Construction Addendum 2.pdf

PDF 114 KB Posted

Attached to
472/24055. DPL; Gus Harrison CF - Replace Smoke Purge System
Solicitation number
RFQ 171 260000000466 3
Issued by
Michigan

About this file

This is a Construction Bid Addendum issued by the Department of Technology, Management and Budget (DTMB), State Facilities Administration Design & Construction Division, for the Gus Harrison Correctional Facility Smoke Purge System Repair/Replace project (File Number 472/24055.DPL). The addendum was issued on October 6, 2026, with a bid opening date of October 14, 2026. The professional administering the project is Matrix Consulting Engineers, with David Lenz serving as Project Director. This addendum represents a clarification and modification to the original bidding documents that all bidders must acknowledge to avoid bid rejection.

The key clarification provided in this addendum states that the base bid does not include temporary walls, which will be issued as separate change orders if required once the project is under contract. Contractors are instructed to provide pricing for temporary wall scope to DTMB and Michigan Department of Corrections (MDOC) for review. This addendum becomes part of the contract documents and must be acknowledged by bidders in the Bid Summary and Bid Form as a condition of bid acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 2

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

10/6/2026

PROJECT NAME

Gus Harrison Correctional Facility – Smoke Purge System Repair/ Replace

FILE NUMBER

472/24055.DPL

PROFESSIONAL

Matrix Consulting Engineers

PROJECT DIRECTOR

David Lenz

BID OPENING DATE:

10/14/2026

ADDENDUM ITEMS:

1. Clarification: Base Bid does not include the temporary walls. Temporary wall scope will be issued as changeorders if deemed required once the project is under contract. Contractor to provide pricing for DTMB and MDOC to review.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Troy Thelen, Matrix DATE: 10/6/2026

APPROVED BY:

PROJECT DIRECTOR: David Lenz

DATE: 10/6/2026