 Seal Water Tank EA 1
41 Tanks (Ballast), Clean and Inspect - - - -
41.1 3-B-0-W EA 1
41.2 4-75-1-W EA 1
41.3 4-75-2-W EA 1
41.4 4-103-1-W EA 1
41.5 4-103-2-W EA 1
41.6 4-169-0-W EA 1
41.7 4-228-1-W EA 1
41.8 4-228-2-W EA 1
41.9 4-242-0-W EA 1
42 Tanks (Dirty Oil and Waste), Clean and Inspect - - - -
42.1 4-165-1-F EA 1
42.2 4-169-1-F EA 1
43 Tanks (Lube Oil), Clean and Inspect EA 1
44 Tanks (MP Fuel Service), Clean and Inspect - - - -
44.1 2-228-1-F EA 1
44.2 4-165-3-F EA 1
44 3 4-165-4-F EA 1
270 DS IDIQ Est R4_BLANK 110410 Issued
44.3 4-165-4-F EA 1
45 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - - - -
45.1 4-26-1-F EA 1
45.2 4-26-1-F EA 1
45.3 4-47-1-F EA 1
45.4 4-47-2-F EA 1
45.5 4-82-0-F EA 1
45.6 4-82-1-F EA 1
45.7 4-82-2-F EA 1
45.8 4-96-0-F EA 1
45.9 4-103-0-F EA 1
45.10 4-165-2-F EA 1
45.11 4-207-0-F EA 1
45.12 4-207-1-F EA 1
45.13 4-207-2-F EA 1
46 Tanks (MP Fuel), Preserve "100%" - - - -
46.1 2-228-1-F EA 1
46.2 4-26-1-F EA 1
46.3 4-26-1-F EA 1
46.4 4-47-1-F EA 1
46.5 4-47-2-F EA 1
46.6 4-82-0-F EA 1
46.7 4-82-1-F EA 1
46.8 4-82-2-F EA 1
46.9 4-96-0-F EA 1
46.13 4-165-4-F EA 1
46.14 4-207-0-F EA 1
46.15 4-207-1-F EA 1
46.16 4-207-2-F EA 1
47 Tanks (Hydraulic Oil), Clean and Inspect EA 1
48 Tanks (Aviation Fuel Service), Clean and Inspect - - - -
48.1 3-190-1-J EA 1
48.2 3-190-2-J EA 1
49 Tanks (Aviation Fuel Service), Preserve"100%" - - - -
49.1 3-190-1-J EA 1
49.2 3-190-2-J EA 1
50 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect - - - -
50.1 4-186-1-J EA 1
50.2 4-186-2-J EA 1
50.3 4-190-1-J EA 1
50.4 4-190-2-J EA 1
51 Tanks (Aviation Fuel Stowage and Overflow), Preserve "100%" - - - -
51.1 4-186-1-J EA 1
51.2 4-186-2-J EA 1
51.3 4-190-1-J EA 1
51.4 4-190-2-J EA 1
52 Insulation, Ventillation Ducting, Renew 10 SQ-FT 1
53 Insulation, Bulkhead / Overhead, Renew 10 SQ-FT 1
54 Insulation, MDE Exhaust Blankets, Fabricate and Install 10 SQ-FT 1
A-O Composite Labor Rate HOUR 1
B-D GFP Report NSP EA 1 NSP
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Option Items
270 DS IDIQ Est R4_BLANK 110410 Issued
| 270 DS IDIQ Est R4_BLANK 110410 Issued Summary.pdf |
| Summary |
| 270 DS IDIQ Est R4_BLANK 110410 Issued YR1 |
| YR 1 - BASE 2011 |
| 270 DS IDIQ Est R4_BLANK 110410 Issued YR2 |
| YR 2 - 2012 |
| 270 DS IDIQ Est R4_BLANK 110410 Issued YR3 |
| YR 3 - 2013 |
| 270 DS IDIQ Est R4_BLANK 110410 Issued YR4 |
| YR 4 - 2014 |
| 270 DS IDIQ Est R4_BLANK 110410 Issued YR5 |
| YR 5 - 2015 |
File details come from the government source that posted it. Updated .