1-Attachment 11_References.docx

DOCX document 49 KB Posted

Attached to
Master Agreement AZ|CTR074222
Contract number
CTR074222
Issued by
Arizona

About this file

This document is an Attachment 11 References document from a Request for Proposal (RFP) Solicitation No. BPM006379 issued by the Arizona Department of Environmental Quality (ADEQ) for Capacity Development/Technical Assistance to Small Public Drinking Water Systems. The references provided are for GHD, a consulting firm that has completed multiple municipal and industrial infrastructure projects in Arizona, including work for the Town of Cave Creek, Felix Construction, and the City of Surprise.

The references demonstrate GHD's expertise in water and wastewater infrastructure projects, including system assessments, design, engineering, and infrastructure rehabilitation. The projects range from wastewater collection system mapping and capital improvement planning to industrial pretreatment plant design and municipal wastewater treatment facility upgrades. Each reference includes detailed project scopes, key personnel, and deliverables such as construction drawings, design reports, permitting support, and 3D modeling. The references cover projects completed between 2019 and 2024, with project values and specific technical scopes highlighting the firm's capabilities in municipal water and wastewater infrastructure consulting.

View the file

Other files

File Type Posted
1-Attachment 10_Experience and Capacity Response.docx DOCX document
1-Attachment 2_Boycott of Israel Disclosure.pdf PDF
1-Attachment 6_Key Personnel .docx DOCX document
1-Attachment 8_Organization Profile.docx DOCX document
1-Attachment 9_Proposed Subcontractors.pdf PDF
2024-12-01_GHD_GAWP.pdf PDF
CTR074222_Pricing.pdf PDF
BAFO GHD Attachment 1 Offer and Acceptance Form.pdf PDF
1-Attachment 12_Method of Approach.docx DOCX document
1-Attachment 4_Confidential Information Designation.pdf PDF
1-Attachment-Supplement Insurance.pdf PDF
2024-12-01 GHD GAWP.pdf PDF
ArizonaDepartmentofEnvironmentalQuality_W39391781.pdf PDF
Attachment_5_BPM006379_Conformance_Statements_and_Exceptions_Requests.xlsx XLSX spreadsheet
BAFO GHD Attachment 13_Pricing Sheet Rev 2024-10-11.pdf PDF
BPM006379 Award Letter - GHD.pdf PDF
CTR074222_Amendment_1_-_Revises_Key_Personnel.pdf PDF
CTR074222_Amendment_2_-_Adds_and_Revises_Key_Personnel.pdf PDF
GHD Attachment 13_Pricing Sheet.docx DOCX document
1-Attachment 14_OFFER CHECKLIST.pdf PDF
1-Attachment 1_Offer and Acceptance Form_Signed.pdf PDF
1-Attachment 3_Forced Labor of Ethnic Uyghurs Ban.pdf PDF
2025-07-01 GHD CTR074222.pdf PDF
2025-12-01_GHD_GAWP.pdf PDF
BPM006379 Solicitation Requirements.pdf PDF
CTR074222__Contract_Amendment_3_-_Contract_Extension_to_10-31-26.pdf PDF
BAFO GHD Email 2024-10-11.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal Solicitation No. BPM006379 Capacity Development/Technical Assistance to Small Public Drinking Water Systems

Arizona Department of Environmental Quality (ADEQ) 1110 W. Washington Street Phoenix, AZ 85007

Attachment 11 – References

ADEQ intends to conduct reference checks for accounts provided by Offerors. ADEQ may, at its sole discretion, contact additional clients not presented as references, including internal state clients. Offerors shall provide at least three (3) client references for assignments that replicate or mirror the requirements of this Solicitation. At least one (1) of the projects referenced must be related to public sector work. All references shall be for work received and completed within the last five (5) years. Include information which documents successful and reliable past performance to clients providing services similar to those detailed in solicitation Scope of Work, DO NOT include ADEQ references. One (1) page maximum per reference.

1
Client company/Address
Contact
Project Begin date
Project End date
Town of Cave Creek
Shawn Kreuzwiesner
7/2019
4/2020
Phone number
Email address
480.488.6618
skreuzwiesner@cavecreekaz.gov

Summarize the scope and deliverables provided, including timeline and outcome. Include similar services performed as those required by this solicitation. State the name(s) of any of Offeror’s key personnel proposed in Attachment 6, who worked on this project:

The Town of Cave Creek’s collection system and wastewater treatment plant had deteriorated markedly, and maintenance had been deferred for some time. New leadership intended to manage the infrastructure more proactively, and needed to know infrastructure condition, order of criticality, and 5-year funding requirements.

GHD completed a system-wide assessment and mapping for the collection and treatment systems. Subsequently, we did extensive modeling and evaluated the systems to project current capacity and future needs, considering condition, performance, and compliance. We used the results to develop 20 projects to be undertaken over a 5-year CIP schedule to meet the challenges and quantify the financial investment required to maintain the system safely and efficiently.

Staff: Frederick Tack – PM; Frank Dubasik – Engineer; David Hilliard - Engineer

List key Materials or Services provided.

100% construction drawings, permitting support, design report.

2
Client company/Address
Contact
Project Begin date
Project End date
Felix Construction
Adam Seymour
04/2022
10/2024
Phone number
Email address
480.450.1051
adam.seymour@felixconstruction.com

Summarize the scope and deliverables provided, including timeline and outcome. Include similar services performed s those required by this solicitation. State the name(s) of any of Offeror’s key personnel proposed in Attachment 6, who worked on this project:

GHD was procured to design a wastewater pretreatment plant for an industrial client. The design had to comply with stringent metals and BOD limits.

GHD designed a pretreatment plant that incorporated 300,000 gallons of storage capacity, chemical storage, neutralization tanks, a lamella clarifier, a filter press, and two gravity filters.

List key Materials or Services provided.

100% construction drawings, permitting support, design report and commissioning support.

3
Client company/Address
Contact
Project Begin date
Project End date
City of Surprise
Ray Aldava
9/2023
4/2024
Phone number
Email address
623.293.1255
reynaldo.aldava@surpriseaz.gov

Summarize the scope and deliverables provided, including timeline and outcome. Include similar services performed s those required by this solicitation. State the name(s) of any of Offeror’s key personnel proposed in Attachment 6, who worked on this project:

GHD was procured to evaluate the existing headworks that was experiencing performance and operational issues related to the mechanical screening equipment and systems. GHD completed field assessments, hydraulic and screening evaluations and developed multiple alternatives to correct the deficiencies, this included an economic evaluation of each alternative. The City of Surprise utilized this recommendation to move forward with engineering and design. GHD completed the engineering and design that included new center flow screens, sluice system, compactors, booster pumps and upgrades to the headwork structure. The project was delivered in BIM.

The major goals of the project, communicated by the City and then evaluated/quantified by GHD, focused on the following:

· Renewed life cycle – Rehabilitating and/or replacing the influent junction structure and any corresponding components to provide a greater-than-30-year life

· Operability – Facilitating ease of operations and maintenance (O&M) for City staff, as well as providing the City with confidence in the facility’s long-term functioning

· Resiliency – Purposefully identifying and implementing strategies for junction structure configuration and equipment that prioritize the City’s ability to maintain O&M and compliance during and after changing conditions

· Safety – Implementing planning and design elements that reduce safety risks to the lowest acceptable level

· Capital cost – Meeting all the desired goals within the budget available (creating a decision matrix to quantify each of the design alternatives)

· O&M costs – Considering how the cost for long-term O&M of infrastructure is far greater than the capital cost (incorporating the long-term costs into the decision matrix)

· Schedule – Understanding the inherent connection between schedule and costs, especially regarding the extremely costly complete bypass of the system required; evaluating every design and construction decision for schedule impacts

List key Materials or Services provided.

3D model, 100% construction drawings, design report, vendor support, permitting support, alternatives study.

Solicitation Attachment – References | Revision No. 1 | Revised 11-22 image1.jpeg

File details come from the government source that posted it. Updated .