Att E Format for NGW System PWS.pdf

PDF 22 KB Posted

Attached to
Military Sealift Command Next Generation Wideband Federal contract opportunity
Solicitation number
HC1013-09-R-2004
Issued by
Defense Information Systems Agency

About this file

Att E - PWS Format

View the file

Other files for this federal contract opportunity

Other files attached to Military Sealift Command Next Generation Wideband, newest first.
File Type Posted
HC1013-09-R-2004_Amend_0009.pdf PDF
20100422_AMEND009_MSC_NGW_Section_M.pdf PDF
20100422_AMEND0009_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100422_AMEND0009_MSC_NGW_Section_L.pdf PDF
20100416_AMEND0007_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100416_AMEND0007_MSC_NGW_Section_M.pdf PDF
HC1013-09-R-2004_AMEND_6.pdf PDF
20100412_AMEND0005_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
HC1013-09-R-2004_AMEND_5.pdf PDF
20100402_AMEND0004_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc DOC document
20100402_AMEND0004_MSC_NGW_Section_M.pdf PDF
20100323_AMEND0003_MSC_NGW_Section_J_Attachment_A_SOO.pdf PDF
20100323_AMEND0003_MSC_NGW_Section_L.pdf PDF
20100324__AMEND0003_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.pdf PDF
20100323_AMEND0003_MSC_NGW_RFP_QA_.pdf PDF
HC1013-09-R-2004_Amend_3.pdf PDF
20100317_AMEND0002_MSC_NGW_Section_M.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc DOC document
T-AKE_7488830_B.pdf PDF
20100317_AMEND0002_MSC_NGW_RFP_Q A.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_H_PWS_Template.doc DOC document
20100317_AMEND0002_List of Attachments.v2.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_I_QASP_Template.doc DOC document
HC1013-09-R-2004_Amend_1.doc DOC document
Section_L_04-March-2010.doc DOC document
20100210_NGW_CDRL_Item_4_Ship_Support_Visit_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_10_Configuration_Baseline_Data_dd1423-2 FINAL.pdf PDF
20100210_NGW_CDRL_Item_6_Engineering_Reference_Package_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_2_Installation_Report_CDRL_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_11_List_of_Support_Equipment_ dd1423-2_FINAL.pdf PDF
ngw Installation Checkout Spares Data cdrl item 9 dd1423.pdf PDF
20100210_NGW_Section_J_Att_N_Past_Performance_Info_Sheet_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_A_SOO_FINAL.doc DOC document
Section_M_.doc DOC document
Section_L_.doc DOC document
List of Attachments.doc DOC document
HC101309R2004.doc DOC document
20100210_NGW_Section_J_Attachment_B_Afloat_Background_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_J_PCA_Questionnaire.doc DOC document
20100210_NGW_Section_J_Attachment_M_Consent_Letter_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_H_PWS_Template_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_F_Standards_and_Specifications_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_K_Questionnaire_ Cover_Letter_FINAL.doc DOC document
Questions 28-Oct-09.pdf PDF
Draft SF33.Rev1.pdf PDF
Att G Past Performance Questionnaire.pdf PDF
Att B NGW Afloat Background.pdf PDF
Att A NGW SOO.pdf PDF
Section B.pdf PDF
Att C MSC Ships by Location.pdf PDF
Show all 50

Military Sealift Command Next Generation Wideband has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E: Format for NGW System Performance Work Statement

(PWS)

i. PROJECT TITLE: Provide a short, descriptive title of the work to be performed.

ii. UNDERSTANDING: Describe the need for the NGW system. Provide a brief description/summary of the NGW system sought.

iii. SCOPE: Indicate the work to be performed. Include a high-level view of the procurement, its objectives, size, and projected outcomes. Do not include anything that will not contribute to the expected result. Do include impacts/implications.

iv. PERFORMANCE REQUIREMENTS: Performance requirements are measurable attributes of system capabilities . Performance requirements are derived and traceable to the objectives and constraints of the SOO.

v. PERFORMANCE WORK STATEMENT: Complete Table 1 with the following information.

a. Area: A major area of NGW work, SATCOM services, Hardware, Life

Cycle Support, and other additional work as specified by the Offeror.

b. PWS Map ID: The numerical system that organizes the PWS under major areas.

c. Work to be Performed: A description of what capabilities will be delivered the contractor proposes to do including

d. Performance Standard: A targeted level of accomplishment associated with a desired set of outcomes and expectations.

e. Metric: How the performance standard will be measured.

f. Acceptable Quality Level: The expected performance level for the area.

g. Monitoring System: The mechanisms used to evaluate the work to be performed.

h. Incentive: The plan for rewarding or penalizing the contractor for reaching or not reaching the acceptable quality level.

i. Reference: The RFP documents used to develop a particular subcategory.

Table 1

Area

PWS

Map

Work to be Performance Metric Acceptable

Quality

Monitoring Incentive References

ID Performed Standard Level System

vi. DELIVERABLES AND DELIVERY SCHEDULE: List the contract deliverables by the PWS number,, Performance Work title, deliverable title, frequency of delivery, due dates, and the Contract Data Requirement (CDRL) number.

vii. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION: Identify the Government-furnished equipment and information, if any, to be provided to the contractor, and identify any limitations on use. Be as specific as possible.

viii. PLACE OF PERFORMANCE: Specify whether the work will be performed at the contractor’s site or at a Government site. Provide exact address if possible.

Describe any local or long distance travel the contractor will be required to perform.

ix. PERIOD OF PERFORMANCE: State the period of performance in terms of total calendar days after TO award (e.g., 365 calendar days after TO award), or in terms of start and end date, e.g., October 1, 20XX through September 30, 20XX.

The use of “calendar days” provides an accurate understanding of the actual length of the TO and allows the actual dates of performance to be set at the time of TO award.

x. SECURITY: State whether the work will be UNCLASSIFIED, CONFIDENTIAL, SECRET or TOP SECRET. TBD.

xi. ACRONYMS AND DEFINITIONS: A list of alphabetical definitions of key words used in the PWS.

xii. APPLICABLE DOCUMENTS: List any relevant legal, regulatory, policy, industry, commercial and tailored Government standards, specifications, processes and/or practices selected as compliance documents. Also provide a list of all Government compliance documents intended to be used as compliance documents during the course of the contract. Include publication number, title, version, date, where the document can be obtained, etc. State which portions of the documents apply.

File details come from the government source that posted it. Updated .