L.1 FAR and GSAR Provisions in Full Text
52.216-1 -- Type of Contract. (Apr 1984) The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.
(End of Provision) 52.233-2 -- Service of Protest. (Sep 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from GSA PBS/7PQB, 819 Taylor St, Fort Worth TX 76102
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision) 52.252-1 -- Solicitation Provisions Incorporated by Reference. (Feb 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vfedara.htm
(End of Provision) 52.252-3 -- Alterations in Solicitation. (Apr 1984) Portions of this solicitation are altered as follows:
(End of Provision) 52.252-5 -- Authorized Deviations in Provisions. (Apr 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any NONE provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of Provision)
L. INSTRUCTIONS TO OFFERORS
Solicitation: GS-07-P-16-JU-D-7006-0003
L.2 FAR and GSAR Provisions incorporated by reference.
Provision or Clause
Date
52.207-1 Notice of Standard Competition. May. 2006 52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts. Jan. 2014 52.204-6 Data Universal Numbering System Number. Jul. 2013 52.204-7 System for Award Management. Jul. 2013 52.211-6 Brand Name or Equal. Aug. 1999 52.212-1 Instructions to Offerors- Commercial Items. Oct. 2015 52.214-12 Preparation of Bids. Apr. 1984 52.214-15 Period for Acceptance of Bids Apr. 1984 52.214-34 Submission of Offers in the English Language Apr. 1991 52.214-35 Submission of Offers in U.S. Currency. Apr. 1991 52.214-4 False Statements in Bids. Apr. 1984 52.214-5 Submission of Bids. Mar. 1997 52.214-6 Explanation to Prospective Biddders Apr. 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. Nov. 1999 52.215-1 Instructions to Offerors-Competitive. Jan. 2004 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data.
Oct. 2010
52.215-22 Limitations on Pass-Through Charges-Identification of Subcontract Effort. Oct. 2009 52.216-27 Single or Multiple Awards. Oct. 1995 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation. Feb. 1999 52.222-46 Evaluation of Compensation for Professional Employees. Feb. 1993 52.225-7 Waiver of Buy American Statute for Civil Aircraft and Related Articles. Feb. 2016 52.232-38 Submission of Electronic Funds Transfer Information with Offer. Jul. 2013 52.237-1 Site Visit. Apr. 1984 52.237-10 Identification of Uncompensated Overtime Mar. 2015 52.250-2 SAFETY Act Coverage Not Applicable. Feb. 2009
L.3. PRE-PROPOSAL MEETING AND SITE VISIT
The Pre-proposal Meeting will be held at the Lanham Federal Building, located at 819 Taylor St, Fort Worth, Texas on the 4th floor in the Texas Room (4A14H). The meeting will take place Friday, August 05, 2016 and it will start at 9:00 a.m. Central Standard Time (CST). Immediately following the pre-proposal meeting, the Site Visit will take place at the Lanham Federal Building, the Fort Worth Parking Garage, and the Mahon Federal Courthouse; all located in Fort Worth, Texas. Please wear comfortable shoes as we may be walking to these buildings. Please email CS Sharon McCreary at sharon.mccreary@gsa.gov and Sandy Nixon at sandy.nixon@gsa.gov to reserve a seat (seating is limited due to space). Please allow enough time to pass the security checkpoint in the building lobby. The meeting will begin promptly as scheduled.
The purpose of the meeting is to provide a briefing of the scope of work, overview contract requirements, and to allow prospective offerors the opportunity to ascertain the complexities and the location of the services to be performed, along with the general and local conditions which could materially affect conduct of operations and the costs involved.
The Government considers attendance at this conference vital to the preparation of a competitive offer. It will enable the Contractor to become acquainted with the areas to be serviced, and to be aware of the specific problem areas which require special attention or services.
mailto:sharon.mccreary@gsa.gov mailto:sandy.nixon@gsa.gov
Failure to attend this meeting may not be used as an excuse for omissions or miscalculations in offers. It is emphasized that it is more advantageous for each offeror to have qualified representation at the Pre-Proposal conference.
While the meeting will provide an opportunity to discuss and clarify the solicitation provisions, nothing said or represented in the conference shall be deemed to modify the solicitation requirements unless followed by a written amendment.
Offerors are strongly encouraged to submit questions relative to the solicitation document in advance of the meeting, in writing, to the Contract Specialist Sharon T McCreary at sharon.mccreary@gsa.gov , so the Government representatives may prepare responses prior to the conference. THE CUTOFF DATE FOR
QUESTIONS UNDER THIS SOLICITATION IS TUESDAY, AUGUST 09, 2016 NO LATER THAN
2:00P.M. CST. QUESTIONS RECEIVED AFTER AUGUST 09, 2016 MAY BE ANSWERED AT THE
DISCRETION OF THE CONTRACTING OFFICER.
Answers to the questions received by the prospective offerors will be posted on FedBizOpps via an amendment for all prospective offeors. Seating capacity is limited (2 per firm request, if possible) and available on a first come, first served basis.
L.3.1. Site Visit/Walk-Through Tours
The site visit/walk-through portion of the buildings will be provided by GSA, directly following the Pre-proposal Meeting. The site visit/walk through portion of the buildings may last all day. An opportunity will be provided to view all locations.
Prospective Contractors are encouraged to make an on-site, in-depth review of the facility(ies), equipment, job requirements, etc.
Please be aware that because of the potential for disruption to governmental activities, particularly in the U.S.
Court, and other tenant areas, additional access to non-public areas of the building(s)/facility(ies) for inspection purposes may not be possible.
Please limit the number of attendees per firm to 2 people.
L.4. Instructions for Submitting Proposals
Proposals shall be received Monday, August 22, 2016 no later than 3:00 P.M. CST to the following address:
General Services Administration (GSA) Public Building Service Attn: Sharon T McCreary, Contract Specialist (7PQB) 819 Taylor Street, Floor 12B01 Fort Worth, TX 76102
L.4.1. General
The following information is instructions for the preparation and submission of proposals. The purpose is to establish requirements for the format and content of proposals so that proposals contain all essential information and can be evaluated equitably. The proposal submission shall be clear, concise, and shall include sufficient detail to evaluate and substantiate the validity of stated claims. Offerors shall assume that the Government has no prior knowledge of the company's capability and experience.
Non-compliance may result in the offeror being ineligible for award. All proposal information is subject to verification by the Government. All information within the page limitations of the solicitation is subject to evaluation. Information that is contained in pages that exceed page limitations will not be evaluated. The Government will evaluate proposals in accordance with the evaluation criteria set forth in Section M of this solicitation.
mailto:sharon.mccreary@gsa.gov
Offerors are prohibited from modifying, in any way, shape, or form, any documents, printed or electronic, associated with this solicitation, including, but not limited to, the Statement of Work and any amendment(s) thereto.
The electronic solicitation documents, as posted on FedBizOpps.Gov (http://www.fedbizopps.gov) shall be the "official" documents for this solicitation. Any inconsistency between the official documents posted on FedBizOpps.Gov and the offeror's copy of these documents shall be resolved by giving precedence to the official documents posted on FedBizOpps.Gov. Additionally, any other documents provided to offerors by the Government via first class mail, express mail, electronic mail, or any other delivery method, shall be considered official documents, and shall not be altered.
L.4.2. Submittal Package
Failure to submit any of the following information, including any documents within each factor, may deem the offeror unacceptable for award.
L.4.2.1. Proposals shall be submitted in three (3) separate parts:
Part 1 - Technical Proposal
A. Management Plan B. Experience C. Past Performance
Part 2 - Price Proposal
Part 3 - Miscellaneous Documents
Signed Standard Form 33 Signed Standard Form 30 (s), if any List on offeror key personnel and point of contact information
Proof of registration in System for Award Management (www.sam.gov)
L.4.2.2. Format
Offerors shall submit their Technical Proposal using the following format:
Page size shall be 8.5 x 11 inches;
Pages shall be single-spaced;
The font size shall be no less than eleven (11) point except for tables, charts, graphs and figures, which shall be no smaller than eight (8) point; text in “screen shot”, intended for representation of the actual item, are exempt from font size requirements when there is accompanying text explaining them.
Top and bottom margins shall be at least one-inch. Margins may contain a disclaimer regarding proprietary information in the footer and provide corporate logos in the header within the one-inch top and bottom margins.
Side margins shall be at least ¾-inch;
Tables, charts, graphs and figures may be used wherever practical to depict systems and layout, implementation schedules, and plans if necessary.
The electronic copy of the proposal shall be provided on CD-R (not CD-RW) compact disks, using Adobe Reader (.pdf format) (Version 9.4) and Microsoft Word format (.doc format) for the technical proposal and Microsoft Excel 2007 (.xlsx format) for Figure L-2 Management Plan Worksheet. All CD-R compact disk(s) shall be labeled with the solicitation number, company name and date. Offerors shall ensure that all disks are virus free.
Nothing may be on the disks except the proposal files.
L.4.2.3 Submission
The offeror shall submit Part One - Technical Proposal, Part Two - Price Proposal and Part Three – Miscellaneous Documents in conformance with the outline detailed in this section.
Part One - Technical Proposal shall be in a separate sealed package and contain 5 Original Paper Copy and 5 Electronic CD-R of the Technical Proposal, marked “TECHNICAL PROPOSAL for Solicitation GS-07-P-16- JU-D-7006”. The Electronic copies located on the CD-R must consist of a consolidated Adobe Acrobat compatible .pdf file of all components of the technical proposal. Additionally, the CD-R must include original completed versions of spreadsheets provided in Section J in the format provided.
Part Two – Price Proposal shall be in a separate sealed package and 5 Original Paper copy and 5 Electronic CD- R of the Price Proposal, marked “PRICE PROPOSAL for Solicitation GS-07-P-16-JU-D-7006”. The Electronic copies located on the CD-R must consist of a consolidated Adobe Acrobat compatible .pdf file of all components of the price proposal. Additionally, the CD-R must include original completed versions of spreadsheets provided in Section J in the format provided.
Part Three – Miscellaneous Documents shall be in a separate sealed package and contain 5 Original Paper Copy of each document and 5 Electronic CD-R of the Miscellaneous Documents, marked “MISCELLANEOUS DOCUMENTS for Solicitation GS-07-P-16-JU-D-7006.”
Note: For Miscellaneous Documents, the offeror must sign and submit the Standard Form (SF) 33 with their proposal, submit a copy of their CCR and SAM Registration in accordance with the paragraphs (4) and (5).
L.4.2.4 SF 33 Offer and Acceptance
Sign and date (Blocks 15, 17 and 18 of the SF 33) to constitute your acceptance of the terms and conditions of the solicitation
The Government requires a minimum acceptance period of not less than 90 calendar days. The offeror shall complete Block 12 of each SF 33 submitted with full cognizance of the minimum acceptance period established herein. "Acceptance Period” means the number of calendar days available to the Government for awarding a Contract from the date specified in this solicitation for receipt of your offer. Your offer may only specify a longer acceptance period than the Government's minimum requirement.
The offeror must fill out their address, phone number, and authorized representative to commit the offeror to contractual obligations (Block 15A, 15B, and 16 of the SF 33). The address must match the information in the Central Contractor Registration (CCR). The mailing address listed in Block 15A will be the official mailing address used by the Government for letter correspondence.
The offeror must sign and date (Block 17 and 18 of the SF 33) to constitute your acceptance of the terms and conditions of the solicitation.
If any amendments to the solicitation are issued, the offeror must acknowledge the amendment number and date in Block 14 of the SF 30.
L.4.2.5 System for Award Management
The offeror must submit a current printed copy of the company’s System for Award Management (SAM) data at https://www.sam.gov.
L.5. Technical Proposal Requirements
The technical Proposal submission requirements and outline, as set forth below, shall be in consideration of the required services as described in the solicitation.
https://www.sam.gov/
The page limitations set forth below are not guides for Proposal submissions but are FIRM limits. Pages in excess of the stated limitations will not be considered in the evaluation of the Proposal.
L.5.1 Management Plan Proposal
L.5.1.1 Management Plan Narrative: There is a 10 page limitation for the Management Plan Narrative.
The Offeror’s Management Plan narrative must demonstrate that all the services required by this solicitation will be satisfactorily performed. The Offeror shall explain in its Management Plan how it will continuously identify, mitigate, manage, and control risks. The Offeror must convey its ability to insure successful performance.
The Offeror shall demonstrate a clear understanding of the management and performance requirements of this solicitation by providing a concise description of offeror’s proposal for the following topics:
- Managerial Approach
• Explain the offeror’s approach to recruit, retain, and train qualified personnel
• Demonstrate how the offeror is going to fill unexpected manpower shortages until position is filled.
• Explained the offeror’s selection process and ongoing management of subcontractors. Detail the methodology for selecting, tracking, and managing subcontractors and other teaming arrangements, as well as a list of all work that will be subcontracted for each facility covered by the Statement of Work (if any)
• Discuss the Communication Plan and the offeror’s communication approach between Offeror’s Personnel, CO, COR, Building Manager to include the ability to respond to emergencies 24 hours a day/7 days a week.
• Explain the logistic approach to parts and materials and inventory management to include emergency requisitions
- Quality Control Plan:
Demonstrate how the offeror will be proactive in quality control plan Demonstrate how the offeror will perform Quality Control on completed work to include frequency and sampling rates Demonstrate how the offeror will conduct Facility Inspections to include frequency Explain how the offeror will to schedule and perform corrective action on identified deficiencies.
Explain how management will allocate Quality Control personnel
L.5.1.2 Management Plan Worksheet and Narrative (if needed)
Figure L-1, Management Baseline, indicates the government’s baseline manpower projection. The projection is not intended to mandate the labor mixed utilized fulfill this requirement. The offeror may elect to propose any alternative that will fulfill the requirement of this solicitation. If the offeror elects to deviate from the government’s manpower projection, the offer must submit a Worksheet Narrative explaining how their proposed manpower approach will meet the requirement of the solicitation. There is a 2 page limitation on the Worksheet Narrative.
L.5.1.2.1 Additional information regarding Management Plan Worksheet
The staffing/labor mix proposed in the Management Plan Worksheet must be adhered to for the Base year period of performance. The offeror may request an annual review of the labor mix 60 days prior to issuance of the first Option Period. Any requests for changes to the Management Plan Worksheet may be submitted and considered at that time. Any approved adjustment to the labor mix will not result in an increase in price. However, any request to reduce manpower may result in a lower price to be negotiated at time of request. Any deviation from the accepted/approved Management Plan Worksheet may result in deductions.
L.5.1.2.2 Worksheet Instructions.
The Management Plan Worksheet attached to this solicitation must be utilized for this purpose. See the Microsoft Excel Attachment, Section J, titled, “Management Plan Worksheet Figure L-2. No other Management Plan Worksheet will be considered.
The Management Plan Worksheet must be filled out according to the following instructions.
1. An example has been provided as a guide for how to fill out the worksheet.
2. Boxes highlighted in RED [Ensure the L-1 in solicitation is color coded red] are the only input areas allowed by the Offeror. After inputting the numerical data, the Excel spreadsheet will automatically calculate in the ORANGE boxes. Offerors may NOT change any boxes shaded in BLUE.
3. The Management Plan Worksheet must include supervisory and productive work schedules indicating classification of employees for each facility covered by the Statement of Work. When inputting the supervisory classification, the offeror must include “(SUPERVISORY)” next to the position title.
4. Work schedules must be broken out according to LOCATION – See Section C. Scope of Work
5. The labor DISCIPLINE must match the discipline as stated in the Department of Labor Wage Determination or CBA as applicable. Offerors shall list DOL or CBA next to the labor discipline as applicable.
6. 2080 Hours is considered 1 Full Time Equivalent (FTE). This is the maximum number of work hours per year.
Provide the lines of authority and responsibilities to act and to commit for timely problem identification and quick mitigation.
7. WORK SCHEDULE for each discipline. See Normal Working Hours in Section C. Scope of Work.
L.5.2 Experience
The offeror must submit a minimum of 2 projects within the last 5 years that detail experience that is similar to scope and magnitude of this requirement. The offeror must demonstrate experience providing contract services for the management, supervision, labor, materials, equipment and supplies in the services described in Section C that are similar in nature to the size, scope, and complexity of the services being required by this solicitation. To be considered similar the project provided must demonstrate:
- Performing required services for three (3) buildings with approximately 1 Million square feet or greater; either in a single contract or simultaneous contracts - Amendment 0003
- Perform required services for multi-storied/multi-tenant office building to include buildings with high-profile tenants
- Ability to perform scheduled and unscheduled maintenance and repair of equipment and systems
- Ability to operate and maintain mechanical, plumbing, BAS, HVAC, sanitary sewage equipment and ejection systems and Electrical systems (to include multiple Boilers, Chillers, AHU’s in a plant operational environment)
- Ability to operate and maintain fire protection and life safety systems and equipment
- Experience with Building Automation Systems (BAS) such as Niagra Tridium JACE
Solicitation: GS-07-P-16-JU-D-7006-0003 https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.dfe9947f54f1 https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.dbed411d3bbe https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.bc9bdde4e374
- Ability to conduct Service Request Desk Operation to include Computerize Maintenance Management System (CMMS)
- Ability to operate and maintain egress and access systems to include: Locks, keys, keycard system, vehicle barrier system, static and dynamic bollard systems, dock levelers and bumpers, roll-up and sliding garage doors.
The offeror must submit a minimum of two projects but may elect to provide up to 5 projects to demonstrate experience. Each project should be submitted separately. There is a 2 page limitation for each project submitted. For each Project, the Offeror must provide the following information:
• Contractor’s Name
• Contract Number
• Dates of Contract Performance
• Contractor’s DUNS
• Total Contract Value (including options)
• For Government Contracts: Indicate if a Contract Performance and Assessment Report was accomplished.
• Contractor role: [i.e., Prime, Subcontractor, or Joint Venture]
• Address, City, and State of performance
• Building Name, Square Footage, and Type of Services: [Identify each building name, the square footage of each building, and what types of services were provided in each building]
• Total Square Footage
• Type of Space Serviced: [i.e., Commercial Office Building, Federal Courthouse, Federal Parking
Garage, etc.]
• Contract Requirements: Describe all services provided under the contract and any special/unique contract requirements.
• Describe any problems encountered and how they were resolved, and describe the autonomy and authority of the Project Manager
• Briefly describe how this project met each of the relevancy criteria listed above
L.5.3 Past Performance
The offeror must demonstrate that they have satisfactorily performed comparable services to those described in this solicitation. Past Performance information must be submitted on the 2 projects that were submitted for evaluation under L.5.2 Experience. If a CPARS report was accomplished on the projects submitted, the government will use the CPARS report to evaluate Past Performance. If the project(s) were not evaluated in CPARS, the Past Performance will be evaluated using the Past Performance Questionnaire using the directions below. The offeror may submit Past Performance on an additional 3 projects for a maximum of 5 Past Performance projects.
For offers from joint ventures, past performance records of the joint venture and both firms will be considered. A minimum of 1 of the maximum 5 Past Performance projects must be submitted from each member of the joint venture. An offeror may also submit a past performance record for a joint venture in which they were a party; however, they must clearly specify their role and contribution to the joint venture.
In accordance with FAR 15.305(a)(2)(iii), the evaluation will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant as long as it is properly identified.
The Government is not limited to only those references provided by the offeror. The Government may also consider the offeror’s performance on contracts not submitted by the offeror that the Government is aware of or becomes aware of as a result of reference interviews. Additionally, the government may consider information in the Past Performance Information Retrieval System (PPIRS), Contractor Performance Assessment Reporting System (CPARS), or any other available government database.
L.5.3.1 Past Performance Questionnaires
The offeror must submit a Past Performance Questionnaire (Figure L-3) on the 2 projects used for the Experience factor. The offeror may submit an additional 3 Past Performance Questionnaire they deem similar to the size, scope, and complexity of this solicitation. The “Past Performance Questionnaire” attached to this solicitation must be utilized for this purpose. If the projects being submitted have been evaluated in CPARS, the offeror will complete the CONTRACT IDENTIFICATION section of the questionnaire and submit with their proposal, no further action is required.
Past Performance Questionnaires must be received by the Contract Specialist by the due date for receipt of proposals.
The Offeror shall e-mail the Past Performance Questionnaires to the Past Performance references and instruct the references to e-mail their responses directly to the GSA Contract Specialists, Sharon McCreary at sharon.mccreary@gsa.gov and Sandy Nixon at sandy.nixon@gsa.gov . The offer must submit a copy of the Past Performance questionnaire with the Contract Identification and Respondent Identification completed.
An Optional e-mail instruction is provided below to assist in requesting this information from the references:
We are preparing a Proposal for Operation and Maintenances Services in Fort Worth, Texas. The solicitation requires submission of Past Performance Questionnaires. See attached Past Performance Questionnaire.
In accordance with the solicitation instructions, the following Past Performance Questionnaire must be filled out and e-mailed to the Contract Specialists, Sharon McCreary, at sharon.mccreary@gsa.gov ; Sandy Nixon at sandy.nixon@gsa.gov; and Derek Gadberry at derek.gadberry@gsa.gov .
If you have questions you may contact aforementioned names by email.
Please ensure the Past Performance Questionnaire is received by the Contract Specialist on or before Monday, Aug 22, 2016. The e-mail subject line should be marked “Past Performance Questionnaire – Solicitation GS-07-P-16-JU-D-7006”
L.6. Pricing Proposal Requirements
The Offeror shall insert their pricing for the initial Base Period and all Option Periods under Figure B-3, Services, Ordering and Prices and under Section B of the solicitation; then submit as a part of their price proposal. No other pricing template will be considered.
Failure to propose pricing as specified below will result in a rejection of your offer based on non-responsiveness.
a. Basic Services (Section B.1.1. of Figure B-3): The Offeror must propose a price per month for services for facilities listed in Section C.1.
b. Additional Services: Propose a fully burdened price per hour for (6:00am to 6:00 pm) and (6:00 pm to 6:00 am) for each of the skill sets indicated. Additional services are defined in Section C Statement of Work and Section H.18. A fully burdened price per hour is defined as a price that includes wages, overhead, general and administration expenses, and profit.
The Offeror must propose a fixed markup coefficient for the base period and each option period. The proposed material markup rate shall be fixed throughout the life of the contract for reimbursable repairs and additional services under Figure B-3.
Solicitation: GS-07-P-16-JU-D-7006-0003 mailto:sharon.mccreary@gsa.gov mailto:sandy.nixon@gsa.gov mailto:sharon.mccreary@gsa.gov mailto:sandy.nixon@gsa.gov mailto:derek.gadberry@gsa.gov https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.dbed411d3bbe https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.03ef2402cd62 https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.03ef2402cd62 https://docs.google.com/a/gsa.gov/document/d/1GBKv10nRdUtD5qYPb7Cu224roj1oR3VoFJaoPYjQiVs/edit#bookmark=id.6090a81e3ad4
| 52.216-1 -- Type of Contract. (Apr 1984) |
| 52.233-2 -- Service of Protest. (Sep 2006) |
| 52.252-1 -- Solicitation Provisions Incorporated by Reference. (Feb 1998) |
| 52.252-3 -- Alterations in Solicitation. (Apr 1984) |
| 52.252-5 -- Authorized Deviations in Provisions. (Apr 1984) |
File details come from the government source that posted it. Updated .