270 DS IDIQ Est R3_Blank 102110.pdf

PDF 87 KB Posted

Attached to
WMEC 270 "A&B CLASS" MEDIUM ENDURANCE CUTTERS DOCKSIDE REPAIRS
Solicitation number
HSCG80-10-R-P45GK4
Issued by

About this file

270 A B CLASS (WMEC) DOCKSIDE SCHEDULE OF SUPPLIES AND SERVICES PRICING SHEET REV. 3

View the file

Other files

File Type Posted
AMEND A0009 PAGE 2.doc DOC document
270 DS IDIQ SPEC R4 111910 Issued.pdf PDF
Amend A0009.pdf PDF
270 DS IDIQ Est R5_BLANK 111910 Issued.pdf PDF
Amend A0008.pdf PDF
270 DS IDIQ Est R4_Blank 110410 Issued.pdf PDF
Amend A0007.pdf PDF
270 DS IDIQ SPEC R3 110410 Issued.pdf PDF
Amend A0006.pdf PDF
270 DS IDIQ Est R3_Blank 102110.pdf PDF
Amend A0005.pdf PDF
Amend A0004.pdf PDF
AMEND A0003 PAGE 2.doc DOC document
270 IDIQ DS CUTTER CONTACTS.pdf PDF
270 DS IDIQ SPEC R2 092410 —
Amend A0003.pdf PDF
SOSS.pdf PDF
AMEND 0002.pdf PDF
AMEND A0001.pdf PDF
HSCG80-10-R-P45GK4 SOLICITATION.doc DOC document
SF33.pdf PDF
270 DS IDIQ SPEC R1 Issue TEF 072910.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple files are bound together in this PDF Package.

Adobe recommends using Adobe Reader or Adobe Acrobat version 8 or later to work with documents contained within a PDF Package. By updating to the latest version, you’ll enjoy the following benefits:

• Efficient, integrated PDF viewing

• Easy printing

• Quick searches

Don’t have the latest version of Adobe Reader?

Click here to download the latest version of Adobe Reader

If you already have Adobe Reader 8, click a file in this PDF Package to view it.

http://www.adobe.com/products/acrobat/readstep2.html

ITEM DESCRIPTION UNIT PRICE UNIT QTY

BASE YEAR

EXTENDED PRICE

(FY'11)

1-O Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 25

2-O Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 40

3-D Chain Lockers, Inspect JOB 4

4-O Sea Water Piping, Renew 1 LF 1

5-D Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 4

6-D Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 4

7-D Vent Ducts (Engine Room), Commercial Cleaning JOB 4

8-D Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 4

9-D Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 4

10-O Chill Water Piping, Renew 1 LF 16

11-O Feed/Jacket Water Piping, Renew 1 LF 16

12-O Potable Water Piping, Renew 1 LF 16

13-D Potable Water Pneumatic Tank, Clean and Inspect JOB 4

14-O Fuel Piping, Renew 1 LF 4

15-D Fin Stabilizers, General Maintenance JOB 4

SCHEDULE OF SUPPLIES & SERVICES (SOS&S)

270 DOCKSIDE AVAILABILITY IDIQ - 2011, BASE YEAR

(4 Availabilities Projected for 2011)

16-D Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 4

17-D Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 4

18-D Warping Capstan, Perform Level 2 Maintenance JOB 4

19-D Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 4

20-D Helo Talon Grid, Inspect and Test JOB 4

21-D Grey Water Holding Tanks, Clean and Inspect JOB 4

22-D Sewage Collection and Holding Tanks, Clean and Inspect JOB 4

23-O Work Item Deleted - Job - -

24-D Grey Water Piping, Clean and Flush 10 LF 4

25-O Sewage Piping, Renew 1 LF 4

26-D Sewage Piping, Clean and Flush 10 LF 4

27-O Tanks (Ballast), Preserve “100%” - - - -

27-O Ballast, 3-B-0-W EA 1

27-O Ballast, 4-75-1-W EA 1

27-O Ballast, 4-75-2-W EA 1

27-O Ballast, 4-103-1-W EA 1

27-O Ballast, 4-103-2-W EA 1

270 DS IDIQ Est R3_BLANK 10211013

27-O Ballast,4-169-0-W EA 1

27-O Ballast, 4-228-1-W EA 1

27-O Ballast, 4-228-2-W EA 1

27-O Ballast, 4-242-0-W EA 1

28-O Tank (Dirty Oil and Waste), Preserve “100%” JOB 1

29-O Tanks (Potable Water), Preserve “100%” - - - -

29-O Potable Water, 4-78-1-W EA 1

29-O Potable Water, 4-78-2-W EA 1

29-O Potable Water, 4-94-1-W EA 1

30-O Tanks (Sewage and Vacuum Collection), Preserve “100%” - -

30-O Sewage Tank, 3-82-0-E EA 1

30-O Vacuum Collection Tank, 2-82-0-E EA 1

31-O Tanks (Grey Water Holding), Preserve “100% - - - -

31-O Aft, 3-103-0-E EA 1

31-O FWD, 3.82-0-E EA 1

Seal Water Tank EA 1

32-O Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - -

Watertight Door, 12" x 18" EA 1

Watertight Door, 18" x 36" EA 1

Watertight Door, 33" x 66" EA 1

Scuttle, Round, 12" Dia. EA 1Scuttle, Round, 12 Dia. EA 1

Scuttle, Round, 14" Dia. EA 1

Scuttle, Round, 18" Dia. EA 1

Scuttle, Round, 21" Dia. EA 1

Scuttle, Round, 24" Dia. EA 1

33-O Watertight Doors and Scuttles (External), Renew - - - -

Scuttle, Round, 12" Dia. EA 1

34-O Piping Insulation, Renew - - - -

34-O For interior gas, steam, hot water (jacket water only), and oil piping systems: - - - -

34-O 3/4" - 2" O.D. pipe dia. 10 LF 1

270 DS IDIQ Est R3_BLANK 10211023

34-O 2-1/4" - 4" O.D. pipe dia. 10 LF 1

34-O 4-1/4" - 6" O.D. pipe dia. 10 LF 1

34-O For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems: - - - -

35-D Compressed Air Receivers, Clean, Inspect, and Test JOB 4

36-O Tanks (Ballast), Preserve, “Partial” - - - -

36-O Ballast, 3-B-0-W EA 4

36-O Ballast, 4-75-1-W EA 4

36-O Ballast, 4-75-2-W EA 4

36-O Ballast, 4-103-1-W EA 4

36-O Ballast, 4-103-2-W EA 4

36-O Ballast,4-169-0-W EA 4

36-O Ballast, 4-228-1-W EA 4

36-O Ballast, 4-228-2-W EA 4

36-O Ballast, 4-242-0-W EA 4

37-O Tank (Dirty Oil and Waste), Preserve, “Partial” Job 4

38-O Tanks (Potable Water), Preserve “Partial” - - - -

38-O Potable Water, 4-78-1-W EA 4

38 O P t bl W t 4 78 2 W EA 438-O Potable Water, 4-78-2-W EA 4

38-O Potable Water, 4-94-1-W EA 4

39-O Tanks (Sewage Holding), Preserve, “Partial” - - - -

39-O Sewage Tank, 3-82-0-E EA 4

39-O Vacuum Collection Tank, 2-82-0-E EA 4

40-O Tanks (Grey Water Holding), Preserve, “Partial” - - - -

40-O Aft, 3-103-0-E EA 4

40-O FWD, 3.82-0-E EA 4

40-O Seal Water Tank EA 4

A-O Composite Labor Rate HOUR

B-D GFP Report NSP EA 4 NSP

Total Price of Definite Items Total Price of Option Items Total Price of Definite and Option Items

270 DS IDIQ Est R3_BLANK 10211033

YR 1 - BASE 2011

ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE

(FY'12)

1-O Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 12

2-O Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 20

3-D Chain Lockers, Inspect JOB 2

5-D Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 2

6-D Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 2

7-D Vent Ducts (Engine Room), Commercial Cleaning JOB 2

8-D Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 2

9-D Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 2

10-O Chill Water Piping, Renew 1 LF 8

11-O Feed/Jacket Water Piping, Renew 1 LF 8

12-O Potable Water Piping, Renew 1 LF 8

13-D Potable Water Pneumatic Tank, Clean and Inspect JOB 2

14-O Fuel Piping, Renew 1 LF 2

15 D Fi St bili G l M i t JOB 2

270 DOCKSIDE AVAILABILITY IDIQ - 2012, YEAR 2

(2 Availabilities Projected for 2012)

15-D Fin Stabilizers, General Maintenance JOB 2

16-D Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 2

17-D Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 2

18-D Warping Capstan, Perform Level 2 Maintenance JOB 2

19-D Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 2

20-D Helo Talon Grid, Inspect and Test JOB 2

21-D Grey Water Holding Tanks, Clean and Inspect JOB 2

22-D Sewage Collection and Holding Tanks, Clean and Inspect JOB 2

24-D Grey Water Piping, Clean and Flush 10 LF 2

25-O Sewage Piping, Renew 1 LF 2

26-D Sewage Piping, Clean and Flush 10 LF 4

27-O Tanks (Ballast), Preserve “100%” - -

29-O Tanks (Potable Water), Preserve “100%” - -

31-O Tanks (Grey Water Holding), Preserve “100% - -

32-O Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - -

33-O Watertight Doors and Scuttles (External), Renew - - -

34-O For interior refrigerant (LP side only), hot water, cold water, and chill water piping systems: - - - -

35-D Compressed Air Receivers, Clean, Inspect, and Test JOB 2

36-O Tanks (Ballast), Preserve, “Partial” - -

36-O Ballast, 3-B-0-W EA 2

36-O Ballast, 4-75-1-W EA 2

36-O Ballast, 4-75-2-W EA 2

36-O Ballast, 4-103-1-W EA 2

36-O Ballast, 4-103-2-W EA 2

36-O Ballast,4-169-0-W EA 2

36-O Ballast, 4-228-1-W EA 2

36-O Ballast, 4-228-2-W EA 2

36-O Ballast, 4-242-0-W EA 2

37-O Tank (Dirty Oil and Waste), Preserve, “Partial” Job 2

38-O Tanks (Potable Water), Preserve “Partial” - -

38-O Potable Water, 4-78-1-W EA 2

38-O Potable Water, 4-78-2-W EA 2

38-O Potable Water, 4-94-1-W EA 2

39-O Tanks (Sewage Holding), Preserve, “Partial” - -

39-O Sewage Tank, 3-82-0-E EA 2

39-O Vacuum Collection Tank, 2-82-0-E EA 2

40-O Tanks (Grey Water Holding), Preserve, “Partial” - -

40-O Aft, 3-103-0-E EA 2

40-O FWD, 3.82-0-E EA 2

40-O Seal Water Tank EA 2

B-D GFP Report NSP EA 2 NSP

YR 2 - 2012

(FY'13)

1-O Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 1

2-O Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 8

3-D Chain Lockers, Inspect JOB 1

4-O Sea Water Piping, Renew 1 LF 3

5-D Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 1

6-D Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 1

7-D Vent Ducts (Engine Room), Commercial Cleaning JOB 1

8-D Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 1

9-D Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 1

10-O Chill Water Piping, Renew 1 LF 1

11-O Feed/Jacket Water Piping, Renew 1 LF 1

12-O Potable Water Piping, Renew 1 LF 1

13-D Potable Water Pneumatic Tank, Clean and Inspect JOB 1

14-O Fuel Piping, Renew 1 LF 1

15 D Fi St bili G l M i t JOB 1

270 DOCKSIDE AVAILABILITY IDIQ - 2013, YEAR 3

(1 Availabilities Projected for 2013)

15-D Fin Stabilizers, General Maintenance JOB 1

16-D Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 1

17-D Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 1

18-D Warping Capstan, Perform Level 2 Maintenance JOB 1

19-D Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 1

20-D Helo Talon Grid, Inspect and Test JOB 1

21-D Grey Water Holding Tanks, Clean and Inspect JOB 1

22-D Sewage Collection and Holding Tanks, Clean and Inspect JOB 1

24-D Grey Water Piping, Clean and Flush 10 LF 1

25-O Sewage Piping, Renew 1 LF 1

26-D Sewage Piping, Clean and Flush 10 LF 1

32-O Watertight Doors and Scuttles (Internal DC Deck and Below), Renew - - - -

35-D Compressed Air Receivers, Clean, Inspect, and Test JOB 1

36-O Ballast, 3-B-0-W EA 1

36-O Ballast, 4-75-1-W EA 1

36-O Ballast, 4-75-2-W EA 1

36-O Ballast, 4-103-1-W EA 1

36-O Ballast, 4-103-2-W EA 1

36-O Ballast,4-169-0-W EA 1

36-O Ballast, 4-228-1-W EA 1

36-O Ballast, 4-228-2-W EA 1

36-O Ballast, 4-242-0-W EA 1

37-O Tank (Dirty Oil and Waste), Preserve, “Partial” Job 1

38-O Potable Water, 4-78-1-W EA 1

38-O Potable Water, 4-78-2-W EA 1

38-O Potable Water, 4-94-1-W EA 1

39-O Sewage Tank, 3-82-0-E EA 1

39-O Vacuum Collection Tank, 2-82-0-E EA 1

40-O Aft, 3-103-0-E EA 1

40-O FWD, 3.82-0-E EA 1

40-O Seal Water Tank EA 1

B-D GFP Report NSP EA 1 NSP

YR 3 - 2013

(FY'14)

1-O Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 20

2-O Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 30

3-D Chain Lockers, Inspect JOB 3

5-D Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 3

6-D Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 3

7-D Vent Ducts (Engine Room), Commercial Cleaning JOB 3

8-D Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 3

9-D Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 3

10-O Chill Water Piping, Renew 1 LF 12

11-O Feed/Jacket Water Piping, Renew 1 LF 12

12-O Potable Water Piping, Renew 1 LF 12

13-D Potable Water Pneumatic Tank, Clean and Inspect JOB 3

14-O Fuel Piping, Renew 1 LF 3

15 D Fi St bili G l M i t JOB 3

270 DOCKSIDE AVAILABILITY IDIQ - 2014, YEAR 4

(3 Availabilities Projected for 2014)

15-D Fin Stabilizers, General Maintenance JOB 3

16-D Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 3

17-D Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 3

18-D Warping Capstan, Perform Level 2 Maintenance JOB 3

19-D Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 3

20-D Helo Talon Grid, Inspect and Test JOB 3

21-D Grey Water Holding Tanks, Clean and Inspect JOB 3

22-D Sewage Collection and Holding Tanks, Clean and Inspect JOB 3

24-D Grey Water Piping, Clean and Flush 10 LF 3

25-O Sewage Piping, Renew 1 LF 3

26-D Sewage Piping, Clean and Flush 10 LF 3

35-D Compressed Air Receivers, Clean, Inspect, and Test JOB 3

36-O Ballast, 3-B-0-W EA 3

36-O Ballast, 4-75-1-W EA 3

36-O Ballast, 4-75-2-W EA 3

36-O Ballast, 4-103-1-W EA 3

36-O Ballast, 4-103-2-W EA 3

36-O Ballast,4-169-0-W EA 3

36-O Ballast, 4-228-1-W EA 3

36-O Ballast, 4-228-2-W EA 3

36-O Ballast, 4-242-0-W EA 3

37-O Tank (Dirty Oil and Waste), Preserve, “Partial” Job 3

38-O Potable Water, 4-78-1-W EA 3

38-O Potable Water, 4-78-2-W EA 3

38-O Potable Water, 4-94-1-W EA 3

39-O Sewage Tank, 3-82-0-E EA 3

39-O Vacuum Collection Tank, 2-82-0-E EA 3

40-O Aft, 3-103-0-E EA 3

40-O FWD, 3.82-0-E EA 3

40-O Seal Water Tank EA 3

B-D GFP Report NSP EA 3 NSP

YR 4 - 2014

(FY'15)

1-O Hull and Structural Plating – ¼” to ½” Aluminum Plate, Renew 4 SQ FT 30

2-O Hull and Structural Plating – ¼” to ½” Steel Plate, Renew 4 SQ FT 60

3-D Chain Lockers, Inspect JOB 6

5-D Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean JOB 6

6-D Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean JOB 6

7-D Vent Ducts (Engine Room), Commercial Cleaning JOB 6

8-D Vent Ducts (Galley and Pantry Room - All), Commercial Cleaning JOB 6

9-D Vent Ducts (Laundry Exhaust), Commercial Cleaning JOB 6

10-O Chill Water Piping, Renew 1 LF 18

11-O Feed/Jacket Water Piping, Renew 1 LF 18

12-O Potable Water Piping, Renew 1 LF 18

13-D Potable Water Pneumatic Tank, Clean and Inspect JOB 6

14-O Fuel Piping, Renew 1 LF 6

15 D Fi St bili G l M i t JOB 6

270 DOCKSIDE AVAILABILITY IDIQ - 2015, YEAR 5

(6 Availabilities Projected for 2015)

15-D Fin Stabilizers, General Maintenance JOB 6

16-D Commissary Hoist Assembly, Perform Level 2 Maintenance JOB 6

17-D Anchor Windlass Assembly, Perform Level 2 Maintenance JOB 6

18-D Warping Capstan, Perform Level 2 Maintenance JOB 6

19-D Articulating Crane, Hydraulic, Perform Level 2 Maintenance JOB 6

20-D Helo Talon Grid, Inspect and Test JOB 6

21-D Grey Water Holding Tanks, Clean and Inspect JOB 6

22-D Sewage Collection and Holding Tanks, Clean and Inspect JOB 6

24-D Grey Water Piping, Clean and Flush 10 LF 6

25-O Sewage Piping, Renew 1 LF 6

26-D Sewage Piping, Clean and Flush 10 LF 6

35-D Compressed Air Receivers, Clean, Inspect, and Test JOB 6

36-O Ballast, 3-B-0-W EA 6

36-O Ballast, 4-75-1-W EA 6

36-O Ballast, 4-75-2-W EA 6

36-O Ballast, 4-103-1-W EA 6

36-O Ballast, 4-103-2-W EA 6

36-O Ballast,4-169-0-W EA 6

36-O Ballast, 4-228-1-W EA 6

36-O Ballast, 4-228-2-W EA 6

36-O Ballast, 4-242-0-W EA 6

37-O Tank (Dirty Oil and Waste), Preserve, “Partial” Job 6

38-O Potable Water, 4-78-1-W EA 6

38-O Potable Water, 4-78-2-W EA 6

38-O Potable Water, 4-94-1-W EA 6

39-O Sewage Tank, 3-82-0-E EA 6

39-O Vacuum Collection Tank, 2-82-0-E EA 6

40-O Aft, 3-103-0-E EA 6

40-O FWD, 3.82-0-E EA 6

40-O Seal Water Tank EA 6

B-D GFP Report NSP EA 6 NSP