Attachment 2 - Sample SLAs 10 Nov 2010.pdf

PDF 134 KB Posted

Attached to
SITEC Specialty Services Support for USSOCOM Federal contract opportunity
Solicitation number
H92222-10-R-0044
Issued by
United States Special Operations Command

About this file

sample SLAs

View the file

Other files for this federal contract opportunity

Other files attached to SITEC Specialty Services Support for USSOCOM, newest first.
File Type Posted
Attachment 8 - 75 RGR SOO Package 19 Jan 2011.doc DOC document
H92222-10-R-0044 0003 conformed thru AMD 0003.doc DOC document
AMD 0003 mod doc 19 Jan 2011.doc DOC document
Attachment 11 - Questions_and_Answers 18 Jan 11.doc DOC document
H92222-10-R-0044-0002 13 Jan conformed copy.pdf PDF
Attachment 7 - Contract Data Requirements List - Spec Serv 3 Jan 2011.pdf PDF
Attachment 6 - DD254 Contract Security Classification Specification 3 Jan 2011.pdf PDF
H92222-10-R-0044-0002 13 Jan 2011.pdf PDF
Attachment 8 - 75 RGR SOO Package 12 Jan 2011.pdf PDF
Attachment 11 - Questions_and_Answers 12 Jan 11.pdf PDF
Attachment 1 - Section C Specialty Services PWS V 2.1.pdf PDF
Attachment 5 - Exit Plan 3 Jan 2011.pdf PDF
Attachment 10 - SOCPAC-JSOTFP SOO Package 12 Jan 2011.pdf PDF
Attachment 2 - SLAs 3 Jan 2010.pdf PDF
Attachment 9 - SOCCENT SOO Package 12 Jan 2011.pdf PDF
Attachment 4 - Value Engineering Program 3 Jan 2011.pdf PDF
memo extending closing date.pdf PDF
Attachment 8 - 75 RGR SOO Package.pdf PDF
H92222-10-R-0044 0001.pdf PDF
Attachment 4 - Value Engineering Program _10 Aug 10_.pdf PDF
Attachment 8 - Site R SOO Package.pdf PDF
Attachment 7 - SS CDRLs.pdf PDF
H92222-10-R-0044 Spec Services.doc DOC document
Attachment 11 - SS Draft RFP Q A.pdf PDF
Attachment 1 - Specialty Services PWS V1.11 - 11.10.10.pdf PDF
Attachment 3 - Policy References and Guidance _10 Aug 10_.pdf PDF
Attachment 10 - SOCPAC-JSOTFP SOO Package.pdf PDF
Attachment 9 - SOCCENT SOO Package.pdf PDF
Attachment 6 - DD254 SS Con Security Class Spec _01 Oct 10_.pdf PDF
Attachment 5 - Exit Plan _2 Sep 10_.pdf PDF
Attachment 8 - Specialty Services TO 1.pdf PDF
Attachment 5 - Exit Plan _2 Sep 10_.pdf PDF
Attachment 1 - Specialty Services PWS V1.10 - 09.09.10.pdf PDF
Attachment 9 - Specialty Services TO 1 SLAs.pdf PDF
Attachment 3 - Policy References and Guidance _10 Aug 10_.pdf PDF
Attachment 4 - Value Engineering Program _10 Aug 10_.pdf PDF
H92222-10-R-0044 SITEC Specialty Services.pdf PDF
Attachment 10 - Questions and Answer Format 09 Sep 10.doc DOC document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H92222-10-R-0044

Attachment 2

Sample Performance Measurement SLAs

10 Nov 2010

Introduction

The Customer will evaluate contractor performance in accordance with the Service Level Agreements (SLA) contained in Appendix A to this attachment. The Customer’s evaluation will be used to calculate the Contractor’s eligibility for option year Period of Performance (PoP).

Performance Incentive Calculation

The Customer will measure and assess Contractor performance each month to determine the service level achievements performance against the Minimal Acceptable SLA performance criteria, assign a score to each SLA, and develop a monthly performance score by applying weights to each SLA score. The Customer will use the cumulative total of all months for the evaluation period to determine the Contractor’s eligibility for option year Period of Performance (PoP).

If the Contractor exceeds the Target Criteria level of performance stated in block 4B of the SLA the Customer will assign a score “1” for the SLA. If the Contractor meets the Minimum Acceptable level in Block 4C of performance the Customer will assign a score of “0” for the SLA.

If the Contractor fails to meet the Minimum Acceptable level of performance the Customer will assign a score of “-1” for the SLA.

After the Customer has completed the monthly assessment of the SLAs the Customer will determine SLA Area scores and monthly performance score using the weights in Appendix B.

The SLA Area Score will be the sum of each SLA score within the SLA Area multiplied by the weights assign to the respective SLAs. The monthly performance score will be the sum of each SLA Area score multiplied by the weights assign to the respective SLA Areas.

For each evaluation period, the Customer will assess the Contractor’s SLA performance achievement using the monthly performance scores determined. Each Evaluation Period Score will be the sum of the monthly performance scores for all months within the evaluation period.

Additional details pertaining to the Performance Incentive calculation methodology can be found in Appendix A of this document.

F-1 Specialty Services – Service Improvement Plan

1. SLA SUMMARY

1A. TASK AREA Specialty Services 1B. PERFORMANCE

CATEGORY

Quality

1C. SLA # F-1 1D. SLA NAME Service Improvement Plan

2. SLA OVERVIEW

2A. SLA DESCRIPTION IT service performance must be maintained at prescribed levels.

Unsatisfactory levels of performance or identified opportunities for improvement require the development and implementation of Service Improvement Plans (SIPs). This metric monitors the effectiveness of the Specialty Services Contractor in keeping relevant services optimized.

Service Improvement areas are identified and Improvement Plans are developed, which must include the performance measurement method and target criteria and submitted to the ITMO Lead for approval.

SIPs can also be used as a means to evolve service delivery concepts in the case of insertion of new best practices, new external standards releases, as a result of research or other lessons learned from external projects and experiences. SIPs are also used as the vehicle for major coordination of changes that are the results of proactive problem management identified solutions that must be coordinated across IT service providers.

Government-approved SIPs are implemented and managed as a project for risk, cost, schedule, progress towards service improvements, and achieving SIP defined metric goals according to schedule and plan. The SIP mechanism is used whenever service improvements or corrective modifications to services are needed. Examples include improving process compliance by modifying process to handle reoccurring exceptions or removing impediments to service area provider process compliance when in the best interest of USSOCOM as demonstrated by SIP plan approval.

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the Contract Period of Performance.

3. SLA METRICS

3A. MEASUREMENT INTERVAL The Measurement Interval is 1month.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.

3C. SOURCE OF MEASUREMENT

DATA

Project status and review documents for SIPs.

3D. METHOD OF SURVEILLANCE 100 Percent Inspe ction . Monthly report on SIPs.

3E. TIMING OF MEASUREMENT Measurements are taken within 5 calendar days of the end of the Measurement Period.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION a) Number of open SIPs meeting review criteria reviewed in the last review period must be greater than zero.

b) Percentage of Open SIPs Reviewed = Number of open SIPs meeting the specified review criteria that are reviewed in the last three review periods divided by total number of open SIPs meeting the specified review criteria.

c) When SIP action item criteria exceed a +\- 10% variance from the criteria specified in the approved SIP the days until escalation is calculated as the elapsed time in days from the Julian date the variance is escalated to ITMO leadership minus the Julian date the review concludes.

4B. TARGET CRITERIA 100% of SIP Action Items and Milestones are reviewed for costs, schedule and risks. Those where cost/resources, or the targeted service level benefits according to SIP achievement schedule are outside of 10% variance and/or at risk of failure, are escalated within the ITMO for action within 2 business days of review.

4C. MINIMUM ACCEPTABLE 90% of SIP Action Items and Milestones are reviewed for costs, schedule and risks. Those where cost/resources, or the targeted service level benefits according to SIP achievement schedule are outside of 10% variance and/or at risk of failure, are escalated within the ITMO for action within 5 business days of review.

4D. DEFINITIONS None

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY 1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.

2. Monthly reporting of SLA attainment.

5B. NOTES AND COMMENTS None

F-2 Specialty Services – Performance Management Sat isfaction Rate

CATEGORY

Quality

1C. SLA # F-2 1D. SLA NAME Performance Management Satisfaction Rate

2. SLA OVERVIEW

2A. SLA DESCRIPTION High level of USSOCOM satisfaction with Contractor delivery management of IT Services (includes the IT Service Desk services and the corresponding SITEC IT Service Areas).

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the Contract Period of Performance.

3. SLA METRICS

3A. MEASUREMENT INTERVAL The Measurement Interval is 3 months for first year and then every 6 months thereafter.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.

3C. SOURCE OF MEASUREMENT

DATA

Data will be collected from management surveys containing satisfaction criteria specified by USSOCOM that are either developed internally by USSOCOM personnel or by a USSOCOM-selected impartial 3rd party.

3D. METHOD OF SURVEILLANCE Random Sampling. The Government will issue customer satisfaction surveys to designated Government SITEC management representatives (contractors cannot participate) from USSOCOM HQ, AFSOC, NAVSOC, USASOC, MARSOC, JSOC, TSOCs, and survey responses will be tabulated to determine overall satisfaction with Contractor delivery management of IT Services using a 5 category scale. The scale is: Dissatisfied, Less than Satisfied, Satisfied, More than Satisfied, Very Satisfied.

3E. TIMING OF MEASUREMENT Measurements are taken within 5 days of the end of the Measurement Period.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION The number of users who were Satisfied, More Than Satisfied, or Very Satisfied divided by the total number of completed surveys returned. At least 30 Government personnel must complete and return surveys for the results to have at least a 90% confidence factor with a 5% error rate.

4B. TARGET CRITERIA ≥ 90% of all survey respondents are Satisfied, More Than Satisfied, or Very Satisfied with Contractor delivery management of all SITEC IT services.

4C. MINIMUM ACCEPTABLE ≥ 85% of all survey respondents are Satisfied, More Than Satisfied, or Very Satisfied with Contractor delivery management of all SITEC IT services.

4D. DEFINITIONS None.

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY 1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.

2. Monthly reporting of SLA attainment for periods surveyed. Quarterly survey reporting from USSOCOM ITMO during first year, semi-annual thereafter.

5B. NOTES AND COMMENTS None.

F-3 Specialty Services – Accuracy of Configuration / Asset Management Records

CATEGORY

Accuracy & Quality

1C. SLA # F-3 1D. SLA NAME Configuration, Asset, and Reported Accuracy

2. SLA OVERVIEW

2A. SLA DESCRIPTION IT Service Area Contractor monitored changes to IT Services supporting asset and configuration item (CI) attributes are controlled and tracked, with all system configuration and asset data promptly and accurately recorded reflecting the as-installed configuration of the infrastructure CIs within each IT Service Area provider’s area and its associated lifecycle (asset) data.

For each IT Service Area provider, validation checks are performed on a randomly selected set of CIs recorded in the Configuration Management Database (CMDB) of record and compared to the actual as-installed configuration of each CI in the randomly selected data set. Both CI and Asset attributes are validated.

Asset and configuration accuracy reports are generated and reviewed by the ITMO with the Contractor to identify where and how the configuration management process failed and determine corrective action to be taken.

2B. PERFORMANCE

PERIOD

This SLA is in effect on a continuous basis without interruption throughout the Contract Period of Performance for all baselined CIs and assets.

3. SLA METRICS

3A. MEASUREMENT

INTERVAL

The Measurement Interval is a continuous process with CI accuracy validation checks conducted at ITMO-selected periodic intervals within the monthly measurement period, as well as conducted whenever it is determined that the root cause of implementation failure of an authorized Request for Change (RFC) failed.

3B. MEASUREMENT

PERIOD

The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.

3C. SOURCE OF

MEASUREMENT DATA

BMC CMDB, BMC Configuration Exception and Reconciliation Reports, Microsoft SCCM Scan Reports, Change and Release records.

3D. METHOD OF

SURVEILLANCE

Random Sampling. Sampling will occur by ITMO of Specialty Services Contractor configuration and asset accuracy reporting. The ITSM Contractor will review the accuracy of Specialty Services Contractor managed configurations and assets using reconciliation and physical inventory. The ITMO will develop and assign SIP actions to the ITSM Contractor if accuracy of reporting falls below the minimum accuracy used in this SLA or to the Specialty Services Contractor if relevant asset or CMDB accuracy falls below Minimum Acceptable levels.

A performance level baseline will be used by CI and asset type. At USSOCOM’s sole discretion, a determine when the data regarding a service area, grouping of CIs or assets within a service area is stable enough to be baselined and the responsible IT Service Area provider’s ability to maintain configuration and asset accuracy be measured. After a service or system transition, USSOCOM may or may not remove baseline status at their discretion for items until data or process to establish baseline or measure is stable. (Examples: During initial operating capability (IOC), after a major COOP event, or during re-locations).

When a new asset is acquired or a change is made to an existing asset, the IT service provider performing this work shall be required to enter or update the asset and configuration records with accurate data for each CI, which will become the baseline for that asset. Until a CI or asset is baselined, SLA achievement will consider the minimum being met for that CI or asset or it will be excluded from the SLA calculation.

3E. TIMING OF

MEASUREMENT

Performed on an ongoing basis throughout the contract term once items are baselined.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION For IT Service Provider accuracy of CI and Assets:

• Quantity of reviewed CIs having inaccurate, incomplete, or improperly documented CI or asset attributes divided by the total number of CIs baselined by IT service provider area.

4B. TARGET CRITERIA The following targets are established for a CI and for asset accuracy.

IT Service Provider Within 12 Mo of Initial Baseline

Within 24 Mo of Initial Baseline

>24 Mo after Initial Baseline

Networks, Data Center, Distributed Computing, Applications

<=15% CI

inaccuracy

<=10% CI

inaccuracy

<= 5% CI

inaccuracy

<=15% asset inaccuracy

<=10% asset inaccuracy

<= 5% asset inaccuracy

4C. MINIMUM

ACCEPTABLE

The following minimums are established for a CI and for asset accuracy.

IT Service Provider Within 12 Mo of Initial Baseline

Within 24 Mo of Initial Baseline

>24 Mo after Initial Baseline

Networks, Data Center, Distributed Computing, Applications

<=25% CI

inaccuracy

<=15% CI

inaccuracy

<= 10% CI

inaccuracy

<=25% asset inaccuracy

<=15% asset inaccuracy

<= 10% asset inaccuracy

4D. DEFINITIONS Asset allocation usage is defined as the total number of discrete hardware items, software licenses, user accounts, etc. that form the basis of determining total unit counts pertaining to overall resource utilization within each IT Service Area (e.g., number of valid individual personnel Active Directory user accounts, number of installed servers, amount in gigabytes of installed storage, number of routers, firewalls, number of software licenses procured and in use, etc.).

5. SLA ADMINISTRATION

5A. REPORTING

FREQUENCY

1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.

2. Monthly reporting of SLA attainment.

5B. NOTES AND

COMMENTS

The CI attributes that are validated should include at a minimum: Name, Description, Custodian/Steward, Criticality, Type, Manufacturer, Serial number, Support Provider, License information, Version, History, Date of Purchase, Date of Install, Current status, Relationships to IT Services and CIs, how used, Relationships to other service management data objects (incident, problems, changes, etc.), documentation location (operating, contractual, User, COOP, etc.)

Once an enterprise asset management process is established, lifecycle data is captured during procurement/ installation activities (IMAC) and maintained for at least the following: asset location, asset tag, asset serial number, inventory quantity, purchase date, purchase date, cost and warranty/ contract expiration dates.

These are then sampled from the data stores that comprise the CMDB and asset databases and compared to discovery and audit data.

Method of reconciliation is defined as when a sampling criterion is determined and BMC scan runs against SCCM formerly SMS are other discovery/ scanning data sources.

Data is parsed by the tool into two records and compared line for line in the CMDB. The exceptions are then presented in a report/ screen. On the screen Contractor or IT service provider will need to check which fields to use – current CMDB or scan value. It forces reconciliation via the procedures. Note this is the tool the IT Service Area providers will use to clean their data. Not every run of this process is an SLA report, only a monthly run. IT Service Area providers are going to likely run this weekly and will need a day or so prior to SLA report run to clean up where they can. Also, this procedure is used to identify “leaks” where configuration drift is occurring and fix root cause of inaccuracy.

These are then sampled from the data stores that comprise the CMDB and asset databases and compared to discovery and audit data.

The method of reconciliation is defined as when a sampling criterion is determined and BMC scan runs against SCCM formerly SMS are other discovery/ scanning data sources. Data is parsed by the tool into two records and compared line for line in the CMDB. The exceptions are then presented in a report/ screen. On the screen the Contractor or IT service provider will need to check which fields to use – current CMDB or scan value. It forces reconciliation via the procedures. Note that this is the tool the IT service providers will use to clean their data. Not every run of this process is in a SLA report, only a monthly run. IT service providers are going to likely run this weekly and a day or so prior to SLA report run to clean up where they can. This procedure is also used to identify “leaks” where configuration drift is occurring and fix root cause of inaccuracy.

These targets take into account the maturity and ability to capture configuration and asset information by area.

F-4 Specialty Services – Security Incident Alert Response

CATEGORY

Quality and Timeliness

1C. SLA # F-4 1D. SLA NAME Security Incident Alert Response

2. SLA OVERVIEW

2A. SLA DESCRIPTION Elapsed Time from alert to analyze and notify USSOCOM of security events.

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the Contract Period of Performance on a 24x7 basis.

3. SLA METRICS

3A. MEASUREMENT INTERVAL The Measurement Interval is daily.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 and ends at 24:00 each day.

3C. SOURCE OF MEASUREMENT

DATA

Alert and monitoring logs.

3D. METHOD OF SURVEILLANCE 100 Percent Inspection. Review of elapsed time from alert to analysis and notification.

3E. TIMING OF MEASUREMENT Measurements are taken 4 hours after the end of the Measurement Period.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION Elapsed Time: Time of response minus time of event logged = response time. SLA attainment is reached if response time is < = to target criteria.

4B. TARGET CRITERIA 100%; 30 minutes or less response time for true and positive security incidents with priority 1 or 2 assignments.

4C. MINIMUM ACCEPTABLE 99%; 30 minutes or less response time for true and positive security incidents with priority 1 or 2 assignments.

4D. DEFINITIONS None.

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY 1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.

F-5 Specialty Services – Software Patch Coverage

CATEGORY

Quality and Responsiveness

1C. SLA # F-5 1D. SLA NAME Software Patch Coverage

2. SLA OVERVIEW

2A. SLA DESCRIPTION Software patch coverage is a part of the change, release, and security management process that allows USSOCOM to install vendor supplied software “patches” or “fixes” to correct deficiencies that exist in the vendor’s software from a security, vulnerability and functionality aspect. USSOCOM has a reasonable expectation that these patches can be pushed out from central locations within a timely manner without causing additional incidents.

These target deployment windows vary depending upon threat, vulnerability, risk of incident, and business priorities. Therefore, targets are assigned based on USSOCOM priority. Often as is the case many of the end-user devices may be off-line, locked in a secure location while the user is deployed or on temporary duty (TDY). In this case targets are assigned by priority upon first time connectivity is re-established on a USSOCOM network. This measure is designed to look at a release group as a target set of devices with a “push” or release of a patch to the target counted as one patch deployment of several instances of the patch being deployed. Due to network or bandwidth the target device group may be expanded or narrowed.

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the Contract Period of Performance on a 24x7 basis.

3. SLA METRICS

3A. MEASUREMENT INTERVAL The Measurement Interval is 1month.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.

3C. SOURCE OF MEASUREMENT

DATA

BMC Release Management, End-user device scanning logs, HBSS, Alert, monitoring, and domain login logs.

3D. METHOD OF SURVEILLANCE Review of elapsed time from alert to analyze and notification.

3E. TIMING OF MEASUREMENT Measurements are taken 7 business days after the end of the Measurement Period. (To allow for Priority 3 SLA Attainment started in the previous reporting cycle)

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION Measurement begins upon approval received by the Contractor for a patch release to a target group of devices and ends once a scan or patch distribution log confirms the patch has been applied. Patches that cause an incident directly attributable to the patch or the distribution of the patch within 2 business days (48 hours of stable use in the production environment) are not counted as successful and must be re-patched with timers continued from their last value for each patch group that was recorded. Patches that are backed out due to external discovered issues are at the request of USSOCOM are not counted.

End-User Device Patch Coverage = Accumulated patch time per release and percentage of coverage are captured and logged for each target group upon successful completion. The number of target group patches that met coverage and patch time targets is counted. This number is divided by the total number of target patch group patches deployed within the observation period. SLA attainment if End-user Device Patch Coverage is < = to target criteria and the minimum acceptable standard is met or exceeded.

4B. TARGET CRITERIA Target for the observation period is met 95% based on the following target criteria:

Target Performance

Gold Silver Bronze

100% coverage within release package to target group within 1 business day or within 4 hours of first connectivity thereafter without related incident.

100% coverage within release package to target group within 3 business days or within 6 hours of first connectivity thereafter without related incident.

100% coverage within release package to target group within 6 business days or within 24 hours of first connectivity thereafter without related incident.

4C. MINIMUM ACCEPTABLE Target for the observation period is met 85% based on the following target criteria:

Minimum Acceptable Performance

Gold Silver Bronze

80% coverage within release package to target group within 1 business day or within 4 hours of first connectivity thereafter without related incident.

90% coverage within release package to target group within 6 business days or within 6 hours of first connectivity thereafter without related incident.

100% coverage within release package to target group within 10 business days or within 24 hours of first connectivity thereafter without related incident.

4D. DEFINITIONS None

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY Reporting to commence upon Contract Award and continue throughout the Period of Performance.

Monthly reporting of SLA attainment.

5B. NOTES AND COMMENTS None

F-6 Specialty Services – Changes and Releases witho ut Incident

CATEGORY

Quality and Accuracy

1C. SLA # F-6 1D. SLA NAME Changes / Releases without Incidents

2. SLA OVERVIEW

2A. SLA DESCRIPTION Changes and Releases must be introduced into the infrastructure without unscheduled service disruption. The Incident Management system will be scanned to identify all Incident tickets classified as Priority #1 and #2 that have occurred within the Measurement Interval. Details of each selected Incident ticket will be reviewed and compared to RFC Release Management tracking records to determine if there is any direct correlation between any changes introduced up until the previous release cycle or 30 calendar days (whichever is shorter in duration) prior to an incident occurrence. Each such event correlation will be considered as a deficiency in the Change and Release Management processes and included as a “Failed Change” for SLA calculation. Also, the Incident will be escalated to Problem Management to perform Root Cause Analysis (RCA) to determine the underlying cause and recommend corrective action.

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the Contract Period of Performance.

3. SLA METRICS

3A. MEASUREMENT INTERVAL The Measurement Interval is weekly.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.

3C. SOURCE OF MEASUREMENT

DATA

Measurement data will be sourced from the Service Desk Incident Management system, the Change Management request for change (RFC) record repository, and the Release Management record repository.

3D. METHOD OF SURVEILLANCE Periodic Inspection. Monthly reporting of SLA attainment providing the results of failed change analysis. The Government ITMO personnel will periodically inspect service desk data for a reporting period(s) to ensure / validate accurate reporting.

3E. TIMING OF MEASUREMENT Measurements are taken within 7 calendar days of the end of the Measurement Period.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION The number of Failed Changes divided by the total number of approved RFCs introduced into a production system within the measurement period.

4B. TARGET CRITERIA 0% of introduced RFCs are determined to have caused a Priority 1 or Priority 2 Incident.

4C. MINIMUM ACCEPTABLE ≤ 5% of all introduced RFCs are determined to have caused a Priority 1 or Priority 2 Incident.

4D. DEFINITIONS None.

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY 1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.

F-7 Specialty Services – Staffing Management Timeli ness

CATEGORY

Quality / Availability

1C. SLA # F-7 1D. SLA NAME Staffing Management Timeliness

2. SLA OVERVIEW

2A. SLA DESCRIPTION The Contractor staffs all key personnel, as identified in the Contractor contract organization documents, as may be amended from time to time by customer, with personnel having appropriate skills, training, and experience to meet the job requirements in a timely manner. Contractor is required to notify the Customer in writing within 24 hours of date of initial position vacancy, including position title, name of personnel, the impact such vacancy is anticipated to have on existing work, and action to be taken to mitigate risk.

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the term of the task order agreement.

3. SLA METRICS

3A. MEASUREMENT INTERVAL Measurements to be taken on a rolling daily calendar day basis for each unfilled position.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 on the first calendar day of the month and ends at 24:00 on the last calendar day of the month.

3C. SOURCE OF MEASUREMENT

DATA

The customer will create, maintain, and update a key personnel log where the Contractor will, at minimum, record and track key position titles and responsibilities, date that the position was initially established, date that the key position was staffed, name of the individuals filling the key position at any given period of time, the date that (for any reason) the key position vacated, and the cumulative elapsed time the position is vacant.

3D. METHOD OF SURVEILLANCE 100 Percent Inspection. Monthly report on SLA attainment providing length of elapsed time to fill vacant key positions with qualified and trained staff from date of initial vacancy. The Customer will conduct full reviews of all Contractor key personnel vacancies and the timely filling of open key personnel positions.

3E. TIMING OF MEASUREMENT Measurements are taken monthly on a per-position vacancy basis commencing no more than 24 hours following the date a position is created and unfilled or vacated by Contractor staff member.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION Total elapsed time in calendar days to fill an open key position from date position is initially vacated until qualified appropriately cleared personnel are working onsite is calculated as:

• The Minimum Service Level shall be obtained if the total of calendar days to fill position <= 28 calendar days ; and

• The Target shall be obtained if the total of calendar days to fill position <= 14 calendar days applicable to all open key positions during the measurement period.

4B. TARGET CRITERIA Total elapsed time of not more than 4 calendar weeks (i.e., 14 calendar days) to fill any given key position vacancy with appropriately cleared qualified personnel.

4C. MINIMUM ACCEPTABLE Total elapsed time of not more than 8 calendar weeks (i.e., 28 calendar days) to fill any given key position vacancy with qualified and appropriately cleared qualified personnel.

4D. DEFINITIONS None.

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY 1. Reporting to commence upon Task Order Award and continue throughout the Period of Performance.

2. Monthly reporting of SLA attainment with report provided to the Customer within 5 working days of the end of each calendar month reporting period.

F-8 Specialty Services – Incident Monitoring

CATEGORY

Quality / Process Improvement

1C. SLA # F-8 1D. SLA NAME Incident Monitoring

2. SLA OVERVIEW

2A. SLA DESCRIPTION The Customer will monitor the incident management resolution process for incidents, trace resolution responsibility to the appropriate IT Service Area provider, and submit a report that analyzes and identifies service quality and work volume trends regarding resolution performance relative to the number of sampled incidents that the provider handled and resolved on first occurrence versus the number of handled incidents that the provider reported as resolved, but subsequently reoccurred, resulting in repeated resolution efforts of a single incident.

2B. PERFORMANCE PERIOD This SLA is in effect on a continuous basis without interruption throughout the contract Period of Performance.

3. SLA METRICS

3A. MEASUREMENT INTERVAL The Measurement Interval is 1 month.

3B. MEASUREMENT PERIOD The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.

3C. SOURCE OF MEASUREMENT

DATA

BMC Remedy ticketing and CMDB related incident history records for Configuration Items serviced.

3D. METHOD OF SURVEILLANCE Periodic Inspection . Monthly report on SLA attainment providing the percent of total incidents of any severity level type handled by any IT Service provider result in repeat incidents across all providers. The Customer will periodically inspect all incident report data for a reporting period(s) to ensure / validate accurate reporting. Review will be by severity and time period.

3E. TIMING OF MEASUREMENT Measurements are taken within 5 calendar days of the end of the Measurement Period.

3F. EXCEPTIONS Field left blank intentionally.

4. SLA MEASUREMENT

4A. CALCULATION Calculated to each IT Service Area provider and for each incident severity levels

Service Quality Q% = Ir / It

Where: Q = Service Quality Impact per measurement period.

Ir = Number of recurring incidents (including those that were repeat but not correctly matched against open or previous closed/ resolved incidents) per severity type.

It = Total number of incidents per severity type.

Volume Trend VT = It P1 / It P2

Where: VT% = Volume Trend.

It P1 = Total number of incidents per severity type current period.

It P2 = Total number of incidents per severity type previous period.

4B. TARGET CRITERIA Service Quality Impact (Q) <=5% of total incidents assigned to any IT Service Area provider (by the Service Desk or ITMO) for any severity level will result in repeat incidents across all providers.

4C. MINIMUM ACCEPTABLE Service Quality Impact (Q) ≤10% of total incidents of any severity level type handled by any IT Service provider result in repeat incidents across all providers.

VT% trend should be decreasing on a month-to-month basis by >= 0% (No increase month-over-month/ measurement-period to measurement-period)

4D. DEFINITIONS See definition below of Incident Severity Levels.

5. SLA ADMINISTRATION

5A. REPORTING FREQUENCY 1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.

2. Monthly reporting of SLA attainment.

5B. NOTES AND COMMENTS The metric does not account for the potential negative impact of a single Severity Level 1 or 2 incidents causing multiple service disruptions which collectively overshadow all other incidents in a given month.

At the Customer discretion, the contractor and severity with the most incidents for a monthly reporting period may have SIPs established to drive improvements in incident handling. The goal is to reduce mission disruption and prevent future reoccurrences of the same errors.

File details come from the government source that posted it. Updated .