AMENDMENT NUMBER A00005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00004.pdf | ||
| A00003.pdf | ||
| A00002.pdf | ||
| 327-WIX_3801_115_1_-_-.zip | ZIP file | |
| A00001.pdf | ||
| GFI_DRAWINGS.zip | ZIP file | |
| OMBUDSMAN.doc | DOC document | |
| WI_15_Propulsion_System_SOW_(FINAL).pdf | ||
| WI_15_Propulsion_System_Spec_(FINAL).pdf | ||
| FINAL_SOLICITATION_PACKAGE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
A00005 12/7/2015
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USCG Surface Forces Logistics Center
CPD3/Small Boat Product Line
Mail Stop 26, Bldg. 31, 2 nd
Floor
2401 Hawkins Point Road
Baltimore, MD 21226-5000
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.
HSCG40-16-R-60023
X 9B. DATE (SEE ITEM 11)
10/13/2015
10A. MODIFICATION OF CONTRACT/ORDER
NO. ?
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Attached Page 2 of 2
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
KW
KELLY WYATT, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
12/7/2015 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Solicitation Number HSCG40-16-R-60023
Amendment Number A00005
14A. This Amendment is issued to answer the following questions submitted in response to this Solicitation.
QUESTION: SOW Paragraph 3.2.3.4 describes the requirements for preparing the Work Specifications and states “All tasking required to be performed by the installing activity [ostensibly the Coast Guard Yard] shall be captured in the specification.” Paragraph 3.2.3.4.3 describes the requirements for Dock and Sea Trials that the
Contractor must capture in the work specification. It defines three types of trials:
* 3.2.3.4.3.1.2 – Dock Trial
* 3.2.3.4.3.1.3 – Sea Trial
* 3.2.3.4.3.1.4 – Open Water and Cavitation Tests for the propeller design
Propeller open water and cavitation tests are conducted in tanks using model propellers. They are not commonly conducted due to cost and because propeller design has advanced significantly in recent years.
However, if done, they would occur before the propeller is manufactured to confirm its hydrodynamic performance, and would not be done by an installing activity. There is no requirement for these tests in the
Technical Specification Section 245 for the propeller, including in the section for the factory acceptance testing, where it would be expected to be cited if intended to be conducted by the Contractor. Please clarify the
Contractor’s responsibility with regard to these tests.
ANSWER: Offerors shall include in the proposal the propeller verification test using manufacturer's commercial standards to prove the hydrodynamic performance. This is only required if the submitter is opting to replace the propeller as part of the package.
14B. The due date for receipt of quotations remains as 2:00 PM EST on December 15, 2015.
14C. Offeror’s are required to sign and return one copy of the Amendment with their quotation. Failure to return a signed copy may render the quotation unacceptable and the quotation may be eliminated from further consideration.
(END OF AMENDMENT NUMBER A00005)