About this file
From the source
Atch L-1 - PPI Tool
Other files for this federal contract opportunity
Other files attached to Wind Tunnel Compressor Rotor Blades, newest first.
| File |
Type |
Posted |
| Industry_Day_2_Slides_-_scan.pdf |
PDF |
|
| Amendment_0002_-_FBO.pdf |
PDF |
|
| Amendment_0001.pdf |
PDF |
|
| Current_Spacer_Seal_Configuration.xlsx |
XLSX spreadsheet |
|
| Amendment_0001_Answers_to_Industry_Questions.pdf |
PDF |
|
| Slides_Industry_Day_12_April_17_-_FBO.pdf |
PDF |
|
| Revised_Atch_2_16T_C1_Compressor_Blades_Equipment_Specification.pdf |
PDF |
|
| Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx |
XLSX spreadsheet |
|
| AEDC_Map.pdf |
PDF |
|
| Flying_into_Nashville_and_Driving_to_AEDC.pdf |
PDF |
|
| Map_to_GLC.pdf |
PDF |
|
| run03_r3_pressure.csv |
CSV file |
|
| FA9101-17-R-1000.pdf |
PDF |
|
| run06_r3_pressure.csv |
CSV file |
|
| Attachment_3_-_Section_L.pdf |
PDF |
|
| run04_r1_pressure.csv |
CSV file |
|
| run05_r2_pressure.csv |
CSV file |
|
| run06_r2_pressure.csv |
CSV file |
|
| Attachment_6__-_Section_M_Phase_2.pdf |
PDF |
|
| Attachment_L-5,_Subcontractor_Consent_Letter.pdf |
PDF |
|
| run04_r3_pressure.csv |
CSV file |
|
| run01_r1_pressure.csv |
CSV file |
|
| run05_r3_pressure.csv |
CSV file |
|
| run07_r3_pressure.csv |
CSV file |
|
| run05_r1_pressure.csv |
CSV file |
|
| run03_r2_pressure.csv |
CSV file |
|
| Attachment_L-1,_PPI_Tool_Instruction.pdf |
PDF |
|
| SKRO6199.pdf |
PDF |
|
| run06_r1_pressure.csv |
CSV file |
|
| Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx |
XLSX spreadsheet |
|
| PG108760_C_2_CALSP_stamp_stamp.pdf |
PDF |
|
| PG631713.01_B.stp |
STP file |
|
| PG209017_A_1_stamp_stamp_stamp.pdf |
PDF |
|
| PU630917.01_A_2_SVEPA_stamp_stamp_stamp.pdf |
PDF |
|
| 16T_Blade_Pin_Aero_Surface.SLDPRT |
— |
|
| RowB_Blade_Assembly_For_Information_Only.stp |
STP file |
|
| RowA_Blade_Assembly_For_Information_Only.stp |
STP file |
|
| PG108761_C_2_CALSP_stamp_stamp.pdf |
PDF |
|
| PG108760_C_1_CALSP_stamp_stamp.pdf |
PDF |
|
| PG108761.stp |
STP file |
|
| Attachment_L-9,_Cost_Model.xlsx |
XLSX spreadsheet |
|
| C1_compressor_blade_synopsis.pdf |
PDF |
|
| Draft_RFP_Cover_Letter_-_signed.pdf |
PDF |
|
| Industry_Day_Attendee_List.pdf |
PDF |
|
| Industry_Day_-_Morning_Presentation.pdf |
PDF |
|
| PWT_16T_Comp_C1_Blades_RFI_v_04.pdf |
PDF |
|
| 16T_C1_Blade_Design_SOW_14424-002-17.pdf |
PDF |
|
| 3202100.6_H_0106_AROIN_stamp_stamp.pdf |
PDF |
|
| Transonic_C1_Compressor_Fiberglass_Blade_Construction.pdf |
PDF |
|
| PWT_16T_Comp_C1_Blades_RFI_Draft_v_03.pdf |
PDF |
|
Show all 50
Wind Tunnel Compressor Rotor Blades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .