1340_W._6th_St._price_form.pdf
PDF 18 KB Posted
- Solicitation number
- GS-1340-W6
About this file
Price form
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL EVALUATED PRICE FORM
GS-1340-W6
OFFEROR: ________________________________________________________________
I. LUMP SUM BASE BID: ________________________________________________
II. OPTION
Option 1: Basement Tech Workshop
III. A. ESTIMATED MODIFICATION COSTS:
Provide your mark-up rate that will be in the form of a single mark-up to be applied to the total direct cost of any modification. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated sum for direct costs for future modifications (based on agency precedent) to arrive at the evaluated future modification mark-up cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.
Contract Modification Mark-Up Rate.
MARK-UP RATE ESTIMATED DIRECT TOTAL ESTIMATED
COSTS MARK-UP
____________% X $450,000.00 = $_____________________
B. EVALUATED COMPENSABLE DELAY COSTS:
Provide your daily delay rate to be used as the sole daily delay cost to include all contractor and subcontractor (at any tier) field overhead, home office overhead, general overhead, general and administrative costs, commissions, profits, bonds, insurance fees, and any other direct and indirect costs which are the result of delays caused solely by the Government. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated calendar days of delay (based on agency precedent) to arrive at the evaluated total estimated delay cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.
Evaluated Compensable Delay Costs:
CONTRACTOR OFFERED EST. DELAY TOTAL ESTIMATED
DAILY RATE DELAY COST
$___________/Day X 30 Calendar Days = $_________________________
TOTAL EVALUATED PRICE: $_________________________________________________
(Sum of I, II., III.A and III.B.
BID BREAKDOWN OF BASE CONTRACT WORK ONLY
RFP GS-1340-W6
OFFEROR: __________________________________________________________
ARCHITECTURAL/ENGINEER: $____________________________________
DIVISION 1: $____________________________________
FOUNDATIONS: $____________________________________
BASEMENT CONSTRUCTION: $____________________________________
EXTERIOR CLOSURE: $____________________________________
ROOFING: $____________________________________
INTERIOR CONSTRUCTION: $____________________________________
STAIRS: $____________________________________
INTERIOR FINISHES: $____________________________________
CONVEYANCE SYSTEMS: $____________________________________
PLUMBING: $____________________________________
HVAC: $____________________________________
FIRE PROTECTION: $____________________________________
ELECTRICAL: $____________________________________
EQUIPMENT: $____________________________________
FURNISHINGS: $____________________________________
SELECTIVE BUILDING DEMOLITION: $____________________________________
SITEWORK – BUILDING RELATED: $____________________________________
SITEWORK – NON-BUILDING: $____________________________________
OTHER: $____________________________________
TOTAL LUMP SUM BASE BID: $__________________________________________
File details come from the government source that posted it. Updated .