1340_W._6th_St._bid_sheet.pdf

PDF 18 KB Posted

Attached to
1340 W. 6th St. Repair and Alteration Design Build Project
Solicitation number
GS-1340-W6
Issued by

About this file

Revised bid sheet

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE FORM - GS-1340-W6

OFFEROR: ________________________________________________________________

I. LUMP SUM BASE BID: ________________________________________________

II. OPTIONS

Option 1: Basement Tech Workshop

Option 2: Painting of all interior window mullions

III. A. ESTIMATED MODIFICATION COSTS:

Provide your mark-up rate that will be in the form of a single mark-up to be applied to the total direct cost of any modification. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated sum for direct costs for future modifications (based on agency precedent) to arrive at the evaluated future modification mark-up cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.

Contract Modification Mark-Up Rate:

MARK-UP RATE ESTIMATED DIRECT TOTAL ESTIMATED

COSTS MARK-UP

____________% X $450,000.00 = $_____________________

B. EVALUATED COMPENSABLE DELAY COSTS:

Provide your daily delay rate to be used as the sole daily delay cost to include all contractor and subcontractor (at any tier) field overhead, home office overhead, general overhead, general and administrative costs, commissions, profits, bonds, insurance fees, and any other direct and indirect costs which are the result of delays caused solely by the Government. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated calendar days of delay (based on agency precedent) to arrive at the evaluated total estimated delay cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.

Evaluated Compensable Delay Costs:

CONTRACTOR OFFERED EST. DELAY TOTAL ESTIMATED

DAILY RATE DELAY COST

$___________/Day X 30 Calendar Days = $_________________________

TOTAL EVALUATED PRICE: $_________________________________________________

(Sum of I, II., III.A and III.B.)

BID BREAKDOWN OF BASE CONTRACT WORK ONLY

RFP GS-1340-W6

OFFEROR: __________________________________________________________

ARCHITECTURAL/ENGINEER: $____________________________________

DIVISION 1: $____________________________________

FOUNDATIONS: $____________________________________

BASEMENT CONSTRUCTION: $____________________________________

EXTERIOR CLOSURE: $____________________________________

ROOFING: $____________________________________

INTERIOR CONSTRUCTION: $____________________________________

STAIRS: $____________________________________

INTERIOR FINISHES: $____________________________________

CONVEYANCE SYSTEMS: $____________________________________

PLUMBING: $____________________________________

HVAC: $____________________________________

FIRE PROTECTION: $____________________________________

ELECTRICAL: $____________________________________

EQUIPMENT: $____________________________________

FURNISHINGS: $____________________________________

SELECTIVE BUILDING DEMOLITION: $____________________________________

SITEWORK – BUILDING RELATED: $____________________________________

SITEWORK – NON-BUILDING: $____________________________________

OTHER: $____________________________________

TOTAL LUMP SUM BASE BID: $__________________________________________

File details come from the government source that posted it. Updated .