Answers_to_Industry_Questions_16_May_2017.pdf

PDF 70 KB Posted

Attached to
Wind Tunnel Compressor Rotor Blades Federal contract opportunity
Solicitation number
FA9101-17-R-1000
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Answers to Industry Questions 16 May 2017

View the file

Other files for this federal contract opportunity

Other files attached to Wind Tunnel Compressor Rotor Blades, newest first.
File Type Posted
Industry_Day_2_Slides_-_scan.pdf PDF
Amendment_0002_-_FBO.pdf PDF
Attachment_3_-_Revised_Section_L.pdf PDF
Amendment_0001.pdf PDF
Current_Spacer_Seal_Configuration.xlsx XLSX spreadsheet
Industry_Day_2_Attendees.pdf PDF
CFD_Condition_Chart_Blade_RFP.pdf PDF
Attachment_L-6,__Relevancy_Matrix.xlsx XLSX spreadsheet
AEDC_Map.pdf PDF
Industry_Day_12_April_17_Agenda.pdf PDF
run03_r3_pressure.csv CSV file
FA9101-17-R-1000.pdf PDF
run06_r3_pressure.csv CSV file
Attachment_3_-_Section_L.pdf PDF
run04_r1_pressure.csv CSV file
run05_r2_pressure.csv CSV file
run06_r2_pressure.csv CSV file
Attachment_6__-_Section_M_Phase_2.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
run04_r3_pressure.csv CSV file
run01_r1_pressure.csv CSV file
run04_r2_pressure.csv CSV file
run02_r2_pressure.csv CSV file
Attachment_4_-_Section_L_Phase_2.pdf PDF
Attachment_L-4,_Client_Authorization_Letter.pdf PDF
run07_r2_pressure.csv CSV file
Attachment_5__-_Section_M.pdf PDF
run01_r3_pressure.csv CSV file
Attachment_L-7,_Cross_Reference_Matrix.xlsx XLSX spreadsheet
run02_r1_pressure.csv CSV file
PG108760_C_2_CALSP_stamp_stamp.pdf PDF
PPI_Tool.accdb —
AR1001B_C_01_stamp.pdf PDF
16T_Blade_Pin_Aero_Surface.SAT —
AR1001C_C_01_stamp.pdf PDF
RowC_Blade_Assembly_For_Information_Only.stp STP file
PG108745_C_1_CALSP_stamp_stamp.pdf PDF
PU630917.01_A_1_SVEPA_stamp_stamp_stamp.pdf PDF
Draft_RFP_Cover_Letter_-_signed.pdf PDF
FA9101-17-R-1000.pdf PDF
Industry_Day_Attendee_List.pdf PDF
Industry_Day_-_Morning_Presentation.pdf PDF
Agenda.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_v_04.pdf PDF
16T_C1_Blade_Design_SOW_14424-002-17.pdf PDF
3202100.6_H_0106_AROIN_stamp_stamp.pdf PDF
Transonic_C1_Compressor_Fiberglass_Blade_Construction.pdf PDF
3202100.6_H_0206_AROIN_stamp_stamp.pdf PDF
3202100.6_H_0206_AROIN_stamp.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_Draft_v_03.pdf PDF
Show all 50

Wind Tunnel Compressor Rotor Blades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CQ# QUESTION OPR RESPONSE

1 Nowhere in the cost model is there a mention of profit. Are the labor rates, material costs, and other items we are supposed to fill in expected to include fully burdened rates? Because of the later G&A calculations and labor overhead tabs included in certain sheets of the workbook it is somewhat confusing whether we should break out our expected profit or include it in the earlier lines.

Also, is there an expectation for what contractors should operate on in terms of overall percentage of profit that is fair and reasonable?

1. On the Tabs labeled CLIN 0001 and 0003, line 70 of the cost model includes a cell for “Fixed Fee.” This is the proposed profit for these CLINs.

2. The later CLINs are all firm fixed price. It is expected for the offeror to incorporate any fee and overhead into the total labor cost (you would incorporate any material overhead into the material cost). The reason why G&A is broken out in the proposal is to have insight into that factor for cost estimating change orders.

3. The Government does not provide any expectations of a fair and reasonable profit. Those determinations are made during the evaluation.

4. Please keep in mind the amount proposed on CLIN 0003 is a Not to Exceed.

2 Can you please let me know if the entire past performance section is due 5/18/2017 or just the questionnaires?

The entire Past Performance Volume must be submitted to the Contracting Officer by 18 May 2017.

Blades_Final_RFP_Questions.xlsx DRFPQuestions Source Selection Sensitive 5/16/2017 3:34 PM

File details come from the government source that posted it. Updated .