Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Wind Tunnel Compressor Rotor Blades, newest first.
File Type Posted
Industry_Day_2_Slides_-_scan.pdf PDF
Amendment_0002_-_FBO.pdf PDF
Current_Spacer_Seal_Configuration.xlsx XLSX spreadsheet
Amendment_0001_Answers_to_Industry_Questions.pdf PDF
Slides_Industry_Day_12_April_17_-_FBO.pdf PDF
Revised_Atch_2_16T_C1_Compressor_Blades_Equipment_Specification.pdf PDF
Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx XLSX spreadsheet
AEDC_Map.pdf PDF
Flying_into_Nashville_and_Driving_to_AEDC.pdf PDF
Map_to_GLC.pdf PDF
run03_r3_pressure.csv CSV file
FA9101-17-R-1000.pdf PDF
run06_r3_pressure.csv CSV file
Attachment_3_-_Section_L.pdf PDF
run04_r1_pressure.csv CSV file
run05_r2_pressure.csv CSV file
run06_r2_pressure.csv CSV file
Attachment_6__-_Section_M_Phase_2.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
run04_r3_pressure.csv CSV file
run01_r1_pressure.csv CSV file
run05_r3_pressure.csv CSV file
Attachment_L-1_PPI_Tool.accdb —
run07_r3_pressure.csv CSV file
run05_r1_pressure.csv CSV file
run03_r2_pressure.csv CSV file
Attachment_L-1,_PPI_Tool_Instruction.pdf PDF
SKRO6199.pdf PDF
run06_r1_pressure.csv CSV file
Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx XLSX spreadsheet
PG108760_C_2_CALSP_stamp_stamp.pdf PDF
PG631713.01_B.stp STP file
PG209017_A_1_stamp_stamp_stamp.pdf PDF
PU630917.01_A_2_SVEPA_stamp_stamp_stamp.pdf PDF
16T_Blade_Pin_Aero_Surface.SLDPRT —
RowB_Blade_Assembly_For_Information_Only.stp STP file
RowA_Blade_Assembly_For_Information_Only.stp STP file
PG108761_C_2_CALSP_stamp_stamp.pdf PDF
PG108760_C_1_CALSP_stamp_stamp.pdf PDF
PG108761.stp STP file
Attachment_L-9,_Cost_Model.xlsx XLSX spreadsheet
C1_compressor_blade_synopsis.pdf PDF
Draft_RFP_Cover_Letter_-_signed.pdf PDF
Industry_Day_Attendee_List.pdf PDF
Industry_Day_-_Morning_Presentation.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_v_04.pdf PDF
16T_C1_Blade_Design_SOW_14424-002-17.pdf PDF
3202100.6_H_0106_AROIN_stamp_stamp.pdf PDF
Transonic_C1_Compressor_Fiberglass_Blade_Construction.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_Draft_v_03.pdf PDF
Show all 50

Wind Tunnel Compressor Rotor Blades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Insp

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

21 April 2017

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFTC/PZI (ARNOLD) CODE 7. ADMINISTERED BY (If other than Item 6) CODE

AFTC/PZI (ARNOLD)

100 KINDEL DRIVE, SUITE A337

ARNOLD AFB, TN 37389-1337

EDWARD CRENSHAW 931-454-7844

EDWARD.CRENSHAW@US.AF.MIL

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

TO ALL POTENTIAL OFFERORS:

FA9101-17-R-1000

X 9B. DATED (SEE ITEM 11)

4 APRIL 2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule of Changes

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 11 Sep 2014 3:40 PM

SCHEDULE OF CHANGES

The purpose of this amendment is to:

A. Incorporate revised Attachment 1, Statement of Work for 16T C1 Compressor Rotor Blades, dtd 21

April 2017, which includes the following changes:

(1) Section 3.1.1.E. - The number of spare cuffs per row will be corrected to 10 (total of 30).

(2) Section 3.8.3 – Added submittal for void content testing during manufacturing process development

B. Incorporate revised Attachment 2, Equipment Specification for 16T C1 Compressor Blades, dtd 21

April 2017, which includes the following changes:

(1) Section 3.7.1.F. – The final sentence will be revised to add “tested per section 4.1.5.”

(2) Section 4.1.2.D. shall read: The Contractor shall either conduct void content testing on panels created for material characterization or shall report the void content from the industry data source from which B-basis allowables are taken. The Contractor shall conduct void content tests on as-built blade material during the manufacturing process development phase in order to assure that their process can produce parts that do not require further material property knockdowns due to excessive void content.

(3) 3.7.3 – Remove requirement for 1% void content in the finished blade

(4) Section 3.7.1.D. identifies current blade frequencies as follows:

The natural frequencies of the current blades were addressed in questions to the draft RFP as follows: The current blade natural frequencies are:

1st Bending : 17.7 Hz 2nd Bending : 63.7 Hz 1st Torsion : 97 Hz 3rd Bending : 139 Hz 2nd Torsion : 165 Hz These numbers are calculated from a blade mounted horizontally in a fixture with the cuff supporting the blade weight and no clamping on the opposite cuff surface. This information will be added to the specification for reference.

(5) Section 4.1.3.A – Revised to add: The test panel shall be fabricated such that additional material is available for void content testing. Void content testing of the panel shall be performed and included with the test report.

C. Remove the following clauses / provisions from the Request for Proposal:

(1) FAR 52.230-01, Cost Accounting Standards

(2) FAR 52.230-07, Proposal Disclosure—Cost Accounting Practice Changes

(3) DFARS 252.225-7021, Trade Agreements.

(4) DFARS 252.225-7020, Trade Agreements Certificate.

The date for submission of past performance volumes is extended from 4 May 2017 to 18 May 2017, 1:00 P.M. CDT. The date for submission of proposals is extended from 19 May 2017 to 1 June 2017, 1:00 P.M. CDT.