ATTACHMENT___4_J-C4_Historical_Work_Requests.xlsx
XLSX spreadsheet 167 KB Posted
- Solicitation number
- HQ0034-14-R-0163
- Issued by
-
DOD Washington Headquarters Service
About this file
HISTORICAL WORK REQUESTS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended_Attachment__1__J-C1_FCMP_PWS_10-17-14.doc | DOC document | |
| HQ0034-14-R-0163_AMENDMENT_01.doc | DOC document | |
| ATTACHMENT___12_HQ0034-14-R-0163__RFI__RESPONSES_10-17-2014.docx | DOCX document | |
| ATTACHMENT___6__J-C6_WAGE_DETERMINATION.docx | DOCX document | |
| ATTACHMENT___1_J-C1_FCMP_PWS.doc | DOC document | |
| Attachment___8__J-L1_PAST_PERFORMANCE_DATA_SHEET.docx | DOCX document | |
| ATTACHMENT___2__J-C2_QASP__8-01-14.doc | DOC document | |
| ATTACHMENT___5__J-C5_WAGE_DETERMINATION.docx | DOCX document | |
| Attachment___9_J-L2_CLIENT_AUTHORIZATION_LETTER.docx | DOCX document | |
| Attachment___7_J-B1_Pricing_Submission_Worksheet.docx | DOCX document | |
| ATTACHMENT_11__J-1_DD254.pdf | ||
| HQ0034-14-R-0163_FCMP_SOLICITATION.doc | DOC document | |
| ATTACHMENT___3_J-C3_Responsibilty_Matrix.xls | XLS spreadsheet | |
| Attachment___10__J-L3_Contractor_Performance_Evaluation_Survey.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HQ0034-14-R-0163 ATTACHMENT # 4 J-C4 Work Service Request October 31 2012 | |||||||
| Duration in Minutes | Status | Available Services | Type of Service | Summary | Department | Resolution | |
| 1 | 4 | Pending | New CADD Work | CM/eFIC External - Project | This is new Cad work. Waiting on management to give go ahead. | Engineering and Technical Services Division | |
| 2 | 9,011 | In Progress | Information Research | CM/eFIC Internal | Review and update current Electronic Data Standards | enterprise Facilities Information Center | |
| 3 | 9,761 | Pending | Information Research | CM/eFIC Internal | Review and update current Electronic Data Standards | enterprise Facilities Information Center | |
| 4 | 1,268 | Pending | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Basement B1 | Federal Facilities Division | Some shapes are missing from the original port and will be added later. |
| 5 | 46 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Executive Services Directorate | This request has been completed. The drawing has been sent via email to the client. |
| 6 | 123 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This Request has been completed plot 8 hard copy of RDF Roof drawing. |
| 7 | 965 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 4 | Federal Facilities Division | All shapes that could be changed have been modified to meet WHS Standards. |
| 8 | 64 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | Completed converted the drawing pdf format of Bollard – exterior standard. |
| 9 | 486 | Closed | Presentation Support | CM/eFIC Internal | Presentation Support - Creating Monthly Remedy Report and Charts for October 2011 | Federal Facilities Division | Presentation Support - Created Monthly Remedy Report and Charts for October 2011 to be reviewed by management. (KT) |
| 10 | 197 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Headquarters Marine Corps | This request has been completed. The client has been notified that the CD is ready to be picked up. |
| 11 | 94 | Closed | Master Record Drawings | CM/eFIC Internal | MRD Support - Created Furniture Container for a80ih57_.dgn | enterprise Facilities Information Center | MRD Support - Created Furniture Container for a80ih57_.dgn (YP) |
| 12 | 65 | Closed | Master Record Drawings | CM/eFIC Internal | MRD Support - Created Furniture Container for a80ih58_.dgn | enterprise Facilities Information Center | MRD Support - Created Furniture Container for a80ih58_.dgn (YP) |
| 13 | 65 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified via email that his request is ready to be picked up. |
| 14 | 67 | Closed | Master Record Drawings | CM/eFIC Internal | MRD Support - Created Furniture Container for a80ih59_.dgn | enterprise Facilities Information Center | MRD Support - Created Furniture Container for a80ih59_.dgn (YP) |
| 15 | 364 | Closed | New CADD Work | CM/eFIC External - 3 days | New CADD Work | Reservation Construction | This request has been completed and send email PDF drawing to Bassima to review. |
| 16 | 482 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 5 | Federal Facilities Division | All assignable shapes have been modified. |
| 17 | 82 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | The request has been completed. The drawings have been stored in a shared drive. |
| 18 | 36 | Closed | TRIRIGA Support | CM/eFIC External - Training | Tririga Training | Leased Facilities Division | Tririga user name has been created |
| 19 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for Mech. HVAC | enterprise Facilities Information Center | Created MRD container for d80hf126.dgn - 1st Floor Wedge 5 (KT) |
| 20 | 65 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for Mech. HVAC | enterprise Facilities Information Center | Created MRD container for d80hf127.dgn - 1st Floor Wedge 5 (KT) |
| 21 | 28 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Retrieve Heating and Refrigeration Plant Intake / Outfall |
Fire Alarm Plan
| Sheet : 66a 0f 67 | Federal Facilities Division | This request has been completed. The CD has been picked up. | ||||||
| 22 | 125 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This Request has been completed and delivered of Pentagon Mechanical 3rd Floor Corridor 2 B-Ring Room #3B255, provide 1 hard copy "C Sise Drawing" | |
| 23 | 128 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This Request has been completed and delivered of Pentagon Mechanical 5th Floor Corridor 6th D-Ring Room #5D652, Provide 1 hard copy "C Size Drawing" | |
| 24 | 122 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for Mechanical HVAC.dgn | enterprise Facilities Information Center | Master Record Drawings - Creating MRD overall for 1st Floor_Wedge 5_Mechanical HVAC.dgn (KT) | |
| 25 | 183 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | Plot 4 copies of drawings (gray scale) of all floors in Wedge 3 indicating the suite #s and Squared Footage in each of them, including Corridor 7 and Corridor 9. This request has been completed. | |
| 26 | 184 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | Plot 2 color copies of all floors in Wedge 3 of indicating Suite #s and Squared Footage in all types of space. This will include Corridors 7, 7-1/2, 8, 8-1/2 and 9. This Request has been completed | |
| 27 | 132 | Closed | EDMS Support | CM/eFIC Internal | ProjectWise Insllation/Account Creation for BRAC & PBMO (AO) | enterprise Facilities Information Center | This task has been completed. All of the notes have been recorded under the work detail tabs. | |
| 28 | 122 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | Plotted Grayscale BS and MZ | |
| 29 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for Mechanical HVAC.dgn | enterprise Facilities Information Center | Created MRD overall for 1st Floor_Mechanical HVAC.dgn (KT) | |
| 30 | 122 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | Plotted BS and MZ pdfs | |
| 31 | 153 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Reservation Construction | This request has been completed and is ready for pick up. | |
| 32 | 180 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | This request is for river terrace/parade field limestone drawings (AO) | Reservation Construction | This request has been completed. The client has been notified that the drawings are saved in the G Drive. | |
| 33 | 720 | Closed | Information Research | CM/eFIC Internal | Prepare monthly EDS reports | Federal Facilities Division | request completed | |
| 34 | 60 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed and client has been picked it up. | |
| 35 | 106 | Closed | Information Research | CM/eFIC External - Meeting | EDS Powerpoint meeting | Reservation Construction | Meeting ended | |
| 36 | 106 | Closed | Information Research | CM/eFIC External - Meeting | EDS Powerpoint Meeting | Engineering and Technical Services Division | Meeting ended | |
| 37 | 133 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed of EM&CS Remote Delivery Facility Pentagon, P&ID Sheet 1 of 2, create 1 CD. | |
| 38 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Updated a80hf11_.dgn & a80hf15_.dgn using MRD's that Rich created | enterprise Facilities Information Center | Updated a80hf11_.dgn & a80hf15_.dgn using MRD's that Rich created with Marina's help (KT) | |
| 39 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD containers for 2nd Floor Mech. HVAC | enterprise Facilities Information Center | Created MRD containers for a80hf21_.dgn and a80hf25_.dgn (KT) | |
| 40 | 61 | Closed | Information Research | CM/eFIC External - 3 days | update Project Identifier List | Reservation Construction | Request completed | |
| 41 | 33 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for 2nd Floor Mech. HVAC | enterprise Facilities Information Center | Created MRD container for a80hf22_.dgn (KT) | |
| 42 | 842 | Closed | Quality Control | CM/eFIC External - QA | EDS Compliance check for SAL | Engineering and Technical Services Division | Request completed | |
| 43 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for 2nd Floor W2 Mech. HVAC | enterprise Facilities Information Center | Created MRD container for a80hf23_.dgn (KT) | |
| 44 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor Wedge 2 | enterprise Facilities Information Center | Created MRD container for a80hf24_.dgn (KT) | |
| 45 | 66 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for 2nd Floor W2 | enterprise Facilities Information Center | Creating MRD container for a80hf26_.dgn (KT) | |
| 46 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for 2nd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf27_.dgn (KT) | |
| 47 | 123 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf28_.dgn. Notes, Cells, Symbols were copied from Plot Model into Design Model (KT) | |
| 48 | 194 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified via email to pick up the CD. | |
| 49 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD container for Mech. HVAC 2nd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf29_.dgn. Copied Cells and Symbols from Plot Model (KT) | |
| 50 | 124 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | Provided requested drawing of the Child Development Center, the HVAC, Mechanical Piping and Electrical. and create 1 CD, This request has been completed. | |
| 51 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 2nd Floor_Wedge 2_Mechanical HVAC.dgn | enterprise Facilities Information Center | Creating MRD overall for 2nd Floor_Wedge 2_Mechanical HVAC.dgn referencing created containers (KT) | |
| 52 | 181 | Closed | Information Research | CM/eFIC Internal | EDS Monthly report- finishing changes | Federal Facilities Division | Request completed | |
| 53 | 123 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed and is ready for pick up. | |
| 54 | 93 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf210.dgn (KT) | |
| 55 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf211.dgn (KT) | |
| 56 | 1,571 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment 6th Floor | Federal Facilities Division | Completed updating Shapes to WHS standards | |
| 57 | 81 | Closed | EDMS Support | CM/eFIC External - Training | ProjectWise Training | Federal Facilities Division | The client has received the ProjectWise Training. | |
| 58 | 71 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W3 | enterprise Facilities Information Center | Creating MRD container for b80hf212.dgn (KT) | |
| 59 | 67 | Closed | EDMS Support | CM/eFIC Internal | Up-Load CD to Physical Media Tracking_ | enterprise Facilities Information Center | This Request has been completed uploading and successful to ProjectWise Physical Media Tracking link located @ J-059 PENTAGON PAC II RENOVATION AS-BUILT VOL.1 of 2_10.21.11. | |
| 60 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W3 | enterprise Facilities Information Center | Creating MRD container for b80hf213.dgn (KT) | |
| 61 | 1,112 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 7 | Federal Facilities Division | Assignable shapes have been adjusted. | |
| 62 | 393 | Closed | Information Research | CM/eFIC External - QA | Review QAs for projects that need to be corrected | Federal Facilities Division | Request completed | |
| 63 | 22 | Closed | TRIRIGA Support | CM/eFIC External - Training | TRIRIGA Support | Leased Facilities Division | Provided Tririga user name access | |
| 64 | 122 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W3 | enterprise Facilities Information Center | Creating MRD container for b80hf214.dgn (KT) | |
| 65 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf216.dgn (KT) | |
| 66 | 32 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 2nd Floor_Wedge 3_Mechanical HVAC.dgn | enterprise Facilities Information Center | Created MRD overall for 2nd Floor_Wedge 3_Mechanical HVAC.dgn referencing Mech. HVAC containers (KT) | |
| 67 | 280 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified to pick up the CD. | |
| 68 | 604 | Closed | Quality Control | CM/eFIC External - QA | PAC Phase II QA - | Federal Facilities Division | Request completed | |
| 69 | 64 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | Request completed | |
| 70 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf217.dgn (KT) | |
| 71 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf218.dgn (KT) | |
| 72 | 76 | Closed | EDMS Support | CM/eFIC Internal | ProjectWise Maintenance - Fix the security settings for the BRAC personnel | enterprise Facilities Information Center | This task has been completed. The PW security settings have been modified. | |
| 73 | 6 | Assigned | New CADD Work | CM/eFIC External - Project | CAD & TRIRIGA Support | Space Policy and Acquisition Division | ||
| 74 | 6 | Assigned | New CADD Work | CM/eFIC External - Project | CAD & TRIRIGA Support | Space Policy and Acquisition Division | This request is pending because eFIC 1st priority is to complete theMC. This decsion was made by Curtis Williams and Doug Hall. | |
| 75 | 39 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | TRIRIGA Support | Leased Facilities Division | This request has been completed. The client has been notified to pick up the CD. | |
| 76 | 34 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Leased Facilities Division | created Tririga user account | |
| 77 | 422 | Closed | Quality Control | CM/eFIC Internal | 36" Chilled Water research | Reservation Construction | Request completed | |
| 78 | 33 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Leased Facilities Division | created Tririga user account | |
| 79 | 815 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Estimating time for EDS compliance for B58 Army Phase III | Federal Facilities Division | Estimating time for EDS compliance for B58 Army Phase III (KT) | |
| 80 | 36 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval - Rhodes D | Reservation Construction | This request has been completed. The drawing has been saved in the G drive where the client could get it. | |
| 81 | 1,925 | In Progress | EDMS Support | CM/eFIC Internal | Back Log eFIC Library | Federal Facilities Division | ||
| 82 | 1,925 | In Progress | EDMS Support | CM/eFIC Internal | Back Log eFIC Library | Federal Facilities Division | ||
| 83 | 482 | Pending | Information Research | CM/eFIC Internal | Axiom rules formatting and research | enterprise Facilities Information Center | ||
| 84 | 1,054 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 8 | Federal Facilities Division | All assignable shapes have been updated. | |
| 85 | 94 | Closed | Presentation Support | CM/eFIC Internal | Presentation Support - Updating the project list | enterprise Facilities Information Center | This task has been completed. The excel file has been sent out via email. | |
| 86 | 65 | Closed | Document or Drawing Retrieval | CM/eFIC External - Project | Drawing Retrieval | Engineering and Technical Services Division | Turned off corresponding levels and plotted 2 copies each | |
| 87 | 88 | Closed | EDMS Support | CM/eFIC Internal | ProjectWise Maintenance - Load the SAL Sentry Program Drawings and Air Force Wedge 3 Backfill | Federal Facilities Division | This task has been completed. 4 different CDs were loaded to ProjectWise. | |
| 88 | 604 | Closed | Quality Control | CM/eFIC External - QA | Lightning Protection QA | Federal Facilities Division | Request completed | |
| 89 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf219.dgn (KT) | |
| 90 | 65 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | This request has been completed and is sent the client by email. | |
| 91 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf220.dgn (KT) | |
| 92 | 724 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Document or Drawing Retrieval | Engineering and Technical Services Division | This request has been completed and is ready for pick up. | |
| 93 | 93 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf221.dgn (KT) | |
| 94 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf222.dgn (KT) | |
| 95 | 99 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf223.dgn (KT) | |
| 96 | 32 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 2nd Floor_Wedge 4_Mechanical HVAC.dgn | enterprise Facilities Information Center | Creating MRD overall for 2nd Floor_Wedge 4_Mechanical HVAC.dgn referencing MRD containers (KT) | |
| 97 | 62 | Closed | EDMS Support | CM/eFIC Internal | Up-Load CD to Physical Media Tracking | enterprise Facilities Information Center | CD Up-Load to ProjectWise Media Tracking has been successful and completed. | |
| 98 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W5 | enterprise Facilities Information Center | Created MRD container for d80hf224.dgn (KT) | |
| 99 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W5 | enterprise Facilities Information Center | Created MRD container for d80hf225.dgn (KT) | |
| 100 | 141 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Provide electrical drawings (PDF) for the Pentagon building - Greer J | Federal Facilities Division | This request has been completed. The client has been notified to pick up the CD. | |
| 101 | 184 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Rtieval | Federal Facilities Division | This request has been completed provide 2 set drawing hard copy and create 2 CD PDF Format of PFPA Staging Project K-9 Operation Unit and CLE. | |
| 102 | 185 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This Request has been provided to customer Child Develope Center for the PFPA K-9 create 1 cd PDF format and 1 set hard copy drawings. | |
| 103 | 1,084 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 9 | Federal Facilities Division | Assignable shapes have been updated. | |
| 104 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W5 | enterprise Facilities Information Center | Created MRD container for d80hf226.dgn (KT) | |
| 105 | 84 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed create 1 CD (DGN Format ) of architectural floor plans for Pentagon Basement, Mezzanine and RDF. | |
| 106 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W5 | enterprise Facilities Information Center | Created MRD container for d80hf227.dgn (KT) | |
| 107 | 720 | Assigned | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA Support | Space Policy and Acquisition Division | ||
| 108 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 2nd Floor W5 | enterprise Facilities Information Center | Created MRD container for d80hf228.dgn (KT) | |
| 109 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 2nd Floor_Wedge 5_Mechanical HVAC.dgn | enterprise Facilities Information Center | Creating MRD overall for 2nd Floor_Wedge 5_Mechanical HVAC.dgn by referencing containers (KT) | |
| 110 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 2nd Floor_Mechanical HVAC.dgn | enterprise Facilities Information Center | Master Record Drawings - Creating MRD overall for 2nd Floor_Mechanical HVAC.dgn by referencing overall wedges (KT) | |
| 111 | 40 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | This request has been completed. The valve schedules have been sent to the drive where the client could get them. | |
| 112 | 364 | Closed | Master Record Drawings | CM/eFIC External - 3 days | Master Record Drawings | Engineering and Technical Services Division | This request has been completed and is ready for pick up. | |
| 113 | 60 | Assigned | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA Support | Space Policy and Acquisition Division | ||
| 114 | 49 | Closed | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA Support | Space Policy and Acquisition Division | changed BTA to DLA on the 9th floor of the Mark Center in TRIRIGA. | |
| 115 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf31_.dgn (KT) | |
| 116 | 79 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The CD has been picked up. | |
| 117 | 90 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf32_.dgn (KT) | |
| 118 | 1,083 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 10 | Federal Facilities Division | Adjusted shapes | |
| 119 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf33_.dgn (KT) | |
| 120 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf34_.dgn (KT) | |
| 121 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf35_.dgn (KT) | |
| 122 | 184 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrival | Federal Facilities Division | Plot the Fire Alarm drawings. Just capture between corridor 2.5-10.5. this request has been completed. | |
| 123 | 45 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified to pick up the CD. | |
| 124 | 669 | Closed | Quality Control | CM/eFIC Internal | Army Basement QA | Federal Facilities Division | Request completed | |
| 125 | 64 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf36_.dgn (KT) | |
| 126 | 61 | Closed | Information Research | CM/eFIC Internal | Meeting with XXXXXXX about Axiom | enterprise Facilities Information Center | meeting ended | |
| 127 | 211 | Closed | Quality Control | CM/eFIC External - QA | Meeting with SAL Contractors | Engineering and Technical Services Division | Request completed | |
| 128 | 64 | Closed | TRIRIGA Support | CM/eFIC External - Training | TRIRIGA Support | Federal Facilities Division | Tririga account has been created for Mr. Upshur and Samet | |
| 129 | 363 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed and client has been picked it up. | |
| 130 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf37_.dgn (KT) | |
| 131 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf38_.dgn (KT) | |
| 132 | 303 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Pentagon Force Protective Agency | This request has been completed and is ready for pick up. | |
| 133 | 50 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Space Policy and Acquisition Division | all the 12 BS rooms changed to the new space type | |
| 134 | 29 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | This request has been completed. The PDF has been sent to the client. | |
| 135 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W2 | enterprise Facilities Information Center | Created MRD container for a80hf39_.dgn (KT) | |
| 136 | 185 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Document Retrieval | Engineering and Technical Services Division | Create 20 copies CD's of Navy Annex/FOB2 Property Transfer RDF and Bridging Documents, this request has been completed and delivered. | |
| 137 | 27 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Please provide S160 - Roof Framing Plan | Federal Facilities Division | This request has been completed. The files have been sent via email. | |
| 138 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 3rd Floor_Wedge 2_Mechanical HVAC.dgn | enterprise Facilities Information Center | Creating MRD overall for 3rd Floor_Wedge 2_Mechanical HVAC.dgn by referencing containers. (KT) | |
| 139 | 785 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 11 | Federal Facilities Division | Assignable shapes have been updated. | |
| 140 | 121 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf310.dgn (KT) | |
| 141 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf311.dgn (KT) | |
| 142 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf312.dgn (KT) | |
| 143 | 50 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Leased Facilities Division | This request has been completed. The PDFs were sent to the client via email. | |
| 144 | 34 | Closed | EDMS Support | CM/eFIC External - Project | E.D.M.S Access Training | Leased Facilities Division | The software installation ticket has been created and forwarded to ITMD | |
| 145 | 365 | Closed | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA Support | Space Policy and Acquisition Division | Updated the space types for MC flrs 1, B1, B2 | |
| 146 | 964 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Department of Air Force | This request has been ocmpleted and is ready for pick up. | |
| 147 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf313.dgn (KT) | |
| 148 | 38 | Closed | EDMS Support | CM/eFIC External - Project | E.D.M.S Access Training | Leased Facilities Division | This request has been completed. The ticket has been created and submitted to ITMD. | |
| 149 | 20 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Space Policy and Acquisition Division | This request has been completed. The drawing was sent via email to the client. | |
| 150 | 122 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf314.dgn (KT) | |
| 151 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf315.dgn (KT) | |
| 152 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W3 | enterprise Facilities Information Center | Created MRD container for b80hf316.dgn (KT) | |
| 153 | 24 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Pentagon Force Protective Agency | RDF architecture floor plan in pdf format was created and sent to customer | |
| 154 | 92 | Closed | Information Research | CM/eFIC Internal | Call with IT | enterprise Facilities Information Center | Request completed | |
| 155 | 61 | Closed | RFI | CM/eFIC External - 10 days | Provide response to RFI 41 | Federal Facilities Division | Request completed | |
| 156 | 62 | Closed | RFI | CM/eFIC External - 10 days | RFI Response | Federal Facilities Division | Request completed | |
| 157 | 35 | Closed | EDMS Support | CM/eFIC External - Project | E.D.M.S Access Training | Leased Facilities Division | The software installation ticket has been created and forwarded to ITMD | |
| 158 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 3rd Floor_Wedge 3_Mechanical HVAC.dgn | enterprise Facilities Information Center | Created MRD overall for 3rd Floor_Wedge 3_Mechanical HVAC.dgn by referencing containers. (KT) | |
| 159 | 92 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf317.dgn (KT) | |
| 160 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf318.dgn (KT) | |
| 161 | 60 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Federal Facilities Division | created NMCC pdf for BS and MZ | ||
| 162 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf319.dgn (KT) | |
| 163 | 110 | Closed | EDMS Support | CM/eFIC Internal | Upload the new BRAC Deliverables in BRAC Physical Media Tracking Folder | enterprise Facilities Information Center | This task has been completed. I have sent an email to Rick Marcey informing him that all of the closeout documentations have bene loaded to ProjectWise. | |
| 164 | 32 | Closed | EDMS Support | CM/eFIC External - Project | E.D.M.S Access Training | Leased Facilities Division | The software installation ticket has been created and forwarded to ITMD. | |
| 165 | 34 | Closed | EDMS Support | CM/eFIC External - Project | E.D.M.S Access Training | Leased Facilities Division | The software installation ticket has been created and forwarded to ITMD. | |
| 166 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf320.dgn (KT) | |
| 167 | 51 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The PDFs have been sent to the client via email. | |
| 168 | 63 | Closed | Information Research | CM/eFIC Internal | Meeting to go over Axiom Report, and Contractor Questions | enterprise Facilities Information Center | Meeting ended | |
| 169 | 1,477 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 12 | Federal Facilities Division | Adjusted shapes | |
| 170 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf321.dgn (KT) | |
| 171 | 964 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor B1 | Federal Facilities Division | All shapes have been modified. | |
| 172 | 30 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Federal Facilities Division | Created Tririga user account and sent to customer | |
| 173 | 95 | Closed | Presentation Support | CM/eFIC External - 3 days | Presentation Support | Space Policy and Acquisition Division | Plot 2 hard copy of Visio Presentation Poster, this request has been provided to client. | |
| 174 | 62 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf322.dgn (KT) | |
| 175 | 63 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mech. HVAC MRD container for 3rd Floor W4 | enterprise Facilities Information Center | Created MRD container for c80hf323.dgn (KT) | |
| 176 | 32 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating MRD overall for 3rd Floor_Wedge 4_Mechanical HVAC.dgn | enterprise Facilities Information Center | Creating MRD overall for 3rd Floor_Wedge 4_Mechanical HVAC.dgn by referencing containers. (KT) | |
| 177 | 484 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mechanical HVAC containers for 3rd Floor Wedge 5 | enterprise Facilities Information Center | Created Mech. HVAC containers and overalls for the 3rd Floor Wedge 5 | |
| 178 | 4 | Assigned | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA Support | Space Policy and Acquisition Division | ||
| 179 | 4 | Assigned | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA Support | Space Policy and Acquisition Division | ||
| 180 | 723 | Closed | Document or Drawing Retrieval | CM/eFIC External - 10 days | Drawing Retrival | Federal Facilities Division | This request has been completed and the drawings were sent to client by e-mail. | |
| 181 | 812 | Closed | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mechanical HVAC containers for 4th Floor Wedge 2 | enterprise Facilities Information Center | Created Mechanical HVAC containers and overall for 4th Floor Wedge 2 (KT) | |
| 182 | 214 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Leased Facilities Division | This request has been completed. The client has been notified via email to pick up the CD. | |
| 183 | 180 | Closed | Master Record Drawings | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | This request has been completed. The client has been informed via email to pick up the CD and hard copies. | |
| 184 | 152 | In Progress | Master Record Drawings | CM/eFIC External - Project | Master Record Drawings - Creating Mechanical HVAC containers for 4th Floor Wedge 3 | enterprise Facilities Information Center | ||
| 185 | 155 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Space Policy and Acquisition Division | Prepared MC report for floors 2-10 with all the spaces in Application and CAD , and emailed Sharon McCormick can provide feedback/updates | |
| 186 | 182 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Space Policy and Acquisition Division | Worked on MC floors 11-17 to give it to Sharon Mccormick & provide her feedback/updates interms of Agency assignment and space types | |
| 187 | 93 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Space Policy and Acquisition Division | MC pdfs - 21 floors re-created in Black and White | |
| 188 | 430 | Assigned | Quality Control | CM/eFIC External - QA | EDS Compliance Request-36" Legacy Chilled Water | Federal Facilities Division | ||
| 189 | 902 | In Progress | TRIRIGA Support | CM/eFIC External - Project | Adjust BRAC Floor 13 assignable shapes | Federal Facilities Division | ||
| 190 | 812 | In Progress | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 14 | Federal Facilities Division | ||
| 191 | 30 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. | |
| 192 | 426 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed and the client has picked it up. | |
| 193 | 4 | Assigned | TRIRIGA Support | CM/eFIC External - Project | TRIRIGA & EDMS Support | Space Policy and Acquisition Division | ||
| 194 | 4 | Pending | New CADD Work | CM/eFIC External - Project | TRIRIGA & EDMS Support | Space Policy and Acquisition Division | This request is pending because eFIC 1st priority is to complete theMC. This decsion was made by Curtis Williams and Doug Hall. | |
| 195 | 428 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed and the client has picked it up. | |
| 196 | 600 | In Progress | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | ||
| 197 | 60 | Assigned | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | ||
| 198 | 50 | Assigned | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | ||
| 199 | 124 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | Create 1 CD OF NMCC DECONTAMIMATION STATION AS- BUILT DRAWINGS THIS REQUEST HAS BEEN COMPLETED. | |
| 200 | 35 | Closed | TRIRIGA Support | CM/eFIC External - Training | TRIRIGA Support | Leased Facilities Division | A Tririga account has been created | |
| 201 | 129 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | PROVIDE 1 CD OF Pentegon Archicture all floor plan, this request has been completed. | |
| 202 | 60 | Closed | EDMS Support | CM/eFIC Internal | UP - Load CD | enterprise Facilities Information Center | Completed UP - Loading CD to Physical Media Tracking of Pentagon NMCC Decontamination As-Built_10.18.11 | |
| 203 | 120 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | Provide 2 copy CD of FOB#2 Drawings, this request has been completed. | |
| 204 | 194 | In Progress | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Reservation Construction | ||
| 205 | 60 | Closed | Presentation Support | CM/eFIC External - 3 days | Presentation Support | Space Policy and Acquisition Division | This request has been completed. | |
| 206 | 15 | Assigned | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | ||
| 207 | 40 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | This request has been completed. The drawings have been saved in the G Drive. | |
| 208 | 844 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Basement B2 | Federal Facilities Division | All shapes have been adjusted. | |
| 209 | 81 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. No current drawings have been located. | |
| 210 | 362 | Closed | Presentation Support | CM/eFIC Internal | Presentation Support - Creating Monthly Remedy Report and Charts for November 2011 | Federal Facilities Division | Created Monthly Remedy Report and Charts for November 2011 (KT) | |
| 211 | 847 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed and is ready for pick up. | |
| 212 | 781 | Closed | Information Research | CM/eFIC Internal | Prepare monthly EDS Report | Federal Facilities Division | Request completed | |
| 213 | 55 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | Drawings were provided | |
| 214 | 151 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Basement B3 | Federal Facilities Division | All assignable shapes have been modified. | |
| 215 | 1,564 | Closed | TRIRIGA Support | CM/eFIC External - Project | Adjusting BRAC Floor 15 assignable shapes | Federal Facilities Division | Adjusted shapes | |
| 216 | 392 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 16 | Federal Facilities Division | All shapes have been adjusted. | |
| 217 | 128 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | Plot 2 set hard copy of Drawing Title: |
- HVAC - Heating Plant / Admin Second Floor Plan Drawings
- Pentagon H&RP DCS Upgrade - Type 01 FPVAV Point Schedule Current Revision: 08/22/11
- Pentagon H&RP DCS Upgrade - Type 01 FPVAV Flow Diagram Current Revision: 08/22/11
This request has been completed.
| 218 | 63 | Closed | Information Research | CM/eFIC External - Meeting | Client Meeting - As-Builts and One Line Drawings Project | enterprise Facilities Information Center | The meeting notes have been attached in the work detail tab. |
| 219 | 632 | Closed | Master Record Drawings | CM/eFIC Internal | Master Record Drawings - Creating Mechanical HVAC containers for 4th Floor Wedge 4 | enterprise Facilities Information Center | Created Mechanical HVAC containers for 4th Floor Wedge 4 (KT) |
| 220 | 304 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This requet has been completed and is ready for pick up. |
| 221 | 91 | Closed | EDMS Support | CM/eFIC External - Training | ProjectWise Training | Federal Facilities Division | The training has been completed. |
| 222 | 2,221 | Closed | Quality Control | CM/eFIC Internal | Run Axiom SpecChecker on 4 reservation projects | enterprise Facilities Information Center | Request completed |
| 223 | 90 | Closed | EDMS Support | CM/eFIC External - Training | ProjectWise Training | Federal Facilities Division | The training has been completed. |
| 224 | 23 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Department of Army | pdf of the reservation has been provided |
| 225 | 51 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | DoD Concessions Committee | This request has been completed. The client has been notified via email to pick up the CDs. |
| 226 | 294 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified to pick up the CD and hard copies. |
| 227 | 512 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 17 | Federal Facilities Division | All shapes have been modified. |
| 228 | 964 | Closed | Document or Drawing Retrieval | CM/eFIC External - 10 days | Drawing Retrieval | Reservation Construction | This request has been completed and is ready for pick up. |
| 229 | 603 | Closed | Master Record Drawings | CM/eFIC Internal | Master Record Drawings - Creating Mechanical HVAC containers for 4th Floor Wedge 5 | enterprise Facilities Information Center | Created Mechanical HVAC containers for 4th Floor Wedge 5 (KT) |
| 230 | 34 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Space Policy and Acquisition Division | Tririga account has been created. |
| 231 | 34 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | TRIRIGA Support | Space Policy and Acquisition Division | Tririga account has been created. |
| 232 | 152 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has picked up the drawings. |
| 233 | 63 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Pentagon Force Protection Agency | This Request has been completed of Fire Alarm System Overlay. |
| 234 | 902 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 1 | Federal Facilities Division | All shapes have been modified. |
| 235 | 185 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | This request has been completed and is ready for pick up. |
| 236 | 142 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been picked up the client. |
| 237 | 227 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has picked up the drawings. |
| 238 | 1,053 | Closed | Master Record Drawings | CM/eFIC Internal | Master Record Drawings - Creating Mechanical HVAC containers for 5th Floor Wedge 2 | enterprise Facilities Information Center | Created Mechanical HVAC containers for 5th Floor Wedge 2 (KT) |
| 239 | 125 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | Provided 2 copy CD's of Pentagon Heating Refrigeration Pant Intake/Outfall SOL#mda47-02-C-0001 Volumes 1-6, This request has been completed. |
| 240 | 273 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Reservation Construction | Request completed |
| 241 | 35 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Pentagon Force Protection Agency | a pdf has been created for the reservation |
| 242 | 43 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | This request has been completed. The client has been notified to pick up the CD and hard copy. |
| 243 | 45 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | This request has been completed. The client has been notified to pick up the CD and hard copy. |
| 244 | 247 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | This request has been completed and is ready for pick up. |
| 245 | 63 | Closed | TRIRIGA Support | CM/eFIC External - 3 days | Drawing Retrieval | Space Policy and Acquisition Division | This Request has been completed provide 1 CD (format - PDF) of PNT color coded space assignment pdf. Floors 1,2,3,4,5,BS and MZ. |
| 246 | 123 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed provide of Wedge 3 Mechanical room plan (HL drawings) total 24 sheets of hard copy drawings. |
| 247 | 173 | Closed | Document or Drawing Retrieval | CM/eFIC External - 5 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified to pick up the CD and hard copies. |
| 248 | 127 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Engineering and Technical Services Division | This request has been completed ans the client has been pick it up. |
| 249 | 697 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 1 | Federal Facilities Division | All shaft and elevator that had a room number have been updated. |
| 250 | 68 | Closed | RFI | CM/eFIC External - 5 days | RFI | Engineering and Technical Services Division | RFI has been answered |
| 251 | 32 | Closed | EDMS Support | CM/eFIC External - Training | EDMS Support | Federal Facilities Division | This request has been completed. The ticket has been submitted to ITMD for ProjectWise and Microstation V8i installation. |
| 252 | 87 | Closed | Document or Drawing Retrieval | CM/eFIC External - 3 days | Drawing Retrieval | Federal Facilities Division | This request has been completed. The client has been notified to pick up the CD and hard copies. |
| 253 | 752 | Closed | TRIRIGA Support | CM/eFIC External - Project | BRAC Assignable Shape Adjustment Floor 2 | Federal Facilities Division | All elevators and 4 of the main shafts have been added to tririga. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .