Asbestos_Notification_EZiolkowski_20211220.pdf

PDF 126 KB Posted

Attached to
Fort Florida Road Bridge Replacement-Konomac Canal
Solicitation number
22-25
Issued by
Volusia County, Florida

About this file

This document is an Asbestos 10-Day Renovation/Demolition Notification Form, which is a standard regulatory document used to report planned asbestos-related work. The form is designed to provide detailed information about a renovation or demolition project involving potential asbestos-containing materials. While the specific details of the project are not filled in, the form requires comprehensive information about the facility, type of operation, asbestos presence, facility information, asbestos removal procedures, waste transportation, and disposal.

The form outlines critical regulatory requirements for handling asbestos, including certification that a trained individual will be on-site during the demolition or renovation, adherence to NESHAP (National Emission Standards for Hazardous Air Pollutants) provisions, and legal acknowledgment of the accuracy of the submitted information. It captures key operational details such as the type of project (renovation or demolition), whether asbestos is present, scheduled dates for work, work practices, engineering controls, and procedures for unexpected asbestos discovery. The form serves as an important documentation and notification mechanism to ensure safe and compliant asbestos management during construction or demolition activities.

View the file

Other files

File Type Posted
22-25_-_Fort_Florida_Road_Bridge_Notice_of_Award_NOA.pdf PDF
22-25_Bid_Opening_Results_&_Sign-In_Sheet.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Notice_of_Intended_Decision_NOI.pdf PDF
Addendum_2_-_Cover_Document_-_Bid_22-25.pdf PDF
Geo_Tech_Report_-_H1245183_Ft._Florida_Road_Bridge_Replacement.pdf PDF
Army_Corp_Engrs_-_Permit_20250530_SAJ-2025-00935_NWP-14_Ft_Florida_Rd_bridge.pdf PDF
Existing_Bridge_No._794162_D5_EDMS-825856-v1-BA794162.pdf PDF
Ft._Florida_SJRWMD_Permit.pdf PDF
2025-08-22_-_Fort_Florida_Bridge_Replacement-PLANS-_ADDENDUM_No._1.pdf PDF
Cover_Document_-_Bid_22-25-ADDENDUM_No.1.pdf PDF
FPL_Dam_Safety_and_Construction_Plan-_ADDENDUM_No.1.pdf PDF
2025-08-22_-_Fort_Florida_Bridge_Replacement-PLANS-_ADDENDUM_No._1.pdf PDF
CONTRACT_-_Instructions_to_Bidders_and_Proposal_Forms_-_ADDENDUM_No._1.pdf PDF
22-25_-__Bridge_Replacement-KCanal_Price_Submission_Sheet-_ADDENDUM_No._1.xlsx XLSX spreadsheet
CONTRACT_-_Instructions_to_Bidders_and_Proposal_Forms_-_ADDENDUM_No._1.pdf PDF
22-25_-__Bridge_Replacement-KCanal_Price_Submission_Sheet-_ADDENDUM_No._1.xlsx XLSX spreadsheet
Cover_Document_-_Bid_22-25-ADDENDUM_No.1.pdf PDF
FPL_Dam_Safety_and_Construction_Plan-_ADDENDUM_No.1.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal_Sign-In_Sheet.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal_Sign-In_Sheet.pdf PDF
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS 10-DAY RENOVATION / DEMOLITION NOTIFICATION FORM

Operator Project # Postmark Date Received Notification #

I. Type of Notification (check one): Original Revised Canceled

II. Facility Description Building Name: ____________________________________________________________________________________________

Address: _________________________________________________________________________________________________

City: __________________________________ State: __________ Zip Code: _____________ County: ______________

Site Location : _____________________________________________________________________________________________

Building Size (square feet): __________________________ # of Floors: ________________ Age in Years: __________

Present Use: _______________________________________ Prior Use: ___________________________________________

III. Type of Operation (check one): Demo Ordered Demo Renovation Emergency Renovation Fire Training

IV. Is Asbestos Present? (check one): Yes No

V. Facility Information Owner Name: ______________________________________________________________________________________

Address: ___________________________________________________________________________________________

City: ____________________________________________ State: _______________ Zip Code: _______________

Contact: ___________________________________ Telephone: (____)__________________ Fax: _________________

Removal Contractor Name: __________________________________________________________________________

Address: __________________________________________________________________________________________

City: ____________________________________________ State: _______________ Zip Code: _______________

Contact: ___________________________________ Telephone: (____)__________________ Fax: _________________

Other Operator (demolition/general): __________________________________________________________________

Address: ___________________________________________________________________________________________

City: ____________________________________________ State: _______________ Zip Code: _______________

Contact: ___________________________________ Telephone: (____)__________________ Fax: _________________

VI. Procedure, including analytical methods, employed to detect the presence of and to estimate the quantity of RACM and Category I and Category II non-friable ACM:

VII. Approximate Amount of Asbestos Materials:

RACM to be Removed Non-friable Asbestos Material to be Removed Non-friable Asbestos Material

NOT to be Removed

Category I Category II Category I Category II

Pipes (linear feet)

Surface Area (square feet)

Facility Components (cubic feet)

VIII. Scheduled Dates Demolition or Renovation: Start: Complete:

IX. Dates for Asbestos Removal (MM/DD/YY) Start: Complete:

Days of the Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Hours of Operation:

ASBESTOS 10-DAY RENOVATION / DEMOLITION NOTIFICATION FORM

X. Description of planned Demolition or Renovation work to be performed and method(s) to be employed, including demolition or renovation techniques to be used and description of affected facility component s:

XI. Description of work practices and engineering controls to be used to comply with the requirements, including asbestos removal and waste handling emission control procedures:

XII. Waste Transporter #1 Name:

Address:

City: State: Zip Code:

Contact: Telephone: ( )

Waste Transporter #2 Name:

Address:

City: State: Zip Code:

Contact: Telephone: ( )

XIII. Waste Disposal Name:

Address:

City: State: Zip Code:

Contact: Telephone: ( )

XIV. Emergency Demolition (complete Item XIV only if this project is an Emergency Demo.)

1. Attach a copy of the Order to this notice.

2. Name of Authority Issuing Order: Title:

3. Authority of Order (Citation of Code):

4. Date of Order (MM/DD/YY): Date Ordered to Begin

XV. Emergency Renovation (Attach separate sheet with the following information if project is Emergency Renovation.)

1. Date and Hour of the Emergency:

2. Description of the Sudden, Unexpected Event:

3. Explanation of how the event caused unsafe conditions or equipment damage or an unreasonable financial burden.

XVI. Description of procedures to be followed in the event that unexpected RACM is found or non-friable ACM becomes crumbled, pulverized, or reduced to powder.

I certify that an individual trained in the provisions of NESHAP (40 CFR PART 61, SUBPART M) will be on -site during the Demolition or Renovation, and evidence that the required training has been accomplished by this person will be available during normal business hours.

XVII.

Signature of Owner/Operator Date Type or Print Name and Title

I acknowledge the existence of laws prohibiting the submission of false or misleading statements, and I certify that facts contained in this notification are true, accurate, and complete.

XVIII.

Signature of Owner/Operator Date Type or Print Name and Title

Operator Project:
Postmark:
Date Received:
Notification:
Building Name:
Address:
City:
State:
Zip Code:
County:
Site Location:
Building Size square feet:
of Floors:
Age in Years:
Present Use:
Prior Use:
Owner Name:
Address_2:
City_2:
State_2:
Zip Code_2:
Contact:
Removal Contractor Name:
Address_3:
City_3:
State_3:
Zip Code_3:
Contact_2:
Other Operator demolitiongeneral:
Address_4:
City_4:
State_4:
Zip Code_4:
Contact_3:
VI Procedure including analytical methods employed to detect the presence of and to estimate the quantity of RACM and Category I and Category II nonfriable ACM:
RACM to be RemovedPipes linear feet:
Category IPipes linear feet:
Category IIPipes linear feet:
Category IPipes linear feet_2:
Category IIPipes linear feet_2:
RACM to be RemovedSurface Area square feet:
Category ISurface Area square feet:
Category IISurface Area square feet:
Category ISurface Area square feet_2:
Category IISurface Area square feet_2:
RACM to be RemovedFacility Components cubic feet:
Category IFacility Components cubic feet:
Category IIFacility Components cubic feet:
Category IFacility Components cubic feet_2:
Category IIFacility Components cubic feet_2:
MondayHours of Operation:
TuesdayHours of Operation:
WednesdayHours of Operation:
ThursdayHours of Operation:
FridayHours of Operation:
SaturdayHours of Operation:
SundayHours of Operation:
XII:
Date:
Type or Print Name and Title:
Date_2:
Type or Print Name and Title_2:
Type of Notification: Original: Off
Type of Notification: Revised: Off
Type of Notification: Canceled: Off
Type of Operation: Demo: Off
Type of Operation: Ordered Demo: Off
Type of Operation: Renovation: Off
Type of Operation: Emergency Renovation: Off
Type of Operation: Fire Training: Off
Is Asbestos Present?: Yes: Off
Is Asbestos Present?: No: Off
Other Operator: Phone:
Phone_3:
Phone_2:
Telephone_2:
Telephone_3:
Telephone_4:
Fax_4:
Fax_3:
Fax_2:
VIII Scheduled Dates Demolition or Renovation Start:
VIII Scheduled Dates Demolition or Renovation Complete:
IX Dates for Asbestos Removal Start:
IX Dates for Asbestos Removal Complete:
X:
Text25:
XVI:
XII Name:
XII Address:
XII State:
XII Zip Code:
XII Phone:
XII Area Code:
XII Area Code2:
XII Name2:
XII Address2:
XII City:
XII Contact:
XII Contact2:
XII City2:
XII State2:
XII Zip Code2:
XII Phone2:
XIII Name:
XIII Address:
XIII City:
XIII State:
XIII Zip Code:
XIII Phone:
XIII Area Code:
XIV 2:
XIV 2 Title:
XIV 4:
XIV 4b:
Authority of Order:

File details come from the government source that posted it. Updated .