GHD Attachment 13_Pricing Sheet.docx

DOCX document 54 KB Posted

Attached to
Master Agreement AZ|CTR074222
Contract number
CTR074222
Issued by
Arizona

About this file

This document is a Pricing Sheet (Attachment 13) for a Request for Proposal (Solicitation No. BPM006379) issued by the Arizona Department of Environmental Quality (ADEQ) for Capacity Development/Technical Assistance to Small Public Drinking Water Systems. The document is associated with GHD, a consulting firm that currently has a contract with ADEQ and is proposing updated pricing for professional services.

The pricing sheet details hourly rates for various professional classifications, ranging from $90 for Clerical/Administrative staff to $275 for Principals. The rates cover multiple professional levels including Project Managers (I-III), Engineers (I-III), Environmental Specialists/Scientists, Hydrogeologists, and Technicians. GHD notes that the proposed rates represent an approximately 12% increase from their previous contract rates. The pricing is all-inclusive, covering labor rates, benefits, insurance, taxes, overhead, and administrative costs. The document indicates that ADEQ will not reimburse any costs beyond the specified rates, and the contractor must submit pricing through the Arizona Procurement Portal (APP) system.

View the file

Other files

File Type Posted
1-Attachment 11_References.docx DOCX document
1-Attachment 14_OFFER CHECKLIST.pdf PDF
1-Attachment 1_Offer and Acceptance Form_Signed.pdf PDF
1-Attachment 3_Forced Labor of Ethnic Uyghurs Ban.pdf PDF
2025-07-01 GHD CTR074222.pdf PDF
2025-12-01_GHD_GAWP.pdf PDF
BPM006379 Solicitation Requirements.pdf PDF
CTR074222__Contract_Amendment_3_-_Contract_Extension_to_10-31-26.pdf PDF
1-Attachment 12_Method of Approach.docx DOCX document
1-Attachment 4_Confidential Information Designation.pdf PDF
1-Attachment-Supplement Insurance.pdf PDF
2024-12-01 GHD GAWP.pdf PDF
ArizonaDepartmentofEnvironmentalQuality_W39391781.pdf PDF
Attachment_5_BPM006379_Conformance_Statements_and_Exceptions_Requests.xlsx XLSX spreadsheet
BAFO GHD Attachment 13_Pricing Sheet Rev 2024-10-11.pdf PDF
BPM006379 Award Letter - GHD.pdf PDF
CTR074222_Amendment_1_-_Revises_Key_Personnel.pdf PDF
CTR074222_Amendment_2_-_Adds_and_Revises_Key_Personnel.pdf PDF
1-Attachment 10_Experience and Capacity Response.docx DOCX document
1-Attachment 2_Boycott of Israel Disclosure.pdf PDF
1-Attachment 6_Key Personnel .docx DOCX document
1-Attachment 8_Organization Profile.docx DOCX document
1-Attachment 9_Proposed Subcontractors.pdf PDF
2024-12-01_GHD_GAWP.pdf PDF
CTR074222_Pricing.pdf PDF
BAFO GHD Attachment 1 Offer and Acceptance Form.pdf PDF
BAFO GHD Email 2024-10-11.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 13 – Pricing Sheet

Offeror to complete ALL ITEMS in Attachment 13 - Pricing Sheet in its entirety. Offeror shall enter an hourly rate amount for all applicable personnel classification listed below. If your firm does not have a personnel classification, enter N/A. Failure to return a completed Attachment 13 - Pricing Sheet may result in the rejection of the offer.

Item #
Classification Title
Enter Hourly Rate
1.
Principal
$275
2.
Project Manager I
$245
Project Manager II
$220
Project Manager III
$200
3.
Project Engineer I
$185
Project Engineer II
$170
Project Engineer III
$160
4.
Engineer in Training
$135
5.
Environmental Specialist/Scientist I
$185
Environmental Specialist/Scientist II
$170
Environmental Specialist/Scientist III
$160
6.
Hydrogeologist I
$185
Hydrogeologist II
$170
Hydrogeologist III
$160
7.
Technician (e.g., field, engineering, CAD) I
$145
Technician (e.g., field, engineering, CAD) II
$135
Technician (e.g., field, engineering, CAD) III
$120
8.
Clerical/Administrative
$90

In addition, Offeror shall complete the Line Item in the Items (F) tab in the Arizona Procurement Portal (APP) system by inputting one-dollar ($1.00) in the “Unit Price” field to ensure offer submission for the Offer to be considered.

Pricing shall be submitted on an all-inclusive basis and shall include all costs associated with performance of the Scope of Work, including without limitation, labor rate, labor benefits, payroll burden, insurance, Workman’s Compensation, fees, all taxes, profit, overhead (including repairs and maintenance if applicable), administrative costs, reporting and all other related cost factors for services offered in response to this solicitation. ADEQ will not reimburse any item other than the all-inclusive rates contained in the Pricing Schedule. The Pricing Schedule is not meant to indicate all costs related to additional services.

Request for Proposal Solicitation No. BPM006379 Capacity Development/Technical Assistance to Small Public Drinking Water Systems

Arizona Department of Environmental Quality (ADEQ) 1110 W. Washington Street Phoenix, AZ 85007

Solicitation Attachment 13 – Pricing Sheet | Revision No. 1 | Revised 04-23

Indicate whether organization will offer a prompt payment discount, please complete one or more that will apply:

DISCOUNT WILL BE 0% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN SEVEN (7) CALENDAR DAYS FROM ADEQ’S RECEIPT OF INVOICE.

DISCOUNT WILL BE 0% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN TEN (10) CALENDAR DAYS FROM ADEQ’S RECEIPT OF INVOICE.

DISCOUNT WILL BE 0% IF ADEQ PAYMENT ISSUANCE DATE TO CONTRACTOR IS WITHIN N/A CALENDAR DAYS FROM ADEQ’S RECEIPT OF INVOICE.

Offeror to include one or two paragraph(s) describing how Offeror derived pricing proposed in Pricing Document. Offeror Response:

GHD currently has a contract with ADEQ for the TASPDWS. The proposed rates are an average 12% increase from the rates we have been using in the past years.

End of Attachment 13 image1.jpeg

File details come from the government source that posted it. Updated .