CDRL A003.pdf
PDF 199 KB Posted
- Attached to
- Remote Readout Units
- Solicitation number
- H9224115R0012
- Issued by
-
United States Special Operations Command
About this file
CDRL A003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H92241-15-R-0012-0002.pdf | ||
| H92241-15-R-0012-U0001.pdf | ||
| 09-02-2015_Response_to_Questions.pdf | ||
| 08-24-2015_Response_to_Questions.pdf | ||
| 08-15-2015_Clarification_on_Performance_Specifications.pdf | ||
| Attachment_1_RRU_Statement_of_Work_Final.pdf | ||
| CDRL A004.pdf | ||
| CDRL A010.pdf | ||
| Attachment_2_Performance_Specification_Final.pdf | ||
| CDRL A007.pdf | ||
| CDRL A008.pdf | ||
| CDRL A009.pdf | ||
| CDRL A005.pdf | ||
| CDRL A011.pdf | ||
| CDRL A002.pdf | ||
| H92241-15-R-0012.pdf | ||
| CDRL A006.pdf | ||
| CDRL A001.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ __
D. SYSTEM/ITEM
Remote Readout Unit
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Qualification Test Reports
3. SUBTITLE
A/MH-6M Block 3.0
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SOW 3.2.2 & 3.2.3
6. REQUIRING OFFICE
AMSAM-SPT
7. DD 250 REQ
LT
9. DIST
STATEMENT
D
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
The government shall have unlimited rights to this document. Contractor format is acceptable.
BLK 8 – Upon submittal, the Govt. shall have 45 days from receipt to comment on and/or approve the document. The Govt. shall have 15 days from the receipt of subsequent submittals to comment on and/or approve the document. Final copy should be submitted 20 days after receipt of comments, to include dispositions to each comment and change bars against document modifications.
BLK 9 – The following information shall be included on the deliverable: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only to protect technical or operational data or information from automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative or operational purposes. This statement may be applied to manuals, pamphlets, technical orders, technical reports, and other publications containing valuable technical or operational data.
Determination made on date of final delivery. Other requests for this document shall be referred to the Technology Applications Program Office, 401 Lee Blvd, Fort Eustis, VA 23604
BLK 10 – As required to obtain approval.
BLK 12 – 30 days after test
BLK 14a – Letter only to AMSAM-SPK
BLK 14b – Electronic copies only. Documents requiring signatures shall have signature page scanned, or digital signature shall be applied.
AMSAM-SPK LT
R
AMSAM-SPT 1 1
15. TOTAL --------- 1 1
G. PREPARED BY
Michael L. Chen
H. DATE
17 June 2015
I. APPROVED BY J. DATE
17 June 2015
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _3_ of _9_ Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP