About this file

This is a fenestration exhibit and site plan document prepared for the County of Orange's Progressive Design Build for a New Emergency Operations Center in Tustin, California, dated June 10, 2026. The exhibit provides illustrative site plans, conceptual elevations, and detailed floor plans for the facility's exterior envelope and fenestration design. The project includes a multi-level building with Level 01 at 0'-0" and Level 02 at 14'-0", with a roof elevation at 30'-5". Key site elements include a proposed parking structure, second floor addition, paved plaza with staff break area, trash enclosure, mechanical/generator yard enclosure, and relocated fencing for accessible path of travel. The design addresses specific fenestration constraints imposed by future mechanical equipment loads on the existing exterior walls, which will limit new exterior openings to a maximum of 10% per the 2025 CBC Existing Buildings Code Section 503.4 Exception 1, unless additional structural seismic study is performed and funded by the design-build entity.

The exhibit documents four fenestration options for the building envelope ranging from minimal openings without reinforcement to full-spandrel glazing systems, with detailed keynotes and performance requirements specified in accompanying mechanical narratives. The facility includes multiple functional areas across 118'-5" of building depth, encompassing data center, engineering work areas, customer service lobby, staff specialist offices, copy areas, and coffee bar spaces. Building envelope performance requirements must coordinate with mechanical design criteria and exterior insulation and cladding specifications. The document reflects a preliminary design phase with field verification required for existing conditions and coordination between the design-build team, structural engineers, and mechanical designers to finalize fenestration selections and any necessary reinforcement measures.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO PARKING

03 102 101 100

HB

HB

FHFH

36 1/2" 36 3/4"

5' -0

/8

9'

-2

/8

4'-4 1/4"

18'-1 3/4"

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

(E)

(E

(E

(E

(E

FR

O

N T

BA

C

K

(E ) M

EC

H

. E Q

U

IP

. T O

R

EM

AI

N

A200

VI

F

5'-

0"

76'-0" VIF 76'-0" VIF

PROPERTY LINE

PR

OP

ER

TY

LI

NE

PR

OP

ER

TY

LI

NE

PROPERTY LINE

(E) FENCE

(E ) F

EN

CE

(E ) F

EN

CE

T

LEVEL 01

0' - 0"

LEVEL 02

14' - 0"

ROOF

30' - 5"

1234567891011

MECHANICAL UNIT ROOFTOP ZONE

As indicated

4995-001-00

2026/02/06

NEW SITE AND

EXTERIORS

EOC-TUSTIN

1/32" = 1'-0"1 ILLUSTRATIVE SITE PLAN 2 ISOMETRIC VIEW

1" = 20'-0"3 CONCEPTUAL NORTH WEST ELEVATION

KEYNOTES

# DESCRIPTION

3 EXISTING FENCE

7 PROPOSED MECH/GEN YARD ENCLOSURE BY OTHERS

11 NEW TRASH ENCLOSURE

17 DEMAND CAPACITY RATIO: FUTURE NEW MECHANICAL UNITS ON ROOF WILL INCREASE STRUCTURAL LOAD ON EXISTING

EXTERIOR WALLS; LOAD INCREASE WILL LIMIT FUTURE NEW EXTERIOR OPENINGS TO 10% (2025 CBC EXISTING BUILDINGS CODE: 503.4 EXCEPTION 1. DBE TO INCLUDE SUCH LIMITATION IN ITS BASE DESIGN (DBE TO PROVIDE FEE FOR ADDITIONAL STRUCTURAL SEISMIC STUDY REQUIRED TO INCREASE EXTERIOR OPENINGS PAST 10% LIMITATION). SEE NARRATIVE FOR

MORE INFO.

18 VERIFY IN FIELD EXISTING CONDITION AND COORDINATE EXTERIOR INSULATION AND CLADDING WITH BUILDING ENVELOPE REQUIREMENT AND MECHANICAL DESIGN CRITERIA. SEE BUILDING ENVELOPE PERFORMANCE TABLE IN

MECHANICAL NARRATIVE FOR REQUIREMENTS.

20 PROPOSED LID PLANTER, SEE LANDSCAPE DRAWINGS FOR ADDITIONAL DETAILS

21 LINE OF THE 33' UNOBSTRUCTED ZONE, SEE LANDSCAPE DRAWINGS FOR ADDITIONAL DETAILS

22 PROPOSED PARKING STRUCTURE

23 PROPOSED 2ND FLOOR ADDITION

26 PROPOSED PAVED PLAZA WITH STAFF BREAK AREA, SEE LANDSCAPE DRAWINGS FOR ADDITIONAL DETAILS

27 PROPOSED RELOCATED FENCE FOR ACCESSIBLE PATH OF TRAVEL

0 16' 64'32'

0 10' 40'20'

0 25' 100'50'

2026/02/13

MECHANICAL UNIT ROOFTOP ZONE

MECHANICAL UNIT ROOFTOP ZONE

MECHANICAL UNIT ROOFTOP ZONE

4'-0"

F3F3

4 4

3 1

4 4

3 1

42 42

F3F3

F3F3

F

F

41 41

43 43

F

F

41 41

F3F3

F3F3

F3F3

F3F3 F3F3

F3F3

F3F3

F3F3

F3F3

F3F3

F

F

F3F3

4 4

2 2

4 4

2 2

F3F3

M

ATCH

LIN

E

S U

P E

R V

IS

IN

G C

O M

M T

E C

H

S U

P E

R V

IS

IN

G C

O M

M T

E C

H

S E

N

IO

R T

E L

E C

O M

M E

N G

C U

S T

O M

E R

S E

R V

IC

E

L O

B B

Y

S T

A F

F S

P E

C

IA

L

IS

T

C U

S T

O M

E R

S E

R V

IC

E

W O

R K

A R

E A

W O

R K

A R

E A

M

. II

D A

T A

C E

N T

E R

E N

G W

O R

K A

R E

A

C O

F F

E E

B A

R

C O

P Y

A R

E A

'-6

'-6

'-1

'-5

SFEC

SFEC

SFEC

SFEC

A B

PHPHPH

PH

PH

60" MIN.

" M

IN

" M

IN

MIN.

1 2 " 60" MIN.

MIN.

1 2 "

" M

IN

24" MIN.

" M

IN

24" MIN.

24" MIN.

" M

IN

" M

IN

" M

IN

E N

G W

O R

K A

R E

A

Fire rise r#

22'-2 1/2"

6'-1/4"

3'-11 1/2"

13'-6"

3'-0" AFF

8'-0" AFF

8'-0" AFF

3'-0" AFF LEVEL 02

14' - 0"13'-6"

1,415.41 sf

6 5 4

NO FENESTRATION ZONE

OPTION 1: 10% OPENNING PER PNL -

NO REINFORCEMENT REQ'D

OPTION 2: RIBBON WINDOWS

WITHOUT SPANDREL OPENING

OPTION 3: RIBBON WINDOWS WITH

SPANDREL OPENING

CODE: 503.

STRUCTUR

MORE INFO

VERIFY IN

A

PARTIAL LEVEL 2 OVERLAY

PARTIAL LEVEL 1 OVERLAY

2'-0"

4'-0"

MECHANICAL UNIT ROOFTOP ZONE

WITHOUT SPANDREL OPENING

OPTION 3: RIBBON WINDOWS WITH

SPANDREL OPENING

OPTION 4: ZERO SPANDREL GLAZING

LEGEND

EXISTING BUILDING

AREA OF SCOPE

EXTEND

OF TILT-UP

PANEL

BEYOND

2026/06/10

File details come from the government source that posted it. Updated .