Attachment 13 - Tactile Warning Surfacing

View the file

Other files for this federal contract opportunity

Other files attached to General Construction for Perimeter Security Improvements Project, newest first.
File Type Posted
Amendment_5_to_GS11P16MKC7003.pdf PDF
Amendment_4_to_GS11P16MKC7003.pdf PDF
Site_Visit__2_Sign_In_Sheet.pdf PDF
Amendment_3_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_321413_(Unit_Paving)_dated_3_June_2016.pdf PDF
Revised_DWG_DETAILS_L503_dated_3_June_2016.pdf PDF
GC_Past_Performance_Reference_Form.pdf PDF
Amendment_1_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_334100_(Storm_Piping)_dated_3_June_2016.pdf PDF
The_Solicitation_dated_9June16_Revised.pdf PDF
Attachment_A_-_SITE_VISIT_Info_Sheet_Revised.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment_11_EnvironmentalAssessment_Jan_2012.pdf PDF
GSA527-15.pdf PDF
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
Attachment 12B_Traffic Impact Study.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment_3__Final_Drawing_Mylar_Submission.pdf PDF
Attachment_12B_Traffic_Impact_Study.pdf PDF
Pricing_Sheet.pdf PDF
Attachment_6B_C D-Waste-Monthly-Report.PerimeterSecurity_(1).xlsx XLSX spreadsheet
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment_5_Safety__and_Health_Specification_Section_01546.pdf PDF
The_Agreement_Small_Business_Set-Aside_GC_FINAL.pdf PDF
Attachment 6A_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Attachment_2_Project_Specifications_Manual_6_March_2015.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment_4_ConstructionWasteMgmt_and_Disposal_Spec.pdf PDF
Attachment_12A_Traffic_Impact_Study_Jan_2012.pdf PDF
Attachment_9_Geotechnical_Engineering_Report_3_March_2015.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
The_Solicitation_Small_Business_Set_Aside_GC_LPTA__FINAL.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment_8_USMSContractor_Security_clearance_request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 12A_Traffic Impact Study Jan 2012.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment 10_ALTA-ACSM Final Survey 06-24-15 —
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
SF1442_Form_(GS-11-P-16-MK-C-7003).pdf PDF
C301_GC_Reps_ _Certs.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Show all 50

General Construction for Perimeter Security Improvements Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Albert V. Bryan U.S. Courthouse Perimeter Security Improvements June 3, 2016

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY

Do not remove this notice – Properly destroy or return documents when no longer needed

TACTILE WARNING SURFACING 321726 - 1

Geier Brown Renfrow Architects, LLC | Carvalho & Good, PLLC Final Submission

SECTION 32 1726

TACTILE WARNING SURFACING

PART 1 - GENERAL

A. DESCRIPTION

1. This section specifies furnishing and installing Cast in Place Detectable/Tactile

Warning Surface tiles where indicated.

B. QUALITY ASSURANCE

1. Provide Case-In-Place Warning tiles and accessories as produced by a single manufacturer with a minimum of three (3) years of experience in the manufacturing of Cast-in-Place Warning tiles.

2. Installer’s Qualifications: Engage an experienced installer certified in writing by

Cast-In-Place Warning tile manufacturer as qualified for installation, who has successfully completed installations similar in material, design, and extent to that indicated for the project.

3. Provide Cast-in-Place Warning tiles which are in compliance with the following standards (or most recent):

a. Americans with Disabilities Act (Title III Regulations, 28 CFR Part 36

ADA STANDARDS FOR ACCESSIBLE DESIGN, Appendix A, Section 4.29.2 DETECTABLE WARNINGS ON WALKING

SURFACES).

4. Vitrified Polymer Composite (VPC) Cast-in-Place Warning tiles shall be an epoxy polymer composition with a ultra-violet coating employing aluminum oxide particles in the truncated domes; “Armor Tile” as distributed under license by Engineered Plastics (1-800-682-2525) or equivalent product approved prior project award.

5. Dimensions: See drawings for VDOT approved dimensions.

6. Product Data: Vitrified Polymer Composite (VPC) Cast-in-Place Warning tiles shall meet or exceed the following criteria:

ASTM D 695 Compressive Strength ≥28,000 psi

ASTM D 790 Flexural Strength ≥25,000 psi

ASTM D 638 Tensile Strength ≥19,000 psi

ASTM D 5420 Impact Resistance ≥550 in-lbf/in

ASTM D 696 Coefficient of Thermal Expansion 2.78 x 10 (-6)/F

ASTM C 1028 Static Coefficient of Friction ≥ 0.80

ASTM E 84 Flame Spread Index ≤ 25

Do not remove this notice – Properly destroy or return documents when no longer needed

TACTILE WARNING SURFACING 321726 - 2

ASTM D 570 Water Absorption ≤ 0.05%

ASTM C 501 Abrasive Wear Index lw ≥ 500

ASTM D 2486 Abrasive Scrub Test ≤ 0.06

ASTM B 117 Salt Spray (300 hrs) No Failure

ASTM D 1037 Accelerated Aging Cycle Testing No Failure

ASTM D 543 Chemical Resistance No Failure

ASTM G 155 Accelerated Weathering ΔE < 3

C. SUBMITTALS

1. Product Data: Submit manufacturer’s literature describing products, installation procedures and routine maintenance.

2. Samples for Verification Purposes: Submit one (1) 12” x 12” size tile sample.

3. Shop drawings are required for products specified showing fabrication details, composite structural system, tile surface profile, fastener and anchor locations, plans of tile placement including joints, and material to be used as well as outlining installation materials and procedure.

4. Material Test Reports: Submit complete test reports from qualified accredited independent testing laboratories to qualify that materials proposed for use are in compliance with requirements and meet or exceed the properties indicated on the specifications. All tests shall be conducted on a Cast in Place Warning tile (or approved equal) as certified by a qualified independent testing laboratory.

5. Maintenance Instructions: Submit copies of manufacturer’s specified installation and maintenance practices for each type of Warning tile and accessory as required.

D. DELIVERY, STORAGE AND HANDLING

1. Cast-in-Place Warning tiles shall be suitably packaged or crated to prevent damage in shipment and handling. Finished surfaces shall be protected by sturdy plastic wrappings to protect tile from concrete residue during installation and tile type shall be identified by part number.

2. Cast-in-Place Warning tiles shall be delivered to location at building site for storage prior to installation.

E. SITE CONDITIONS

1. Environmental Conditions and Protection: Maintain minimum temperature of

41°F in spaces to receive Cast-in-Place Warning tiles for at least 24 hours prior to installation, during installation, and for not less than 24 hours after installation.

2. The use of water for work, cleaning or dust control, etc. shall be contained and controlled and shall not be allowed to come into contact with the general public.

Provide barricades or screens to protect the general public.

Do not remove this notice – Properly destroy or return documents when no longer needed

TACTILE WARNING SURFACING 321726 - 3

F. MANUFACTURER’S WARRANTY

1. Cast-in-Place Warning tile shall be warranted in writing for a period of five (5)

Years from date of substantial completion. The guarantee includes factory defects, breakage, and deformation.

G. INSTALLATION WARRANTY

1. Cast-in-Place Warning tile installation shall be warranted in writing for a period of two (2) years. Alternate products approved during the tendering process must be guaranteed for an additional three (3) years. Product must be guaranteed from defective work.

PART 2 – PRODUCTS

A. MANUFACTURERS

1. Basis of Design: The Vitrified Polymer Composite (VPC) Cast-in-Place

Detectable/Tactile Warning Surface tile specified is based on “Armor Tile” as distributed under license by Engineering Plastics Inc. (1-800-682-2525).

Existing engineering and field tested products, which have been in successful service for a period of three (3) years are subject to compliance with requirements, may be incorporated in the work and shall meet or exceed the specified test criteria and characteristics.

2. Color: Color shall be homogeneous throughout the tile.

PART 3 - EXECUTION

A. INSTALLATION

1. During Cast-in-Place Detectable/Tactile Warning Surface tile installation procedures, ensure adequate safety guidelines are in place and that they are in accordance with the applicable industry and government standards.

2. Prior to placement of the Cast-in-Place Warning tile system, review manufacturer and contract drawings with the Contractor prior to the construction and refer any and all discrepancies to the Engineer.

3. The specifications of the structural embedment flange system and related materials shall be in strict accordance with the contract documents and the guidelines set by their respective manufacturers. Not recommended for asphalt applications.

4. The physical characteristics of the concrete shall be consistent with the contract specifications while maintaining a slump range of 4-7 inches to permit solid placement of the Cast-in-Place Warning tile system. An overly wet mix may cause the tile to float. Under these conditions, suitable weights such as 2 concrete blocks or 25 lb sandbags shall be placed on each tile.

Do not remove this notice – Properly destroy or return documents when no longer needed

TACTILE WARNING SURFACING 321726 - 4

5. The concrete pouring and finishing operations require typical mason’s tools, however, a 4’ long level with electronic slope readout, 25 lb weights, and a large non-marring rubber mallet are specific to the installation of the Cast-in-Place

Warning tile system. A vibrating mechanism such as that manufactured by

Vibco can be employed, if desired. The vibrating unit should be fixed to a soft base such as wood, at least 1 foot square.

6. The factory-installed plastic sheeting must remain in place during the entire installation process to prevent the splashing of concrete onto the finished surface of the tile.

7. When preparing to set the tile, it is important that no concrete be removed in the area to accept the tile. It is imperative that the installation technique eliminates any air voids under the tile. Holes in the tile perimeter allow air to escape during the installation process. Concrete will flow through the large holes in each embedment flange on the underside of the tile. This will lock the tile solidly into the cured concrete.

8. The concrete shall be poured and finished true and smooth to the required dimenstions and slope prior to the tile placement. Immediately after finishing concrete, the electronic level should be used to check that the required slope is achieved. The tile shall be placed true and square to the curb edge in accordance with the contract drawings. The Cast-in-Place Warning tiles shall be tamped (or vibrated) into the fresh concrete to ensure that the field level of the tile is flush to the adjacent concrete surface. The embedment process should not be accomplished by stepping on the tile as this may cause uneven setting which can result in air voids under the tile surface. The contract drawings indicate that the tile field level (base of truncated dome) is flush to adjacent surfaces to permit proper water drainage and eliminate tripping hazard between adjacent finishes.

9. In cold weather climates it is recommended that the Cast-in-Place Warning tiles be set deeper such that the top of the domes are level to the adjacent concrete on the top and sides of ramp and that the base of domes to allow water drainage.

This installation will reduce the possibility of damage due to snow clearing operations.

10. Immediately after placement, the tile elevation is to be checked to adjacent concrete. The elevation and slope should be set consistent with contract drawings to permit water drainage to curb as the design dictates. Ensure that the field surface of the tile is flush with the surrounding concrete and back of curb so that no ponding is possible on the tile at the back side of the curb.

Do not remove this notice – Properly destroy or return documents when no longer needed

TACTILE WARNING SURFACING 321726 - 5

11. While concrete is workable, a 3/8” radius edging tool shall be used to create a finished edge of concrete, then a steel trowel shall be used to finish the concrete around the tile’s perimeter, flush to the field level of the tile.

12. During and after the tile installation and the concrete curing stage, it is imperative that there is no walking, leaning or external forces placed on the tile that may rock the tile causing a void between the underside of tile and concrete.

13. Following tile placement, review installation tolerances to contract drawings and adjust tile before the concrete sets. Two suitable weights of 25 lb each may be required to be placed on each tile as necessary to ensure solid contact of the underside of tile to concrete.

14. Following the concrete curing stage, protective plastic wrap is to be removed from the tile surface by cutting the plastic with a sharp knife, tight to the concrete /tile interface. If concrete bled under the plastic, a soft brass wire brush will clean the residue without damage to the tile surface.

15. If desired, individual tiles can be bolted together using ¼” or equivalent hardware. This can help to ensure that adjacent tiles are flush to each other during the installation process. Tape of caulking can be placed on the underside of the bolted butt joint to ensure that concrete does not rise up between the tiles during installation. Any protective plastic wrap which was peeled back to facilitate bolting or cutting, should be replaced and taped to ensure that the tile surface remains free of concrete during the installation process.

B. CLEANING, PROTECTING AND MAINTENANCE

1. Protect tiles against damage during construction period to comply with

Warning tile manufacturer’s specification.

2. Protect tiles against damage from rolling loads following installation by covering with plywood or hardwood.

3. Clean tiles not more than four days prior to date scheduled for inspection intended to establish date of substantial completion in each area of the project.

Clean tile by method specified by tile manufacturer.

4. Comply with manufacturer’s maintenance manual for cleaning and maintaining tile surface and it is recommended to perform annual inspections for safety and integrity.

END OF SECTION