Ft._Florida_SJRWMD_Permit.pdf

PDF 266 KB Posted

Attached to
Fort Florida Road Bridge Replacement-Konomac Canal
Solicitation number
22-25
Issued by
Volusia County, Florida

About this file

This document is a General Environmental Resource Permit issued by the St. Johns River Water Management District to the City of DeBary for the Fort Florida Road Bridge Replacement project located in Volusia County, Florida. The permit (No. 231390-2) was issued on May 20, 2025, and authorizes the city to replace the existing bridge over the St. Johns River. The permit is valid for five years and allows the city to conduct bridge replacement activities in accordance with specific environmental and construction guidelines. The project involves replacing the bridge while maintaining compliance with state water quality standards, protecting wetland areas, and ensuring minimal disruption to aquatic ecosystems.

The permit requires the city to adhere to numerous environmental protection conditions, including implementing erosion and sediment control measures, protecting listed aquatic species, and restoring disturbed wetland areas. The city must also obtain a separate permit from the U.S. Army Corps of Engineers, as the project does not qualify for federal authorization under the State Programmatic General Permit. The permit allows for minor bridge configuration changes and potential widening from a single lane to two travel lanes, but does not authorize new road corridors or additional roadway connections. The city must submit documentation and potentially publish a newspaper notice to close the point of entry for potential administrative challenges to the permit.

View the file

Other files

File Type Posted
22-25_-_Fort_Florida_Road_Bridge_Notice_of_Award_NOA.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Notice_of_Intended_Decision_NOI.pdf PDF
22-25_Bid_Opening_Results_&_Sign-In_Sheet.pdf PDF
Asbestos_Notification_EZiolkowski_20211220.pdf PDF
Army_Corp_Engrs_-_Permit_20250530_SAJ-2025-00935_NWP-14_Ft_Florida_Rd_bridge.pdf PDF
Existing_Bridge_No._794162_D5_EDMS-825856-v1-BA794162.pdf PDF
Addendum_2_-_Cover_Document_-_Bid_22-25.pdf PDF
Geo_Tech_Report_-_H1245183_Ft._Florida_Road_Bridge_Replacement.pdf PDF
22-25_-__Bridge_Replacement-KCanal_Price_Submission_Sheet-_ADDENDUM_No._1.xlsx XLSX spreadsheet
CONTRACT_-_Instructions_to_Bidders_and_Proposal_Forms_-_ADDENDUM_No._1.pdf PDF
22-25_-__Bridge_Replacement-KCanal_Price_Submission_Sheet-_ADDENDUM_No._1.xlsx XLSX spreadsheet
Cover_Document_-_Bid_22-25-ADDENDUM_No.1.pdf PDF
FPL_Dam_Safety_and_Construction_Plan-_ADDENDUM_No.1.pdf PDF
2025-08-22_-_Fort_Florida_Bridge_Replacement-PLANS-_ADDENDUM_No._1.pdf PDF
Cover_Document_-_Bid_22-25-ADDENDUM_No.1.pdf PDF
FPL_Dam_Safety_and_Construction_Plan-_ADDENDUM_No.1.pdf PDF
2025-08-22_-_Fort_Florida_Bridge_Replacement-PLANS-_ADDENDUM_No._1.pdf PDF
CONTRACT_-_Instructions_to_Bidders_and_Proposal_Forms_-_ADDENDUM_No._1.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal_Sign-In_Sheet.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal_Sign-In_Sheet.pdf PDF
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
22-25_-__Bridge_Replacement-Konomac_Canal_Price_Submission_Sheet.xlsx XLSX spreadsheet
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
CONTRACT_-_Construction_Contract_-_Bonds_Forms_-_General_Conditions.pdf PDF
22-25_-_Fort_Florida_Road_Bridge_Replacement-Konomac_Canal.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
2025-05-28_-_Fort_Florida_Bridge_Replacement-PLANS.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
CONTRACT_-__Special_Provisions.pdf PDF
CONTRACT_-_Additional_Terms_SJRWMD__No.34931.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 20, 2025

Richard Villaseor City of DeBary 16 Colomba Rd Debary, FL 32713-3322

SUBJECT: General Permit 231390-2

Dear Sir/Madam:

The District has received your notice to use a general permit. Based on the submitted information, the proposed activity qualifies for a General Environmental Resource Permit pursuant to section 62-330.443, Florida Administrative Code, provided it is constructed and operated in accordance with that general permit and the general and special conditions set forth in section 62-330.443, Florida Administrative Code (attached).

Please be advised that the St. Johns River Water Management District will not publish a notice in the newspaper advising the public that it has determined your project qualifies for this general permit. Newspaper publication, using the District’s notice form, notifies members of the public of their right to challenge the use of the general permit. If proper notice is given by newspaper publication, then there is a 21-day time limit for someone to file a petition for an administrative hearing to challenge the use of the permit. To close the point of entry for filing a petition, you may publish (at your own expense) a one-time notice of the District’s decision in a newspaper of general circulation within the affected area as defined in Section 50.11 of the Florida Statutes. If you do not publish a newspaper notice to close the point of entry, the time to challenge your use of the permit will not expire and someone could file a petition even after your project is constructed.

Please refer to the attached Notice of Rights to determine any legal rights you may have concerning the District’s agency action.

The proposed activity as outlined on your exemption determination does not qualify for federal authorization pursuant to the State Programmatic General Permit VI-R1 (SPGP VI-R1) Coordination Agreement, therefore a SEPARATE permit or authorization may be required from the U.S. Army Corps of Engineers (Corps).You may need to apply separately to the Corps using the appropriate federal application form. More information about the Corps permitting may be found online in the JacksonvilleDistrict. Failure to obtain Corps authorization prior to construction could subject you to federal enforcement action by that agency.

A copy of the notice form and a partial list of newspapers of general circulation are attached for your convenience. However, you are not limited to those listed newspapers. If you choose to close the point of entry and the notice is published, the newspaper will return to you an affidavit of publication. In that event, it is important that you either submit a scanned copy of the affidavit by https://nam11.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.saj.usace.army.mil%2FMissions%2FRegulatory%2FSource-Book%2F&data=04%7C01%7C%7C15e531319ee14c579aa108d982b5f2a2%7Cb0c8375fdaa740b9a01b690d8d3723b9%7C0%7C0%7C637684544908523797%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=09THp%2BmgTsJ%2Fz0Z7OQZivvwL%2BAAfsnmIstGWoX5fXL0%3D&reserved=0 emailing it to compliancesupport@sjrwmd.com (preferred method) or send a copy of the original affidavit to:

Margaret Daniels, Office Director Office of Records and Regulatory Support 4049 Reid Street Palatka, FL 32177

A copy of your application was transmitted to the U.S. Army Corps of Engineers for review. This authorization to use a general environmental resource permit does not obviate the need for obtaining all necessary permits or approval from other agencies.

Sincerely, Jeff Prather, Division Director Division of Regulatory Services

Enclosures: Permit Notice of Rights

List of Newspapers for Publication cc: District Permit File Brianna Sanders Terracon Consultants, Inc.

1675 Lee Rd Winter Park, FL 32789-2207

Forest Adkins Stanley Consultants, Inc.

80 Spring Vista Dr Ste 100 Debary, FL 32713-1821 mailto:compliancesupport@sjrwmd.com

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

GENERAL ENVIRONMENTAL RESOURCE PERMIT

PERMIT NO: 231390-2 DATE ISSUED: May 20, 2025 PROJECT NAME: Fort Florida Road Bridge Replacement

A PERMIT AUTHORIZING:

Use of the General Permit to the Florida Department of Transportation, Counties, and Municipalities for Minor Bridge Alteration, Placement, Replacement, Removal, Maintenance, and Operation pursuant to Chapter 62-330.443, F.A.C. for Fort Florida Road Bridge Replacement to be constructed as per plans received by the District on April 28, 2025.

LOCATION:

Section(s): 5 Township(s): 19S Range(s): 30E

Volusia County

Receiving Water Body:

Name Class

St. Johns River III Fresh, OFW, IW

ISSUED TO:

City of DeBary 16 Colomba Rd Debary, FL 32713-3322

The District received your notice to use a General Environmental Resource Permit pursuant to Chapter 62-330, Florida Administrative Code (F.A.C.).

Based on the forms, design plans, and other documents submitted with your notice, it appears that the project meets the requirements for a General Environmental Resource Permit. Any activities performed under a General Environmental Resource Permit are subject to the general conditions and special conditions specified in rules 62-330.405 and 62-330.443, F.A.C.

respectively (attached). Any deviations from these conditions may subject you to enforcement action and possible penalties.

Please be advised that the General Environmental Resource Permit expires 5 years from the date on which the notice of intent to use a General Environmental Resource Permit was received by the District.

The proposed activity as outlined on your exemption determination does not qualify for federal authorization pursuant to the State Programmatic General Permit VI-R1 (SPGP VI-R1) Coordination Agreement, therefore a SEPARATE permit or authorization may be required from the U.S. Army Corps of Engineers (Corps).You may need to apply separately to the Corps using the appropriate federal application form. More information about the Corps permitting may be found online in the JacksonvilleDistrict. Failure to obtain Corps authorization prior to construction could subject you to federal enforcement action by that agency.

https://nam11.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.saj.usace.army.mil%2FMissions%2FRegulatory%2FSource-Book%2F&data=04%7C01%7C%7C15e531319ee14c579aa108d982b5f2a2%7Cb0c8375fdaa740b9a01b690d8d3723b9%7C0%7C0%7C637684544908523797%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=09THp%2BmgTsJ%2Fz0Z7OQZivvwL%2BAAfsnmIstGWoX5fXL0%3D&reserved=0

A copy of your notice also has been sent to the U.S. Army Corps of Engineers (USACOE) for review. The USACOE may require a separate permit. Failure to obtain this authorization prior to construction could subject you to enforcement action and possible penalties.

AUTHORIZED BY: St. Johns River Water Management District Division of Regulatory Services

By:

Thomas Evans Supervising Regulatory Scientist

"EXHIBIT A"

CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 231390-2

Fort Florida Road Bridge Replacement DATED May 20, 2025

1. The general permit is valid only for the specific activity indicated. Any deviation from the specified activity and the conditions for undertaking that activity shall constitute a violation of the permit and may subject the permittee to enforcement action and revocation of the permit under Chapter 373, F.S.

2. The general permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any construction, alteration, operation, maintenance, removal or abandonment authorized by this permit; and it does not authorize any violation of any other applicable federal, state, local, or special district laws (including, but not limited to, those governing the “take” of listed species).

3. The general permit does not convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the general permit.

4. The general permit does not relieve the permittee from liability and penalties when the permitted activity causes harm or injury to: human health or welfare; animal, plant or aquatic life; or property. It does not allow the permittee to cause pollution that violates state water quality standards.

5. Section 253.77, F.S., provides that a person may not commence any excavation, construction, or other activity involving the use of state-owned or other lands of the state, the title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund without obtaining the required consent, lease, easement, or other form of authorization authorizing the proposed use. Therefore, the permittee is responsible for obtaining any necessary authorizations from the Board of Trustees prior to commencing activity on state-owned lands.

6. The authorization to conduct activities under a general permit may be modified, suspended or revoked in accordance with Chapter 120, F.S., and Section 373.429, F.S.

7. The general permit is not transferable to a third party. To be used by a different permittee, a new notice to use a general permit must be submitted in accordance with Rule 62- 330.402, F.A.C. Activities constructed in accordance with the terms and conditions of a general permit are automatically authorized to be operated and maintained by the permittee and subsequent owners in accordance with subsection 62-330.340(1), F.A.C.

Any person holding the general permit, persons working under the general permit, and owners of land while work is conducted under the general permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to sale, conveyance, or other transfer of ownership or control of the permitted project, activity, or the real property at which the permitted project or activity is located.

8. Upon reasonable notice to the permittee, Agency staff with proper identification shall have permission to enter, inspect, sample and test the permitted system to ensure conformity with the plans and specifications approved by the general permit.

9. The permittee shall maintain any permitted project or activity in accordance with the plans submitted to the Agency and authorized in the general permit.

10. A permittee's right to conduct a specific activity under the general permit is authorized for a duration of five years.

11. Activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards. Performance-based erosion and sediment control best management practices shall be implemented and maintained immediately prior to, during, and after construction as needed to stabilize all disturbed areas, including other measures specified in the permit to prevent adverse impacts to the water resources and adjacent lands. Erosion and sediment control measures shall be installed and maintained in accordance with the State of Florida Erosion and Sediment Control Designer and Reviewer Manual (Florida Department of Environmental Protection and Florida Department of Transportation June 2007), available at https://www.flrules.org/Gateway/reference.asp?No=Ref-04227, and the Florida Stormwater Erosion and Sedimentation Control Inspector’s Manual (Florida Department of Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, July 2008), available at http://publicfiles.dep.state.fl.us/DEAR/Stormwater_Training_Docs/erosion-inspectors-manual.pdf.

12. Unless otherwise specified in the general permit, temporary vehicular access within wetlands during construction shall be performed using vehicles generating minimum ground pressure to minimize rutting and other environmental impacts. Within forested wetlands, the permittee shall choose alignments that minimize the destruction of mature wetland trees to the greatest extent practicable. When needed to prevent rutting or soil compaction, access vehicles shall be operated on wooden, composite, metal, or other non-earthen construction mats. In all cases, access in wetlands shall comply with the following:

a. Access within forested wetlands shall not include the cutting or clearing of any native wetland tree having a diameter 4 inches or greater at breast height;

b. The maximum width of the construction access area shall be limited to 15 feet;

c. All mats shall be removed as soon as practicable after equipment has completed passage through, or work has been completed, at any location along the alignment of the project, but in no case longer than seven days after equipment has completed work or passage through that location; and

d. Areas disturbed for access shall be restored to natural grades immediately after the maintenance or repair is completed.

13. Barges or other work vessels used to conduct in-water activities shall be operated in a manner that prevents unauthorized dredging, water quality violations, and damage to submerged aquatic communities.

14. The construction, alteration, or use of the authorized project shall not adversely impede navigation or create a navigational hazard in the water body.

15. Except where specifically authorized in the general permit, activities must not:

a. Impound or obstruct existing water flow, cause adverse impacts to existing surface water storage and conveyance capabilities, or otherwise cause adverse water quantity or flooding impacts to receiving water and adjacent lands; or

b. Cause an adverse impact to the maintenance of surface or ground water levels or surface water flows established pursuant to Section 373.042, F.S., or a Works of the District established pursuant to Section 373.086, F.S.

16. If prehistoric or historic artifacts, such as pottery or ceramics, projectile points, stone tools, dugout canoes, metal implements, historic building materials, or any other physical remains https://www.flrules.org/Gateway/reference.asp?No=Ref-04227 http://publicfiles.dep.state.fl.us/DEAR/Stormwater_Training_Docs/erosion-inspectors-manual.pdf http://publicfiles.dep.state.fl.us/DEAR/Stormwater_Training_Docs/erosion-inspectors-manual.pdf that could be associated with Native American, early European, or American settlement are encountered at any time within the project site area, the permitted project shall cease all activities involving subsurface disturbance in the vicinity of the discovery. The permittee or other designee shall contact the Florida Department of State, Division of Historical Resources, Compliance Review Section (DHR), at (850) 245-6333, as well as the appropriate permitting agency office. Project activities shall not resume without verbal or written authorization from the Division of Historical Resources. If unmarked human remains are encountered, all work shall stop immediately and the proper authorities notified in accordance with Section 872.05, F.S.

17. The activity must be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed, and must comply with any applicable District special basin and geographic area criteria.

18. The permittee shall comply with the following when performing work within waters accessible to federally- or state-listed aquatic species, such as manatees, marine turtles, smalltooth sawfish, and Gulf sturgeon:

(a) All vessels associated with the project shall operate at “Idle Speed/No Wake” at all times while in the work area and where the draft of the vessels provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.

(b) All deployed siltation or turbidity barriers shall be properly secured, monitored, and maintained to prevent entanglement or entrapment of listed species.

(c) All in-water activities, including vessel operation, must be shut down if a listed species comes within 50 feet of the work area. Activities shall not resume until the animal(s) has moved beyond a 50-foot radius of the in-water work, or until 30 minutes elapses since the last sighting within 50 feet. Animals must not be herded away or harassed into leaving. All on-site project personnel are responsible for observing water-related activities for the presence of listed species.

(d) Any listed species that is killed or injured by work associated with activities performed shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1(888)404-3922 and ImperiledSpecies@myFWC.com.

(e) Whenever there is a spill or frac-out of drilling fluid into waters accessible to the above species during a directional drilling operation, the FWC shall be notified at imperiledspecies@myfwc.com with details of the event within 24 hours following detection of the spill or frac-out.

19. The permittee shall hold and save the Agency harmless from any and all damages, claims, or liabilities which may arise by reason of the construction, alteration, operation, maintenance, removal, abandonment or use of any activity authorized by the general permit.

20. The permittee shall immediately notify the Agency in writing of any submitted information that is discovered to be inaccurate.

21. No dredging of access or work channels is authorized by this general permit.

22. Temporary fill roads shall not be constructed waterward of mean high water or ordinary high water.

23. All fill placed in wetlands, other than fill on which a bridge or approach is constructed, shall be regraded to the original wetland elevations and revegetated with native wetland species endemic to adjoining, undisturbed wetlands, within seven days of completion of construction. Within clear zones, revegetation shall be with native herbaceous species endemic to adjoining, undisturbed wetlands. During the five-year period following the initial planting or restoration of the site, these areas shall be maintained to ensure planted or mailto:ImperiledSpecies@myFWC.com mailto:imperiledspecies@myfwc.com naturally recruited native wetland species are surviving and growing, and that the areal coverage of exotic and invasive species constitutes less than 10% areal coverage.

24. Hydraulic openings of bridges shall be sufficient to prevent downstream scour, increased downstream water velocities, and increased flood elevations on the property of others.

25. Minimum horizontal and vertical navigational clearances on bridges over navigable waters of the United States shall be established in accordance with procedures outlined in Chapter 2 the U.S. Coast Guard Bridge Administration Manual, COMDTINST M16590.5C, (March 26, 2004), incorporated by reference herein (http://www.flrules.org/Gateway/reference.asp?No=Ref-03150), a copy of which may be obtained from the Agency, as described in subsection 62-330.010(5), F.A.C, and in no circumstance shall placement or replacement of a bridge result in a reduction of horizontal and vertical navigational clearances.

26. Replacement or modification of a bridge that includes changes in the configuration of the bridge and fill areas due to changes in materials, construction techniques, or meeting current construction codes or safety standards are authorized under this permit. Any connecting road expansion or alteration associated with such replacement or modification must be authorized by a separate general or individual permit under Chapter 62-330, F.A.C., as applicable, before the start of construction.

27. This general permit does not authorize the construction of additional travel lanes for motorized vehicles, except that any single-lane bridge may be widened to two travel lanes, provided the bridge widening does not exceed that reasonably necessary to match the existing travel lane alignment of a two-lane road. This permit does not authorize new corridors or roadway connections where there is no existing structure over wetlands or waterways.

Notice Of Rights

1. A person whose substantial interests are or may be affected has the right to request an administrative hearing by filing a written petition with the St. Johns River Water Management District (District). Pursuant to Chapter 28-106 and Rule 40C-1.1007, Florida Administrative Code, the petition must be filed (received) either by delivery at the office of the District Clerk at District Headquarters, P. O. Box 1429, Palatka Florida 32178-1429 (4049 Reid St., Palatka, FL 32177) or by e-mail with the District Clerk at Clerk@sjrwmd.com, within twenty-six (26) days of the District depositing the notice of District decision in the mail (for those persons to whom the District mails actual notice), within twenty-one (21) days of the District emailing the notice of District decision (for those persons to whom the District emails actual notice), or within twenty-one (21) days of newspaper publication of the notice of District decision (for those persons to whom the District does not mail or email actual notice). A petition must comply with Sections 120.54(5)(b)4. and 120.569(2)(c), Florida Statutes, and Chapter 28-106, Florida Administrative Code. The District will not accept a petition sent by facsimile (fax), as explained in paragraph no. 4 below.

2. Please be advised that if you wish to dispute this District decision, mediation may be available and that choosing mediation does not affect your right to an administrative hearing. If you wish to request mediation, you must do so in a timely-filed petition. If all parties, including the District, agree to the details of the mediation procedure, in writing, within 10 days after the time period stated in the announcement for election of an administrative remedy under Sections 120.569 and 120.57, Florida Statutes, the time limitations imposed by Sections 120.569 and 120.57, Florida Statutes, shall be tolled to allow mediation of the disputed District decision. The mediation must be concluded within 60 days of the date of the parties’ written agreement, or such other timeframe agreed to by the parties in writing. Any mediation agreement must include provisions for selecting a mediator, a statement that each party shall be responsible for paying its pro-rata share of the costs and fees associated with mediation, and the mediating parties’ understanding regarding the confidentiality of discussions and documents introduced during mediation.

If mediation results in settlement of the administrative dispute, the District will enter a final order consistent with the settlement agreement. If mediation terminates without settlement of the dispute, the District will notify all the parties in writing that the administrative hearing process under Sections 120.569 and 120.57, Florida Statutes, is resumed. Even if a party chooses not to engage in formal mediation, or if formal mediation does not result in a settlement agreement, the District will remain willing to engage in informal settlement discussions.

3. A person whose substantial interests are or may be affected has the right to an informal administrative hearing pursuant to Sections 120.569 and 120.57(2), Florida Statutes, where no material facts are in dispute. A petition for an informal hearing must also comply with the requirements set forth in Rule 28-106.301, Florida Administrative Code.

Notice Of Rights

4. A petition for an administrative hearing is deemed filed upon receipt of the complete petition by the District Clerk at the District Headquarters in Palatka, Florida during the District’s regular business hours. The District’s regular business hours are 8:00 a.m. – 5:00 p.m., excluding weekends and District holidays. Petitions received by the District Clerk after the District’s regular business hours shall be deemed filed as of 8:00 a.m. on the District’s next regular business day. The District’s acceptance of petitions filed by e-mail is subject to certain conditions set forth in the District’s Statement of Agency Organization and Operation (issued pursuant to Rule 28-101.001, Florida Administrative Code), which is available for viewing at sjrwmd.com. These conditions include, but are not limited to, the petition being in the form of a PDF or TIFF file and being capable of being stored and printed by the District. Further, pursuant to the District’s Statement of Agency Organization and Operation, attempting to file a petition by facsimile is prohibited and shall not constitute filing.

5. Failure to file a petition for an administrative hearing within the requisite timeframe shall constitute a waiver of the right to an administrative hearing. (Rule 28-106.111, Florida Administrative Code).

6. The right to an administrative hearing and the relevant procedures to be followed are governed by Chapter 120, Florida Statutes, Chapter 28-106, Florida Administrative Code, and Rule 40C-1.1007, Florida Administrative Code. Because the administrative hearing process is designed to formulate final agency action, the filing of a petition means the District’s final action may be different from the position taken by it in this notice. A person whose substantial interests are or may be affected by the District’s final action has the right to become a party to the proceeding, in accordance with the requirements set forth above.

7. Pursuant to Section 120.68, Florida Statutes, a party to the proceeding before the District who is adversely affected by final District action may seek review of the action in the District Court of Appeal by filing a notice of appeal pursuant to Rules 9.110 and 9.190, Florida Rules of Appellate Procedure, within 30 days of the rendering of the final District action.

8. A District action is considered rendered, as referred to in paragraph no. 7 above, after it is signed on behalf of the District and filed by the District Clerk.

9. Failure to observe the relevant timeframes for filing a petition for judicial review as described in paragraph no. 7 above will result in waiver of that right to review.

NOR.Decision.DOC.001 Revised 12.7.11

NOTICING INFORMATION

Please be advised that the St. Johns River Water Management District will not publish a notice in the newspaper advising the public that it has issued a permit for this project.

Newspaper publication, using the District’s notice form, notifies members of the public of their right to challenge the issuance of the permit. If proper notice is given by newspaper publication, then there is a 21-day time limit for someone to file a petition for an administrative hearing to challenge the issuance of the permit.

To close the point of entry for filing a petition, you may publish (at your own expense) a one-time notice of the District’s decision in a newspaper of general circulation within the affected area as defined in Section 50.011 of the Florida Statutes. If you do not publish a newspaper notice to close the point of entry, the time to challenge the issuance of your permit will not expire and someone could file a petition even after your project is constructed.

A copy of the notice form and a partial list of newspapers of general circulation are attached for your convenience. However, you are not limited to those listed newspapers. If you choose to close the point of entry and the notice is published, the newspaper will return to you an affidavit of publication. In that event, it is important that you either submit a scanned copy of the affidavit by emailing it to compliancesupport@sjrwmd.com (preferred method) or send a copy of the original affidavit to:

Office of Records and Regulatory Support 4049 Reid Street Palatka, FL 32177

If you have any questions, please contact the Office of Records and Regulatory Support at

(386) 329-4570.

NOTICE OF AGENCY ACTION TAKEN BY THE

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

Notice is given that the following permit was issued on ____________________:

(Name and address of applicant)______________________________________ permit#____________________. The project is located in _____________County, Section ________, Township ________ South, Range ________ East. The permit authorizes a surface water management system on ________ acres for _____________________________________________________________ known as ____________________. The receiving water body is ________________.

A person whose substantial interests are or may be affected has the right to request an administrative hearing by filing a written petition with the St. Johns River Water Management District (District). Pursuant to Chapter 28-106 and Rule 40C-1.1007, Florida Administrative Code (F.A.C.), the petition must be filed (received) either by delivery at the office of the District Clerk at District Headquarters, P.O. Box 1429, Palatka FL 32178-1429 (4049 Reid St, Palatka, FL 32177) or by e-mail with the District Clerk at Clerk@sjrwmd.com, within twenty-one (21) days of newspaper publication of the notice of District decision (for those persons to whom the District does not mail or email actual notice). A petition must comply with Sections 120.54(5)(b)4. and 120.569(2)(c), Florida Statutes (F.S.), and Chapter 28-106, F.A.C. The District will not accept a petition sent by facsimile (fax). Mediation pursuant to Section 120.573, F.S., may be available and choosing mediation does not affect your right to an administrative hearing.

A petition for an administrative hearing is deemed filed upon receipt of the complete petition by the District Clerk at the District Headquarters in Palatka, Florida during the District’s regular business hours. The District's regular business hours are 8 a.m. – 5 p.m., excluding weekends and District holidays. Petitions received by the District Clerk after the District's regular business hours shall be deemed filed as of 8 a.m. on the District’s next regular business day. The District's acceptance of petitions filed by e-mail is subject to certain conditions set forth in the District’s Statement of Agency Organization and Operation (issued pursuant to Rule 28- 101.001, Florida Administrative Code), which is available for viewing at www.sjrwmd.com.

These conditions include, but are not limited to, the petition being in the form of a PDF or TIFF file and being capable of being stored and printed by the District. Further, pursuant to the District’s Statement of Agency Organization and Operation, attempting to file a petition by facsimile (fax) is prohibited and shall not constitute filing.

The right to an administrative hearing and the relevant procedures to be followed are governed by Chapter 120, Florida Statutes, Chapter 28-106, Florida Administrative Code, and Rule 40C- 1.1007, Florida Administrative Code. Because the administrative hearing process is designed to formulate final agency action, the filing of a petition means the District's final action may be different from the position taken by it in this notice. Failure to file a petition for an administrative hearing within the requisite time frame shall constitute a waiver of the right to an administrative hearing. (Rule 28-106.111, F.A.C.).

If you wish to do so, please visit http://www.sjrwmd.com/nor_dec/ to read the complete Notice of Rights to determine any legal rights you may have concerning the District's decision(s) on the permit application(s) described above. You can also request the Notice of Rights by contacting the Director of Records and Regulatory Support, 4049 Reid St., Palatka, FL 32177-2529, tele.

no. (386)329-4570.

NEWSPAPER ADVERTISING

ALACHUA BAKER

Gainesville Sun, Legal Advertising Baker County Press, Legal Advertising 2700 SW 13th Street P. O. Box 598 Gainesville, FL 32608 Maclenny, FL 3206 3 866-858-9652 904-259-2400/ fax 904-259-6502

BRADFORD BREVARD

Bradford County Telegraph, Legal Advertising Florida Today, Legal Advertising P. O. Drawer A P. O. Box 419000 Starke, FL 32901 Melbourne, FL 32941-9000 904-964-6305/ fax 904-964-8628 321-242-3832/ fax 321-242-6618

CLAY DUVAL

Clay Today, Legal Advertising Daily Record, Legal Advertising 1560 Kinsley Ave., Suite 1 P. O. Box 1769 Orange Park, FL 32073 Jacksonville, FL 32201 904-264-3200/ fax 904-264-3285 904-356-2466 / fax 904-353-2628

FLAGLER INDIAN RIVER

Flagler Tribune, c/o News Journal Treasure Coast News P. O. Box 2831 760 NW Enterprise Dr.

Daytona Beach, FL 32120-2831 Port St. Lucie, Fl 34986 386- 681-2322 772-283-5252

LAKE MARION

Daily Commercial, Legal Advertising Ocala Star Banner, Legal Advertising P. O. Drawer 490007 2121 SW 19th Avenue Road Leesburg, FL 34749 Ocala, FL 34474 352-365-8235/fax 352-365-1951 352-867-4010/fax 352-867-4126

NASSAU OKEECHOBEE

News-Leader, Legal Advertising Okeechobee News, Legal Advertising P. O. Box 766 P. O. Box 639 Fernandina Beach, FL 32035 Okeechobee, FL 34973-0639 904-261-3696/fax 904-261-3698 863-763-3134/fax 863-763-5901

ORANGE OSCEOLA

Sentinel Communications, Legal Advertising Little Sentinel, Legal Advertising 633 N. Orange Avenue 633 N. Orange Avenue Orlando, FL 32801 Orlando, FL 32801 407-420-5160/ fax 407-420-5011 407-420-5160/ fax 407-420-5011

PUTNAM ST. JOHNS

Palatka Daily News, Legal Advertising St. Augustine Record, Legal Advertising P. O. Box 777 P. O. Box 1630 Palatka, FL 32178 St. Augustine, FL 32085 386-312-5200/ fax 386-312-5209 904-819-3439

SEMINOLE VOLUSIA

Sanford Herald, Legal Advertising News Journal Corporation, Legal Advertising 300 North French Avenue P. O. Box 2831 Sanford, FL 32771 Daytona Beach, FL 32120-2831 407-323-9408 (386) 681-2322

File details come from the government source that posted it. Updated .