22-25_-__Bridge_Replacement-KCanal_Price_Submission_Sheet-_ADDENDUM_No._1.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Fort Florida Road Bridge Replacement-Konomac Canal
Solicitation number
22-25
Issued by
Volusia County, Florida

About this file

The document is an Addendum No. 1 Bid Price Sheet for the City of DeBary's Fort Florida Road Bridge Replacement-Konomac Canal project (Bid No. 22-25). The bid encompasses a comprehensive infrastructure project involving bridge replacement, roadway reconstruction, and associated civil works. The bid price sheet details 40 separate line items, including mobilization, maintenance of traffic, excavation, embankment, asphalt work, concrete installations, guardrail systems, signage, and environmental compliance measures. The project involves replacing an existing bridge (Bridge No. 794162) with a new box culvert structure spanning approximately 860 linear feet, constructing a two-lane road with 11-foot travel lanes, 8-foot shoulders, and a 10-foot shared use path. The mandatory pre-bid conference is scheduled for August 20, 2025, at 2:00 PM, with bid submissions due on September 12, 2025, at 2:00 PM, and a project completion timeline of 180 calendar days from the Notice to Proceed.

The project is funded through a $1,000,000 legislative appropriation from the State of Florida's General Revenue Fund, with additional cost-sharing from the St. Johns River Water Management District. The bid requires a 5% bid security, and contractors must provide comprehensive insurance coverage, including general liability and workers' compensation. Liquidated damages are set at $500 per calendar day for delays beyond the June 1, 2026 completion date. The bid price sheet allows contractors to submit unit prices for each line item, with estimated quantities provided for components such as sediment barriers, excavation, embankment, asphalt work, concrete installations, and environmental compliance measures. While no specific set-asides are mentioned, the project requires compliance with various statutory requirements, including drug-free workplace certification and anti-lobbying regulations.

View the file

Other files

File Type Posted
22-25_-_Fort_Florida_Road_Bridge_Notice_of_Award_NOA.pdf PDF
22-25_Bid_Opening_Results_&_Sign-In_Sheet.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Notice_of_Intended_Decision_NOI.pdf PDF
Existing_Bridge_No._794162_D5_EDMS-825856-v1-BA794162.pdf PDF
Ft._Florida_SJRWMD_Permit.pdf PDF
Addendum_2_-_Cover_Document_-_Bid_22-25.pdf PDF
Asbestos_Notification_EZiolkowski_20211220.pdf PDF
Geo_Tech_Report_-_H1245183_Ft._Florida_Road_Bridge_Replacement.pdf PDF
Army_Corp_Engrs_-_Permit_20250530_SAJ-2025-00935_NWP-14_Ft_Florida_Rd_bridge.pdf PDF
CONTRACT_-_Instructions_to_Bidders_and_Proposal_Forms_-_ADDENDUM_No._1.pdf PDF
Cover_Document_-_Bid_22-25-ADDENDUM_No.1.pdf PDF
FPL_Dam_Safety_and_Construction_Plan-_ADDENDUM_No.1.pdf PDF
2025-08-22_-_Fort_Florida_Bridge_Replacement-PLANS-_ADDENDUM_No._1.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal_Sign-In_Sheet.pdf PDF
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

City of DeBary Bid Price Sheet - ADDENDUM No. 1
Bid Title:22-25 - Fort Florida Road Bridge Replacement-Konomac Canal
Contractor Name:
Pay Item #DescriptionUnit of MeasureEstimated QuantityUnit PriceExtended Price
0101 1MOBILIZATIONLump Sum1$ - 0
0102 1MAINTENANCE OF TRAFFICLump Sum1$ - 0
0104 10 3SEDIMENT BARRIERLinear Foot732$ - 0
0104 11FLOATING TURBIDITY BARRIERLinear Foot50$ - 0
0110 1 1CLEARING & GRUBBINGAcre0.412$ - 0
0110 4 10REMOVAL OF EXISTING CONCRETESquare Yard70$ - 0
0120 1REGULAR EXCAVATIONCubid Yard380.0$ - 0
0120 6EMBANKMENTCubid Yard1090.0$ - 0
0160 4TYPE B STABILIZATIONSquare Yard962$ - 0
0285701OPTIONAL BASE, BASE GROUP 01Square Yard136$ - 0
0285706OPTIONAL BASE, BASE GROUP 06Square Yard453$ - 0
0327 70 6MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTHSquare Yard307$ - 0
0334 1 53SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22Ton37.4$ - 0
0337 7 83ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC-12.5, PG 76-22Ton73.9$ - 0
0339 1MISCELLANEOUS ASPHALT PAVEMENTTon12.8$ - 0
0515 1 2PIPE HANDRAIL - GUIDERAIL, ALUMINUMLinear Foot74$ - 0
0521 72 40SHOULDER CONCRETE BARRIER, 38" OR 44" HEIGHTLinear Foot67$ - 0
0522 1CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICKSquare Yard86$ - 0
0524 1 2CONCRETE DITCH PAVEMENT, NON REINFORCED, 4"Square Yard39$ - 0
0530 5 11GABION, MATTRESS LESS THAN 1 FOOT THICKNESSSquare Yard194$ - 0
0530 5 12ADUMPED RIPRAP D50 = 12"Cubid Yard13$ - 0
0530 5 13GABION, BASKETCubid Yard10$ - 0
0536 1 1GUARDRAIL -ROADWAY, GENERAL TL-3Linear Foot350$ - 0
0536 8112GUARDRAIL TRANSITION CONNECTION TO RIGID BARRIER, F&I- INDEX 536-001, APPROACH TL-3Each4$ - 0
0536 85 24GUARDRAIL END TREATMENT- PARALLEL APPROACH TERMINALEach4$ - 0
0536 73GUARDRAIL REMOVALLinear Foot252$ - 0
0550 10110FENCING, TYPE A, 0.0-5.0', STANDARDLinear Foot200$ - 0
0570 1 2PERFORMANCE TURF, SODSquare Yard948$ - 0
0700 1500SINGLE COLUMN GROUND SIGN ASSEMBLY, RELOCATEEach4$ - 0
0706 1 3RAISED PAVEMENT MARKER, TYPE BEach14$ - 0
0711 16101THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6"Liner Measurement (GM)0.098$ - 0
0711 16201THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6"Liner Measurement (GM)0.098$ - 0
CITY 01COMPLIANCE WITH FPL DAM SAFETY PLANLump Sum1$ - 0
CITY 02DEWATERINGDAY180$ - 0
CITY 03AS-BUILT DRAWINGSLump Sum1$ - 0
CUL-(0110-3)REMOVAL OF EXISTING STRUCTURESquare Foot1617$ - 0
CUL-(0400-4-1)CONCRETE CLASS IV, CULVERTSCubid Yard272$ - 0
CUL-(0415-1-1)REINFORCING STEEL - ROADWAYPound Force66918$ - 0
Total Bid$ - 0