WHS - ACQUISITION DIRECTORATE

1225 S CLARK STREET, SUITE 1202

ARLINGTON VA 22202-4371

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

HQ0347

(No Collect Calls)

6.5million

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

SEE ITEM 9

HQ0034-12-R-0002 22-Dec-2011

b. TELEPHONE NUMBER

703.545.1580

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 08 Feb 2012

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

04-Jun-2012

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

AECOM/PARSONS, A JOINT VENTURE

MARY C. KRISTMANN

3101 WILSON BLVD

ARLINGTON VA 22201-4443

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

4VBC2

TEL. 703.682.6109

HQ0034

SIZE STD:

9. ISSUED BY

4VBC2

FACILITY

CODE

17a.CONTRACTOR/

DFAS INDIANAPOLIS

8899 E. 56TH STREET

INDIANAPOLIS IN 46249-1510

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE HQ0050 16. ADMINISTERED BY

WHS/FSD/ECM/CONSTRUCTION MGMT DIVISION

GREGORY PARKER

100 BOUNDARY CHANNEL DRIVE

ARLINGTON VA 22202-3712

HQ003412D0007P00009 04-Jun-2012

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MARCUS FIELDS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

541611

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

Michael Schuman / Contracting Officer

TEL: 703-545-1574 EMAIL: michael.schuman@whs.mil

$33,390,919.62 EST

0 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE SCHEDULE

.OFFER DATED 26-Jan-2012 YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE HQ0034-12-D-0007

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

HQ0034-12-D-0007

P00009

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 12 Months $23,500.00 $282,000.00 CMTSS Program Principal

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity= 12months x 1 personnel -

MAX NET AMT $282,000.00

CEILING PRICE $0.00

UNIT UNIT PRICE MAX AMOUNT

0002 12 Months $14,570.00 $174,840.00 Senior Analyst

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity= 12 months x1 personnel -

MAX NET AMT $174,840.00

UNIT UNIT PRICE MAX AMOUNT

0003 48 Months $12,690.00 $609,120.00 Project Manager

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x 4 personnel -

MAX NET AMT $609,120.00

UNIT UNIT PRICE MAX AMOUNT

0004 36 Months $10,497.00 $377,892.00 Estimators

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x 3 personnel -

MAX NET AMT $377,892.00

UNIT UNIT PRICE MAX AMOUNT

0005 84 Months $10,716.00 $900,144.00 Quality Assurance Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x 7 personnel -

MAX NET AMT $900,144.00

UNIT UNIT PRICE MAX AMOUNT

0006 12 Months $7,833.00 $93,996.00 Asst Quality Assurance Inspector

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x 1 personnel -

MAX NET AMT $93,996.00

UNIT UNIT PRICE MAX AMOUNT

0007 36 Months $6,110.00 $219,960.00 Office Engineers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $219,960.00

UNIT UNIT PRICE MAX AMOUNT

0008 24 Months $9,870.00 $236,880.00 Schedulers

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x 2 personnel -

MAX NET AMT $236,880.00

UNIT UNIT PRICE MAX AMOUNT

0009 84 Months $11,907.00 $1,000,188.00 Construction Managers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $1,000,188.00

UNIT UNIT PRICE MAX AMOUNT

0010 72 Months $9,243.00 $665,496.00 Design Coordinators

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x 6 personnel -

MAX NET AMT $665,496.00

UNIT UNIT PRICE MAX AMOUNT

0011 12 Months $7,520.00 $90,240.00 Asst Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $90,240.00

UNIT UNIT PRICE MAX AMOUNT

0012 12 Months $7,520.00 $90,240.00 Transitions Specialist

FFP-LOE

The contractor shall perform all construction management technical support

UNIT UNIT PRICE MAX AMOUNT

0013 48 Months $13,724.00 $658,752.00 Safety Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $658,752.00

UNIT UNIT PRICE MAX AMOUNT

0014 12 Months $12,690.00 $152,280.00 Commissioning Specialist

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $152,280.00

UNIT UNIT PRICE MAX AMOUNT

1001 12 Months $23,500.00 $282,000.00

EXERCISED

OPTION

CMTSS Program Principal

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12months x 1 personnel -

MAX NET AMT $282,000.00

UNIT UNIT PRICE MAX AMOUNT

1002 12 Months $14,570.00 $174,840.00

EXERCISED

OPTION

Senior Analyst

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity = 12 months x1 personnel -

MAX NET AMT $174,840.00

UNIT UNIT PRICE MAX AMOUNT

1003 48 Months $12,690.00 $609,120.00

EXERCISED

OPTION

Project Manager

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $609,120.00

UNIT UNIT PRICE MAX AMOUNT

1004 36 Months $10,497.00 $377,892.00

EXERCISED

OPTION

Estimators

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $377,892.00

UNIT UNIT PRICE MAX AMOUNT

1005 84 Months $10,716.00 $900,144.00

EXERCISED

OPTION

Quality Assurance Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $900,144.00

UNIT UNIT PRICE MAX AMOUNT

1006 12 Months $7,833.00 $93,996.00

EXERCISED

OPTION

Asst Quality Assurance Inspector

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $93,996.00

UNIT UNIT PRICE MAX AMOUNT

1007 36 Months $6,110.00 $219,960.00

EXERCISED

OPTION

Office Engineers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $219,960.00

UNIT UNIT PRICE MAX AMOUNT

1008 24 Months $9,870.00 $236,880.00

EXERCISED

OPTION

Schedulers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $236,880.00

UNIT UNIT PRICE MAX AMOUNT

1009 84 Months $11,907.00 $1,000,188.00

EXERCISED

OPTION

Construction Managers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $1,000,188.00

UNIT UNIT PRICE MAX AMOUNT

1010 72 Months $9,243.00 $665,496.00

EXERCISED

OPTION

Design Coordinators

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $665,496.00

UNIT UNIT PRICE MAX AMOUNT

1011 12 Months $7,520.00 $90,240.00

EXERCISED

OPTION

Asst Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support

UNIT UNIT PRICE MAX AMOUNT

1012 12 Months $7,520.00 $90,240.00

EXERCISED

OPTION

Transitions Specialist

FFP-LOE

The contractor shall perform all construction management technical support

UNIT UNIT PRICE MAX AMOUNT

1013 48 Months $13,724.00 $658,752.00

EXERCISED

OPTION

Safety Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $658,752.00

UNIT UNIT PRICE MAX AMOUNT

1014 12 Months $12,690.00 $152,280.00

EXERCISED

OPTION

Commissioning Specialist

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $152,280.00

UNIT UNIT PRICE MAX AMOUNT

1015 12 Months $19,500.00 $234,000.00

EXERCISED

OPTION

SENIOR CONSULTANT

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

- Quantity=12 months x 1 personnel

PURCHASE REQUEST NUMBER: MMF062820130700

MAX NET AMT $234,000.00

UNIT UNIT PRICE MAX AMOUNT

1016 12 Months $16,500.00 $198,000.00

EXERCISED

OPTION

FUNCTIONAL MANAGER

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $198,000.00

UNIT UNIT PRICE MAX AMOUNT

2001 12 Months $23,970.00 $287,640.00

EXERCISED

OPTION

CMTSS Program Principal

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $287,640.00

UNIT UNIT PRICE MAX AMOUNT

2002 12 Months $14,861.00 $178,332.00

EXERCISED

OPTION

Senior Analyst

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity= 12 months x 1 personnel -

MAX NET AMT $178,332.00

UNIT UNIT PRICE MAX AMOUNT

2003 48 Months $12,944.00 $621,312.00

EXERCISED

OPTION

Project Manager

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $621,312.00

UNIT UNIT PRICE MAX AMOUNT

2004 36 Months $10,707.00 $385,452.00

EXERCISED

OPTION

Estimators

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $385,452.00

UNIT UNIT PRICE MAX AMOUNT

2005 84 Months $10,930.00 $918,120.00

EXERCISED

OPTION

Quality Assurance Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $918,120.00

UNIT UNIT PRICE MAX AMOUNT

2006 12 Months $7,990.00 $95,880.00

EXERCISED

OPTION

Asst Quality Assurance Inspector

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $95,880.00

UNIT UNIT PRICE MAX AMOUNT

2007 36 Months $6,232.00 $224,352.00

EXERCISED

OPTION

Office Engineers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $224,352.00

UNIT UNIT PRICE MAX AMOUNT

2008 24 Months $10,067.00 $241,608.00

EXERCISED

OPTION

Schedulers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $241,608.00

UNIT UNIT PRICE MAX AMOUNT

2009 84 Months $12,145.00 $1,020,180.00

EXERCISED

OPTION

Construction Managers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $1,020,180.00

UNIT UNIT PRICE MAX AMOUNT

2010 72 Months $9,428.00 $678,816.00

EXERCISED

OPTION

Design Coordinators

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $678,816.00

UNIT UNIT PRICE MAX AMOUNT

2011 12 Months $7,670.00 $92,040.00

EXERCISED

OPTION

Asst Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $92,040.00

UNIT UNIT PRICE MAX AMOUNT

2012 12 Months $7,670.00 $92,040.00

EXERCISED

OPTION

Transitions Specialist

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $92,040.00

UNIT UNIT PRICE MAX AMOUNT

2013 48 Months $13,998.00 $671,904.00

EXERCISED

OPTION

Safety Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $671,904.00

UNIT UNIT PRICE MAX AMOUNT

2014 12 Months $12,944.00 $155,328.00

EXERCISED

OPTION

Commissioning Specialist

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $155,328.00

UNIT UNIT PRICE MAX AMOUNT

2015 12 Months $19,890.00 $238,680.00

EXERCISED

OPTION

SENIOR CONSULTANT

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $238,680.00

UNIT UNIT PRICE MAX AMOUNT

2016 12 Months $16,830.00 $201,960.00

EXERCISED

OPTION

FUNCTIONAL MANAGER

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $201,960.00

UNIT UNIT PRICE MAX AMOUNT

3001 12 Months $24,449.00 $293,388.00

EXERCISED

OPTION

CMTSS Program Principal

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity= 12months x 1 personnel -

MAX NET AMT $293,388.00

UNIT UNIT PRICE MAX AMOUNT

3002 12 Months $15,159.00 $181,908.00

EXERCISED

OPTION

Senior Analyst

FFP-LOE

The contractor shall perform all construction management technical support

- Quantity= 12 months x1 personnel -

MAX NET AMT $181,908.00

UNIT UNIT PRICE MAX AMOUNT

3003 48 Months $13,203.00 $633,744.00

EXERCISED

OPTION

Project Manager

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $633,744.00

UNIT UNIT PRICE MAX AMOUNT

3004 36 Months $10,921.00 $393,156.00

EXERCISED

OPTION

Estimators

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $393,156.00

UNIT UNIT PRICE MAX AMOUNT

3005 84 Months $11,149.00 $936,516.00

EXERCISED

OPTION

Quality Assurance Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $936,516.00

UNIT UNIT PRICE MAX AMOUNT

3006 12 Months $8,150.00 $97,800.00

EXERCISED

OPTION

Asst Quality Assurance Inspector

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $97,800.00

UNIT UNIT PRICE MAX AMOUNT

3007 36 Months $6,357.00 $228,852.00

EXERCISED

OPTION

Office Engineers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $228,852.00

UNIT UNIT PRICE MAX AMOUNT

3008 24 Months $10,269.00 $246,456.00

EXERCISED

OPTION

Schedulers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $246,456.00

UNIT UNIT PRICE MAX AMOUNT

3009 84 Months $12,388.00 $1,040,592.00

EXERCISED

OPTION

Construction Managers

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $1,040,592.00

UNIT UNIT PRICE MAX AMOUNT

3010 72 Months $9,617.00 $692,424.00

EXERCISED

OPTION

Design Coordinators

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $692,424.00

UNIT UNIT PRICE MAX AMOUNT

3011 12 Months $7,824.00 $93,888.00

EXERCISED

OPTION

Asst Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $93,888.00

UNIT UNIT PRICE MAX AMOUNT

3012 12 Months $7,824.00 $93,888.00

EXERCISED

OPTION

Transitions Specialist

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $93,888.00

UNIT UNIT PRICE MAX AMOUNT

3013 48 Months $14,278.00 $685,344.00

EXERCISED

OPTION

Safety Inspectors

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $685,344.00

UNIT UNIT PRICE MAX AMOUNT

3014 12 Months $13,203.00 $158,436.00

EXERCISED

OPTION

Commissioning Specialist

FFP-LOE

The contractor shall perform all construction management technical support

MAX NET AMT $158,436.00

UNIT UNIT PRICE MAX AMOUNT

3015 12 Months $20,287.80 $243,453.60

EXERCISED

OPTION

SENIOR CONSULTANT

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $243,453.60

UNIT UNIT PRICE MAX AMOUNT

3016 12 Months $17,166.60 $205,999.20

EXERCISED

OPTION

FUNCTIONAL MANAGER

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $205,999.20

UNIT UNIT PRICE MAX AMOUNT

4001 12 Months $24,938.00 $299,256.00

EXERCISED

OPTION

CMTSS Program Principal

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 12months x 1 personnel -

PURCHASE REQUEST NUMBER: EL0415160959

MAX NET AMT $299,256.00

UNIT UNIT PRICE MAX AMOUNT

4002 12 Months $15,462.00 $185,544.00

EXERCISED

OPTION

Senior Analyst

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $185,544.00

UNIT UNIT PRICE MAX AMOUNT

4003 48 Months $13,467.00 $646,416.00

EXERCISED

OPTION

Project Manager

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $646,416.00

UNIT UNIT PRICE MAX AMOUNT

4004 36 Months $11,139.00 $401,004.00

EXERCISED

OPTION

Estimators

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $401,004.00

UNIT UNIT PRICE MAX AMOUNT

4005 84 Months $11,372.00 $955,248.00

EXERCISED

OPTION

Quality Assurance Inspectors

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $955,248.00

UNIT UNIT PRICE MAX AMOUNT

4006 12 Months $8,313.00 $99,756.00

EXERCISED

OPTION

Asst Quality Assurance Inspector

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $99,756.00

UNIT UNIT PRICE MAX AMOUNT

4007 36 Months $6,484.00 $233,424.00

EXERCISED

OPTION

Office Engineers

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $233,424.00

UNIT UNIT PRICE MAX AMOUNT

4008 24 Months $10,474.00 $251,376.00

EXERCISED

OPTION

Schedulers

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $251,376.00

UNIT UNIT PRICE MAX AMOUNT

4009 84 Months $12,635.00 $1,061,340.00

EXERCISED

OPTION

Construction Managers

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $1,061,340.00

UNIT UNIT PRICE MAX AMOUNT

4010 72 Months $9,809.00 $706,248.00

EXERCISED

OPTION

Design Coordinators

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $706,248.00

UNIT UNIT PRICE MAX AMOUNT

4011 12 Months $7,980.00 $95,760.00

EXERCISED

OPTION

Asst Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $95,760.00

UNIT UNIT PRICE MAX AMOUNT

4012 12 Months $7,980.00 $95,760.00

EXERCISED

OPTION

Transitions Specialist

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $95,760.00

UNIT UNIT PRICE MAX AMOUNT

4013 48 Months $14,564.00 $699,072.00

EXERCISED

OPTION

Safety Inspectors

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $699,072.00

UNIT UNIT PRICE MAX AMOUNT

4014 12 Months $13,467.00 $161,604.00

EXERCISED

OPTION

Commissioning Specialist

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $161,604.00

UNIT UNIT PRICE MAX AMOUNT

4015 12 Months $20,693.56 $248,322.72

EXERCISED

OPTION

SENIOR CONSULTANT

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $248,322.72

UNIT UNIT PRICE MAX AMOUNT

4016 12 Months $17,509.93 $210,119.16

EXERCISED

OPTION

FUNCTIONAL MANAGER

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $210,119.16

UNIT UNIT PRICE MAX AMOUNT

5001 6 Months $24,938.00 $149,628.00 EST Program Principal

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 1 personnel -

PURCHASE REQUEST NUMBER: SCM041120170457

MAX NET AMT $149,628.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5002 6 Months $15,462.00 $92,772.00 EST Senior Analyst

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x1 personnel -

MAX NET AMT $92,772.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5003 24 Months $13,467.00 $323,208.00 EST Project Managers

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 4 personnel -

MAX NET AMT $323,208.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5004 18 Months $11,139.00 $200,502.00 EST Estimators

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 3 personnel -

MAX NET AMT $200,502.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5005 42 Months $11,372.00 $477,624.00 EST Quality Assurance Inspectors

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 7 personnel -

MAX NET AMT $477,624.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5006 6 Months $8,313.00 $49,878.00 EST Assistant Quality Assurance Inspector

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $49,878.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5007 18 Months $6,484.00 $116,712.00 EST Office Engineer

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 3 personnel -

MAX NET AMT $116,712.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5008 12 Months $10,474.00 $125,688.00 EST Scheduler

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 2 personnel -

MAX NET AMT $125,688.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5009 42 Months $12,635.00 $530,670.00 EST Construction Manager

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 7 personnel -

MAX NET AMT $530,670.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5010 36 Months $9,809.00 $353,124.00 EST Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 6 personnel -

MAX NET AMT $353,124.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5011 6 Months $7,980.00 $47,880.00 EST Assistant Design Coordinator

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $47,880.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5012 6 Months $7,980.00 $47,880.00 EST Transitional Specialist

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $47,880.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5013 24 Months $14,564.00 $349,536.00 EST Safety Inspector

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 4 personnel -

MAX NET AMT $349,536.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5014 6 Months $13,467.00 $80,802.00 EST Comissioning Specialist

FFP-LOE

The contractor shall perform all construction management technical support services in accordance with the performance work statement.

MAX NET AMT $80,802.00 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5015 6 Months $20,693.56 $124,161.36 EST Senior Consultant

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 1 personnel

MAX NET AMT $124,161.36 (EST.)

UNIT UNIT PRICE MAX AMOUNT

5016 6 Months $17,509.93 $105,059.58 EST Functional Manager

FFP-LOE

The contractor shall peform all construction management technical support services in accordance with the performance work statement.

- Quantity = 6 months x 1 personnel

MAX NET AMT $105,059.58 (EST.)

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$240,000.00 $70,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

3.00 $16,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001 3.00

0002 3.00

0003 3.00

0004 3.00

0005 3.00

0006 3.00

0007 3.00

0008 3.00

0009 3.00

0010 3.00

0011 3.00

0012 3.00

0013 3.00

0014 3.00

1001 3.00

1002 3.00

1003 3.00

1004 3.00

1005 3.00

1006 3.00

1007 3.00

1008 3.00

1009 3.00

1010 3.00

1011 3.00

1012 3.00

1013 3.00

1014 3.00

2001 3.00

2002 3.00

2003 3.00

2004 3.00

2005 3.00

2006 3.00

2007 3.00

2008 3.00

2009 3.00

2010 3.00

2011 3.00

2012 3.00

2013 3.00

2014 3.00

3001 3.00

3002 3.00

3003 3.00

3004 3.00

3005 3.00

3006 3.00

3007 3.00

3008 3.00

3009 3.00

3010 3.00

3011 3.00

3012 3.00

3013 3.00

3014 3.00

4001 3.00

4002 3.00

4003 3.00

4004 3.00

4005 3.00

4006 3.00

4007 3.00

4008 3.00

4009 3.00

4010 3.00

4011 3.00

4012 3.00

4013 3.00

4014 3.00

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

See attachment J-C1 Performance Work Statement

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government

2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government 4016 Destination Government Destination Government 5001 Destination Government Destination Government 5002 Destination Government Destination Government 5003 Destination Government Destination Government 5004 Destination Government Destination Government 5005 Destination Government Destination Government 5006 Destination Government Destination Government 5007 Destination Government Destination Government 5008 Destination Government Destination Government 5009 Destination Government Destination Government 5010 Destination Government Destination Government 5011 Destination Government Destination Government 5012 Destination Government Destination Government 5013 Destination Government Destination Government 5014 Destination Government Destination Government 5015 Destination Government Destination Government 5016 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 04-JUN-2012 TO

03-JUN-2013

N/A WHS/FSD/ECM/CONSTRUCTION MGMT

DIVISION

GREGORY PARKER

100 BOUNDARY CHANNEL DRIVE

ARLINGTON VA 22202-3712

703-693-8966 FOB: Destination

HQ0050

0002 POP 04-JUN-2012 TO

03-JUN-2013

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 04-JUN-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 04-JUN-2013 TO

03-JUN-2014

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

1016 POP 04-JUN-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 04-JUN-2014 TO

03-JUN-2015

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2012 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2015 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

2016 POP 04-JUN-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 04-JUN-2015 TO

03-JUN-2016

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3007 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3008 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3009 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3010 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3011 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3012 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3013 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3014 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3015 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

3016 POP 04-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 04-JUN-2016 TO

03-JUN-2017

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4007 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4008 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4009 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4010 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4011 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4012 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4013 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4014 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4015 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

4016 POP 04-JUN-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 04-JUN-2017 TO

03-DEC-2017

N/A (SAME AS PREVIOUS LOCATION)

5002 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5003 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5004 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5005 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5006 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5007 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5008 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5009 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5010 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5011 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5012 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5013 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5014 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5015 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

5016 POP 04-JUN-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

2 in 1 Services

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

D – D (Destination/ Destination)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC HQ0347 Issue By DoDAAC HQ0034 Admin DoDAAC HQ0034 Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) HQ0050 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

victor.a.marina.civ@mail.mil gregory.p.parker.civ@mail.mil michael.p.stebbing.civ@mail.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

dwight.j.morrow2.civ@mail.mil WAWF Support corey.v.forshee.civ@mail.mil Contracting Officer Sara.c.moore11.civ@mail.mil Contract Specialist

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

CONTRACTING OFFICER’S REPRESENTATIVE (COR) (MARCH 2007)

The COR is a representative for the Government with limited authority who has been designated in writing by the Contracting Officer to provide technical direction, clarification, and guidance with respect to existing specifications and statement of work (SOW)/statement of objectives (SOO) as established in the contract. The COR also monitors mailto:victor.a.marina.civ@mail.mil mailto:gregory.p.parker.civ@mail.mil mailto:michael.p.stebbing.civ@mail.mil mailto:dwight.j.morrow2.civ@mail.mil mailto:corey.v.forshee.civ@mail.mil mailto:Sara.c.moore11.civ@mail.mil the progress and quality of the Contractor’s performance for payment purposes. The COR shall promptly report Contractor performance discrepancies and suggested corrective actions to the Contracting Officer for resolution.

The COR is NOT authorized to take any direct or indirect actions or make any commitments that will result in changes to price, quantity, quality, schedule, place of performance, delivery or any other terms or conditions of the written contract.

The Contractor is responsible for promptly providing written notification to the Contracting Officer if it believes the COR has requested or directed any change to the existing contract (or task/delivery order). No action shall be taken by the Contractor for any proposed change to the contract until the Contracting Officer has issued a written directive or written modification to the contract (or task/delivery order). The Government will not accept and is not liable for any alleged change to the contract unless the change is included in a written contract modification or directive signed by the Contracting Officer.

If the Contracting Officer has designated an Alternate COR (ACOR), the ACOR may act only in the absence of the COR (due to such reasons as leave, official travel, or other reasons for which the COR is expected to be gone and not readily accessible for the day).

COR authority IS NOT delegable.

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

H-1 ORDERING/FTE LEVEL AUTHORIZATION

The Government Contracting Officer will notify the Contractor, through a task order, of the required FTE level of effort during the contract period of performance. The contractor will be provided not less than 30 calendar days notice for an increase in FTE level. The contractor will acknowledge and provide confirmation of the issued task order and the changes to the Government Contracting Officer.

(End of Clause)

H-2 INSURANCE INSTRUCTIONS

Required Insurance (IAW FAR 28.306 (b): The contractor shall maintain insurance in the minimum amounts specified below and as required by FAR 52.228-5, Insurance – Work on a Government Installation, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under this contract.

(a) Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a state, which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory.The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

(b) General Liability Insurance. Bodily injury liability insurance, in the minimum limits of

$100,000 per person and $500,000 per occurrence shall be required on the comprehensive form of the policy.

(c) Automobile Liability Insurance. This insurance shall be required on the comprehensive form of the policy and shall provide injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.

(End of Clause)

H-3 ORGANIZATIONAL CONFLICTS OF INTEREST

(a) Purpose. This clause applies to the Contractor and its affiliates, consultants and subcontractors of any tier (collectively referred to as “Contractor”). Attention is directed to FAR Subpart 9.5 and the provisions which follow.

(b) Government Contractor Participation in Solicitation/Statement of Work, Award or Administration.

The following Government contractors participated in the preparation of the Statement of Work/Solicitation or are expected to assist in the award and administration of the contract:

1. Infinity Technology, LLC

(c) Scope-Actual or Potential Conflicts of Interest. This clause is intended to ensure that the Contractor

(1) does not obtain or appear to obtain an unfair competitive advantage over other parties by virtue of actual or potential unauthorized use or disclosure of proprietary or procurement-related information, (2) does not obtain or appear to obtain an unfair competitive advantage over other parties by virtue of any relationship (social, familial, financial etc) between the Contractor or Contractor’s employees and any Government employee, Government contractor or Government contractor employee involved in the procurement process or the administration of the contract whether or not specifically identified in this solicitation, (3) is not biased or potentially biased or its ability to render impartial advice to the Government impaired or potentially impaired due to Contractor’s current or planned interests (financial, contractual, organizational or otherwise) that relate to the services performed or products to be delivered under this solicitation, or (4) any other potential conflict of interest identified or within the scope of FAR

9.5. Parts (1), (2) and (3) above are examples of potential conflicts of interest governed by this clause.

(d) Contractor Representation. The Contractor represents by submission of its offer that, to the best of its knowledge and belief, Contractor has no actual or potential conflict of interest or, pursuant to paragraph (e), has disclosed to the Contracting Officer in writing all relevant information regarding any actual or potential conflict of interest.

(e) Contractor Disclosure of Actual or Potential Conflicts of Interest Before and After Award. If, before or after award, an actual or potential conflict of interest is identified by the Government or discovered by the Contractor, the Contractor shall immediately make a full disclosure in writing to the Contracting Officer. The Contractor further recognizes that during the term of this contract, conditions may change which may give rise to a newly recognized actual or potential conflict of interest. In the event that the Government identifies or the Contractor discovers an actual or potential conflict of interest before or after award, the Contractor shall, at a minimum, immediately provide the following information:

(1) a description of the actual or potential conflict of interest and identify the parties involved;

(2) a description of the work affected by the actual or potential conflict of interest; and

(3) a mitigation plan as described in section (f).

(f) Mitigation Plan. To the extent that the Contractor or the Government has at any time before or after award identified an actual or potential conflict of interest, the Contractor shall propose a mitigation plan which concisely describes all relevant facts concerning any potential conflict of interest including any past, present, or currently planned interest (financial, contractual, organizational, or otherwise) relating to the services performed or product to be delivered under this solicitation.