Geo_Tech_Report_-_H1245183_Ft._Florida_Road_Bridge_Replacement.pdf
PDF 3 MB Posted
- Solicitation number
- 22-25
- Issued by
- Volusia County, Florida
About this file
This is a Geotechnical Engineering Report prepared by Terracon for Stanley Consultants, focusing on the Fort Florida Road Bridge Replacement project located in the City of Debary, Volusia County, Florida. The project involves replacing an existing bridge culvert with a multiple cell concrete box culvert, each cell measuring approximately 10 feet span by 7 feet rise, and restoring the associated paved road approaches. The investigation was conducted on August 7, 2024, and the report was finalized on November 26, 2024, with the project number H1245183.
The geotechnical investigation included standard penetration testing, hand auger borings, and pavement core sampling to assess subsurface conditions. Laboratory testing revealed the site primarily consists of fine sand, silty sand, and clayey sand, with a seasonal high groundwater table estimated at about 4 feet below grade. The report provides detailed recommendations for subsoil preparation, foundation design, and construction considerations, including notes on dewatering, filter fabric specifications, and potential seepage risks due to the nearby Konomac Lake reservoir. The corrosion series testing indicated an extremely aggressive subsurface environment, which will require special consideration for concrete and steel selection.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Cover Page
Ft. Florida Road Bridge Replacement Geotechnical Engineering Report
November 26, 2024 | Terracon Project No. H1245183
Prepared for:
STANLEY CONSULTANTS
5775 Wayzata Blvd. Suite 300 Minneapolis, MN 55416
1675 Lee Road Winter Park, FL 32789
P (407) 740-6110 Terracon.com
Facilities | Environmental | Geotechnical | Materials
Report Cover Letter to Sign
November 26, 2024
STANLEY CONSULTANTS
5775 Wayzata Blvd. Suite 300 Minneapolis, MN 55416
Attn: Luis J. Santana II, PE, Sr. Structural Engineer P: 561.584.8717 E: SantanaLuis@stanleygroup.com
Re: Geotechnical Engineering Report Ft. Florida Road Bridge Replacement Ft. Florida Road City of Debary, Florida Terracon Project No. H1245183
Dear Mr. Santana:
We have completed the scope of Geotechnical Engineering services for the above referenced project in general accordance with Terracon Proposal No. PH1245183 dated May 24, 2024. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of bridge culvert foundations for the proposed project.
We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us.
Sincerely, Terracon
Liming Xue, P.E. Elias N. Jammal, P.E.
Project Engineer Department Manager
Florida PE #98384 Florida PE #60126
This item has been digitally signed and sealed by Elias N. Jammal, P.E. on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAYc7S0jX2mDiMsxHAlgNXmr2gsKKxPsU9 https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAYc7S0jX2mDiMsxHAlgNXmr2gsKKxPsU9
Geotechnical Engineering Report Ft. Florida Road Bridge Replacement | City of Debary, Florida November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials i
Table of Contents
1.0 INTRODUCTION
2.0 REVIEW OF AVAILABLE DATA
3.0 SUBSURFACE EXPLORATION
4.0 GENERAL SUBSURFACE CONDITIONS
5.0 LABORATORY TESTING
6.0 EVALUATION AND RECOMMENDATIONS
General Comments
Appendix
Vicinity Map and Soil Map Site Location and Exploration Plans Subsurface Profile and GeoModel Exploration and Laboratory Results Supporting Information
Note: This report was originally delivered in a web-based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.
Refer to each individual Attachment for a listing of contents.
http://client.terracon.com/ http://client.terracon.com/
Facilities | Environmental | Geotechnical | Materials
Geotechnical Engineering Report Ft. Florida Road Bridge Replacement
City of Debary, Florida Terracon Project No. H1245183
1.0 INTRODUCTION
The project site is located on Ft. Florida Road, approximately 1,900 ft north of 10th street, in City of Debary, Florida. A vicinity map showing the project site location is presented on the attached Appendix. It is our understanding that the project consists of replacement of the existing bridge culvert with a multiple cell concrete box culvert, each cell is about 10’ span x 7’ rise; and restoring the associated paved road approaches with pavement section to match existing condition. The provided plan shows the proposed invert elevation of culvert is about +8 feet. The elevations provided in this report are based on the provided site grading plan prepared by Pegasus Engineers, dated December 19,2019.
2.0 REVIEW OF AVAILABLE DATA
Based on the United States Geological Survey (USGS) “Sanford, Florida” Quadrangle Map, the predeveloped subject site appears to be near elevation +15 to +20 feet, NGVD. An excerpt of the USGS “Sanford, Florida” Quadrangle Map for the project site is shown on Exhibit A-1 in the Appendix. The Konomac Lake reservoir is located immediately east of this project site along Ft.
Florida Road and is elevated above the adjacent roadway.
The United States Department of Agriculture (USDA) Volusia County Area Soil Survey of the project location identifies the predevelopment soil types at the subject site are shown on Exhibit A-2 in the Appendix. Soils found in the vicinity of the project are listed in the following table.
USDA
Map
Symbol
USDA Soil Name
Depth of Seasonal High
Groundwater Table for Site in its Natural Condition (inches)
23 Farmton fine sand within 10 inches
It should be noted that the Soil Survey is not intended as a substitute for site-specific geotechnical Exploration, rather it is a useful tool in planning in that it provides information on soil types likely to be encountered. Boundaries between adjacent soil types on the maps are approximate.
Based on review of the St. John’s River Water Management District (SJRWMD) potentiometric maps of the upper Floridan Aquifer for this project area, the estimated elevation of the artesian head appears to be near elevation +20 feet, NGVD, for the project site. Artesian conditions were not observed by the driller at the time that the soil borings were performed, and artesian conditions are not expected to be encountered for the proposed construction. Due to the presence of the elevated Konomac Lake reservoir immediately east of Ft. Florida Road, there is a strong potential for seepage
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials 2 to occur within excavations. Safety requirements for work adjacent to the reservoir should be utilized and followed.
3.0 SUBSURFACE EXPLORATION
Geotechnical field exploration for proposed box culvert replacement consisted of performing one Standard Penetration Testing (SPT) boring in the westbound shoulder, near the existing abutment, to about 40 feet below the existing surface. One hand auger boring was performed at the bottom of canal, in the upstream area, to assist with scour analysis. A total of two hand auger borings were performed near the edge of pavement and two pavement cores were performed in the traffic lanes, just north and south of the bridge, to obtain the existing pavement data. The approximate locations of the soil borings and pavement cores locations are presented on the Exploration Plan in the Appendix.
Standard Penetration Tests were performed continuously in the SPT borings to a depth of 10 feet, and at 5-foot depth intervals thereafter. Each sample was removed from the sampler in the field and was examined and visually classified by an Engineering Technician. Representative portions of each sample were packaged and sealed for transportation to our office for further examination and visual classification. Water levels were measured in the boreholes at the time of our field exploration to evaluate the depth to groundwater. The SPT borings were sealed with cement grout upon completion.
Adjacent to the SPT boring profile are the "N" values. These "N" values are the number of hammer blows required to advance the split spoon sampler a distance of 12 inches. The "N" values have been empirically correlated with various soil properties and are considered to be indicative of the relative density of cohesionless soils and consistency of cohesive soils.
A CME automatic SPT hammer was used to advance the split-barrel sampler in the borings performed on this site. A significantly greater efficiency is achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. This higher efficiency has an appreciable effect on the SPT-N value. The effect of the automatic hammer's efficiency has been considered in the interpretation of the subsurface data for this report.
Pavement cores (6-inches) were performed at the requested locations, with a diamond tip core-barrel mounted to an electric drill. The pavement core locations were patched with asphalt cold patch upon completion.
The hand auger boring procedure consisted of manually turning a 3-inch-diameter, 6-inch-long sampler into the soil until it was full. The sampler was then retrieved and the soils in the sampler were visually examined and classified. This procedure was repeated until the desired termination depth was achieved. Samples of representative strata were obtained for further visual examination and classification in our laboratory. These boreholes were backfill with soil cutting upon completion.
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials 3
4.0 GENERAL SUBSURFACE CONDITIONS
Subsurface conditions encountered in the borings and existing pavement section at requested locations are shown in the Appendix.
Culvert: Generally, the subsurface conditions at boring B-1 location consists of loose fine sand to fine sand with silt (SP, SP-SM) to about 18 feet, underlain by soft sandy silt (ML) to about 23 feet, followed by medium stiff to stiff sandy clay (CH) to about 33 feet and medium dense sand with silt (SP-SM) to the explored depth of 40 feet. Note that medium stiff sandy silt with some organics (OC%=15%) (ML) was found in the boring from approximately 33 to 38 feet below the surface.
Auger boring HA-3 was performed at the bottom of canal, in the upstream. After manually removing approximately 24 inches of riprap, silty sand (SM) was encountered to about 36 inches below the water surface at the time of field exploration. The boring was terminated at 48 inches as further removal of riprap was not feasible. The water level at the boring location was about 6 inches above the surface at the time of field exploration was performed.
Roadway: Two auger borings performed near the edge of pavement at requested locations encountered two generalized soil strata to the maximum depths of about 5 feet below the surface.
Descriptions of the soils encountered in the roadway borings are accompanied by the AASHTO classification symbol (A-3, A-2-4, etc.) based on visual classification and laboratory testing. In general, the soil stratification is as follows:
Stratum No.
Description
AASHTO
Classification
1 Dark gray to brown fine sand to fine sand with silt A-3
2 Dark gray to brown silty to clayey sand A-2-4, A-2-6
The auger borings HA-1 and HA-2 mostly encountered Stratum 1 soils from the existing ground surface to about 2 to 3 feet, underlain by Stratum 2 to the explored depth of about 5 feet below the existing surface.
The above subsurface conditions are only general descriptions. For details at individual boring locations, refer to the boring profiles (GeoModel) in the Appendix.
The existing pavement sections based on the field measurements, at P-1 and P-2 locations consist of about 3.5 to 4.5 inches of asphalt concrete and about 4 to 6 inches of cement modified soil base.
The approximate pavement section thickness of existing pavement, at individual core location are summarized in the following table. The pavement section thickness at other locations may vary from those reported herein.
Core No.
Approx.
Asphalt
Thickness (in.)
Approx. Base Thickness and Type
Approx. Total Length of Pavement
Section (in.)
P-1 4.5 4” cement modified soil 8.5
P-2 3.5 6” cement modified soil 9.5
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials 4
Photos of the pavement cores are presented in the Appendix.
Groundwater Condition: The boreholes were observed during drilling for the presence and level of groundwater. Groundwater was not observed in boring B-1 to a depth of about 10 feet, at which point it was necessary to switch to a rotary wash drilling procedure and introducing drilling slurry, which tends to mask the presence or absence of groundwater. Groundwater was not observed to the explored depth of about 5 ft below the surface at HA-1 and HA-2 locations at the time of field exploration (August 2024). About 6 inches of standing water was observed at boring HA-3.
It should be recognized that fluctuations of the groundwater table will occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the boring was performed. In addition, perched water can develop within higher permeability soils overlying less permeable soils. Therefore, groundwater levels during construction or at other times in the future may be higher or lower than the levels indicated on the boring logs.
We estimate that during the normal wet season, the groundwater level is estimated to be at a depth of about 4 feet below existing grade at the B-1, HA-1 and HA-2 boring locations. Our estimates of the seasonal groundwater conditions are based on review of the USDA Soil Survey, the encountered soil types, recent weather conditions, and the observed water levels.
These seasonal water table estimates do not represent the temporary rise in water table that occurs immediately following a storm event, including adjacent to other stormwater management facilities.
This is different from static groundwater levels in wet ponds and/or drainage canals which can affect the design water levels of new, nearby ponds. The seasonal high water table may vary from normal when affected by extreme weather changes, localized or regional flooding, karst activity, future grading, drainage improvements, or other construction that may occur on our around the site following the date of this report.
5.0 LABORATORY TESTING
The soil samples retrieved from the boring locations were transported to our laboratory for visual examination and selective soil testing. Testing consisted of moisture content, full gradation analysis, and Atterberg Limits testing. Laboratory testing was performed in general accordance with the appropriate Florida methods. Below D50 value obtained from the bottom of canal materials can be used in scout analysis.
Boring No.
Approx. Depth (ft)
Material Descriptions D50 (mm)
HA-3 2 - 2.5 Silty sand (SM) 0.16
HA-3 2.5 - 3 Silty sand (SM) 0.15
B-1 13.5 - 15 Silty sand (SM) 0.16
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials 5
5.1 Corrosion Series Testing
A series of 2 corrosion tests were performed on soil and water samples obtained at the project site.
These results indicate that the subsurface environment is classified as extremely aggressive (Chlorides=2,000 ppm) for use in selection of an appropriate class of concrete or steel; in accordance with the Florida Department of Transportation (FDOT) Standards. The environmental classifications are based on the Structures Design Guidelines. The corrosion series test results are summarized below
Boring No.
Sample
Depth (ft) pH
Minimum Resistivity (ohm-cm)
Chlorides (ppm)
Sulfates (ppm)
Water Sample -- 7.8 6,600 2,000 56
B-1 0 -2 8 11,000 30 B.D.
B.D. = below detection
6.0 EVALUATION AND RECOMMENDATIONS
The following conclusions and recommendations are based on the project characteristics previously described, the data obtained in our field exploration and our experience with similar subsurface conditions and construction types. If the final locations or grades are significantly different from those previously described, or if subsurface conditions different from those disclosed by the borings are encountered during construction, we should be notified immediately so that we might review the following recommendations regarding such changes.
Geotechnical Consideration: It is our opinion that the proposed box culvert replacement and wing walls could be supported on shallow footings if the recommended site preparation procedures are implemented at the site.
Subsoil Preparation: It is our understanding that the proposed toe slab and cut off wall will be constructed near an elevation of 8 feet, corresponding to about 10 feet below the roadway surface.
Results of soil borings are presented on the subsurface profile and GeoModel sheets in the Appendix.
If surficial organics are encountered below the proposed culvert foundation areas, this material should be over-excavated and replaced with clean granular soil. Subsoil preparation consisting of riprap removal, dewatering, stripping, subsoil compaction, and fill compaction will be required to provide adequate support for the proposed box culvert foundations. Preparation of the subsoil below a concrete box culvert should be performed in accordance with Specification 410 of the FDOT Standard Specifications.
Notes should be added to the culvert plans regarding:
■ Subsoil preparation includes removal and replacement of loose sediment material in the proposed foundation areas (per Standard Specification 410).
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials 6
■ Filter fabric specifications for wrapping box culvert joints.
■ Dewatering requirements
Suggested notes recommended to be included in the plans regarding filter fabric and dewatering are presented below. Dewatering methods should also account for the presence of the elevated Konomac Lake reservoir immediately east of Ft. Florida Road.
■ Filter fabric note: “All box culvert joints (top & sides) and wingwall/box culvert joints shall be covered with filter fabric a minimum of 2 feet in width and meeting the requirements of Section 985 of the FDOT Standard Specifications, Type D-3 with an AOS (sieve number) of 40 to 70.”
■ Dewatering note: “Contractor shall anticipate that dewatering by standard methods may not be adequate for proper densification of box culvert and headwall/wingwall foundation soils. Dewater foundation excavations in accordance with Sections 455-28 and 455-29.2.”
Temporary side slopes of open excavations up to 5 feet should be no steeper than 1.5 horizontal to 1 vertical (1.5H:1V). If steeper slopes or deeper excavations are required, then properly designed shoring and bracing of excavations would be required to provide safe working conditions.
Once dewatering has been accomplished, the subsoil should be examined by the Geotechnical Engineer, or a representative of the Geotechnical Engineer, and should be proofrolled using an adequately sized roller. At that time, any organic, plastic or highly compressive soils, such as clays, peat or muck, should be removed in accordance with Specification 125 of the FDOT Standard Specifications.
Foundation Design: Once existing subsoil or fill soils have been prepared in accordance with the recommendations above, the box culvert and headwalls can be supported on shallow foundations.
Erosion control measures should be provided at the culvert headwalls to prevent undermining of the foundation soils. General soil parameters for use in the design of the precast box culvert are presented below.
Design Recommendations:
Soil Parameter Description Soil Parameter Value
Nominal Bearing Capacity 1 6,000 lb/ft²
Allowable Bearing Capacity 1 2,000 lb/ft²
Modulus of Subgrade Reaction 60 lb/in³
Soil Friction Angle 30 1The recommended allowable bearing capacity is the pressure in excess of the minimum surrounding overburden pressure at the footing base depth. Assumes any unsuitable fill or soft soils, if encountered, will be undercut and replaced with engineered fill.
Long-Term Settlement: Soft sandy silt and medium stiff to stiff sandy clay were encountered in the boring at a depth of about 18 to 33 feet. Soil with organics (OC=15%) was found in the sandy silt layer, about 33 to 38 feet below the surface.
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials 7
Based on results of moisture content and Atterberg Limits testing, the clay soil layer is assumed to be pre-consolidated. Based on the depth and thickness of the clay layer, correlated parameters from the FDOT consolidation test database, and depth influence corrections, we estimated long-term settlement will be approximately one inch, with most of the estimated settlement should occur during construction. Considering the consistency of the clay layer in the boring, the differential settlement is anticipated to be less than 0.5 inches.
General Comments
Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations.
Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
Our services and any correspondence are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended.
Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made.
Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly affect excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety and cost estimating including excavation support and dewatering requirements/design are the responsibility of others. Construction and site development have the potential to affect adjacent properties. Such impacts can include damages due to vibration, modification of groundwater/surface water flow during construction, foundation movement due to undermining or subsidence from excavation, as well as noise or air quality concerns. Evaluation of these items on nearby properties are commonly associated with contractor means and methods and are not addressed in this report.
The owner and contractor should consider a preconstruction/precondition survey of surrounding development. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing.
November 26, 2024 | Terracon Project No. H1245183
Attachments
November 26, 2024 | Terracon Project No. H1245183
Facilities | Environmental | Geotechnical | Materials
Site Location and Exploration Plans
Contents:
Site Location Plan Soils Map Exploration Plan
Note: All attachments are one page unless noted above.
Drawn By:
Checked By:
Approved By:
Project Mngr:
File No.
Date:
Scale:
Project No. EXHIBITTOPOGRAPHIC VICINITY MAP
7.5 MINUTE SERIES (QUADRANGLE)
ISSUED: 2021
SANFORD, FLORIDA
N
LX
AS
LX
ENJ
H1245183
AS SHOWN
H1245183
8-5-24
FT FLORIDA ROAD BRIDGE REPLACEMENT
FORT FLORIDA ROAD (28.865080, -81.348410)
GEOTECHNICAL ENGINEERING REPORT
DEBARY, VOLUSIA COUNTY, FLORIDA
1675 LEE ROAD WINTER PARK, FLORIDA 32789
FAX. (407) 740-6112PH. (407) 740-6110
50004500400030002500 3500200015005000 1000500
FEET
SCALE 1"=1000'
SIT
E
AutoCAD SHX Text
UNITED STATES - DEPARTMENT OF THE INTERIOR - GEOLOGICAL SURVEY
Approved By:
Project Mngr:
File No.
Date:
Scale:
Project No. EXHIBITSOILS MAP
N
LX
AS
LX
ENJ
H1245183
AS SHOWN
H1245183
8-5-24
FT FLORIDA ROAD BRIDGE REPLACEMENT
FORT FLORIDA ROAD (28.865080, -81.348410)
GEOTECHNICAL ENGINEERING REPORT
DEBARY, VOLUSIA COUNTY, FLORIDA
1675 LEE ROAD WINTER PARK, FLORIDA 32789
FAX. (407) 740-6112PH. (407) 740-6110
50004500400030002500 3500200015005000 1000500
FEET
SCALE 1"=1000'
FT FLORIDA RD
SOIL LEGEND
FARMTON FINE SAND23
U.S.D.A. SOIL SURVEY FOR VOLUSIA COUNTY, FLORIDA
SITE
Approved By:
Project Mngr:
File No.
Date:
Scale:
Project No. EXHIBITEXPLORATION PLANLX
AS
LX
ENJ
H1245183
AS SHOWN
H1245183
8-5-24
FT FLORIDA ROAD BRIDGE REPLACEMENT
FORT FLORIDA ROAD (28.865080, -81.348410)
GEOTECHNICAL ENGINEERING REPORT
DEBARY, VOLUSIA COUNTY, FLORIDA
1675 LEE ROAD WINTER PARK, FLORIDA 32789
FAX. (407) 740-6112PH. (407) 740-6110
N
LEGEND
APPROXIMATE LOCATION OF STANDARD
PENETRATION TEST BORING
FO
R
T
FL
O R
ID
A
R O
AD
APPROXIMATE LOCATION OF HAND
AUGER BORING
APPROXIMATE LOCATION OF
PAVEMENT CORE
B-1
HA-1
HA-2
C-1
C-2
HA-3
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APPROXIMATE
Exploration and Laboratory Results
Contents:
Boring Logs (B-1, HA1 through HA-3) Grain Size Distribution Photo of Cores
N=4
N=3
N=5
N=11
N=4
N=3
N=2
N=4
N=7
N=5
N=23
BT-40.0 Ft.
B-1
NOTES:
Borehole Number
Liquid and Plastic Limits
AR
BT
LL PLMoisture Content
%w
B-1
Water Level Reading at time of drilling.
Water Level Reading after drilling.
Sampling (See General Notes)
Explanation
Borehole Lithology
Borehole Termination Type
Poorly-graded Sand
Poorly-graded Sand with Silt
Gravelly Lean Clay Silty Sand Gravelly Silt
Fat Clay
D E
P T
H B
E L
O W
G R
A D
E
F ee t)
See Exhibit A-2 for orientation of soil profile.
See General Notes in Appendix C for symbols and soil classifications.
Soils profile provided for illustration purposes only.
Soils between borings may differ AR - Auger Refusal BT - Boring Termination
1675 Lee Rd Winter Park, FL
PH. 407-740-6110 FAX. 407-740-6112
SUBSURFACE PROFILE EXHIBITProject Manager: LX
FT. FLORIDA ROAD BRIDGE REPLACEMENT
FORT FLORIDA ROAD
DEBARY, FL
File Name:
Scale: N.T.S.
Project No.: H1245183
Drawn by:
Date: 9/3/2024
Approved by:
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T . S
M A
R T
F E
N C
E H
F T
. F
LO
R
ID
A R
O A
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/3
/2
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
D E
P T
H B
E L
O W
G R
A D
E
F ee
t) Ft. Florida Road Bridge Replacement DeBary, FL Terracon Project No. H1245183
Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project.
Numbers adjacent to soil column indicate depth below ground surface.
NOTES:
HA-1 HA-2 HA -3
This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions.
GEOMODEL
3 Rip·rap Rock
LEGEND
Poorly-graded Sand with Silt
Silty Clayey Sand
Silty Sand
Clayey Sand
Water 1
Aggregate Base Course
Model Layer General DescriptionLayer Name
Fine sand to fine sand with silt (SP, SP-SM)
Silty sand to clayey sand (SM, SC-SM, SC)2
Riprap
Sand
Silty Sand
SAND (SP), fine grained, brown, loose
POORLY GRADED SAND WITH SILT (SP-SM), fine grained, brown, loose
CLAYEY FINE SAND (SC), gray, loose
SILTY SAND (SM), fine grained, gray, medium dense
POORLY GRADED SAND WITH SILT (SP-SM), fine grained, orange grayish brown, loose
SILTY SAND (SM), fine grained, gray, loose
SANDY SILT (ML), gray, soft
Boring Log No. B-1
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
G ra p h ic
L o g
17.1
31.0
64.1
31-19-12
2.0
4.0
6.0
8.0
13.5
18.5
2-2-2-2 N=4
2-1-2-3 N=3
3-2-3-4 N=5
4-5-6-7 N=11
2-2-2-2 N=4
1-1-2 N=3
1-1-1 N=2
Fort Florida Road | DeBary, FL
Terracon Project No. H1245183 Winter Park, FL
1675 Lee Rd
Drill Rig 898 Mini Rig
Hammer Type Automatic
Driller Chris
Logged by
Boring Started 08-07-2024
Boring Completed 08-07-2024
Abandonment Method Boring backfilled with cement-bentonite grout upon completion.
Advancement Method Rotary Wash Standard Penetration Testing (SPT)
Notes
Water Level Observations GNE to 10 ft
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Ft. Florida Road Bridge Replacement
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
) Atterberg
Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 28.8651° Longitude: -81.3481°
Depth (Ft.)
O rg an ic
C o n te n t
Fi el d T es t
R es u lt s
SANDY SILT (ML), gray, soft (continued)
FAT CLAY WITH SAND (CH), gray, medium stiff to stiff
SANDY SILT (ML), dark brown, medium stiff, ,with some organics
SAND WITH SILT (SP-SM), fine grained, gray, medium dense
Boring Terminated at 40 Feet
Boring Log No. B-1
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
G ra p h ic
L o g
38.9
74.2
87-24-63
23.5
33.5
38.5
40.0
14.9
1-2-2 N=4
2-3-4 N=7
1-2-3 N=5
2-7-16 N=23
Fort Florida Road | DeBary, FL
Terracon Project No. H1245183 Winter Park, FL
1675 Lee Rd
Drill Rig 898 Mini Rig
Hammer Type Automatic
Driller Chris
Logged by
Boring Started 08-07-2024
Boring Completed 08-07-2024
Abandonment Method Boring backfilled with cement-bentonite grout upon completion.
Advancement Method Rotary Wash Standard Penetration Testing (SPT)
Notes
Water Level Observations GNE to 10 ft
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Ft. Florida Road Bridge Replacement
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
) Atterberg
Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 28.8651° Longitude: -81.3481°
Depth (Ft.)
O rg an ic
C o n te n t
Fi el d T es t
R es u
SAND WITH SILT (SP-SM), dark gray to gray
SILTY CLAYEY SAND (SC-SM), brownish gray
Boring Terminated at 5 Feet
Boring Log No. HA-1
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
G ra p h ic
L o g
10.2
15.6
3.0
5.0
Fort Florida Road | DeBary, FL
Terracon Project No. H1245183 Winter Park, FL
1675 Lee Rd
Drill Rig
Driller Mack C.
Logged by
Boring Started 08-07-2024
Boring Completed 08-07-2024
Abandonment Method Boring backfilled with Auger Cuttings and/or Bentonite
Advancement Method Auger
Notes
Water Level Observations GNE to 5 ft
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Ft. Florida Road Bridge Replacement
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
) Atterberg
Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 28.8656° Longitude: -81.3480°
Depth (Ft.)
O rg an ic
C o n te n t
Fi el d T es t
R es u
SAND WITH SILT (SP-SM), dark gray
SILTY SAND (SM), brownish gray
CLAYEY SAND (SC), brownish gray
Boring Terminated at 5 Feet
Boring Log No. HA-2
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
G ra p h ic
L o g
1916.4 2.0
4.5
5.0
Fort Florida Road | DeBary, FL
Terracon Project No. H1245183 Winter Park, FL
1675 Lee Rd
Drill Rig
Driller Mack C.
Logged by
Boring Started 08-07-2024
Boring Completed 08-07-2024
Abandonment Method Boring backfilled with Auger Cuttings and/or Bentonite
Advancement Method Auger
Notes
Water Level Observations GNE to 5 ft
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Ft. Florida Road Bridge Replacement
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
) Atterberg
Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 28.8647° Longitude: -81.3481°
Depth (Ft.)
O rg an ic
C o n te n t
Fi el d T es t
R es u
Riprap, Vary in sizes
SILTY SAND (SM), gray
Riprap, Vary in sizes
Boring Terminated at 4 Feet
Boring Log No. HA -3
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
G ra p h ic
L o g
30.0
32.9
0.5
2.0
3.0
4.0
Fort Florida Road | DeBary, FL
Terracon Project No. H1245183 Winter Park, FL
1675 Lee Rd
Drill Rig
Driller Mack C.
Logged by
Boring Started 08-07-2024
Boring Completed 08-07-2024
Abandonment Method
Advancement Method Auger
Notes
Water Level Observations Approximately 6 inches of standing water
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Ft. Florida Road Bridge Replacement
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
) Atterberg
Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 28.8647° Longitude: -81.3481°
Depth (Ft.)
O rg an ic
C o n te n t
Fi el d T es t
R es u
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
AASHTO T-88
PROJECT NUMBER: H1245183
PROJECT: Ft. Florida Road Bridge Replacement
SITE: Fort Florida Road DeBary, FL
CLIENT: Stanley Consultants Inc West Palm Beach, FL
EXHIBIT: B-1
1675 Lee Rd Winter Park, FL
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R T
G R
A
IN
S
IZ
E : A
A S
H T
O T
-8
H
F
T . F
LO
R
ID
A
R O
A D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/3 /2
B-1
SAND
SILT OR CLAY
D30
D60
BORING ID
#10 #20 #40 #60 #100 #140 #200
99.06 98.83 98.69 97.71 50.16 22.68 16.91
COARSE MATERIAL
fine
16.9
CC
CU
D10
13.5 - 15
0.167
0.116
82.1 coarse
Sieve
REMARKS
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
COEFFICIENTS
GRAIN SIZE
Xue, Liming Arrow
Xue, Liming Arrow
Xue, Liming Callout D50 = 0.16
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
AASHTO T-88
PROJECT NUMBER: H1245183
PROJECT: Ft. Florida Road Bridge Replacement
SITE: Fort Florida Road DeBary, FL
CLIENT: Stanley Consultants Inc West Palm Beach, FL
EXHIBIT: B-1
1675 Lee Rd Winter Park, FL
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : A
A S
H T
O T
-8
H
F
T . F
LO
R
ID
A
R O
A D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/3 /2
B-1
D30
D60
BORING ID
#4 #10 #20 #40 #60 #100 #140 #200
100.0 99.34 97.71 96.8 95.87 86.15 67.57 60.96
COARSE MATERIAL
fine
61.0
18.5 - 20 0.0 0.7 38.4
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
COEFFICIENTS
GRAIN SIZE
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
AASHTO T-88
PROJECT NUMBER: H1245183
PROJECT: Ft. Florida Road Bridge Replacement
SITE: Fort Florida Road DeBary, FL
CLIENT: Stanley Consultants Inc West Palm Beach, FL
EXHIBIT: B-1
1675 Lee Rd Winter Park, FL
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : A
A S
H T
O T
-8
H
F
T . F
LO
R
ID
A
R O
A D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/3 /2
HA-1
D30
D60
BORING ID
#4 #10 #20 #40 #60 #100 #140 #200
100.0 99.81 99.65 98.27 90.29 31.31 10.93 6.38
COARSE MATERIAL
fine
6.4
1.5 - 2
0.192
0.147
0.099
1.95
1.13
0.0 0.2 93.4
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
AASHTO T-88
PROJECT NUMBER: H1245183
PROJECT: Ft. Florida Road Bridge Replacement
SITE: Fort Florida Road DeBary, FL
CLIENT: Stanley Consultants Inc West Palm Beach, FL
EXHIBIT: B-1
1675 Lee Rd Winter Park, FL
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : A
A S
H T
O T
-8
H
F
T . F
LO
R
ID
A
R O
A D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/3 /2
HA-2
D30
D60
BORING ID
#10 #20 #40 #60 #100 #140 #200
100.0 99.96 99.05 91.95 43.63 23.71 19.47
COARSE MATERIAL
fine
19.5
2 - 2.5
0.178
0.118
0.0 0.0 80.5
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
AASHTO T-88
PROJECT NUMBER: H1245183
PROJECT: Ft. Florida Road Bridge Replacement
SITE: Fort Florida Road DeBary, FL
CLIENT: Stanley Consultants Inc West Palm Beach, FL
EXHIBIT: B-1
1675 Lee Rd Winter Park, FL
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : A
A S
H T
O T
-8
H
F
T . F
LO
R
ID
A
R O
A D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/3 /2
HA -3
D30
D60
BORING ID
#10 #20 #40 #60 #100 #140 #200
100.0 94.67 90.63 87.6 45.75 19.65 13.88
COARSE MATERIAL
fine
13.9
2 - 2.5
0.178
0.122
0.0 0.0 86.1
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
COEFFICIENTS
GRAIN SIZE
Xue, Liming Arrow
Xue, Liming Arrow
Xue, Liming
D50 =0.16
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
AASHTO T-88
PROJECT NUMBER: H1245183
PROJECT: Ft. Florida Road Bridge Replacement
SITE: Fort Florida Road DeBary, FL
CLIENT: Stanley Consultants Inc West Palm Beach, FL
EXHIBIT: B-1
1675 Lee Rd Winter Park, FL
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : A
A S
H T
O T
-8
H
F
T . F
LO
R
ID
A
R O
A D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/3 /2
HA -3
D30
D60
BORING ID
#10 #20 #40 #60 #100 #140 #200
98.22 97.73 97.56 96.39 54.64 23.69 17.06
COARSE MATERIAL
fine
17.1
2.5 - 3
0.16
0.114
81.2
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
COEFFICIENTS
GRAIN SIZE
Xue, Liming Arrow
Xue, Liming Arrow
Xue, Liming
D50 = 0.15
Supporting Information
Contents:
General Notes Unified Soil Classification System
General Notes
SAMPLING WATER LEVEL FIELD TESTS
(N) Standard Penetration Test Resistance
(HP) Hand Penetrometer
(T) Torvane
(DCP) Dynamic Cone Penetrometer
(PID) Photo-Ionization Detector
(OVA) Organic Vapor Analyzer
(DRI) Double Ring Infiltrometer
Descriptive Soil Classification
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a
#200 sieve; their principal descriptors are: boulders, cobbles, gravel, or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In a ddition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
Location And Elevation Notes
Exploration point locations as shown on the Exploration Plan and as noted on the soil boring logs in the form of Latitude and Longitude are approximate. See Exploration and Testing Procedures in the report for the methods used to locate the exploration points for this project. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area.
RELATIVE DENSITY OF COARSE-GRAINED SOILS
More than 50% retained on No. 200 sieve. Density determined by Standard
Penetration Resistance
CONSISTENCY OF FINE-GRAINED SOILS
(50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance
Descriptive Term (Density) Automatic Hammer SPT N-Value
(Blow/Ft.)
Descriptive
Term
(Consistency)
Unconfined Compressive
Strength Qu, (psf)
Automatic Hammer
SPT N-Value
(Blow/Ft.)
Very Loose <3 Very Soft less than 500 <1
Loose 3 – 8 Soft 500 to 1,000 1 – 3
Medium Dense 8 – 24 Medium
Stiff 1,000 to 2,000 3 – 6
Dense 24 – 40 Stiff 2,000 to 4,000 6 – 12
Very Dense >40 Very Stiff 4,000 to 8,000 12 – 24
Refusal >50 / 1” Hard >8,000 >24
RELATIVE PROPORTIONS
GRAIN SIZE TERMINOLOGY
Descriptive term(s) of other constituents
Percent of Dry Weight
Sand and Gravel Sand and
Gravel Major Component of
Sample Particle Size
Trace <15 <5 Boulders Over 12 in. (300mm)
With 15 – 29 5 – 12 Cobbles 12 in. to 3 in. (300mm to 75mm)
Modifier >30 >12 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Plasticity Description: Non-Plastic (PI=0); Low (1<PI<10)
Medium (11<PI<30), High (PI>30)
Sand #4 to #200 sieve (4.75mm to 0.075mm
Silt or Clay Passing #200 sieve (0.075mm)
Relevance of Exploration and Laboratory Test Results: Exploration/field results and/or laboratory test data contained within this document are intended for application to the project as described in this document. Use of such exploration/field results and/or laboratory test data should not be used independently of this document.
Standard
Penetration
Test
Rock Core
No
Recovery
Water Initially Encountered
Water Level After a Specified Period of Time
Water Level After a Specified Period of Time
Caved in Encountered
Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated.
Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations.
Grab
Sampl e
Auger
Cuttin gs
Shelby
Tube
Unified Soil Classification System
Criteria for Assigning Group Symbols and Group Names Using
Laboratory Tests A
Soil Classification
Group Symbol Group Name
B
Coarse-Grained Soils:
More than 50% retained on No. 200 sieve
Gravels:
More than 50% of coarse fraction retained on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu≥4 and 1≤Cc≤3 E GW Well-graded gravel F
Cu<4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F, G, H
Fines classify as CL or CH GC Clayey gravel F, G, H
Sands:
50% or more of coarse fraction passes No. 4 sieve
Clean Sands:
Less than 5% fines D
Cu≥6 and 1≤Cc≤3 E SW Well-graded sand I
Cu<6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G, H, I
Fines classify as CL or CH SC Clayey sand G, H, I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than
Inorganic:
PI > 7 and plots above “A” line J CL Lean clay K, L, M
PI < 4 or plots below “A” line J ML Silt K, L, M
Organic:
𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑
𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑
< 0.75 OL
Organic clay K, L, M, N
Organic silt K, L, M, O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K, L, M
PI plots below “A” line MH Elastic silt K, L, M
Organic:
𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑
𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑
< 0.75 OH
Organic clay K, L, M, P
Organic silt K, L, M, Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-inch (75-mm) sieve.
B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay.
E Cu = D60/D10 Cc =
F If soil contains ≥ 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains ≥ 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or
“with gravel,” whichever is predominant.
L If soil contains ≥ 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ≥ 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ≥ 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
DxD
)(D
| Sheets and Views |
| AV-Color PDF |
| H1245183 Quad Map-AV-Color PDF |
| Sheets and Views |
| AV-Color PDF |
| H1245183 Soil Map-AV-Color PDF |
| Sheets and Views |
| AV-Color PDF |
| General Note Pages Newer Version |
| B1 gm |
| Roadway gm |
| Logs |
| B1 13.5ft |
| B1 18.5ft |
| HA-1 1.5ft |
| HA-2 2ft |
| HA-3 0ft |
| HA-3 2ft |
| 2x2a |
| Roadway gm |
| Roadway Logs |
| Roadway Logs |
| Elias.Jammal@terracon.com | |
| 2024-11-26T14:59:05-0800 | |
| Elias Jammal | |
| Seal Uploaded |
| Date 1: 11/26/2024 | |
| Signature 1: Signed | |
| 2024-11-27T13:11:01-0800 | |
| Adobe Sign agreement certified |
| 2024-11-27T13:11:01-0800 | |
| Adobe Sign agreement certified |
File details come from the government source that posted it. Updated .