Gus Harrison C.F. - Smoke Purge System Repair & Replace - CD Drawings-1.pdf
PDF 23 MB Posted
- Solicitation number
- RFQ 171 260000000466 3
- Issued by
- Michigan
About this file
This is a Construction Drawings document for the Michigan Department of Licensing and Regulatory Affairs (DLRA) related to the Gus Harrison Correctional Facility's smoke purge system replacement project (Contract 472/24055.DPL). The document contains detailed Construction Drawings (CD) that provide the technical specifications and design requirements for replacing the existing smoke purge system at the facility. The drawings serve as the basis for bidders to understand the scope of work, including the removal of the current system and installation of new components to meet current safety and operational standards for the correctional facility.
The Construction Drawings are essential technical documents that establish the exact specifications, dimensions, materials, and installation requirements that contractors must follow to complete the smoke purge system replacement. These drawings enable potential bidders to develop accurate cost estimates and project timelines. The document functions as a critical reference for all parties involved in the procurement process, ensuring that submitted bids are based on a consistent understanding of the work scope and technical requirements necessary to successfully complete the system replacement project at Gus Harrison Correctional Facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .